210730 IndustryDayResponse.pdf

PDF 127 KB Posted

Attached to
INDUSTRY DAY FOR FY23 MCON P-209 DRY DOCK 3 REPLACEMENT, JOINT BASE PEARL HARBOR-HICKAM, HAWAII
Solicitation number
N62742SIOPINDUS
Issued by

View the file

Other files

File Type Posted
P-209 Industry Questionnaire.pdf PDF
2021-07-22 35pct Dwgs Package A (ContractorPackage)_Part1.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part3.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part4.pdf PDF
2021-07-22 35pct Dwgs Package A (ContractorPackage)_Part4.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part1.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part2.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part5.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part9.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part7.pdf PDF
2021-07-22 35pct Dwgs Package A (ContractorPackage)_Part2.pdf PDF
2021-07-22 35pct Dwgs Package A (ContractorPackage)_Part3.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part6.pdf PDF
2021-07-22 35pct Dwgs Package A (ContractorPackage)_Part5.pdf PDF
210723 IndustryDayResponse.pdf PDF
2021-07-22 35pct Dwgs Package B (ContractorPackage)_Part8.pdf PDF
Industry Day Presentation.pdf PDF
Industry Day Attendee List.pdf PDF
SIOP Revised Pre-Proposal Flyer.pdf PDF
SIOP IndustryP209Dwgs.pdf PDF
SIOP Pre-Proposal Flyer.pdf PDF
SIOP Industry Questionnaire.pdf PDF
P-209 Industry Day Flyer.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

P-209 INDUSTRY DAY QUESTIONS AND ANSWERS

30 July 2021

INDUSTRY DAY FOR FY23 MILCON P-209, DRY DOCK 3 REPLACEMENT

JOINT BASE PEARL HARBOR-HICKAM, HAWAII

QUESTIONS & ANSWERS

NOTE: No final decisions have been made with regards to P-209 which is subject to cancellation or change as a result of ongoing environmental impact analysis.

The following provides responses to questions received prior to, during and after the P-209 Industry Day held on July 14, 2021.

63. On the Industry day conference, a slide showing a yellow dashed line as temporary CIA fence bordering the existing drydock #3 was shown. Please clarify that the area for construction beyond the yellow dashed line will be considered as non-CIA restricted area & will not require the CIA access requirements?

ANSWER: Confirmed. However, it is noted that until the temporary CIA fence is constructed and certified, the DD5 site will still be within the CIA and subject to CIA access requirements.

64. What level of design is required for Package B of the SIOP MACC?

ANSWER: The level of conceptual development of elements to be included in the Design-Build Package B has not yet been determined.

65. Will design/build portion of Package B require the General Contractor to fully design the ancillary structures or will the Navy provide a partial schematic drawing for the GC to complete the design?

ANSWER: The level of conceptual development of elements to be included in the Design-Build Package B has not yet been determined.

66. Will Package A & Package B of the SIOP MACC be two separate task orders or will they be combined to one task order?

ANSWER: Package A and Package B will be issued under one task order.