DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
258 MAKALAPA DR STE 100
PEARL HARBOR HI 96860-3134
P-209 INDUSTRY DAY QUESTIONS AND ANSWERS
30 July 2021
INDUSTRY DAY FOR FY23 MILCON P-209, DRY DOCK 3 REPLACEMENT
JOINT BASE PEARL HARBOR-HICKAM, HAWAII
QUESTIONS & ANSWERS
NOTE: No final decisions have been made with regards to P-209 which is subject to cancellation or change as a result of ongoing environmental impact analysis.
The following provides responses to questions received prior to, during and after the P-209 Industry Day held on July 14, 2021.
63. On the Industry day conference, a slide showing a yellow dashed line as temporary CIA fence bordering the existing drydock #3 was shown. Please clarify that the area for construction beyond the yellow dashed line will be considered as non-CIA restricted area & will not require the CIA access requirements?
ANSWER: Confirmed. However, it is noted that until the temporary CIA fence is constructed and certified, the DD5 site will still be within the CIA and subject to CIA access requirements.
64. What level of design is required for Package B of the SIOP MACC?
ANSWER: The level of conceptual development of elements to be included in the Design-Build Package B has not yet been determined.
65. Will design/build portion of Package B require the General Contractor to fully design the ancillary structures or will the Navy provide a partial schematic drawing for the GC to complete the design?
ANSWER: The level of conceptual development of elements to be included in the Design-Build Package B has not yet been determined.
66. Will Package A & Package B of the SIOP MACC be two separate task orders or will they be combined to one task order?
ANSWER: Package A and Package B will be issued under one task order.