This document is a Bill of Quantities (BOQ) for a Design-Build (D/B) contract opportunity to construct a Simulation Facility and Concrete Road Network at the Fort Magsaysay (FMSS) site in Nueva Ecija, Philippines. The BOQ provides a detailed breakdown of the estimated quantities, material and labor costs for the construction of the simulation facility and concrete road. The key elements include foundations, superstructure, exterior closure, roofing, interior finishes, plumbing, HVAC, electrical, equipment, furnishings, and site work. The total estimated cost is not provided. The related federal contract opportunity has a solicitation number of N6274224R6713 and a project magnitude between $1-5 million. A pre-proposal site visit is tentatively scheduled for June-July 2024, and contractors must submit a Base Access Request by May 21, 2024 to attend. The contracting agency is the Department of the Navy Naval Facilities Engineering Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6274224R6713_0005 Released.pdf | ||
| N6274224R6713_0004 PPIs and SOW.pdf | ||
| N6274224R6713_0003 Extend Due Date.pdf | ||
| N6274224R6713 _0002 Extend due date.pdf | ||
| N6274224R6713-0001_080724.pdf | ||
| Exhibit A Pre Proposal Inquiry Form.xlsx | XLSX spreadsheet | |
| N6274224R6713 released.pdf | ||
| EXHIBIT A-D.pdf | ||
| PHIL_BAR_Base Access Request Form.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IGE Group 3
| DATE PREPARED: | |||
| BILL OF QUANTITIES | |||
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NUMBER: | ||
| ROICC Site Thailand | N62742R | 246713 |
| PROJECT TITLE: | ESTIMATED BY: | ||||||||
| D/B UFC FMSS Simulation Facility and Concrete Road Network | |||||||||
| QUANTITY | MATERIAL COST | LABOR/EQUIPMENT COST | ENGINEERING ESTIMATE | ||||||
| NUMBER | UNIT | UNIT, USD | TOTAL | UNIT, USD | TOTAL | UNIT, USD | TOTAL, USD | ||
| CLIN 0001 | DESIGN AND CONSTRUCTION OF SIMULATION FACILITY | ||||||||
| A10 | FOUNDATIONS | - 0 | |||||||
| Special Foundations | |||||||||
| Pedestal Columns and Foundation for Maintenance Bay | EA | ||||||||
| Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | |||||||||
| Slab on Grade | SM | ||||||||
| Compacted base course 30 cm. thick | CM | ||||||||
| Geotextile Cover | SM | ||||||||
| Floor moisture barrier | SM | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| Structural steel (columns and roof frame) including purlins and bracings | EA | ||||||||
| Maintenance Ramp | Lot | ||||||||
| Water Tower | Lot | ||||||||
| B20 | EXTERIOR CLOSURE | ||||||||
| Exterior Walls | |||||||||
| CMU Walls (incl. rebars, mortar & plaster) | SM | ||||||||
| Exterior Windows | |||||||||
| Window, including hardware and Insect Screen for Storage room | EA | ||||||||
| Window, including hardware and Insect Screen for Simulation area | EA | ||||||||
| Window, including hardware and Insect Screen for Toilets | EA | ||||||||
| Exterior Doors | |||||||||
| Solid Core Door, including Hardware for entrances | EA | ||||||||
| B30 | ROOFING | ||||||||
| Roof Coverings & Roof Drains | |||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and insulation and wire mesh. | SM | ||||||||
| Roof Truss incl. purlins for enclosed area | SM | ||||||||
| C10 | INTERIOR CONSTRUCTION |
| C30 | INTERIOR FINISHES | |
| Ceramic floor finishes for Storage room and Simulation area | SM | |
| Non-slipery ceramic floor finishes for Toilet and bath | SM | |
| Ceramic wall finishes for Toilet and bath | SM | |
| Painting | SM | |
| Ceiling: 9 mm thick painted gypsum board with concealed aluminum frame for simulationy area and storage room | SM | |
| Ceiling: 9 mm thick painted moisture resistant gypsum board with concealed aluminum frame for toilet and bath | SM | |
| Interior Doors | ||
| Solid Core Double Door, including Hardware and Installation | EA | |
| Solid Core Single Door, including Hardware and Installation | EA | |
| D20 | PLUMBING | |
| PLUMBING FIXTURES | ||
| Water Closet with Bidet | EA | |
| Toilet Paper Holder | EA | |
| Electric Hand Drier | EA | |
| Soap Dispenser | EA | |
| Cloth hook | EA | |
| Lavatories | EA | |
| Shower | EA | |
| Mirrors | EA | |
| Mob Sink | EA | |
| Portable Floor Mob Kit | EA | |
| Service Faucets with Hose Bibbs outdoor | EA | |
| WATER SUPPLY | ||
| Elevated Water Tank | Lot | |
| Water Cistern | Lot | |
| Pump to lift water from cistern tank to elevated tank | Lot | |
| SANITARY SYSTEM | ||
| Sanitary Pipes | Lot | |
| Septic Tank & Leech Field | Lot | |
| RAINWATER COLLECTION | ||
| Rainwater Pipes | Lot | |
| D30 | HVAC & Mechanical | |
| Cooling Generating Systems | ||
| Exhaust Fans | EA | |
| Oscillating fans | EA | |
| Air-conditioning system | EA | |
| D40 | FIRE PROTECTION | |
| Fire Alarm and Detection | ||
| Fire Alarm and Detection | Lot | |
| Other Fire Protection Systems | ||
| Portable fire extinguisher with cabinet | Lot | |
| D50 | ELECTRICAL | |
| Electrical service and distribution system including lightning protection system, and testing and commissioning | ||
| Rough‐ins | SM | |
| Wiring | Lot | |
| Panel boards and circuit breakers | Lot | |
| Manual Transfer Switch | EA | |
| Electrical Outlets | Lot | |
| Lightning Protection | LS | |
| Lighting & Branch Wiring | ||
| Lights, fixtures and wiring devices - include perimeter lighting | Lot | |
| E10 | EQUIPMENT | |
| Whole-house Water Purification System | EA | |
| Provide and install 50kVA backup generator | EA | |
| Provide and Install 50L Water Heater | EA | |
| E20 | FURNISHINGS | |
| a. Movable Furnishing | ||
| Toilet and Bath | ||
| Provide and install wall-hung cabinet | EA | |
| Storage Room | ||
| Provide and install heavy-duty 5-tier shelves | EA | |
| Simulation Area | ||
| Provide and Install Double Bunks with Mattress and Pillow | EA | |
| Provide and Install Lockable Bedside Cabinets | EA | |
| Provide room key tags | EA | |
| Provide wall-mounted locable key cabinet | EA | |
| G10 | SITE PREPARATION | |
| Clearing, grubbing, tree cutting | SM | |
| Excavation of Footing trenches and grid beams | CM | |
| Backfilling, levelling, Compaction | CM | |
| G20 | SITE IMPROVEMENT | |
| Gravel Cover for Open Area (50mx28m less bldg. footprint) | ||
| Gravel Cover (4" of 3/4" thick crushed gravel) | SM | |
| Compacted based course, 200 cm thick | CM | |
| Geotextile | SM | |
| Concrete Access Road 6 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric) | ||
| Concrete Cover (6") | SM | |
| Compacted based course, 30 cm. thick | CM | |
| Geotextile | SM | |
| Concrete Parking for 8 Vehicles (est. 200 sqm)) | ||
| Concrete Cover 6" | SM | |
| Compacted based course, 30 cm. thick | CM | |
| Geotextile | SM | |
| Perimeter wall and gates | ||
| Chain-link fence including foundation | SM | |
| Single swing gate | EA | |
| Double swing gate | EA | |
| Security room | EA | |
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | |
| Site Water Supply System | ||
| Water Lines from existing water mains | Lot | |
| Site Storm Drainage System | ||
| Site Storm Drainage System | Lot | |
| G40 | SITE ELECTRICAL UTILITIES | |
| Electrical connection to base including posts, electrical cables and required transformers | ||
| Transformer | EA | |
| Low Voltage Cable to the New Building | LM | |
| High Voltage Cable Extension Incl. Posts, Cable and Accessaries | Lot | |
| G90 | G90 OTHER SITE CONSTRUCTION | |
| Construct one (1) pump house. This work includes construction of reinforced concrete pad for water storage tank, all structure, wall, roofing, locakble door, lighiting, power supply and receptacles. | Lot | |
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |
| X10 | Field Requirements | |
| Mobilization | LS | |
| Demobilization | LS | |
| Project Management & Supervision, QC, Safety | Months | |
| Design, Construction Plans incl Rendering | LS | |
| Topographic & Geotech Survey | LS | |
| Closeout Requirements | LS | |
| X20 | Office Overhead | |
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | |
| SUBTOTAL FOR CLIN 0001 | ||
| CLIN 0002 | DESIGN AND CONSTRUCTION OF CONCRETE ROAD | |
| G10 | SITE PREPARATION | |
| Excavation of and replacement of unsuitable soil, fill & compaction (0.50 m) | CM | |
| G20 | SITE IMPROVEMENT | |
| Concrete Road | ||
| Concrete | LM | |
| Compacted based course, 20 cm. thick | CM | |
| Geotextile | SM | |
| Drainage | ||
| Cross Drains (60 cm.) incl. headwall ncl. Trench excavation & bedding | EA | |
| One side drainage trench | LM | |
| Slope Protection | LM | |
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | |
| X10 | Field Requirements | |
| Mobilization | LS | |
| Demobilization | LS | |
| Project Management & Supervision, QC, Safety | LS | |
| Design, Construction Plans | LS | |
| Topographic & Geotech Survey | LS | |
| Closeout Requirements | LS | |
| X20 | Office Overhead | |
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | |
| SUBTOTAL FOR CLIN 0002 | ||
| TOTAL ESTIMATED COST |
&F
FOR OFFICIAL USE ONLY
BOQ
| DATE PREPARED: | |||||||||||
| BLANK BILL OF QUANTITIES | 26-Jun-24 | Contingency, % | 5.00% | ||||||||
| ACTIVITY AND LOCATION: | CONSTRUCTION CONTRACT NUMBER: | Profit, % | 10.00% | ||||||||
| ROICC Site Thailand | N62742R | 246713 | Labor, % | 35.00% | |||||||
| Exchange Rate | [$PHP] 54.00 | ||||||||||
| PROJECT TITLE: | PREPARED BY | 1 US$ = Php ___ | |||||||||
| D/B UFC FMSS Simulation Facility and Concrete Road Network | THANH NGUYEN | ||||||||||
| QUANTITY | MATERIAL COST | LABOR/EQUIPMENT COST | ENGINEERING ESTIMATE | ||||||||
| NUMBER | UNIT | UNIT, USD | TOTAL | UNIT, USD | TOTAL | UNIT, USD | TOTAL, USD | ||||
| CLIN 0001 | DESIGN AND CONSTRUCTION OF SIMULATION FACILITY | ||||||||||
| A10 | FOUNDATIONS | - 0 | |||||||||
| Special Foundations | |||||||||||
| Pedestal Columns and Foundation for Maintenance Bay | EA | - 0 | |||||||||
| Slab on Grade (cast-in-place slab-on-grade reinforced concrete slab with breathable water-resistant concrete sealer), 10.5x40 | |||||||||||
| Slab on Grade | SM | - 0 | |||||||||
| Compacted base course 30 cm. thick | CM | - 0 | |||||||||
| Geotextile Cover | SM | - 0 | |||||||||
| Floor moisture barrier | SM | - 0 | |||||||||
| B10 | SUPERSTRUCTURE | - 0 | |||||||||
| Structural steel (columns and roof frame) including purlins and bracings | EA | - 0 | |||||||||
| Maintenance Ramp | Lot | - 0 | |||||||||
| Water Tower | Lot | - 0 | |||||||||
| B20 | EXTERIOR CLOSURE | - 0 | |||||||||
| Exterior Walls | |||||||||||
| CMU Walls (incl. rebars, mortar & plaster) | SM | - 0 | |||||||||
| Exterior Windows | |||||||||||
| Window, including hardware and Insect Screen for Storage room | EA | - 0 | |||||||||
| Window, including hardware and Insect Screen for Simulation area | EA | - 0 | |||||||||
| Window, including hardware and Insect Screen for Toilets | EA | - 0 | |||||||||
| Exterior Doors | |||||||||||
| Solid Core Door, including Hardware for entrances | EA | - 0 | |||||||||
| B30 | ROOFING | - 0 | |||||||||
| Roof Coverings & Roof Drains | |||||||||||
| Steel Roof covering (Kliplock type) incl. accessories, gutters, downspouts and insulation and wire mesh. | SM | - 0 | |||||||||
| Roof Truss incl. purlins for enclosed area | SM | - 0 | |||||||||
| C10 | INTERIOR CONSTRUCTION | - 0 |
| C30 | INTERIOR FINISHES | - 0 | |
| Ceramic floor finishes for Storage room and Simulation area | SM | - 0 | |
| Non-slipery ceramic floor finishes for Toilet and bath | SM | - 0 | |
| Ceramic wall finishes for Toilet and bath | SM | - 0 | |
| Painting | SM | - 0 | |
| Ceiling: 9 mm thick painted gypsum board with concealed aluminum frame for simulationy area and storage room | SM | - 0 | |
| Ceiling: 9 mm thick painted moisture resistant gypsum board with concealed aluminum frame for toilet and bath | SM | - 0 | |
| Interior Doors | |||
| Solid Core Double Door, including Hardware and Installation | EA | - 0 | |
| Solid Core Single Door, including Hardware and Installation | EA | - 0 | |
| D20 | PLUMBING | - 0 | |
| PLUMBING FIXTURES | |||
| Water Closet with Bidet | EA | - 0 | |
| Toilet Paper Holder | EA | - 0 | |
| Electric Hand Drier | EA | - 0 | |
| Soap Dispenser | EA | - 0 | |
| Cloth hook | EA | - 0 | |
| Lavatories | EA | - 0 | |
| Shower | EA | - 0 | |
| Mirrors | EA | - 0 | |
| Mob Sink | EA | - 0 | |
| Portable Floor Mob Kit | EA | - 0 | |
| Service Faucets with Hose Bibbs outdoor | EA | - 0 | |
| WATER SUPPLY | |||
| Elevated Water Tank | Lot | - 0 | |
| Water Cistern | Lot | - 0 | |
| Pump to lift water from cistern tank to elevated tank | Lot | - 0 | |
| SANITARY SYSTEM | |||
| Sanitary Pipes | Lot | - 0 | |
| Septic Tank & Leech Field | Lot | - 0 | |
| RAINWATER COLLECTION | |||
| Rainwater Pipes | Lot | - 0 | |
| D30 | HVAC & Mechanical | - 0 | |
| Cooling Generating Systems | |||
| Exhaust Fans | EA | - 0 | |
| Oscillating fans | EA | - 0 | |
| Air-conditioning system | EA | - 0 | |
| D40 | FIRE PROTECTION | - 0 | |
| Fire Alarm and Detection | |||
| Fire Alarm and Detection | Lot | - 0 | |
| Other Fire Protection Systems | |||
| Portable fire extinguisher with cabinet | Lot | - 0 | |
| D50 | ELECTRICAL | - 0 | |
| Electrical service and distribution system including lightning protection system, and testing and commissioning | |||
| Rough‐ins | SM | - 0 | |
| Wiring | Lot | - 0 | |
| Panel boards and circuit breakers | Lot | - 0 | |
| Manual Transfer Switch | EA | - 0 | |
| Electrical Outlets | Lot | - 0 | |
| Lightning Protection | LS | - 0 | |
| Lighting & Branch Wiring | |||
| Lights, fixtures and wiring devices - include perimeter lighting | Lot | - 0 | |
| E10 | EQUIPMENT | - 0 | |
| Whole-house Water Purification System | EA | - 0 | |
| Provide and install 50kVA backup generator | EA | - 0 | |
| Provide and Install 50L Water Heater | EA | - 0 | |
| E20 | FURNISHINGS | - 0 | |
| a. Movable Furnishing | |||
| Toilet and Bath | |||
| Provide and install wall-hung cabinet | EA | - 0 | |
| Storage Room | |||
| Provide and install heavy-duty 5-tier shelves | EA | - 0 | |
| Simulation Area | |||
| Provide and Install Double Bunks with Mattress and Pillow | EA | - 0 | |
| Provide and Install Lockable Bedside Cabinets | EA | - 0 | |
| Provide room key tags | EA | - 0 | |
| Provide wall-mounted locable key cabinet | EA | - 0 | |
| G10 | SITE PREPARATION | - 0 | |
| Clearing, grubbing, tree cutting | SM | - 0 | |
| Excavation of Footing trenches and grid beams | CM | - 0 | |
| Backfilling, levelling, Compaction | CM | - 0 | |
| G20 | SITE IMPROVEMENT | - 0 | |
| Gravel Cover for Open Area (50mx28m less bldg. footprint) | |||
| Gravel Cover (4" of 3/4" thick crushed gravel) | SM | - 0 | |
| Compacted based course, 200 cm thick | CM | - 0 | |
| Geotextile | SM | - 0 | |
| Concrete Access Road 6 m. wide, approx 250 m. long (with 30 cm. compacted base course and geotextile fabric) | |||
| Concrete Cover (6") | SM | - 0 | |
| Compacted based course, 30 cm. thick | CM | - 0 | |
| Geotextile | SM | - 0 | |
| Concrete Parking for 8 Vehicles (est. 200 sqm)) | |||
| Concrete Cover 6" | SM | - 0 | |
| Compacted based course, 30 cm. thick | CM | - 0 | |
| Geotextile | SM | - 0 | |
| Perimeter wall and gates | |||
| Chain-link fence including foundation | SM | - 0 | |
| Single swing gate | EA | - 0 | |
| Double swing gate | EA | - 0 | |
| Security room | EA | - 0 | |
| G30 | SITE CIVIL/ MECHANICAL UTILITIES | - 0 | |
| Site Water Supply System | |||
| Water Lines from existing water mains | Lot | - 0 | |
| Site Storm Drainage System | |||
| Site Storm Drainage System | Lot | - 0 | |
| G40 | SITE ELECTRICAL UTILITIES | - 0 | |
| Electrical connection to base including posts, electrical cables and required transformers | |||
| Transformer | EA | - 0 | |
| Low Voltage Cable to the New Building | LM | - 0 | |
| High Voltage Cable Extension Incl. Posts, Cable and Accessaries | Lot | - 0 | |
| G90 | G90 OTHER SITE CONSTRUCTION | - 0 | |
| Construct one (1) pump house. This work includes construction of reinforced concrete pad for water storage tank, all structure, wall, roofing, locakble door, lighiting, power supply and receptacles. | Lot | - 0 | |
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||
| X10 | Field Requirements | - 0 | |
| Mobilization | LS | - 0 | |
| Demobilization | LS | - 0 | |
| Project Management & Supervision, QC, Safety | Months | - 0 | |
| Design, Construction Plans incl Rendering | LS | - 0 | |
| Topographic & Geotech Survey | LS | - 0 | |
| Closeout Requirements | LS | - 0 | |
| X20 | Office Overhead | - 0 | |
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | - 0 | |
| SUBTOTAL FOR CLIN 0001 | - 0 | ||
| CLIN 0002 | DESIGN AND CONSTRUCTION OF CONCRETE ROAD | ||
| G10 | SITE PREPARATION | - 0 | |
| Excavation of and replacement of unsuitable soil, fill & compaction (0.50 m) | CM | - 0 | |
| G20 | SITE IMPROVEMENT | - 0 | |
| Concrete Road | |||
| Concrete | LM | - 0 | |
| Compacted based course, 20 cm. thick | CM | - 0 | |
| Geotextile | SM | - 0 | |
| Drainage | |||
| Cross Drains (60 cm.) incl. headwall ncl. Trench excavation & bedding | EA | - 0 | |
| One side drainage trench | LM | - 0 | |
| Slope Protection | LM | - 0 | |
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||
| X10 | Field Requirements | - 0 | |
| Mobilization | LS | - 0 | |
| Demobilization | LS | - 0 | |
| Project Management & Supervision, QC, Safety | LS | - 0 | |
| Design, Construction Plans | LS | - 0 | |
| Topographic & Geotech Survey | LS | - 0 | |
| Closeout Requirements | LS | - 0 | |
| X20 | Office Overhead | - 0 | |
| TempFacil, permits, Utilities, Field Office, Environment Protection, Clean-Up | Months | - 0 | |
| SUBTOTAL FOR CLIN 0002 | - 0 | ||
| TOTAL ESTIMATED COST | - 0 |
&F
FOR OFFICIAL USE ONLY
File details come from the government source that posted it. Updated .