JL-10 Questions and Answers.pdf

PDF 103 KB Posted

Attached to
Navy Expeditionary Forces Regional Contract (NEFRSC) II
Solicitation number
N6274224R3570
Issued by

About this file

This document is a collection of questions and answers related to a federal contract opportunity for the Navy Expeditionary Forces Regional Contract (NEFRSC) II.

The key details are:

  • This is a solicitation to provide support services to Department of Defense components in Southeast Asia, South Asia, and Oceania. Services include humanitarian assistance, civic assistance, construction projects, contingency efforts, and exercise support.
  • The solicitation requires offerors to provide details on corporate experience, past performance, safety metrics, and technical approach. Specific requirements include providing 5 recent relevant projects valued at $15 million or more per year, performed in remote locations outside the U.S.
  • The original proposal due date of April 10 has been extended to May 1, 2024. The solicitation also includes amendments clarifying requirements around items like Government-furnished facilities, lodging, and remote site support.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M as te r

Q ue s.

Reference (page #, etc.) RFP Section (s) PWS Section (s) Question Government Response

Date Rec'd Annex

PWS

Section Revised A m en d

Corporate Experience Contract Value

Section L and M for Factor 2 N/A

Please confirm that $4 million is the correct threshold.

In section L, it says:

The five (5) projects submitted for Factor 2 – Corporate Experience, must also be submitted for Factor 1 – Past Performance.

The additional five (5) recent relevant projects must have a value of $4 million or more per year, may be cost-type or firm-fixed price, multi-function and performed in remote locations outside of the U.S

In Section M, it says:

Five recent relevant cost-type, multi-function support service contracts, performed in remote locations outside of the U.S. with a value of $15 million or more per year.

The $4 million threshold is only applicable to "the additional five (5) recent relevant projects" submitted for Factor 1 - Past Performance.

For Factor 2 - Corporate Experience, refer to RFP Section L, "The Offeror shall complete and submit Attachment JL-6, Corporate Experience Worksheet identifying a total of five (5) recent relevant projects that are cost-type, multi-function support service contracts, performed in remote locations outside of the U.S. with a value of $15 million or more per year."

For Factor 1 - Past Performance, refer to RFP Section L, "The five (5) projects submitted for Factor 2 – Corporate Experience, must also be submitted for Factor 1 – Past Performance.

The additional five (5) recent relevant projects must have a value of $4 million or more per year, may be cost-type or firm-fixed price, multi-function and performed in remote locations outside of the U.S."

3/8/2024 N/A N/A N/A

EMR, TCR and DART Safety Metrics

Factor 5 - Safety N/A

Factor 5, Safety requires offerors to provide DART and TCR rates.

Since both of these rates are self-reported and open to manipulation, will the Government consider also requiring offerors to provide their Experience Modification Rating (EMR)? The EMR is calculated by insurance companies, not self-reported by the Offeror.

No, offers will not be required to provide their EMR. DART and TRC are not to be confused with EMR, as only the U.S. uses EMR (primarily for insurance purposes).

3/8/2024 N/A N/A N/A

3 Quality Management System

Section L.6, Factor 5, Safety, Item 4 N/A

The last sentence of Item 4, Safety, states "The Quality Management System submission is limited to ten (10) single-sided pages." There is no other reference in Section L.6 to a Quality Management System.

Can the Government please confirm that there is no requirement for Offeror's to discuss a Quality Management System in their proposals?

Confirmed there is no requirement for Quality Management System.

Amendment 0002 has removed the sentence "The Quality Management System submission is limited to ten (10) single sided pages."

3/8/2024 N/A N/A 0002

4 Proposal Adequacy Checklist

Clause Incorporated by Reference 252.215-7009

N/A

Can the Government please specify whether or not a Proposal Adequacy Checklist is required? If it is required, where in the proposal should it be provided?

Proposal Adequacy Checklist is not a submission requirement of the RFP. DFARS 252.215-7009 is included in the RFP by reference to facilitate submission of a thorough, accurate, and complete proposal.

Per DFARS 252.215-7009 offerors shall complete the Proposal Adequacy Checklist when preparing their proposals.

3/8/2024 N/A N/A N/A

5 Earned Value Management System

Under part (5) Contractor Business Systems and Cost Accounting Standards (CAS)

N/A

The referenced section states that "Earned Value Management Systems (EVMS) is not applicable;" however, clause incorporated by reference 252.234-7002 Earned Value Management System is included in the RFP. Can the Government please confirm that EVMS is not a requirement?

In accordance with the RFP, Section L.6, Volume I - Cost Proposal, Under Part (5) Contractor Business Systems and Cost Accounting Standards (CAS), Contractor Business Systems, the RFP does not require the submission of the date, results, and the reporting Government office for the most recent reviews performed of the Earned Value Managment Systems (EVMS) in proposals.

However, DFARS 252.234-7002 will remain in the contract. For additional information, see the DFARS prescription and clause.

3/8/2024 N/A N/A N/A

Mission Essential Contractor Services Plan

252.237-7023 Continuation of Essential Contractor Services (Oct 2010)

N/A Please confirm that the Mission Essential Contractor Services Plan is not required to be included in the proposal. The RFP does not require the submission of Mission Essential

Contractor Services Plans in proposals. 3/8/2024 N/A N/A N/A

Report of Intended Performance Outside the United States and Canada - Submission with Offer

252.225-7003 Report of Intended Performance Outside the United States and Canada

N/A Please specify where the Report of Intended Performance Outside the United States and Canada should be included in the proposal.

Offeror's response to DFARS 252.237-7023 shall be included in Volume I- Cost Proposal, Under Part (4) Representations & Certifications.

3/8/2024 N/A N/A N/A

8 Proposal Due Date Section L.1 N/A Will the Government consider extending the proposal due date to 4/26 due to the size a volume of pages?

Amendment 0002 has extended the proposal due date to 1 May 2024 at 2:00 p.m. Hawaii Standard Time, (HST). 3/8/2024 N/A N/A 0002

9 Hard Copy Requirements Section L.1 N/A

To alleviate the time and cost burdens on businesses, would the Government please change the hard copy print submissions requirements to electronic only submissions in support of Paper Reduction Act?

No, this requirement will not change. 3/8/2024 N/A N/A N/A

10 Laundry Service N/A J-1000000-03

Laundry service is usually measured in pounds, not number of articles. 15 pieces of clothing could be 5 to 10 lbs, depending on bulk. Would the USG consider changing to a pounds per person per week?

No. This requirement, Annex 1000000 Spec Item 3.5.4 will not change. 3/15/2024 1000000 N/A N/A

11 Integrated Solid Waste Program N/A J-1503000-03

The Workload indicates quantities for Collection, Disposal and containers for the Contractor Provided Warehouse Space, but only requires containers for the project sites. Is it the Government's intent that collection and disposal for the project sites is not part of the Contractor's responsibility (containers only)?

No. Annex 1503000 Spec Item 3.1 Integrated Solid Waste Collection and Annex 1503000 Spec Item 3.2 Integrated Solid Waste Disposal, for remote project sites are also the Contractor's responsibility.

Amendment 0002 includes "Remote Project Sites per Annex 1, spec item 1.3 to be funded with project funding" in Spec Items 3.1 and 3.2, for each detail location.

3/15/2024 1503000 150300 0002

NEFRSC_II_JB_1_

Cost_Summary_Wor ksheet.xlsx

N/A

Annexes 0200000 1000000 1501000 1503000 1503020 1700000

How does the USG intend for the contractor to price "unspecified" workload? If so, on what basis do we provide pricing?

Additionally, It is difficult to estimate "General Conditions" support / staffing without a basis.

Suggestion is to include a plug number or some indicator of workload.

Specific area are:

Annex 0200000, Contingency Exercise Support indicates 10/yr and Site Surveys 5/yr, but without scope.

Annex 1000000, Construction Material indicates project dependent.

What are we supposed to price?

Annex 1501000, Facilities Management is all "Project Dependent" with no workload indicated.

Annex 1503000, There is a requirement for Solid Waste Containers for project sites, but workload indicates project dependent with no indicator of level of effort.

Annex 1503020, States pest control is required for project site but provides no level of effort (i.e. average acreage/square footage).

Annex 1700000, Indicates a requirement for MHE and Construction Rentals, but no indication of an average level of effort for a "project".

Refer to JB-1, Note 7 for additional instructions on pricing. See Amenment 0002.

For proposal purposes, utilize $5,000 per site survey under Annex 02000000 Spec Item 2.14

For proposal purposes, utilize 20,000 sq ft for Annex 1503020 Spec Item 3.1 Scheduled Pest Control at remote project sites

3/15/2024

0200000 1000000 1501000 1503000 1503020 1700000

N/A 0002

13 Site Visit Follow Up N/A N/A

During the Palau Site Visit, the CAT Chief indicated there have been significant logistical issues associated with the ongoing Containerized Housing Unit (CHU) project. It was unclear whether these issues are internal government, or external relating to COFAs, country to country agreements. Would the USG provide details of those issues if they involve entities outside Navy's and NEFRSC contractor's direct control?

The logistical issues related to the CHU project were unique to the current Contractor. The CHU project is not part of this solicitation.

Per Annex 0200000 Spec Item 2.1.1 Overseas Operations, "Offerors are expected to familiarize themselves with the laws of host nations whether or not the United States Government provides notice of the existence of such requirements.".

3/15/2024 200000 N/A N/A

14 Proposal Due Date SF33, Item 9 L6 Volume II, Non Cost Proposal

N/A

The combination of a short proposal period (40 days) and requirement for a highly detailed technical proposal provides a significant advantage to the incumbent.

If NAVFAC's intent is to maximize competition while minimizing proposal time, the technical proposal should be no more than 30 pages, with focus on past performance on similar contracts.

If NAVFAC's desire is for a more detailed proposal, then a 90 day proposal period should be provided to allow non-incumbents to identify subcontractors, sources of supply, etc. The 90 days should begin after responses to the technical questions.

The current RFP timeline and Non-Price Volume requirements will challenge any non-incumbent proposer to submit a complete, compliance and competitive proposal.

The Proposal due date of 10 April allows only a 40 day proposal development period of 40 days from issuance. Furthermore, the site visit did not take place until 14 days after the issuance.

See answer to Question #8. 3/15/2024 N/A N/A 0002

Unwanted Vegetation and Invasive Plants

N/A

Section C – 1503000, Spec Item 1.1;

Section C – 1503020, Spec Item 1.1

The requirement to control unwanted vegetation and invasive plants is included in two separate Spec Items.

QUESTION: Would the US Government (USG) please consider removing the unwanted vegetation and invasive plant requirement from Section C – 1503020 Pest Control, Spec Item 1.1, as it is covered under Section C – 1503000 Facility Services, Spec Item 1.1?

No, this requirement will not change. 3/19/2024 1503000 N/A N/A

16 Driver Requirement N/A Section J – 1700000, Attachment 1700000- 03, Spec Item 3.1.1

Attachment 1700000-03, Spec Item 3.1.1 identifies driver requirements for every location, with the exception of Palau.

QUESTION: Will the USG please confirm that drivers are not required in Palau?

No, drivers will not be required in Palau. See Amendment 0002. 3/19/2024 1700000 1700000 0002

17 Test and Operate Stand-by Equipment PWS Section J – 1600000-

03, Spec Item 3.2

PWS Section C – 1600000 and J – 1600000-03 do not align. PWS Section 3.2 applies to "Wastewater," while in J – 1600000-03 it applies to electrical "3.2 Test and Operate Stand-by Equipment."

QUESTION: Will the USG please clarify whether the entire Performance Objective, Related Information, and Performance Standard(s) for electrical 3.2 Test and Operate Stand-by Equipment should be included in PWS Spec Item 3.1 Electrical?

Corrected, see Amendment 0002 3/19/2024 1600000 160000 0002

18 Estimated Quantities J-1600000-03 Section J – 1600000- 03, Spec Item 3.3

The misalignment between PWS Section C – 1600000 and J – 1600000-03 causes a misalignment with all subsequent Spec Items.

QUESTION: Will the USG please provide a PWS-aligned J – 1600000-03?

See response to Question #17. 3/19/2024 1600000 1600000 0002

19 Estimated Quantities J-1800000-03 Section C – 1800000

The PWS lists Spec Items 3 through 3.3.3; however, J – 1800000-03 contains only Spec Item 3.

QUESTION: Will the USG please confirm that all requirements are represented in the J – 1800000-03 attachment under the single Spec Item 3?

Confirmed all requirements are represented in the J-1800000-03 attachment under the single Spec Item 3. 3/19/2024 1800000 N/A N/A

20 Government- Furnished Items PWS

Spec Item 2.4 – Government- Furnished Items

Paragraph 4 states: "Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government." FAR 52.245-1, Government Property Clause indicates that the Contractor is responsible for replacing Government Property due to Contractor's Negligence.

QUESTION: Would the USG please confirm that the FAR 52.245-1 clause takes precedence over this Spec Item?

Confirmed, FAR 52.245-1 Government Property, takes precedence.

Please refer to FAR 52.215-8 Order of Precedence-Uniform Contract Format (Oct 1997). Amendment 0002 has removed "and its replacement shall be the responsibility of the Contractor at no additional cost to the Government." from Annex 0200000 Spec Item 2.4.

3/19/2024 0200000 0200000 0002

Minimum Wage under Executive Order 14026

RFP Section L Clauses Incorporated by Reference

Clause 52.222-41, Service Contract Labor Standards is not referenced in this solicitation; therefore, Clause 52.222-55 Minimum Wages for Contractor Workers under EO 14026 should not be included in this solicitation.

REQUEST: Please remove reference to this clause

FAR 52.222-55 has been removed, see Amendment 0002. 3/19/2024 N/A N/A 0002

Requirements for Location-Specific Details

RFP Section L .1 N/A

The solicitation requires country-specific details for the operational approach, logistics plans, staffing, and other aspects of the program covering seven locations and five distinct and separate countries. The USG, however, only provided bidders an opportunity to participate in site surveys for two of these seven locations. The absence of site surveys to each distinct country/location, combined with the short submission timeline, benefits the incumbent and is a disadvantage to the remaining bidders.

QUESTION: To allow bidders adequate opportunity to gather data and propose country-specific approaches to the level of detail required by the solicitation, would the USG please provide a 90-day extension or reduce the level of country-specific detail required?

See answer to Question #8. 3/19/2024 N/A N/A 0002

23 Video Surveillance Section J – 0401000 Spec Item 3.2, p.

The PWS states "The Contractor shall monitor video surveillance equipment."

QUESTION 1: Will the USG provide a list of video surveillance equipment currently existing at each site?

QUESTION 2: If video surveillance equipment does not exist, please provide the required specs of this equipment to allow bidders to properly estimate costs?

No, a list of current contractor-owned video surveillance equipment, existing at each site, will not be provided.

There is no Government-owned video surveillance equipment. See Annex 0200000 Spec Item 2.5.1 Contractor Furnished Warehouse Workspace Facility, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control. Services for the warehouse workspace facility are further identified in the technical annexes."

3/19/2024 0401000 N/A N/A

24 Container Shipping PWS

SECTION J -

1000000 spec item 3.5.3 p 320-321

Per the PWS, the contractor shall provide ‘four (4) 20-foot containers shipped roundtrip once a year from Palawan to any project location within Philippines.’

QUESTION: To allow bidders to properly estimate shipping costs, will the USG provide the project location(s) within Philippines?

Please refer to the Detail Locations as specified in Annex 0100000 Spec Item 1.3 Project Locations. 3/19/2024 1000000 N/A N/A

25 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3, pp.

320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year from Yap to any project location within Federated States of Micronesia (FSM)." Additionally, "four (4) 20-foot containers are to be shipped roundtrip once a year from Pohnpei to any project location within FSM."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within FSM?

See response to Question #24. 3/19/2024 1000000 N/A N/A

26 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3, pp.

320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year from Tinian to any project location within Commonwealth of the Northern Mariana Islands (CNMI)."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within CNMI?

See response to Question #24. 3/19/2024 1000000 N/A N/A

27 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3, pp.

320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year Manus to any project location within Papua New Guinea (PNG)."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within PNG?

See response to Question #24. 3/19/2024 1000000 N/A N/A

28 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3, p.

320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year Manus to any project location within Palau."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within Palau?

See response to Question #24. 3/19/2024 1000000 N/A N/A

29 Amendment 0002 Factor 5 - Safety, 3.

d. Pg 18

Amendment 0002 reduced the Technical Approach to Safety narrative from 10 pages to 2 pages.

QUESTION: Are bidders correct in assuming that DART Rate and TCR Rate discussions are excluded from the 2-page Technical Approach to Safety narrative?

Yes, For Factor 3 - Safety, DART Rate and TCR Rate are separate submittal requirements from the Technical Approach to Safety narrative, and are not included in the two (2) single-sided page count.

4/2/2024 N/A N/A N/A

30 Government- Furnished Facilities

PWS Section 2.4.1 pg 16

The PWS states, "The Government may utilize host nation provided land and/or facilities to setup detail sites (lodging, warehouse/equipment, laydown area) in connection with this contract."

QUESTION: Will the USG provide space on host nation provided property to set up warehouse and workspace facilities?

No, at this time the Government is not providing space on host nation provided property to set up warehouse and workspace facilities.

However, the Government may provide space in the future, see PWS Annex 0200000 Spec Item 2.4.2 "The Government may utilize host nation provided land and/or facilities to setup Detail sites (lodging, warehouse/equipment, laydown area) in connection with this contract."

4/2/2024 0200000 N/A N/A

31 Government- Furnished Facilities

PWS Section 2.4.1 pg 16

The PWS states, "The Government may utilize host nation provided land and/or facilities to setup detail sites (lodging, warehouse/equipment, laydown area) in connection with this contract."

QUESTION: Should the USG provide space within host nation provided properties, will these facilities be existing warehouses?

See response to Question #31. 4/2/2024 0200000 N/A N/A

32 Government- Furnished Facilities

PWS Section 2.4.1 pg 16

The PWS states, "The Government may utilize host nation provided land and/or facilities to setup detail sites (lodging, warehouse/equipment, laydown area) in connection with this contract."

QUESTION: Should the USG provide space within existing warehouses, will these facilities meet the Annex 0200000 Spec Item

2.5.1 PWS requirements which mandate at least 4300 sq.ft?

See response to Question #31. 4/2/2024 0200000 N/A N/A

33 Government- Furnished Facilities

PWS Section 2.4.1 pg 16

The PWS states, "The Government may utilize host nation provided land and/or facilities to setup detail sites (lodging, warehouse/equipment, laydown area) in connection with this contract."

QUESTION: Will connections to existing infrastructure (i.e., electrical, water, sewage) be available at Government provided warehouse locations?

The current warehouse is furnish by and unique to the current Contractor. There are no Government-owned warehouse locations.

See Annex 0200000 Spec Item 2.5.1 Contractor Furnished Warehouse Workspace Facility, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control. Services for the warehouse workspace facility are further identified in the technical annexes."

4/2/2024 0200000 N/A N/A

Contractor- Furnished Warehouse Workspace Facility

PWS Section 2.5.1 pg 16

The PWS states, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control."

QUESTION: Does the Government have proximity requirements to remote sites, project locations, lodging, etc. for Contractor warehouse and workspace facilities?

No, the Government does not have proximity requirements for the Contractor Furnished Warehouse Workspace Facility, Spec Item

2.5.1. For proposal purposes, the warehouse locations can be located anywhere on the respective islands.

4/2/2024 0200000 N/A N/A

Contractor- Furnished Warehouse Workspace Facility

PWS Section 2.5.1 pg 16

The PWS states, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control."

QUESTION: Where commercial space is limited (e.g., Papua New Guinea or Tinian), will the USG accept the use of containers for warehouse and workspace facilities?

The Contractor will determine the means and methods to meet the requirements of the PWS, however for proposal and evaluation purposes, the Government will not accept the use of shipping containers.

Warehouse Workspace Facility Requirements are provided in Annex 0200000, Spec Item 2.5.1, "The warehouse shall have a covered Storage Area with workspace and office space. The warehouse shall have a covered Storage Area with at least 4300 square feet of space including room for at least one 420 square foot air conditioned office to include required office furniture. All offices and doors shall be equipped with keyed door locks, keyed deadbolts.

The Contractor shall ensure locks are functioning and keys issued to the Detail. The intent of the Warehouse Workspace Facility is to store Civil Engineering Support Equipment (CESE) and have working spaces for the detail leadership. Estimated Quantities are found in J- 0200000-09.".

4/2/2024 0200000 N/A N/A

Contractor- Furnished Warehouse Workspace Facility

PWS Section 2.5.1 pg 16

The PWS states, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control."

QUESTION: Do the contractor workspace facility and the contractor warehouse need to be collocated?

Yes. Annex 0200000 Spec Item 2.5.1 Contractor Furnished Warehouse Workspace Facility, shall be collocated. See response to Question #36.

4/2/2024 0200000 N/A N/A

Contractor- Furnished Warehouse Workspace Facility

PWS Section 2.5.1 pg 16

The PWS states, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control."

QUESTION: If the Contractor workspace facility and contractor warehouse need not be collocated, what is the maximum distance allowed between the two facilities?

See response to Question #37. 4/2/2024 0200000 N/A N/A

38 Personnel Lodging PWS Section 3.1 pg

During the site visit, the site survey team visited two hotels where Seabees stay: the Lori Lynn hotel in Tinian and the Cove in Palau. Per the PWS, "The Contractor shall provide lodging accommodations for personnel nearest remote construction or other mission required projects."

QUESTION: Does the USG restrict the offerors to using the Lori Lynn hotel in Tinian and the Cove hotel in Palau for lodging?

No, the Government does not restrict offerors to using Lori Lynn Hotel in Tinian and the Cove Hotel in Palau for lodging.

Refer to Annex 1403000 Section C, Spec Item 3.1.1 LNO Lodging and Spec Item 3.1.2 Personnel Lodging, for specific lodging requirements.

4/2/2024 1403000 N/A N/A

39 Personnel Lodging PWS Section 3.1 pg

The PWS states, "The Contractor shall provide lodging accommodations for personnel nearest remote construction or other mission required projects."

QUESTION: Since offerors are not familiar with future construction projects, will the USG identify preferred lodging locations for NEFRSC sites?

No, the Government will not identify preferred lodging locations.

Refer to Annex 1403000 Section C, Spec Item 3.1.1 LNO Lodging and Spec Item 3.1.2 Personnel Lodging, for specific lodging requirements.

4/2/2024 1403000 N/A N/A

40 Personnel Lodging PWS Section 3.1 pg

The PWS states, "The Contractor shall provide lodging accommodations for personnel nearest remote construction or other mission required projects."

QUESTION: Where preferred lodging is not identified, does the USG place distance restrictions between the construction sites and lodging locations?

No, for proposal purposes distance restrictions have not been identified by the Government, thus lodging locations can be located anywhere on the respective islands.

Refer to Annex 1403000 Section C, Spec Item 3.1.2 Personnel Lodging, "The Contractor shall provide lodging accommodations for personnel as needed nearest to remote construction and other mission required projects".

4/2/2024 1403000 N/A N/A

Contractor- Furnished Warehouse Workspace Facility

PWS 2.5.1, pg 16

The PWS states, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control."

QUESTION: Will the USG confirm that offerors are required to provide the generators at each Contractor-provided warehouse and workspace facility?

No, offerors are not required to provide "generators"; however, offerors shall meet the requirements of the PWS including providing electricity in accordance with Annex 0200000 Spec Item 2.5.1 and Annex 1600000 Spec Item 3.1.

4/2/2024 0200000 N/A N/A

Amendment 0002 Q&A #11

Remote Site Annex Support

J-1503000-03

In Amendment 0002 Q&A #11, the USG stated that "Annex 1503000 Spec Item 3.1 Integrated Solid Waste Collection and Annex 1503000 Spec Item 3.2 Integrated Solid Waste Disposal, for remote project sites are also the Contractor's responsibility. Amendment 0002 includes 'Remote Project Sites per Annex 1, spec item 1.3 to be funded with project funding" in Spec Items 3.1 and 3.2, for each detail location.'" QUESTION: Are bidders correct in assuming that remote project site requirements for all annexes will be covered through separate project funding?

No. Offerors should not assume all project site requirements for all Annexes/Sub-Annexes will be covered under separate project funding.

Please refer to the PWS Section J for each respective Technical Annex/Sub-Annex, for information on remote project sites funded with project funding.

4/2/2024

0304010 0401000 1000000 1403000 1501000 1502000 1503000 1503020 1600000 1700000 1800000

N/A N/A

Corporate Experience Total Contracts

L.6 Vol II, Factor 2, Corporate Experience

N/A

RFP requires "a total of five (5) recent relevant projects..." Does this mean that 5 contracts must be submitted, or up to 5 contracts may be submitted?

In accordance with Section L Factor 2 - Corporate Experience, "Solicitation Submittal Requirements:

The Offeror shall complete and submit Attachment JL-6, Corporate Experience Worksheet identifying a total of five [emphasis added]

(5) recent relevant projects…"

4/3/2024 N/A N/A N/A

Corporate Experience Contract Types

L.6 Vol II, Factor 2, Corporate Experience

N/A

RFP requires "a total of five (5) recent relevant projects that are cost-type, multi-function support services contracts, performed in remote locations outside the U.S. with a value of $15 million or more per year." However, Section M.1, Note 3 indicates these types of contracts may be considered more favorably. Must all contracts be cost-type or can some be FFP or Hybrid (FFP/Cost Type)?

In accordance with Section L Factor 2 - Corporate Experience, "Solicitation Submittal Requirements:

The Offeror shall complete and submit Attachment JL-6, Corporate Experience Worksheet identifying a total of five (emphasis added) (5) recent relevant projects that are cost-type [emphasis added], multi-function support service contracts, performed in remote locations outside of the U.S. with a value of $15 million or more per year."

4/3/2024 N/A N/A N/A

Corporate Experience Contract Locations

L.6 Vol II, Factor 2, Corporate Experience

N/A

RFP requires "a total of five (5) recent relevant projects that are cost-type, multi-function support services contracts, performed in remote locations outside the U.S. with a value of $15 million or more per year." However, Section M.1, Note 3 indicates these types of contracts may be considered more favorably. Must all contracts be outside the US, or can some be inside the US?

For Factor 2 - Corporate Experience, the five (5) rerecent relevant projects submitted shall be performed in remote locations outside of the U.S.

Amendment 0003 has revised Section M.1, Notes for Factors 1 and 2, as follows: "Corporate experience in cost-type, multi-function support service contracts, performed in remote locations outside of the U.S. in Southeast Asia, South Asia and Oceania may be considered more favorable".

4/3/2024 N/A N/A 0003

46 Past Performance CPAR Submissions

L.6 Vol II, Factor 1, Past Performance N/A

RFP requires "If both final and interim CPARs evaluations are available, they shall be submitted with the proposal." How many CPARs are required (i.e., one, all, all for last 5 years)?

All Final and Interim CPARS available for all projects submitted within the five (5) years from the issuance date of the solicitation, shall be submitted.

4/3/2024 N/A N/A N/A