This document contains questions and answers related to a federal contract opportunity for the Navy Expeditionary Forces Regional Contract (NEFRSC) II. The contract will provide support services to various Department of Defense components in Southeast Asia, South Asia, and Oceania, including humanitarian assistance, civic assistance, construction projects, contingency efforts, and exercise support.

Key details include:

  • Clarification on the $4 million versus $15 million contract value thresholds for different evaluation factors
  • Confirmation that safety metrics like DART and TCR rates, but not EMR, are required
  • Confirmation that a Quality Management System and Mission Essential Contractor Services Plan are not required
  • Extension of the proposal due date to May 1, 2024
  • Responses to questions regarding pricing of unspecified workload, container shipping estimates, and video surveillance requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q ue st io n

Reference (page #, etc.) RFP Section (s) PWS Section (s) Question Government Response

Date Rec'd Annex

PWS Section Revised A m en dm en t#

Corporate Experience Contract Value

Section L and M for Factor 2 N/A

Please confirm that $4 million is the correct threshold.

In section L, it says:

The five (5) projects submitted for Factor 2 – Corporate Experience, must also be submitted for Factor 1 – Past Performance.

The additional five (5) recent relevant projects must have a value of $4 million or more per year, may be cost-type or firm-fixed price, multi-function and performed in remote locations outside of the U.S

In Section M, it says:

Five recent relevant cost-type, multi-function support service contracts, performed in remote locations outside of the U.S. with a value of $15 million or more per year.

The $4 million threshold is only applicable to "the additional five (5) recent relevant projects" submitted for Factor 1 - Past Performance.

For Factor 2 - Corporate Experience, refer to RFP Section L, "The Offeror shall complete and submit Attachment JL-6, Corporate Experience Worksheet identifying a total of five (5) recent relevant projects that are cost-type, multi-function support service contracts, performed in remote locations outside of the U.S. with a value of $15 million or more per year."

For Factor 1 - Past Performance, refer to RFP Section L, "The five (5) projects submitted for Factor 2 – Corporate Experience, must also be submitted for Factor 1 – Past Performance.

The additional five (5) recent relevant projects must have a value of $4 million or more per year, may be cost-type or firm-fixed price, multi-function and performed in remote locations outside of the U.S."

3/8/2024 N/A N/A N/A

EMR, TCR and DART Safety Metrics

Factor 5 - Safety N/A

Factor 5, Safety requires offerors to provide DART and TCR rates.

Since both of these rates are self-reported and open to manipulation, will the Government consider also requiring offerors to provide their Experience Modification Rating (EMR)? The EMR is calculated by insurance companies, not self-reported by the Offeror.

No, offers will not be required to provide their EMR. DART and TRC are not to be confused with EMR, as only the U.S. uses EMR (primarily for insurance purposes).

3/8/2024 N/A N/A N/A

3 Quality Management System

Section L.6, Factor 5, Safety, Item 4 N/A

The last sentence of Item 4, Safety, states "The Quality Management System submission is limited to ten (10) single-sided pages." There is no other reference in Section L.6 to a Quality Management System.

Can the Government please confirm that there is no requirement for Offeror's to discuss a Quality Management System in their proposals?

Confirmed there is no requirement for Quality Management System.

Amendment 0002 has removed the sentence "The Quality Management System submission is limited to ten (10) single sided pages."

3/8/2024 N/A N/A 0002

4 Proposal Adequacy Checklist

Clause Incorporated by Reference 252.215-7009

N/A

Can the Government please specify whether or not a Proposal Adequacy Checklist is required? If it is required, where in the proposal should it be provided?

Proposal Adequacy Checklist is not a submission requirement of the RFP. DFARS 252.215-7009 is included in the RFP by reference to facilitate submission of a thorough, accurate, and complete proposal.

Per DFARS 252.215-7009, Offerors shall complete the Proposal Adequacy Checklist when preparing their proposals.

3/8/2024 N/A N/A N/A

5 Earned Value Management System

Under part (5) Contractor Business Systems and Cost Accounting Standards (CAS)

N/A

The referenced section states that "Earned Value Management Systems (EVMS) is not applicable;" however, clause incorporated by reference 252.234-7002 Earned Value Management System is included in the RFP. Can the Government please confirm that EVMS is not a requirement?

In accordance with the RFP, Section L.6, Volume I - Cost Proposal, Under Part (5) Contractor Business Systems and Cost Accounting Standards (CAS), Contractor Business Systems, the RFP does not require the submission of the date, results, and the reporting Government office for the most recent reviews performed of the Earned Value Managment Systems (EVMS) in proposals.

However, DFARS 252.234-7002 will remain in the contract. For additional information, see the DFARS prescription and clause.

3/8/2024 N/A N/A N/A

Mission Essential Contractor Services Plan

252.237-7023 Continuation of Essential Contractor Services (Oct 2010)

N/A Please confirm that the Mission Essential Contractor Services Plan is not required to be included in the proposal. The RFP does not require the submission of Mission Essential

Contractor Services Plans in proposals. 3/8/2024 N/A N/A N/A

Report of Intended Performance Outside the United States and Canada - Submission with Offer

252.225-7003 Report of Intended Performance Outside the United States and Canada

N/A Please specify where the Report of Intended Performance Outside the United States and Canada should be included in the proposal.

Offeror's response to DFARS 252.237-7023 shall be included in Volume I- Cost Proposal, Under Part (4) Representations & Certifications.

3/8/2024 N/A N/A N/A

8 Proposal Due Date Section L.1 N/A Will the Government consider extending the proposal due date to 4/26 due to the size a volume of pages?

Amendment 0002 has extended the proposal due date to 1 May 2024 at 2:00 p.m. Hawaii Standard Time (HST). 3/8/2024 N/A N/A 0002

9 Hard Copy Requirements Section L.1 N/A

To alleviate the time and cost burdens on businesses, would the Government please change the hard copy print submissions requirements to electronic only submissions in support of Paper Reduction Act?

No, this requirement will not change. 3/8/2024 N/A N/A N/A

10 Laundry Service N/A J-1000000-03

Laundry service is usually measured in pounds, not number of articles.

15 pieces of clothing could be 5 to 10 lbs, depending on bulk. Would the USG consider changing to a pounds per person per week?

No. This requirement, Annex 1000000 Spec Item 3.5.4 will not change. 3/15/2024 1000000 N/A N/A

11 Integrated Solid Waste Program N/A J-1503000-03

The Workload indicates quantities for Collection, Disposal and containers for the Contractor Provided Warehouse Space, but only requires containers for the project sites. Is it the Government's intent that collection and disposal for the project sites is not part of the Contractor's responsibility (containers only)?

No. Annex 1503000 Spec Item 3.1 Integrated Solid Waste Collection and Annex 1503000 Spec Item 3.2 Integrated Solid Waste Disposal, for remote project sites are also the Contractor's responsibility.

Amendment 0002 includes "Remote Project Sites per Annex 1, spec item 1.3 to be funded with project funding" in Spec Items 3.1 and 3.2, for each detail location.

3/15/2024 1503000 J-1503000-03 0002

NEFRSC_II_JB_1_

Cost_Summary_Wor ksheet.xlsx

N/A

Annexes 0200000 1000000 1501000 1503000 1503020 1700000

How does the USG intend for the contractor to price "unspecified" workload? If so, on what basis do we provide pricing?

Additionally, It is difficult to estimate "General Conditions" support / staffing without a basis.

Suggestion is to include a plug number or some indicator of workload.

Specific area are:

Annex 0200000, Contingency Exercise Support indicates 10/yr and Site Surveys 5/yr, but without scope.

Annex 1000000, Construction Material indicates project dependent.

What are we supposed to price?

Annex 1501000, Facilities Management is all "Project Dependent" with no workload indicated.

Annex 1503000, There is a requirement for Solid Waste Containers for project sites, but workload indicates project dependent with no indicator of level of effort.

Annex 1503020, States pest control is required for project site but provides no level of effort (i.e. average acreage/square footage).

Annex 1700000, Indicates a requirement for MHE and Construction Rentals, but no indication of an average level of effort for a "project".

Refer to JB-1, Note 7 for additional instructions on pricing. See Amenment 0002.

For proposal purposes, utilize $5,000 per site survey under Annex 02000000 Spec Item 2.14

For proposal purposes, utilize 20,000 sq. ft. for Annex 1503020 Spec Item 3.1 Scheduled Pest Control at remote project sites

3/15/2024

0200000 1000000 1501000 1503000 1503020 1700000

N/A 0002

13 Site Visit Follow Up N/A N/A

During the Palau Site Visit, the CAT Chief indicated there have been significant logistical issues associated with the ongoing Containerized Housing Unit (CHU) project. It was unclear whether these issues are internal government, or external relating to COFAs, country to country agreements. Would the USG provide details of those issues if they involve entities outside Navy's and NEFRSC contractor's direct control?

The logistical issues related to the CHU project were unique to the current Contractor. The CHU project is not part of this solicitation.

Per Annex 0200000 Spec Item 2.1.1 Overseas Operations, "Offerors are expected to familiarize themselves with the laws of host nations whether or not the United States Government provides notice of the existence of such requirements.".

3/15/2024 0200000 N/A N/A

14 Proposal Due Date SF33, Item 9 L6 Volume II, Non Cost Proposal

N/A

The combination of a short proposal period (40 days) and requirement for a highly detailed technical proposal provides a significant advantage to the incumbent.

If NAVFAC's intent is to maximize competition while minimizing proposal time, the technical proposal should be no more than 30 pages, with focus on past performance on similar contracts.

If NAVFAC's desire is for a more detailed proposal, then a 90 day proposal period should be provided to allow non-incumbents to identify subcontractors, sources of supply, etc. The 90 days should begin after responses to the technical questions.

The current RFP timeline and Non-Price Volume requirements will challenge any non-incumbent proposer to submit a complete, compliance and competitive proposal.

The Proposal due date of 10 April allows only a 40 day proposal development period of 40 days from issuance. Furthermore, the site visit did not take place until 14 days after the issuance.

See answer to Question #9. 3/15/2024 N/A N/A 0002

Unwanted Vegetation and Invasive Plants

N/A

Section C – 1503000, Spec Item 1.1;

Section C – 1503020, Spec Item 1.1

The requirement to control unwanted vegetation and invasive plants is included in two separate Spec Items.

QUESTION: Would the US Government (USG) please consider removing the unwanted vegetation and invasive plant requirement from Section C – 1503020 Pest Control, Spec Item 1.1, as it is covered under Section C – 1503000 Facility Services, Spec Item 1.1?

No, this requirement will not change. 3/19/2024 1503000 N/A N/A

16 Driver Requirement N/A

Section J – 1700000, Attachment 1700000-03, Spec Item 3.1.1

Attachment 1700000-03, Spec Item 3.1.1 identifies driver requirements for every location, with the exception of Palau.

QUESTION: Will the USG please confirm that drivers are not required in Palau?

No, drivers will not be required in Palau. See Amendment 0002. 3/19/2024 1700000 J-1700000-03 0002

Test and Operate Stand-by Equipment

PWS

Section J – 1600000-03, Spec Item 3.2

PWS Section C – 1600000 and J – 1600000-03 do not align.

PWS Section 3.2 applies to "Wastewater," while in J – 1600000-03 it applies to electrical "3.2 Test and Operate Stand-by Equipment."

QUESTION: Will the USG please clarify whether the entire Performance Objective, Related Information, and Performance Standard(s) for electrical 3.2 Test and Operate Stand-by Equipment should be included in PWS Spec Item 3.1 Electrical?

Corrected, see Amendment 0002 3/19/2024 1600000 J-1600000-03 0002

18 Estimated Quantities J-1600000-03

Section J – 1600000-03, Spec Item 3.3

The misalignment between PWS Section C – 1600000 and J – 1600000-03 causes a misalignment with all subsequent Spec Items.

QUESTION: Will the USG please provide a PWS-aligned J – 1600000-03?

See response to Question #17. 3/19/2024 1600000 J-1600000-03 0002

19 Estimated Quantities J-1800000-03 Section C –

1800000

The PWS lists Spec Items 3 through 3.3.3; however, J – 1800000-03 contains only Spec Item 3.

QUESTION: Will the USG please confirm that all requirements are represented in the J – 1800000-03 attachment under the single Spec Item 3?

Confirmed, all requirements are represented in the J-1800000- 03 attachment under the single Spec Item 3. 3/19/2024 1800000 N/A N/A

20 Government- Furnished Items PWS

Spec Item 2.4 – Government- Furnished Items

Paragraph 4 states: "Government-Furnished Items, which becomes worn out due to normal wear and tear, shall be returned to the Government and its replacement shall be the responsibility of the Contractor at no additional cost to the Government." FAR 52.245-1, Government Property Clause indicates that the Contractor is responsible for replacing Government Property due to Contractor's Negligence.

QUESTION: Would the USG please confirm that the FAR 52.245-1 clause takes precedence over this Spec Item?

Confirmed, FAR 52.245-1 Government Property, takes precedence. Please refer to FAR 52.215-8 Order of Precedence- Uniform Contract Format (Oct 1997). Amendment 0002 has removed "and its replacement shall be the responsibility of the Contractor at no additional cost to the Government." from Annex 0200000 Spec Item 2.4.

3/19/2024 0200000 0200000 0002

Minimum Wage under Executive Order 14026

RFP Section L Clauses Incorporated by Reference

Clause 52.222-41, Service Contract Labor Standards is not referenced in this solicitation; therefore, Clause 52.222-55 Minimum Wages for Contractor Workers under EO 14026 should not be included in this solicitation.

REQUEST: Please remove reference to this clause.

FAR 52.222-55 has been removed, see Amendment 0002. 3/19/2024 N/A N/A 0002

Requirements for Location-Specific Details

RFP Section L .1 N/A

The solicitation requires country-specific details for the operational approach, logistics plans, staffing, and other aspects of the program covering seven locations and five distinct and separate countries. The USG, however, only provided bidders an opportunity to participate in site surveys for two of these seven locations. The absence of site surveys to each distinct country/location, combined with the short submission timeline, benefits the incumbent and is a disadvantage to the remaining bidders.

QUESTION: To allow bidders adequate opportunity to gather data and propose country-specific approaches to the level of detail required by the solicitation, would the USG please provide a 90-day extension or reduce the level of country-specific detail required?

See answer to Question #9. 3/19/2024 N/A N/A 0002

23 Video Surveillance Section J – 0401000 Spec Item 3.2, p. 303

The PWS states "The Contractor shall monitor video surveillance equipment."

QUESTION 1: Will the USG provide a list of video surveillance equipment currently existing at each site?

QUESTION 2: If video surveillance equipment does not exist, please provide the required specs of this equipment to allow bidders to properly estimate costs?

No, a list of current contractor-owned video surveillance equipment, existing at each site, will not be provided.

There is no Government-owned video surveillance equipment.

See Annex 0200000 Spec Item 2.5.1 Contractor Furnished Warehouse Workspace Facility, "The Contractor shall provide a covered warehouse workspace facility to include, but not limited to, electricity, water, sewage, custodial, Integrated Solid Waste Management (ISWM), force protection, and pest control.

Services for the warehouse workspace facility are further identified in the technical annexes."

3/19/2024 0401000 N/A N/A

24 Container Shipping PWS

SECTION J -

1000000 spec item 3.5.3 p 320-321

Per the PWS, the contractor shall provide ‘four (4) 20-foot containers shipped roundtrip once a year from Palawan to any project location within Philippines.’

QUESTION: To allow bidders to properly estimate shipping costs, will the USG provide the project location(s) within Philippines?

Please refer to the Detail Locations as specified in Annex 0100000 Spec Item 1.3 Project Locations. 3/19/2024 1000000 N/A N/A

25 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3,

pp. 320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year from Yap to any project location within Federated States of Micronesia (FSM)."

Additionally, "four (4) 20-foot containers are to be shipped roundtrip once a year from Pohnpei to any project location within FSM."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within FSM?

See response to Question #24. 3/19/2024 1000000 N/A N/A

26 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3,

pp. 320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year from Tinian to any project location within Commonwealth of the Northern Mariana Islands (CNMI)."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within CNMI?

See response to Question #24. 3/19/2024 1000000 N/A N/A

27 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3,

pp. 320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year Manus to any project location within Papua New Guinea (PNG)."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within PNG?

See response to Question #24. 3/19/2024 1000000 N/A N/A

28 Container Shipping

SECTION J –

1000000, Spec Item 3.5.3, p.

320–321

Per the PWS, the contractor shall provide "four (4) 20-foot containers shipped roundtrip once a year Manus to any project location within Palau."

QUESTION: To allow bidders to properly estimate shipping costs, would the USG please provide the project location(s) within Palau?

See response to Question #24. 3/19/2024 1000000 N/A N/A

File details come from the government source that posted it. Updated .