About this file

This solicitation is for an Indefinite Delivery Indefinite Quantity fixed price remedial action contract to obtain services for performing remedial actions at environmentally contaminated sites located at Navy and Marine Corps installations and other government agencies within the Naval Facilities Engineering Systems Command Pacific area of responsibility. Work may also be performed outside of this area of responsibility and include sites for other NAVFAC components, the Department of Defense, or federal agencies. Services will include sites on the Superfund National Priority List as well as non-NPL, RCRA, UST, and operational small arms firing range sites requiring remedial action. The contract is estimated for a base year and seven one-year option periods not to exceed $120 million or 102 months total. Work will be authorized via task orders with schedules and destinations specified in each order.

View the file

Other files

File Type Posted
N6274221R1801_AMD3.pdf PDF
FRAC QA_AMD3.pdf PDF
Attachment J-6 Key Personnel Assignments_AMD2.docx DOCX document
21-R-1801_SECTION L_AMD2.pdf PDF
21-R-1801_SECTION J_AMD2.pdf PDF
21-R-1801_SECTION M_AMD2.pdf PDF
21-R-1801 QA AMD2.pdf PDF
21-R-1801_SECTION C_AMD2.pdf PDF
Attachment J-4 Workload Form_AMD2.docx DOCX document
Attachment J-5 Key Personnel Experience_AMD2.docx DOCX document
Attachment J-3 Project-Contract Experience Form_AMD2.docx DOCX document
RFP N62742-21-R-1801 AMD2.pdf PDF
N6274221R1801_AMD1.pdf PDF
Attachment J-3 Project-Contract Experience Form.docx DOCX document
Attachment J-5 Key Personnel Experience.docx DOCX document
JL.3 and JL.4 Price Model and Summary.xlsx XLSX spreadsheet
Attachment J-6 Key Personnel Assignments.docx DOCX document
Attachment_J-7_PPQ_Form.rtf RTF text file
RFP N62742-21-R-1801.pdf PDF
JL.2 Proposed Distribution of Work.docx DOCX document
JL.1A and JL.1 Burdened Labor Rates.xls XLS spreadsheet
Attachment J-4 Workload Form.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62742-21-R-1801

Amendment 0002

Section F – Deliveries or Performance

SECTION F

DELIVERIES OR PERFORMANCE

TABLE OF CONTENTS

PARA

NO. TITLE

F1 PLACE OF PERFORMANCE

F2 TERM OF CONTRACT

F3 DELIVERY OF DATA (TASK ORDERS)

F4 WORK SCHEDULE

F5 PRE-PERFORMANCE CONFERENCE – CONTRACT TASK ORDER

N62742-21-R-1801

Amendment 0002

F1 PLACE OF PERFORMANCE

The work to be ordered under this contract will be performed at various sites within the Naval Facilities Engineering

Systems Command (NAVFAC) Pacific area of responsibility (AOR) (NAVFAC Hawaii, NAVFAC Marianas, NAVFAC Far East, NAVFAC Northwest, and NAVFAC Southwest). Work may also be added and performed anywhere outside of the NAVFAC Pacific AOR and may include work for other NAVFAC Components, Department of Defense, or federal agencies, as required by the Government. The exact location of the individual efforts will be designated on individual Contract Task Orders (CTOs). This contract may include performance of work on private, county, or state lands that are associated with the areas identified above.

F2 TERM OF CONTRACT

This contract is estimated to be awarded in February 2022 for a base year and seven (7) one-year option periods, under CLIN 0001. The base contract term shall be for a period of 12 months commencing on the date of contract award. The Government has the option to extend the term of the contract in accordance with FAR 52.217-9, Option to Extend the Term of the Contract (MAR 2000). The Government also has the option to extend the services up to an additional six (6) months, in accordance with FAR 52.217-8, Option to Extend Services (NOV 1999), as referenced in Section I. The entire term of the contract is a maximum of $120 million or 102 months, whichever occurs first.

F3 DELIVERY OF DATA (TASK ORDERS)

Data shall be delivered in accordance with the schedules and destinations specified on the individual task orders issued hereunder.

F4 WORK SCHEDULE

The Contractor shall schedule work so as to minimize interference with installation operations. Work schedules shall be subject to the approval of the Contracting Officer or designated representative. Permission to interrupt any installation roads, parking lots/aprons, or utility service shall be requested in writing a minimum of 30 calendar days prior to the desired date of interruption. Certain installations will restrict interruption of utility services as well as general operations. For project sites that are resting places for endangered species, work shall be scheduled to avoid interference with these species and following United States Fish and Wildlife Section 7 consultation guidelines.

CTOs will specify restrictions when applicable, and specify when the work shall commence and be completed.

F5 PRE-PERFORMANCE CONFERENCE – CONTRACT TASK ORDER

If specified on the task order, prior to commencing work, the contractor may be required to meet with the

Contracting Officer and/or designated technical personnel at a mutually agreeable time to discuss and develop mutual understandings concerning scheduling and administering work