About this file

This document contains pricing templates for a solicitation seeking environmental remediation services. The templates provide instructions for offerors to submit pricing for a base year plus up to seven option years for work at various Navy and Marine Corps sites located within and outside the Naval Facilities Engineering Command Pacific area of responsibility. Pricing is to be submitted using standardized labor categories and cost models for the base year, each option year, and an overall summary. The work will involve performing remedial actions at contaminated sites, including those on the Superfund National Priority List and sites involving resource conservation, underground storage tanks, operational small arms firing ranges, and other locations requiring environmental remediation.

View the file

Other files

File Type Posted
N6274221R1801_AMD3.pdf PDF
FRAC QA_AMD3.pdf PDF
Attachment J-6 Key Personnel Assignments_AMD2.docx DOCX document
21-R-1801_SECTION L_AMD2.pdf PDF
21-R-1801_SECTION F_AMD2.pdf PDF
21-R-1801_SECTION J_AMD2.pdf PDF
21-R-1801_SECTION M_AMD2.pdf PDF
21-R-1801 QA AMD2.pdf PDF
21-R-1801_SECTION C_AMD2.pdf PDF
Attachment J-4 Workload Form_AMD2.docx DOCX document
Attachment J-5 Key Personnel Experience_AMD2.docx DOCX document
Attachment J-3 Project-Contract Experience Form_AMD2.docx DOCX document
RFP N62742-21-R-1801 AMD2.pdf PDF
N6274221R1801_AMD1.pdf PDF
Attachment J-3 Project-Contract Experience Form.docx DOCX document
Attachment J-5 Key Personnel Experience.docx DOCX document
Attachment J-6 Key Personnel Assignments.docx DOCX document
Attachment_J-7_PPQ_Form.rtf RTF text file
RFP N62742-21-R-1801.pdf PDF
JL.2 Proposed Distribution of Work.docx DOCX document
JL.1A and JL.1 Burdened Labor Rates.xls XLS spreadsheet
Attachment J-4 Workload Form.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

BASE YEAR PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($)

F

Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1(BURDENED LABOR)24,670$0.00
BASE YEAR
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)0.00%x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)0.00%x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)0.00%x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL BASE YEAR (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

SOLICITATION N62742-21-R-xxxx

ATTACHMENT JL.3

Option Yr 1

OPTION YEAR 1 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1 (BURDENED LABOR)24,670$0.00
OPTION YEAR 1
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 1 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 2

OPTION YEAR 2 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1 (BURDENED LABOR)24,670$0.00
OPTION YEAR 2
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 2 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 3

OPTION YEAR 3 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1 (BURDENED LABOR)24,670$0.00
OPTION YEAR 3
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 3 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 4

OPTION YEAR 4 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1(BURDENED LABOR)24,670$0.00
OPTION YEAR 4
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 4 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 5

OPTION YEAR 5 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1(BURDENED LABOR)24,670$0.00
OPTION YEAR 5
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 5 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 6

OPTION YEAR 6 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1(BURDENED LABOR)24,670$0.00
OPTION YEAR 6
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 6 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Option Yr 7

OPTION YEAR 7 PRICE MODEL WORKSHEET JL.3
LABOR CATEGORIES, RATES AND HOURS- Table 1
Labor Category
ABRate ($/hr)- CDHours ETotal ($) F
Key Personnel - Program Managerx70$0.00
Key Personnel - Project Managerx1,920$0.00
Key Personnel - Quality Assurance Managerx350$0.00
Key Personnel - Health and Safety Managerx830$0.00
Site Supervisorx2,830$0.00
Contract Administration Managerx50$0.00
Senior Scientist/Geologistx830$0.00
Senior Project Engineerx430$0.00
Project Quality Control Managerx280$0.00
Chemistx160$0.00
Project Engineerx330$0.00
Project Scientist/Geologistx330$0.00
Staff Scientist/Geologistx6,575$0.00
Site Health and Safety Specialistx190$0.00
Engineering Technicianx6,575$0.00
Technical Writerx180$0.00
CADD/GIS Operatorx460$0.00
Word Processorx80$0.00
Administrative Assistantx530$0.00
Project Controls Managerx70$0.00
Subcontract Administratorx80$0.00
Cost/Schedule Analystx70$0.00
Senior UXO Supervisor (SUXOS)x50$0.00
UXO Quality Control Specialist (UXO QCS)x50$0.00
UXO Safety Officer (UXO SO)x50$0.00
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix100$0.00
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx100$0.00
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx100$0.00
DBA Equipment Operator, Group 7x120$0.00
DBA Equipment Operator, Group 8x120$0.00
DBA Equipment Operator, Group 9Ax120$0.00
DBA Equipment Operator, Group 10Ax120$0.00
DBA Equipment Operator, Group 11x120$0.00
DBA Truck Driver, Group 13Bx160$0.00
DBA Construction Laborer, Group 2x240$0.00
TOTAL TABLE 1(BURDENED LABOR)24,670$0.00
OPTION YEAR 7
OTHER DIRECT COSTS AND MULTPLIERS - TABLE 2
Other Direct Costs (Equipment, Supplies, Materials, etc.)$237,500.00
Burden (multiplier JL.1)applied to Other Direct Costs (%)x$237,500.00$0.00
Subcontractors$537,500.00
Burden (Multiplier JL.1) applied to Subcontractors (%)x$537,500.00$0.00
Travel$62,500.00
Burden (Multiplier JL.1) applied to travel (%)x$62,500.00$0.00

Total (ODCs, travel and subcontrator cost with burden)

Direct Costs applied to labor base
(e.g. computer services $ per hour)x$0.00
Burden (Multiplier) applied to direct costs added to labor base
Total direct cost applied to labor base with burden

TOTAL TABLE 2 $837,500.00

TOTAL OPTION YEAR 7 (Burdened Labor, "Other Direct Costs," and Subcontractors) $837,500.00

Notes:
1. Offeror shall not add labor categories, make structural changes, or change the hours on this form.
2. The only entries shall be in column "C". No other columns shall be changed, modified or deleted,
with the exception of Column "E" for "Direct Costs applied to labor base". See note 5 below.
3. Offeror shall only utilize listed labor categories and input burdened direct labor hourly ceiling rates from Attachment JL.1.
4. Under "Other Direct Costs and Multipliers,"offerors shall input under column "C" the applicable multipliers for ODCs,
subcontractors and travel from Attachment JL.1 Chart 2.
5. Offerors shall input the "Direct Costs Applied to Labor Base" from Attachment JL.1 Chart 2. The number of
hours listed in Column "E" for "Direct Cost Applied to Labor Base" reflects the total number of hours under Table 1 above.
If the "Direct Cost" is not applied to the total labor base, e.g. applied to only certain labor categories, adjust the number of hours
in Column E to reflect the correct number of hours using the applicable hours from Table 1 above.
If more than one "Direct Cost" (e.g. $3.00/hr. Computer usage and $2.50/hr. health and safety is applicable,
Modify Table 2 as necessary to show these costs.
6. Table 2 does not include any formulas. In addition to hard copies, Offerors shall submit this form in Microsoft Excel
format on a CD showing all calculations (i.e. multiplier application to other direct costs) used to arrive at the total cost.
7. The direct cost amounts presented above are for informational purposes only and not necessarily
representative of actual costs to be incurred on this contract.

Sum Cost Model for Multiple Off

PRICE MODEL SUMMARY SHEET JL.4
THIS FORM TO BE SUBMITTED BY PRIME CONTRACTOR/JV ENTITY ONLY
BASE YEARTotal Price Model Value for Base Year% of work (JL.2)Total Value of Base Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR BASE YEAR$0.00
OPTION YEAR 1Total Price Model Value for First Option Year% of work (JL.2)Total Value of First Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR OPTION YEAR 1$0.00
OPTION YEAR 2Total Price Model Value for Second Option Year% of work (JL.2)Total Value of Second Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR OPTION YEAR 2$0.00
OPTION YEAR 3Total Price Model Value for Third Option Year% of work (JL.2)Total Value of Third Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL OPTION YEAR 3$0.00
OPTION YEAR 4Total Price Model Value for Fourth Option Year% of work (JL.2)Total Value of Fourth Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR OPTION YEAR 4$0.00
OPTION YEAR 5Total Price Model Value for Fifth Option Year% of work (JL.2)Total Value of Fifth Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR OPTION YEAR 5$0.00
OPTION YEAR 6Total Price Model Value for Sixth Option Year% of work (JL.2)Total Value of Sixth Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL OPTION YEAR 6$0.00
OPTION YEAR 7Total Price Model Value for Seventh Option Year% of work (JL.2)Total Value of Seventh Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Key Subcontractor$0.00$0.00
Key Subcontractor$0.00$0.00
100%$0.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV multiplier ceiling mark-up on Key Subcontactors as provided on JL.1$0.00$0.00
TOTAL VALUE OF PRICE MODEL FOR OPTION YEAR 7$0.00

1. For evaluation purposes, the Governmentwill utilize the percentages listed on Attachment JL.2 (Distribution of Work) rodger.jackson: rodger.jackson:

Make sure proper JL is referenced

(this will be performed for the base and each option year) to arrive at a TOTAL PRICE MODEL VALUE (PER YEAR)
2. In the event an offeror utilizes multiple cost centers, the price model will be filled out for each cost center expected to be utilized in the performance of this contract.
For evaluation purposes, the cost center with the highest "Total" price for the price model will be utilized.
3. Key Subcontractor mark-up : If the prime contractor is a JV, the rate for the JV member with the highest ceiling rate mark-up for a Key sub will be used.
In addittion to hard copy, offerors shall submit this form in Microsoft Excel format on CD.
SEE ADDITIONAL INSTRUCTIONS IN SECTION L.
SAMPLE
Total Price Model Value for Base Year% of work (JL.2)Total Value of Base Year based on % of Work
Prime / JV member$490,000.0030%$147,000.00
Prime/JV member$505,000.0025%$126,250.00
Key Subcontractor A$479,000.0020%$95,800.00
Key Subcontractor B$515,000.0025%$128,750.00
100%$497,800.00
Key Sub Total% Mark-upKey Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontactors,i.e. G&A, as provided on JL.5$224,550.007.5%$16,841.25
TOTAL VALUE OF PRICE MODEL FOR BASE YEAR$514,641.25

rodger.jackson: rodger.jackson:

Make sure proper JL is referenced

ATTACHMENT JL.4

File details come from the government source that posted it. Updated .