This document provides questions and answers related to solicitation number N62742-20-R-1303 from the Department of the Navy Naval Facilities Engineering Command. The solicitation is for the construction of two earth covered magazines and a production area at the Royal Australian Air Force Base in Tindal, Australia. The project includes construction of a munitions assembly conveyor shelter and extension of electrical and telecommunication services to the site. The work will comply with Department of Defense antiterrorism and force protection requirements and apply the Building Code of Australia and Manual of Fire Protection. The document addresses questions from offerors regarding site conditions, material requirements, personnel qualifications and provides revisions to specifications in amendments to the solicitation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
Notice No. 3
04 February 2020
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-20-R-1303
FY20 MCAF PAF180300, APSI EARTH COVERED MAGAZINES,
ROYAL AUSTRALIAN AIR FORCE BASE, TINDAL, AUSTRALIA
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
RESPONSES DEFERRED FROM NOTICE NO. 2 DATED 31 JANUARY 2020
12. Please confirm PFAS is not expected to be encountered during excavations and removal
ANSWER: Please refer to Amendment No. 0003, Specification section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS and associated attachments for the results of the site investigation.
18. Specification STRUCTURAL STEEL 05 12 00, Paragraph 2.2.1. The provided specification requires that the structural steel contain a recycled steel content of 80% or more.
Steel manufacturers in the area of RAAF Tindal that can supply the appropriate sizes for the project only meet 20% recycled steel content. Can the Government clarify if the recycled steel content can be changed to meet local standards?
ANSWER: Specification sections 05 12 00 STRUCTURAL STEEL and 05 12 00.13 STRUCTURAL STEEL FOR ECM DOORS are revised to require minimum 20% recycled steel content. See Amendment No. 0007.
21. Please provide requirements for lean concrete, if applicable.
ANSWER: Specification section 32 11 36.13 LEAN CONCRETE will be added to project’s scope of work in Amendment No. 0007.
22. Please provide requirements for conductive concrete, if applicable.
ANSWER: Specifications section 03 30 00 Cast-In-Place concrete has been revised to include requirements for Conductive Concrete and will be added to the project’s Specifications in Amendment No. 0007.
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
23. Please confirm QC Manager position identified in specification section 03 30 00 is not applicable. Contractor should follow QC requirements in 01 45 00.1.5.
ANSWER: Quality Control Manager identified in Specification section 01 45 00.00 20 paragraph 1.5 QUALITY CONTROL, and Concrete Quality Manager identified in Specification section 03 30 00 CAST-IN-PLACE CONCRETE represent two (2) separate positions required to meet contractual requirements. Please provide personnel who satisfy the requirements for the proposed positions as specified.
25. Please confirm Australian Advanced Rigger’s ticket complies with specification
034533.1.4.2 PCI certification (USA) as an equivalent.
ANSWER: The Contractor will be required to provide documentation that proposed alternate certifications for Riggers meets and/or exceeds requirements of PCI certification. A PDF document is attached of PCI certification requirements for their use and information.
NOTICE NO. 3
26. Amendment 0005, Document 00100, Paragraph b. Can the Government please provide a description and details on what is needed in the Factor 4; Management Plan?
ANSWER: Please see Amendment No. 0002.
27. Drawing E-502; Detail C1. Suppliers of the Stainless Steel Segmented Earth Rods only supply 19mm diameter rods. Will the Government allow the use of 19mm Diameter Stainless Steel Earth Rods?
ANSWER: No exceptions taken on use of 19mm Diameter Stainless Steel Earth Rods.
File details come from the government source that posted it. Updated .