N6274220R1303_Notice #1.pdf
PDF 103 KB Posted
- Attached to
- FY20 MCAF PAF180300, APSI EARTH COVERED MAGAZINES, ROYAL AUSTRALIAN AIR FORCE BASE, TINDAL, AUSTRALIA
- Solicitation number
- N62742-20-R-1303
About this file
This document contains a solicitation for construction services. The Naval Facilities Engineering Command, Pacific is seeking offers to construct two Earth Covered Magazines and a Production Area including a Munitions Assembly Conveyor shelter at Royal Australian Air Force Base Tindal in Northern Territory, Australia. The scope of work involves building the magazines and shelter, extending electrical and telecommunication services to the site, and complying with Australian building codes and fire protection requirements. There are also two priced options: one for an additional prefabricated steel shelter, and another for design and installation of security systems and equipment with associated training. Offers are due by the date specified in the solicitation, and the contract will be awarded according to Federal Acquisition Regulation. The successful offeror will then be provided AutoCAD files and perform the construction work at the specified military base in Australia.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
Notice No. 1
22 January 2020
PRE-PROPOSAL QUESTIONS & ANSWERS
RFP N62742-20-R-1303
FY20 MCAF PAF180300, APSI EARTH COVERED MAGAZINES,
ROYAL AUSTRALIAN AIR FORCE BASE, TINDAL, AUSTRALIA
NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.
1. RFP, SF 1442 pg. 3 of 3, CLIN Schedule, OPTION ITEM NO. 1 and Drawings, Sheet CS102, KEYNOTES. Drawing CS102 shows the work to be performed in Site Plan Area 2. The above referenced “OPTION ITEM NO. 1” and the “KEYNOTES” from drawing CS102 describe the option 1 to be the “MAC SHELTER.” Can the Government please verify that “OPTION ITEM NO. 1” is just the “MAC SHELTER” and that all other scope of work in Site Plan Area 2, excluding the “MAC SHELTER”, is included in the base bid? Reference: RFP, SF 1442 pg. 3 of 3, 111757CLIN Schedule, OPTION ITEM NO. 1 and Drawings, Sheet CS102, KEYNOTES
ANSWER: Yes. Option #1 is just the MAC Shelter, and all other scope of work in Site Plan Area 2, EXCLUDING MAC Shelter shall be included in the base bid. To clarify, structural and architectural drawings detail construction with and without the MAC Shelter (Option #1).
2. N6274220R1303_RFP, SF 1442, CLIN SCHEDULE, OPTION ITEM NO. 2 and N62742-20-R-1303_Drawings, Drawings TT101 – T601.00. Is the CC TV System around the construction laydown going to be linked to the Tindal Security system monitored by Wilson Security? Is there a preferred US defense security system? What is the location of the monitoring station? Will it be US personnel or Tindal security monitoring the system?
ANSWER: CCTV system extension is for the permanent installation of security monitoring of the base perimeter due to the fence extension to incorporate the MAC pad. Reference to construction laydown may not be relevant. CCTV will be integrated into the existing monitoring systems present at RAAF Tindal. The existing system is a Honeywell based system, which is monitored by Wilsons Security at the Tindal Gatehouse.
3. Can the Government please provide the wage determination?
ANSWER: The wage determination is not required for the country of Australia.
DEPARTMENT OF THE NAVY
NAVAL FACILITIES ENGINEERING COMMAND, PACIFIC
258 MAKALAPA DR., STE. 100
PEARL HARBOR, HI 96860-3134
4. Could the Government supply AutoCAD drawing files of the project?
ANSWER: AutoCAD files will be provided to the successful offeror after the award of this contract.