ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264927RK002_0003.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- N6264927RK002
About this file
This is a Contractor Price Breakdown template for the USNS YUKON (T-AO 202) Voyage Repair Availability contract solicitation N6264927RK002, scheduled for November 23 through December 13, 2026 in Chinhae, South Korea.
The pricing template is structured to capture labor hours and costs for both prime contractor and subcontractor efforts across multiple work item categories. The template includes ten specific repair and maintenance work items categorized under CAT A (Intent and General Requirements), encompassing project management, gas-free certificates, containment tub drain valve renewal, winch repairs, strainer basket fabrication, galley refrigeration service, material handling equipment inspection and certification, bridge air conditioning troubleshooting and repair, fan and motor reconditioning, and cargo boom guide bumper replacement. The pricing breakdown requires separate line entries for prime contractor labor hours, labor price in U.S. dollars, material price (CFM), subcontractor labor hours, labor price, material price, and other costs as applicable, with a total price column for each work item. The current template shows all fields populated with zero values, indicating this is a blank form awaiting contractor completion. The prime contractor labor rate field is listed at $0.00, requiring offerors to establish their rate. This pricing template must accompany proposals submitted for this firm-fixed-price (FFP) single-award voyage repair availability solicitation issued by NAVSUP Fleet Logistics Center Yokosuka.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USNS YUKON VRA KR | ||||||
| 23 NOV - 13 DEC 2026 | PRIME CONTRACTOR | SUBCONTRACTOR | Prime Labor Rate : | $0.00 | ||
| Work Item No. | Title | Labor hrs. | Labor |
Price US$ Material Price
(CFM)
US$ Labor hrs. Labor Price US$ Material Price
(CFM)
US$ Other (specify in Remarks)
| US$ | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| 1 | Intent and General Requirements | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 13 | Project Management | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 20 | Gas Free Certificates | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 114 | Renew Containment Tub Drain Valves | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 501 | NR2 CT Winch Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 502 | Fabricate CFW and JW Strainer Baskets | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 601 | Galley Refrigeration Service | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 666 | Inspect, Test and Certify Material Handling Equipment - Aerial Work Platform | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 801 | Troubleshoot and Repair Bridge AC | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 808 | Reconditioning Fans and Motors | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 1002 | Cargo Boom Guide Bumper Replacement | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A |
TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00
Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)
N40345-17-R-0038 ATTACHMENT J-5
Sheet2
Sheet3
File details come from the government source that posted it. Updated .