ATTACHMENT_J_2_Contractor_Price_Breakdown_N6264927RK002.xlsx
XLSX spreadsheet 24 KB Posted
- Solicitation number
- N6264927RK002
About this file
This is a Contractor Price Breakdown template for a Voyage Repair Availability project for USNS YUKON (T-AO 202). The file is an Excel spreadsheet formatted to capture detailed pricing information that contractors must complete and submit as part of their proposal response to solicitation N6264927RK002. As a pricing template, it establishes the structure and format requirements for offerors to present their cost estimates but does not itself specify the individual line items, labor rates, material costs, or other pricing details that would be included in an actual proposal submission. Contractors are responsible for populating this template with their specific pricing data in accordance with the repair work specifications outlined in the Statement of Work (MSCOK 27-002) and Attachment J-1 of the RFP.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USNS YUKON VRA KR | ||||||
| 23 NOV - 13 DEC 2026 | PRIME CONTRACTOR | SUBCONTRACTOR | Prime Labor Rate : | $0.00 | ||
| Work Item No. | Title | Labor hrs. | Labor |
Price US$ Material Price
(CFM)
US$ Labor hrs. Labor Price US$ Material Price
(CFM)
US$ Other (specify in Remarks)
| US$ | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| 1 | Intent and General Requirements | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 13 | Project Management | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 20 | Gas Free Certificates | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 110 | Remove Load Test Padeyes in the Engineering Spaces | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 114 | Renew Containment Tub Drain Valves | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 191 | Port Shor Power BHD Insert | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 501 | NR2 CT Winch Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 502 | Fabricate CFW and JW Strainer Baskets | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 509 | CFW Piping Repair | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 601 | Galley Refrigeration Service | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 666 | Inspect, Test and Certify Material Handling Equipment - Aerial Work Platform | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 801 | Troubleshoot and Repair Bridge AC | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 808 | Reconditioning Fans and Motors | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 1002 | Cargo Boom Guide Bumper Replacement | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A |
TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00
Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)
N40345-17-R-0038 ATTACHMENT J-5
Sheet2
Sheet3
File details come from the government source that posted it. Updated .