J_9_QnA_SGA_VR_24Nov2026.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- USNS SACAGAWEA (T-AKE 2) VRA KR
- Solicitation number
- N6264927RK001
About this file
This file is a Questions and Answers (Q&A) document for the USNS SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) solicitation issued by NAVSUP Fleet Logistics Center Yokosuka (FLCY) Site Chinhae under solicitation number N6264927RK001. The Q&A sheet contains 59 numbered questions and corresponding answers submitted by multiple contractors including Hanwha Ocean Co., Ltd., Unithai Shipyard and Engineering Ltd., Seatrium Repair & Upgrades Pte. Ltd., and Mitsubishi Heavy Industries, Ltd., addressing clarifications on work specifications, equipment lists, quantities, drawing numbers, and scope definitions across numerous work items (WIs) related to ship maintenance and repair operations.
Key clarifications provided through the Q&As include: cancellations of WIs 0583, 0407, 0563A, 0565A, and 0554; confirmation that work items 0563B and 0565B should be performed rather than their alternatives; specification of exact quantities for equipment such as overhaul kits (1 per compressor for WI 0521), thermal detectors (169 units for WI 0569), pilot ladders (2 at 30 feet for WI 0659), and separator plates (6 staterooms for WI 0633); clarification that the Period of Performance (POP) is December 15, 2026 to January 6, 2027 and cannot be modified; confirmation that contractor shall procure updated CAT software and laptops for WI 0506; and notification that replacement parts and hoses will be provided via Government-furnished material (GFM) or contract change orders (CCO) as needed. The document reflects three amendments (0001, 0002, 0003) issued between November 13 and November 24, 2026, progressively removing work items and providing additional technical clarifications and references necessary for accurate bidding.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question No. | Contractor | WI No. | Para. No. | Question | Answer | Amendment | |
| 1 | Hanwha Ocean co., Ltd. | 0583 | N/A | The work specification assigns the removal, transportation, reinstallation, and operational testing of the Detector Units to the Requesting Activity, while the filter changeout is assigned to the Performing Activity. | |||
| Please clarify the contractor's specific scope of work under this Work Item, as no contractor responsibilities are explicitly identified in the specification. | WI 583 is cancelled. | 0001 | |||||
| 2 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0407 | 2.2.1 | Can the Government provide the complete GPETE equipment list referenced in Enclosure 2.2.1, including equipment description, manufacturer, model, serial number, and location, as the current enclosure only contains placeholders? | WI 407 is cancelled. | 0001 | |
| 3 | UNITHAI SHIPYARD AND ENGINEERING LTD. | N/A | N/A | Based on the previous experience, WI 0651B – TAKE-CCSI-Annual Lifeboat Davit Inspection is typically performed in conjunction with WI 0651A – TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12). | |||
| Could you please confirm whether WI 0651B has been intentionally excluded from the current scope of work and is not required for this maintenance period? | Lifeboat davits were certified in September. | 0001 | |||||
| 4 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0521 | 3.1.2&3.3 | Section 3.1.2 specifies a quantity of two (2) High Pressure Air Compressors, whereas Section 3.3 (Bill of Materials) lists only one (1) Overhauling Kit. | |||
| Could you please clarify whether the required quantity of Overhauling Kits should be two (2), one for each compressor? | THIS WILL require a second rebuild kit as well | 0001 | |||||
| 5 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0506 | 7.6 | Section 7.6 requires eight (8) hours of onsite technical training using the vessel's CAT laptop and software. |
Based on our subcontractor's experience during previous maintenance, the CAT laptop and software currently available onboard are outdated, making it difficult to conduct effective training using the latest CAT Electronic Technician (ET) software.
Could you please confirm whether the vessel currently has an updated CAT laptop and ET software available for training?
| If not, please advise whether the vessel intends to procure the updated equipment and software prior to the commencement of the maintenance period. | Request to have Contractor to procure the updated laptop and software. | 0001 | ||
| 6 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0154 | Please clarify the location of tanks: |
para 3.1: Four (4) Salt water ballast tanks 6-45-1,6-45-2,6-54-1,6-54-2
| Enclosure 2.2.2: Cargo Potable Water Tank 3-79-2, Cargo Potable Water Tank 3-80.5-2 | We are doing all six (6) tanks. | 0001 | ||
| 7 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0503 | Please see the response from Appleton OEM: |
I will need to review our schedule but it is unlikely we can support this short POP (15.Dec.2026 - 06.Jan.2027).
Please provide alternate range of dates for our consideration / planning.
Thank you.
Regards,
| Appleton Marine, Inc. | We cannot change the dates. | 0001 | ||||
| 8 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0563A & 0563B | Please clarify what Work Item we should bid for between 563A or 563B. | Perform WI 563B | 0001 | |
| 9 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0565A & 0565B | Please clarify what Work Item we should bid for between 565A or 565B. | Perform WI 563B | 0001 | |
| 10 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0565B | From the last SGA V/R package in August, the work item requested to perform a hydro test and internal visual examination of all cylinders. |
However, Para 7.5 requests to conduct a hydrostatic test of 10% of the cylinders again.
| Would it be acceptable to conduct a hydro test through CFR? | Perform the requirement as stated in the WI. Inspection and Hydro test is a must. | 0001 | |||||
| 11 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0655 | Please provide a previous inspection/service report. | Report provided | 0001 | ||
| 12 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0656 | Please provide a previous inspection/service report. | Survetic Korea completed the last certification. If they reach out to them at the same time, waiting response from the ship. | 0001 | ||
| 13 | Seatrium Repair & Upgrades Pte. Ltd. | 0561A | Please provide a list on para 2.3 and 2.4, and the quantity of Para 3.3. | Calibration list attached. | 0001 | ||
| 14 | Seatrium Repair & Upgrades Pte. Ltd. | 0633 | For bidding purposes, please provide pictures of separator plates in a bad condition. | See attached. | 0001 | ||
| 15 | Seatrium Repair & Upgrades Pte. Ltd. | 0525 | 7.4 | Please get some clarification on the compressor that needs to be worked on for the WI525 – In the beginning the York Marine AB VSB 151 L is called out. However, in section 7 (note after 7.4) a HP air compressor is being called out. |
And what is the required scope: replacement only, or replacement and overhaul?
| The same note states that MSC will arrange for refurbishment, so please confirm whether the overhaul/refurbishment is outside the contractor's scope. | WI was revised, HP air was deleted. | 0001 | |||||
| 16 | Seatrium Repair & Upgrades Pte. Ltd. | 0173 | Due to environmental concerns, we would like to propose to do power tooling only for surface preparation. Please confirm if this is acceptable. | As long as it meets the SSPC-SP1 guidance. | 0001 | ||
| 17 | Mitsubishi Heavy Industries, Ltd. | 0301 | 2.1.3 | Reqiured PARA 2.1.3 ECDIS POWER MODIFICATION Drawing – 420-8938678 | Incorrect drawing number 8938678 incorporated. Correct Drawing 8939678 provided. | 0002 | |
| 18 | Mitsubishi Heavy Industries, Ltd. | 0525 | Will this work item in the current VR cover only the compressor replacement, or should the compressor overhaul also be included in the scope of work? | Only compressor replacement. | 0001 | ||
| 19 | Mitsubishi Heavy Industries, Ltd. | 0802A | For bidding purposes, please provide picture of nameplate for AC Plant Compresser. | Pictures provided. | 0002 | ||
| 20 | Mitsubishi Heavy Industries, Ltd. | 0503 | Is there any other authorized source for this work? In case of unavailability of OEM due to schedule conflicts. Keep contacting OEM to adjust the schedule. | Any crane servicing company can demonstrate for ABS. | 0002 | ||
| 21 | Mitsubishi Heavy Industries, Ltd. | 0521 | OEM replied the 2EA OEM kits with 12-16 weeks lead time. Is this LLTM acceptable? or can be provided as GFM? | Checked with the ship but we do not have the parts on board. We cannot get them GFM in time for this avail. | 0003 | ||
| 22 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0633 | 3.3&7.1&7.2 | Para 3.3 states that approx. 6 separator plates (4" high x 36" wide, stainless steel) are to be resealed/renewed. Para 7.2 states to clean, strip, refurbish (if necessary) and re-seal the separator plates in approx. 130 staterooms. Para 7.1 calls for replacement of deck tile and underlayment, with no quantity or location given. |
Please clarify the following:
- Is the work required for all approx. 130 staterooms, or only for approx. 6 of them? If all 130, please state how many plates are to be renewed (replaced) and how many are only resealed.
| - If deck tile and underlayment replacement (Para 7.1) is required, please provide the area (square feet or square meter) for quotation purposes. | This is for 6 ea stateroom. | 0002 | ||
| 23 | UNITHAI SHIPYARD AND ENGINEERING LTD. | 0651B | TAKE-CCSI-Annual Lifeboat Davit Inspection is typically performed in conjunction with WI 0651A – TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12). |
Could you please confirm whether WI 0651B has been intentionally excluded from the current scope of work and is not required for this maintenance period?
OEM FASSMER has requested a verification for WI651B LB davits.
FASSMER comments : Please see the attached certificates, all equipment, including the lifeboat davits (WI 651B) was certified in February 2026 not September.
Kindly ask MSC to provide the certificates for September 2026.
| In our opinion, all equipment should be certified at the same time (as a system) so all dates align. | Lastest Lifeboat davit inspection report attached. | 0003 | ||
| 24 | 0802A | Please verify the current model number of the AC compressor. |
The work item states Model number of SGC 2817 but based on OEM's history it was recorded as S89.
Different CFM might be required based on a different model.
| Please provide the nameplate of the current AC compressor required for overhaul maintenance. | Pictures provided. | 0002 | |||||
| 25 | 0158 | 3.1.2 | the port bridge wing sliding door as damaged. The instruction in PARA 7.4 to “adjust and correct as needed” is too broad to determine the parts required for pricing. | ||||
| For quotation purposes, please identify the components on the damaged port door that require replacement and specify the quantity of each to be included in the bid. | That is unknown until it is removed and inspected | 0003 | |||||
| 26 | 0173 | The Abstract specifies approximately 20,000 sq. ft. of surface preparation and coating, while Section 3.1.2 specifies only 2,000 sq. ft. Please confirm the correct total surface area and provide the required quantities for bidding purposes. | plan on 2000 sq ft on a weather deck where it is needed, no vertical or elavated surfaces. | 0003 | |||
| 27 | 0205 | 7.2.4 | PARA 7.2.4 requires the DAU power supply modules to be inspected and replaced as needed. Please confirm whether the base bid may cover inspection of the modules and whether the supply and replacement of any modules found defective during inspection may be separately quoted and performed under an approved Contract Change Order (CCO) following submission of a Condition Found Report (CFR). | any replacements would be done on a CCO | 0003 | ||
| 28 | 0450 | 3.2 | PARA 3.2 does not provide the manufacturer, model numbers, or quantities for the Master's Office ECDIS Workstation, Route Planning PC Workstation, and Conning Information Display. | attachment | 0003 | ||
| 29 | 0453 | 3.2 | Please provide the model numbers and quantities for each type of Gyro Repeater for accurate quotation. | 2 | 0003 | ||
| 30 | 0454 | Encl 2.2 | Please provide the signal types and quantities of the bridge alarms connected to the VDR | attachment | 0003 | ||
| 31 | 0455 | 3.2 | Please review and revise the entire equipment list in Section 3.2 to provide accurate model numbers, descriptions, and quantities for bidding purposes. | attachment | 0003 | ||
| 32 | 0456 | 3.2 | Please review and provide the correct equipment information, including manufacturer, model number, and quantity, in Section 3.2 for bidding purposes. | 2 ea Northrup Grumman 74807 and 1 ea spare bowl MV103DG | 0003 | ||
| 33 | 0460 | 2.1/3.1/4.2 | PARA 2.1 |
Please provide References 2.1, including the correct drawing number for Reference 2.1.
PARA 3.1
Please confirm whether the locations indicated as "Various throughout the vessel" can be identified during the Ship Check.
PARA 4 .2
| Please clarify the GFM information, including part numbers, descriptions, quantities, and units of measure, for bidding purposes. | yes these locations can be verified with the Chief engineer uponm ship check GFM clarification there will be two loudspeakers and 5 bells for replacement | 0003 | |||||
| 34 | 0503 | 5.2-5.7 | Please confirm whether Sections 5.2 through 5.7 apply to USNS SACAGAWEA (T-AKE 2), as they reference other vessels and outdated schedules. | this is only for the USNS Sacagawea T-AKE 2 and for the POP of this VR Dec 15, 2026- Jan 52027 | 0003 | ||
| 35 | 0506 | 2.2/3.2/5.2 | PARA 2.2 |
Please provide Reference 2.2 (MSC Drawing No. 079-8382992) for bidding purposes.
PARA 3.2
Please provide the serial number of the Caterpillar Model 3516B Emergency Diesel Generator.
PARA 5.2
| Please clarify the Work Item number indicated as “XXX” in PARA 5.2 | Caterpillar Model 3616B, High Displacement Marine Auxiliary Engine, 16-cylinder 60 Vee 16, electronic fuel injectors, 900-1800 rpm. XXX work item number is to be disregaurded there is no other associated WI | 0003 | |||
| 36 | 0512A | 2.1.1 | Please provide Reference 2.1.1 (ISO/IEC 17025:2017) for bidding purposes. | ||
| 37 | 0521 | 3.1.2 / 3.3 | Section 3.1.2 specifies two (2) high-pressure air compressors, while Section 3.3 lists only one (1) overhaul kit (P/N 085823). |
| Please confirm whether two (2) overhaul kits are required, one (1) for each compressor. | 1 over haul kit per compressor is required. | 0003 | ||
| 38 | 39 | 0525 | PARA 4.1.1 / 4.2 |
Please clarify the GFE and GFM information in PARA 4.1.1 and 4.2, including part number, quantities for bidding purpose.
PARA 7.4 / 7.12.1
| Please confirm whether shop refurbishment is excluded from this Work Item, as PARA 7.4 specifies a separate contract. | Spare XJF151L Compressor and the #1 item on the list for oil Stal/Sabroe K Oil, CPI Solest 180 (per compressor) | 0003 | ||
| 39 | 0554 | Our company inspected, tested, and certified more than thirty (30) cranes and hoists aboard the vessel during the previous availability in August 2026, including the four (4) units listed in Enclosure 2.2.1. |
Since these four (4) units have already undergone inspection, testing, and certification, please clarify why the same work is being required again under this Work Item.
| If the certifications issued in August 2026 remain valid, please confirm whether repeated inspection, testing, and certification are necessary and provide the specific reason for this requirement. | This Work Item is to be deleted | 0003 | ||||
| 40 | 0561A | Please provide Reference 2.3 and 2.4 and confirm the quantities in PARA 3.1 for bidding purpose. | Calibration list attached. | 0003 | ||
| 41 | 0562 | Please clarify the following items for quotation purposes: |
1. SCBA and Cylinder Quantities (Sections 3.1.3 and 3.2)
Please confirm the total quantities of SCBA outfits and cylinders and provide the completed Enclosures 2.2.1 and 2.2.2.
2. CBRN Component Replacement (Sections 7.5.4 and 7.5.5)
Please specify the estimated quantities of CBRN breathing valves and nose cones requiring replacement.
3. Cylinder Hydrostatic Testing (Section 7.8.2)
| Please confirm the estimated number of cylinders requiring hydrostatic testing. | 1 see attachment, 2 estimate 15%, 3 these are interspiro not scott | 0003 | ||
| 42 | 0563B | 1. Pressure Relief Valves (Section 7.3.7) |
Section 7.3.7 requires replacement of "XX pressure relief valves."
Please confirm the quantity and specifications of the pressure relief valves to be replaced.
2. Annual and Two-Year Maintenance (Section 7.4)
Section 7.4 requires annual and two-year maintenance, while Section 7.4.4 only specifies verification of the expiration dates of purification cartridges and filters.
Please clarify whether replacement of the purification cartridges and filters is included in the scope of work.
3. Reference Document (Section 2.2)
Reference 2.2 lists the document number as "XXX-XX-XXX-XXXX."
Please provide the correct reference document number and applicable breathing air quality standards for testing under Sections 7.5.2 and 7.6.
4. Compressor Operating Hours (Section 3.1.2)
Section 3.1.2 indicates the current compressor operating hours as "XXX."
| Please provide the actual operating hours to determine the applicable maintenance requirements. | estimate ror 5 ea Pressure relief valves, we will only be doin the 563B item not the 563A | 0003 | ||
| 43 | 0565B | 1. FM-200 Cylinder Capacity (Para. 3.1.1.c.17 and c.22) |
Please confirm the capacities of the eight (8) FM-200 cylinders for which capacities are not specified.
2. CO₂ Cylinder Quantity and Capacity (Paras. 3.1.1.d and 7.8.2) Para. 7.8.2 requires cylinder inspection, weighing, refilling, and hydrostatic testing.
| Please provide the quantities and capacities of the CO₂ cylinders associated with the seven (7) hose reels for cost estimation purposes. | Stair Tower (3-20-2): One Hose Reel,Main Machinery Room (5-66-0): One Hose Reel, Propulsion Motor Eqpt Rm No. 1 (3-75-1): One Hose Reel,Propulsion Motor Eqpt Rm No. 2 (3-75-2): One Hose Reel,Shaft Alley (5-79-0): One Hose Reel,Main Machinery Rm (5-66-0): Two Hose Reels | 0003 | ||||
| 44 | 0569 | Please confirm the quantity of thermal detectors sepcified in Paragraph 3.1.2(b). | One hundred sixty-nine (169) heat detectors | 0003 | ||
| 45 | 0570 | Paragraph 7.4.1 requires the contractor to include internal examination, hydrostatic testing, and recharging in the estimate; however, the extinguisher types and quantities are indicated as "XXX." |
| Please provide the extinguisher types and quantities to be included in the estimate. | 20% of extinguishers | 0003 | ||
| 46 | 0571 | Reference: Paragraphs 3.1.2 and 7.1, Enclosure 2.2.1 |
Paragraph 3.1.2 provides quantities based on USNS CESAR CHAVEZ, while Enclosure 2.2.1 does not contain the actual fire and smoke damper list for this vessel.
| Please provide the complete Fire and Smoke Damper List, including equipment locations, quantities, and operating types, to establish the scope of work for accurate quotation. | attachment | 0003 | ||
| 47 | 0572 | 1. Enclosure 2.2.3 is identified as a Service Record to be filled out/provided by PPE. However, the enclosure contains only a blank form without any equipment or maintenance history. |
Please provide the latest Service Record, including cylinder quantities, capacities, and previous inspection, hydrostatic testing, and recharge dates, to determine the required scope of work(7.7, 7.8 and 7.12.3)
2. Section 3.1.1 lists six locations, including four with unspecified location codes, while Section 3.1.2 identifies two deep fat fryers, two grills, and two range hoods.
Please confirm the actual equipment locations and quantities, including the number of fire extinguishing systems to be serviced aboard USNS SACAGAWEA (T-AKE 2).
3. Section 7.6.7 requires calibration of "XX Detroit switches" associated with each range hood.
| Please confirm the total number of Detroit switches requiring calibration under this work item. | they don’t need my lastest service history , see attachmant for the equipment list, there are 2 ea detroit switches | 0003 | ||
| 48 | 0573 | Section 4.0 states that no Government Furnished Material is provided, while Para. 7.7 requires defective hoses to be replaced with new ship's spares. |
| Please confirm whether replacement fire hoses will be provided from the ship's existing spares and who will be responsible for supplying additional hoses if sufficient spares are unavailable. | ship will purchase any needed hoses via CCO or credit card. | 0003 | ||
| 49 | 0574A | Section 3.1.2 specifies four (4) sliding watertight/firetight doors, while Sections 7.1, 7.4, 7.5, and 7.6 require work on the fire doors and shutters listed in Enclosure 2.2.1. |
However, Enclosure 2.2.1 contains numerous entries with unspecified door types and operating mechanisms.
Please confirm the actual equipment and quantities included in the scope of work and provide an updated Enclosure 2.2.1 identifying the applicable doors and shutters.
50 0574B Section 3.1.2(a) specifies 254 hinged fire doors. However, Enclosure 2.2.1 does not provide complete door type and operating mechanism information.
Please provide the complete and updated Enclosure 2.2.1 (Joiner Door List) for USNS SACAGAWEA.
| 51 | 0633 | PARA 3.3 / 7.2 | ||
| Please confirm whether the work is limited to six (6) separator plates or applies to all 130 staterooms. | this is for 6 staterooms only | 0003 | ||
| 52 | 0656 | Enclosure 2.2.1 | ||
| Please clarify the missing serial numbers, years of manufacture, and last service dates indicated as "XXX" and "XXXX" in Enclosure 2.2.1. | see attachment | 0003 | ||
| 53 | 0659 | PARA 3.2.1 / 3.2.2 | ||
| Please clarify the ladder lengths indicated as “XX ft” | Pilot Ladder - Two - 30 ft Embarkation Ladders – Six - 50 ft | 0003 | ||
| 54 | 0802A | PARA 3.1.2 / 7.1 / 7.4 |
Please provide the quantity of AC compressors and the applicable AC Plant number(s) for bidding purposes.
PARA 3.3
Please confirm the quantities of the CFM listed
PARA 4.2
| Please clarify the GFM quantities and specifications in PARA 4.2 | 1 A/C Compressor need to be rebuilt. There is no CFMGFM quantities to support rebuild of 1 EA compressor. | 0003 | ||
| 55 | 0823 | Please provide Reference 2.1 (MSC Drawing 514-8386970) and the pipe schedules for the 2-inch and 3-inch chilled water piping. | ||
| 56 | 1058 | PARA 3.2.1 |
Please provide the model number indicated as “XXXXX”
PARA 7.2.3
Please confirm the number of days indicated as "XX Days"
PARA 7.5.8
| Please clarify the quantity indicated as “XX (X)” | 3.2.1 there is no model number feedback for item has been submitted/ 7.2.3 5 days/ 2ea handrakes need to be fitted | 0003 | ||
| 57 | 1059 | PARA 7.3.3 | ||
| Please confirm the number of days indicated as "XX Days" in Section 7.3.3. | 2 days | 0003 | ||
| 58 | 1077 | PARA 2.1 |
Please provide Reference 2.1 for bidding purpose.
PARA 3.1.2 / 4.2.2
Please confirm whether the GFM quantities in PARA 4.2.2 are sufficient for the seven (7) motors specified in PARA 3.1.2.
PARA 3.2.1
Please clarify the equipment description in PARA 3.2.1, as detailed information is missing. PARA 2.1
PARA 3.1.2 / 4.2.2
It is only 5 replenishment motors (Station 1 has 2, Station 3 has 1 and Station 5 has 2). Yes, the GFM is enough to complete the 5 motors listed in the spec.
PARA 3.2.1
Station 1: Highline and Hauling Winch Motors Station 3: Spanwire Motor
| Station 5: Highline and Hauling Winch Motors | 0003 | ||
| 59 | 0651B | Fassmer’s records indicate that the last annual lifeboat davit inspection was completed in February 2026. (see attached cert) The September 2026 repair under WI 0603 was limited to sheave pin replacement on lifeboat davits Nos. 2 and 4. |
Please confirm whether the annual lifeboat davit inspection is due during this availability. If confirmed, please issue an amendment adding WI 0651B, Annual Lifeboat Davit Inspection, with the USNS Sacagawea scope for bid pricing. yes this needs to be inspected. 0003
File details come from the government source that posted it. Updated .