J_8_QASP Quality Assurance Surveillance Plan_FY27.pdf

PDF 115 KB Posted

Attached to
USNS SACAGAWEA (T-AKE 2) VRA KR
Solicitation number
N6264927RK001
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) for the USNS SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) contract, scheduled for December 15, 2026 through January 6, 2027. The QASP establishes the Government's systematic method for monitoring and evaluating contractor performance against requirements specified in the Performance Work Statement (PWS), ensuring services are delivered in a timely, accurate, and complete manner.

The plan measures contractor performance across four key elements: (1) Contractor Quality Assurance Plan and Process Control Procedures, requiring 100% compliance with QC activities, inspections, and corrective actions as inspected by the Principal Port Engineer (PPE)/Port Engineer (PE); (2) Contract Deliverables, with 100% inspection of all deliverables and an acceptable quality level of greater than 95% submitted timely without rework required; (3) Schedule adherence against original due dates and milestones; and (4) Past Performance, assessed per FAR 42.15 regarding conformance to contract requirements, workmanship standards, schedule adherence, and customer satisfaction. Surveillance methods include random or planned sampling, inspections, and validated customer complaints conducted at specified frequencies. The PPE/PE provides a final Contractor Performance Assessment Report (CPARS or annual report) at project completion. Performance below acceptable levels may result in Contract Discrepancy Reports (CDRs) requiring written responses within five days, potential contract termination, and loss of future Government contracts. The contractor is incentivized to maintain quality performance as the Government may require replacement or correction of deficient work at no additional cost.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

Purpose: To ensure that the Government has an effective and systematic method of surveillance for monitoring and evaluating the contractor's performance for each of the objectives listed in the Performance Work Statement (PWS).

The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.

1. Critical performance processes and requirements. To provide a quality surveillance strategy for the USNS

SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) from 15 Dec 2026 – 6 Jan 2027. The primary intent of the plan is to provide a basis of the Principal Port Engineer (PPE) / Port Engineer (PE) evaluation of performance quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the PPE/PE and Contracting Officer a productive mechanism to preclude major deficiencies in performance, provide input for annual contractor past performance evaluations.

2. Performance Standards

a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract.

b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance - In addition to any schedule and deliverables of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship. Additionally, the Government will assess the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, inspections and validated customer complaints.

4. Performance Measurement: Performance of the contractor’s performance will be measured utilizing the

Performance Requirements Summary (PRS) below.

Performance Requirements Summary

Performance

Element

Performance

Requirement

Surveillance

Method Frequency

Acceptable

Quality Level

Contractor Quality

Assurance Plan and Process

Control

Procedures

QC activities, inspections, and corrective actions completed as required by the plan.

Inspection by the

PPE/PE

As required for corrective actions

100%

Compliance with the contractor plan

Performance

Element

Performance

Objective

Surveillance

Method Frequency

Acceptable

Quality Level

Contract

Deliverables

Contract deliverables furnished as prescribed in the PWS, Work Item attachments, CDRLs, etc., as applicable.

Inspection by the

PPE/PE

100% inspection of all contract deliverables.

>95% of deliverables submitted timely and without rework required.

Overall Contract

Performance

Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the

PPE/PE’s final report on Contractor

Performance

Assessment by the

PPE/PE

Project Completion

All performance elements rated

Satisfactory (or higher)

Note:If performance is within acceptable levels, it will be considered to be satisfactory.If not, overall performance may be considered unsatisfactory.

5. Incentives/Disincentives:

The PPE/PE makes a final evaluation report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the PPE/PE’s final report, may result in termination of the contract and may also result in the loss of future Government contracts.

For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report

(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.

In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.