J_8_QASP Quality Assurance Surveillance Plan_FY27.pdf
PDF 115 KB Posted
- Attached to
- USNS SACAGAWEA (T-AKE 2) VRA KR
- Solicitation number
- N6264927RK001
About this file
This is a Quality Assurance Surveillance Plan (QASP) for the USNS SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) contract, scheduled for December 15, 2026 through January 6, 2027. The QASP establishes the Government's systematic method for monitoring and evaluating contractor performance against requirements specified in the Performance Work Statement (PWS), ensuring services are delivered in a timely, accurate, and complete manner.
The plan measures contractor performance across four key elements: (1) Contractor Quality Assurance Plan and Process Control Procedures, requiring 100% compliance with QC activities, inspections, and corrective actions as inspected by the Principal Port Engineer (PPE)/Port Engineer (PE); (2) Contract Deliverables, with 100% inspection of all deliverables and an acceptable quality level of greater than 95% submitted timely without rework required; (3) Schedule adherence against original due dates and milestones; and (4) Past Performance, assessed per FAR 42.15 regarding conformance to contract requirements, workmanship standards, schedule adherence, and customer satisfaction. Surveillance methods include random or planned sampling, inspections, and validated customer complaints conducted at specified frequencies. The PPE/PE provides a final Contractor Performance Assessment Report (CPARS or annual report) at project completion. Performance below acceptable levels may result in Contract Discrepancy Reports (CDRs) requiring written responses within five days, potential contract termination, and loss of future Government contracts. The contractor is incentivized to maintain quality performance as the Government may require replacement or correction of deficient work at no additional cost.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J_3_Contractor_Price_Breakdown_N6264927RK001.xlsx | XLSX spreadsheet | |
| J_2_List of GFP and Estimated Value_SAC_VRA_KR.xlsx | XLSX spreadsheet | |
| J_1_Work_Spec_MSCOK 27-001_N6264927RK001.pdf | ||
| J_6_IRS_FORM_W_14_N6264927RK001.pdf | ||
| Solicitation - N6264927RK001.pdf | ||
| J_7_Contract Administration Plan (CAP).pdf | ||
| J_4_Contractor_Data_Sheet_N6264927RK001.pdf | ||
| J_5_Request for Clarification_N6264927RK001.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose: To ensure that the Government has an effective and systematic method of surveillance for monitoring and evaluating the contractor's performance for each of the objectives listed in the Performance Work Statement (PWS).
The Quality Assurance Surveillance Plan (QASP) will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. To provide a quality surveillance strategy for the USNS
SACAGAWEA (T-AKE 2) Voyage Repair Availability (VRA) from 15 Dec 2026 – 6 Jan 2027. The primary intent of the plan is to provide a basis of the Principal Port Engineer (PPE) / Port Engineer (PE) evaluation of performance quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the PPE/PE and Contracting Officer a productive mechanism to preclude major deficiencies in performance, provide input for annual contractor past performance evaluations.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract.
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance - In addition to any schedule and deliverables of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship. Additionally, the Government will assess the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, inspections and validated customer complaints.
4. Performance Measurement: Performance of the contractor’s performance will be measured utilizing the
Performance Requirements Summary (PRS) below.
Performance Requirements Summary
Performance
Element
Performance
Requirement
Surveillance
Method Frequency
Acceptable
Quality Level
Contractor Quality
Assurance Plan and Process
Control
Procedures
QC activities, inspections, and corrective actions completed as required by the plan.
Inspection by the
PPE/PE
As required for corrective actions
100%
Compliance with the contractor plan
Performance
Element
Performance
Objective
Surveillance
Method Frequency
Acceptable
Quality Level
Contract
Deliverables
Contract deliverables furnished as prescribed in the PWS, Work Item attachments, CDRLs, etc., as applicable.
Inspection by the
PPE/PE
100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the
PPE/PE’s final report on Contractor
Performance
Assessment by the
PPE/PE
Project Completion
All performance elements rated
Satisfactory (or higher)
Note:If performance is within acceptable levels, it will be considered to be satisfactory.If not, overall performance may be considered unsatisfactory.
5. Incentives/Disincentives:
The PPE/PE makes a final evaluation report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract, reflected in the PPE/PE’s final report, may result in termination of the contract and may also result in the loss of future Government contracts.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements.