J_9_QnA_SGA_VR_12Nov2026.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
USNS SACAGAWEA (T-AKE 2) VRA KR
Solicitation number
N6264927RK001
Issued by

About this file

This file is a Questions and Answers (Q&A) document from Amendment 1 of a federal solicitation for voyage repair availability services on USNS SACAGAWEA (T-AKE 2).

The Q&A sheet contains 21 substantive question-and-answer entries submitted by contractors (Hanwha Ocean Co., Ltd., Unithai Shipyard and Engineering Ltd., Seatrium Repair & Upgrades Pte. Ltd., and Mitsubishi Heavy Industries, Ltd.) regarding Work Item specifications and requirements. Key clarifications provided include: WI 583 and WI 407 are cancelled; WI 0651B (Lifeboat Davit Inspection) is not required as davits were certified in September; two overhauling kits are required for two High Pressure Air Compressors under WI 0521; the contractor must procure updated CAT laptop and software for training under WI 0506; all six tanks (not four) must be serviced under WI 0154; performance dates cannot be changed (15 December 2026 to 6 January 2027); contractors should bid on WI 563B and WI 565B only; hydrostatic testing and internal visual examination of all cylinders is mandatory under WI 0565B; WI 0525 revised to include only compressor replacement without overhaul; and surface preparation under WI 0173 must meet SSPC-SP1 guidance if using power tooling. Multiple work items requiring inspection reports, calibration lists, and technical documentation were addressed, with some responses indicating that supporting materials were provided or would be obtained from previous service providers and original equipment manufacturers.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question No.ContractorWI No.Para. No.QuestionAnswerAmendment
1Hanwha Ocean co., Ltd.0583N/AThe work specification assigns the removal, transportation, reinstallation, and operational testing of the Detector Units to the Requesting Activity, while the filter changeout is assigned to the Performing Activity.
Please clarify the contractor's specific scope of work under this Work Item, as no contractor responsibilities are explicitly identified in the specification.WI 583 is cancelled.0001
2UNITHAI SHIPYARD AND ENGINEERING LTD.04072.2.1Can the Government provide the complete GPETE equipment list referenced in Enclosure 2.2.1, including equipment description, manufacturer, model, serial number, and location, as the current enclosure only contains placeholders?WI 407 is cancelled.0001
3UNITHAI SHIPYARD AND ENGINEERING LTD.N/AN/ABased on the previous experience, WI 0651B – TAKE-CCSI-Annual Lifeboat Davit Inspection is typically performed in conjunction with WI 0651A – TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12).
Could you please confirm whether WI 0651B has been intentionally excluded from the current scope of work and is not required for this maintenance period?Lifeboat davits were certified in September.0001
4UNITHAI SHIPYARD AND ENGINEERING LTD.05213.1.2&3.3Section 3.1.2 specifies a quantity of two (2) High Pressure Air Compressors, whereas Section 3.3 (Bill of Materials) lists only one (1) Overhauling Kit.
Could you please clarify whether the required quantity of Overhauling Kits should be two (2), one for each compressor?THIS WILL require a second rebuild kit as well0001
5UNITHAI SHIPYARD AND ENGINEERING LTD.05067.6Section 7.6 requires eight (8) hours of onsite technical training using the vessel's CAT laptop and software.

Based on our subcontractor's experience during previous maintenance, the CAT laptop and software currently available onboard are outdated, making it difficult to conduct effective training using the latest CAT Electronic Technician (ET) software.

Could you please confirm whether the vessel currently has an updated CAT laptop and ET software available for training?

If not, please advise whether the vessel intends to procure the updated equipment and software prior to the commencement of the maintenance period.Request to have Contractor to procure the updated laptop and software.0001
6UNITHAI SHIPYARD AND ENGINEERING LTD.0154Please clarify the location of tanks:

para 3.1: Four (4) Salt water ballast tanks 6-45-1,6-45-2,6-54-1,6-54-2

Enclosure 2.2.2: Cargo Potable Water Tank 3-79-2, Cargo Potable Water Tank 3-80.5-2We are doing all six (6) tanks.0001
7UNITHAI SHIPYARD AND ENGINEERING LTD.0503Please see the response from Appleton OEM:

I will need to review our schedule but it is unlikely we can support this short POP (15.Dec.2026 - 06.Jan.2027).

Please provide alternate range of dates for our consideration / planning.

Thank you.

Regards,

Appleton Marine, Inc.We cannot change the dates.0001
8UNITHAI SHIPYARD AND ENGINEERING LTD.0563A & 0563BPlease clarify what Work Item we should bid for between 563A or 563B.Perform WI 563B0001
9UNITHAI SHIPYARD AND ENGINEERING LTD.0565A & 0565BPlease clarify what Work Item we should bid for between 565A or 565B.Perform WI 563B0001
10UNITHAI SHIPYARD AND ENGINEERING LTD.0565BFrom the last SGA V/R package in August, the work item requested to perform a hydro test and internal visual examination of all cylinders.

However, Para 7.5 requests to conduct a hydrostatic test of 10% of the cylinders again.

Would it be acceptable to conduct a hydro test through CFR?Perform the requirement as stated in the WI. Inspection and Hydro test is a must.0001
11UNITHAI SHIPYARD AND ENGINEERING LTD.0655Please provide a previous inspection/service report.Report provided0001
12UNITHAI SHIPYARD AND ENGINEERING LTD.0656Please provide a previous inspection/service report.Survetic Korea completed the last certification. If they reach out to them at the same time, waiting response from the ship.0001
13Seatrium Repair & Upgrades Pte. Ltd.0561APlease provide a list on para 2.3 and 2.4, and the quantity of Para 3.3.Calibration list attached.0001
14Seatrium Repair & Upgrades Pte. Ltd.0633For bidding purposes, please provide pictures of separator plates in a bad condition.See attached.0001
15Seatrium Repair & Upgrades Pte. Ltd.05257.4Please get some clarification on the compressor that needs to be worked on for the WI525 – In the beginning the York Marine AB VSB 151 L is called out. However, in section 7 (note after 7.4) a HP air compressor is being called out.

And what is the required scope: replacement only, or replacement and overhaul?

The same note states that MSC will arrange for refurbishment, so please confirm whether the overhaul/refurbishment is outside the contractor's scope.WI was revised, HP air was deleted.0001
16Seatrium Repair & Upgrades Pte. Ltd.0173Due to environmental concerns, we would like to propose to do power tooling only for surface preparation. Please confirm if this is acceptable.As long as it meets the SSPC-SP1 guidance.0001
17Mitsubishi Heavy Industries, Ltd.03012.1.3Reqiured PARA 2.1.3 ECDIS POWER MODIFICATION Drawing – 420-8938678
18Mitsubishi Heavy Industries, Ltd.0525Will this work item in the current VR cover only the compressor replacement, or should the compressor overhaul also be included in the scope of work?Only compressor replacement.0001
19Mitsubishi Heavy Industries, Ltd.
20Mitsubishi Heavy Industries, Ltd.
21Mitsubishi Heavy Industries, Ltd.
22UNITHAI SHIPYARD AND ENGINEERING LTD.
23UNITHAI SHIPYARD AND ENGINEERING LTD.
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

File details come from the government source that posted it. Updated .