This file is a Questions and Answers (Q&A) document providing clarifications on the Voyage Repair Availability (VRA) solicitation for USNS SACAGAWEA (T-AKE 2). The document addresses inquiries submitted by prospective offerors regarding work items, specifications, and other solicitation requirements issued under solicitation number N6264927RK001 by NAVSUP Fleet Logistics Center Yokosuka (FLCY) Site Chinhae. The Q&A sheet was added via Amendment 0002 issued on 19 November 2026 and serves to clarify technical and administrative aspects of the work specification MSCOK 27-001 and Attachment J-1 to assist offerors in preparing competitive proposals.

The solicitation seeks a single Firm-Fixed-Price (FFP) award to qualified contractors authorized to operate and conduct business in South Korea under DFARS 252.225-7042. Offerors must be registered in SAM.gov to be eligible for award, and work specifications are available through DoD Safe coordination with the identified points of contact. The Government will not reimburse respondents for questions submitted or information provided. As a template Q&A document, this file provides clarifications on work items, technical specifications, and submission requirements rather than detailing specific products or services, with the actual work scope detailed in the referenced Work Specification MSCOK 27-001 and Attachment J-1.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question No.ContractorWI No.Para. No.QuestionAnswerAmendment
1Hanwha Ocean co., Ltd.0583N/AThe work specification assigns the removal, transportation, reinstallation, and operational testing of the Detector Units to the Requesting Activity, while the filter changeout is assigned to the Performing Activity.
Please clarify the contractor's specific scope of work under this Work Item, as no contractor responsibilities are explicitly identified in the specification.WI 583 is cancelled.0001
2UNITHAI SHIPYARD AND ENGINEERING LTD.04072.2.1Can the Government provide the complete GPETE equipment list referenced in Enclosure 2.2.1, including equipment description, manufacturer, model, serial number, and location, as the current enclosure only contains placeholders?WI 407 is cancelled.0001
3UNITHAI SHIPYARD AND ENGINEERING LTD.N/AN/ABased on the previous experience, WI 0651B – TAKE-CCSI-Annual Lifeboat Davit Inspection is typically performed in conjunction with WI 0651A – TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12).
Could you please confirm whether WI 0651B has been intentionally excluded from the current scope of work and is not required for this maintenance period?Lifeboat davits were certified in September.0001
4UNITHAI SHIPYARD AND ENGINEERING LTD.05213.1.2&3.3Section 3.1.2 specifies a quantity of two (2) High Pressure Air Compressors, whereas Section 3.3 (Bill of Materials) lists only one (1) Overhauling Kit.
Could you please clarify whether the required quantity of Overhauling Kits should be two (2), one for each compressor?THIS WILL require a second rebuild kit as well0001
5UNITHAI SHIPYARD AND ENGINEERING LTD.05067.6Section 7.6 requires eight (8) hours of onsite technical training using the vessel's CAT laptop and software.

Based on our subcontractor's experience during previous maintenance, the CAT laptop and software currently available onboard are outdated, making it difficult to conduct effective training using the latest CAT Electronic Technician (ET) software.

Could you please confirm whether the vessel currently has an updated CAT laptop and ET software available for training?

If not, please advise whether the vessel intends to procure the updated equipment and software prior to the commencement of the maintenance period.Request to have Contractor to procure the updated laptop and software.0001
6UNITHAI SHIPYARD AND ENGINEERING LTD.0154Please clarify the location of tanks:

para 3.1: Four (4) Salt water ballast tanks 6-45-1,6-45-2,6-54-1,6-54-2

Enclosure 2.2.2: Cargo Potable Water Tank 3-79-2, Cargo Potable Water Tank 3-80.5-2We are doing all six (6) tanks.0001
7UNITHAI SHIPYARD AND ENGINEERING LTD.0503Please see the response from Appleton OEM:

I will need to review our schedule but it is unlikely we can support this short POP (15.Dec.2026 - 06.Jan.2027).

Please provide alternate range of dates for our consideration / planning.

Thank you.

Regards,

Appleton Marine, Inc.We cannot change the dates.0001
8UNITHAI SHIPYARD AND ENGINEERING LTD.0563A & 0563BPlease clarify what Work Item we should bid for between 563A or 563B.Perform WI 563B0001
9UNITHAI SHIPYARD AND ENGINEERING LTD.0565A & 0565BPlease clarify what Work Item we should bid for between 565A or 565B.Perform WI 563B0001
10UNITHAI SHIPYARD AND ENGINEERING LTD.0565BFrom the last SGA V/R package in August, the work item requested to perform a hydro test and internal visual examination of all cylinders.

However, Para 7.5 requests to conduct a hydrostatic test of 10% of the cylinders again.

Would it be acceptable to conduct a hydro test through CFR?Perform the requirement as stated in the WI. Inspection and Hydro test is a must.0001
11UNITHAI SHIPYARD AND ENGINEERING LTD.0655Please provide a previous inspection/service report.Report provided0001
12UNITHAI SHIPYARD AND ENGINEERING LTD.0656Please provide a previous inspection/service report.Survetic Korea completed the last certification. If they reach out to them at the same time, waiting response from the ship.0001
13Seatrium Repair & Upgrades Pte. Ltd.0561APlease provide a list on para 2.3 and 2.4, and the quantity of Para 3.3.Calibration list attached.0001
14Seatrium Repair & Upgrades Pte. Ltd.0633For bidding purposes, please provide pictures of separator plates in a bad condition.See attached.0001
15Seatrium Repair & Upgrades Pte. Ltd.05257.4Please get some clarification on the compressor that needs to be worked on for the WI525 – In the beginning the York Marine AB VSB 151 L is called out. However, in section 7 (note after 7.4) a HP air compressor is being called out.

And what is the required scope: replacement only, or replacement and overhaul?

The same note states that MSC will arrange for refurbishment, so please confirm whether the overhaul/refurbishment is outside the contractor's scope.WI was revised, HP air was deleted.0001
16Seatrium Repair & Upgrades Pte. Ltd.0173Due to environmental concerns, we would like to propose to do power tooling only for surface preparation. Please confirm if this is acceptable.As long as it meets the SSPC-SP1 guidance.0001
17Mitsubishi Heavy Industries, Ltd.03012.1.3Reqiured PARA 2.1.3 ECDIS POWER MODIFICATION Drawing – 420-8938678Incorrect drawing number 8938678 incorporated. Correct Drawing 8939678 provided.0002
18Mitsubishi Heavy Industries, Ltd.0525Will this work item in the current VR cover only the compressor replacement, or should the compressor overhaul also be included in the scope of work?Only compressor replacement.0001
19Mitsubishi Heavy Industries, Ltd.0802AFor bidding purposes, please provide picture of nameplate for AC Plant Compresser.Pictures provided.0002
20Mitsubishi Heavy Industries, Ltd.0503Is there any other authorized source for this work? In case of unavailability of OEM due to schedule conflicts. Keep contacting OEM to adjust the schedule.Any crane servicing company can demonstrate for ABS.0002
21Mitsubishi Heavy Industries, Ltd.0521OEM replied the 2EA OEM kits with 12-16 weeks lead time. Is this LLTM acceptable? or can be provided as GFM?Checking with the ship if there are any on board. We cannot get them GFM in time for this avail.0002
22UNITHAI SHIPYARD AND ENGINEERING LTD.06333.3&7.1&7.2Para 3.3 states that approx. 6 separator plates (4" high x 36" wide, stainless steel) are to be resealed/renewed. Para 7.2 states to clean, strip, refurbish (if necessary) and re-seal the separator plates in approx. 130 staterooms. Para 7.1 calls for replacement of deck tile and underlayment, with no quantity or location given.

Please clarify the following:

- Is the work required for all approx. 130 staterooms, or only for approx. 6 of them? If all 130, please state how many plates are to be renewed (replaced) and how many are only resealed.

- If deck tile and underlayment replacement (Para 7.1) is required, please provide the area (square feet or square meter) for quotation purposes.This is for 6 ea stateroom.0002
23UNITHAI SHIPYARD AND ENGINEERING LTD.0651BTAKE-CCSI-Annual Lifeboat Davit Inspection is typically performed in conjunction with WI 0651A – TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12).

Could you please confirm whether WI 0651B has been intentionally excluded from the current scope of work and is not required for this maintenance period?

OEM FASSMER has requested a verification for WI651B LB davits.

FASSMER comments : Please see the attached certificates, all equipment, including the lifeboat davits (WI 651B) was certified in February 2026 not September.

Kindly ask MSC to provide the certificates for September 2026.

In our opinion, all equipment should be certified at the same time (as a system) so all dates align.Inquiring the Liferaft Davit inspection reports from the ship.0002
240802APlease verify the current model number of the AC compressor.

The work item states Model number of SGC 2817 but based on OEM's history it was recorded as S89.

Different CFM might be required based on a different model.

Please provide the nameplate of the current AC compressor required for overhaul maintenance.Pictures provided.0002