J_3_Contractor_Price_Breakdown_N6264927RK001.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- USNS SACAGAWEA (T-AKE 2) VRA KR
- Solicitation number
- N6264927RK001
About this file
This file is a contractor price breakdown template for a Voyage Repair Availability (VRA) solicitation for USNS SACAGAWEA (T-AKE 2), a Navy replenishment ship. The spreadsheet is designed as a pricing submission form for contractors bidding on repair and maintenance work to be performed at the Chinhae shipyard site in South Korea under Work Specification MSCOK 27-001. The template establishes the framework for offerors to submit detailed cost proposals broken down by labor categories, materials, subcontractor services, and other direct costs associated with the vessel's scheduled maintenance and repair activities. This is a Firm-Fixed-Price (FFP) single award solicitation issued by NAVSUP Fleet Logistics Center Yokosuka (FLCY), with the Naval Supply Systems Command managing the acquisition under FAR, DFARS, and NMCARS guidelines. Prospective contractors must be registered in SAM.gov, duly authorized to operate in South Korea per DFARS 252.225-7042, and should coordinate with the identified points of contact to obtain the detailed work specifications (J-1 attachment) due to file size limitations, using DoD Safe for secure transmittal along with their UEI number.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USNS SACAGAWEA VRA KR | ||||||
| 15 DEC 2026 - 6 JAN 2027 | PRIME CONTRACTOR | SUBCONTRACTOR | Prime Labor Rate : | $0.00 | ||
| Work Item No. | Title | Labor hrs. | Labor |
Price US$ Material Price
(CFM)
US$ Labor hrs. Labor Price US$ Material Price
(CFM)
US$ Other (specify in Remarks)
| US$ | Total Price | ||||||||||
| US$ | CAT | ||||||||||
| 1 | General Services and Requirements | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 2 | Utilities and General Services for Ship and Port Engineer | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 4 | Testing and Quality Assurance | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 5 | High Voltage Electrical Safety Procedure Requirements | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | NSP | |
| 23 | HazWaste Disposal at a Contractor Facility | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 107 | T-AKE 2 Mooring Deck Preservation | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 109 | T-AKE 2 Exterior Light Brackets | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 144 | T-AKE Weather Drains | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 154 | T-AKE ABS Special Survey | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 158 | T-AKE 2 Bridge Wing Door Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 173 | T-AKE 2 Point and Preserve 1010 | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 114 | T-AKE 2 Cargo Crane Preservation 2-4 | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 204 | TAKE-CSI-MDE Control Safety Inspection and Test (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 205 | TAKE-CSI-Automation and Propulsion Control Inspection and Test (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 206 | TAKE-CSI-Vulkan Coupling Inspections (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 301 | ECDIS Modification | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 305 | TAKE-CSI-PLC Survey (2YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 353 | TAKE-CCSI-Thermographic Survey (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 407 | TAKE-CSI-Calibrate Electronic Test Equipment (GPETE)(1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 450 | TAKE-CSI-Annual Integrated Bridge Equipment Service and Certification (SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 453 | TAKE-CCSI-Annual Gyro System PM | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 454 | TAKE-CCSI-Annual VDR Recertification | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 455 | TAKE-CCSI-Annual Radio Communication Equipment Recertification | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 456 | TAKE-CCSI-Magnetic Compass Service (2YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 460 | TAKE-CCSI-Annual Inspection of Manually Operated Alarms | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 503 | TAKE-CSI-Cargo Crane Inspection (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 506 | TAKE-CSI-Emergency Diesel Generator-Annual Testing and Inspection (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0512A | TAKE-CSI-Magazine Sprinkler Gauge Calibration (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 521 | TAKE-CSI-High Pressure Air Compressor Overhaul (8K Hrs) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 525 | TAKE-CSI-Cargo Reefer Compressor Replacement (20K Hrs) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 554 | TAKE-CSI-Inspect Test and Certify Machinery Space Cranes and Hoists (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0561A | TAKE-CCSI-Gauge Calibration (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 562 | TAKE-CCSI-SCBA Annual Inspection (SCOTT) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0563A | TAKE-CCSI-SCBA Compressor and Filling Station Inspection and Maintenance (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0563B | TAKE-CCSI-SCBA Compressor and Filling Station Inspection and Maintenance (2YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0565A | TAKE-CCSI-Fixed Gas Firefighting System Inspection and Test (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0565B | TAKE-CCSI-Fixed Gas Firefighting System Inspection and Test (2YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0567A | TAKE-CCSI-Fixed Foam Firefighting System Inspection and Test (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0568A | TAKE-CCSI-Water Mist-Spray-Sprinkler Inspection and Test (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 569 | TAKE-CCSI-Fire and Smoke Detection and Alarm System (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 570 | TAKE-CCSI-Portable Fire Extinguisher Service (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 571 | TAKE-CCSI-Fire and Smoke Damper Service (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 572 | TAKE-CCSI-Deep Fat Fryer and Range Hood Fire Extinguishing System (1YR)(SCSI) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 573 | TAKE-CCSI-Fire Stations and Hoses (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0574A | TAKE-CCSI-Fire Doors and Shutters-Sliding Watertight Doors (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0574B | TAKE-CCSI-Fire Doors and Shutters-Joiner Doors (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 583 | TAKE-CSI-IPDS LR Filter Changeout (2YR)(IAFD) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 510 | T-AKE 2 Elevator 7 Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 823 | T-AKE 2 Chill Water Lagging | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0651A | TAKE-CCSI-Annual Lifeboat Inspection (T-AKE 1-12) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0653A | TAKE-CCSI-Annual Rescue Boat Inspection | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0653B | TAKE-CCSI-Annual Rescue Boat Davit Inspection | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 655 | TAKE-CCSI-Immersion Suit Service (3YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 656 | TAKE-CCSI-Annual Life Raft Certification | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 657 | TAKE-CCSI-Accommodation Ladder Inspection (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 659 | TAKE-CCSI-Pilot Boarding Equipement and Embarkation Ladders (2YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 662 | TAKE-CCSI-Deep Fat Fryer Inspection (1YR) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 615 | T-AKE 2 Handrail Repairs | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 633 | T-AKE 2 Stateroom Shower Replacements | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 0802A | TAKE-CSI-Air Conditionsing Plant Compressor Overhaul (30K Hrs) | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 1058 | Hauling Winch Brake Band Refurbishment | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 1059 | Hauling Winch Cooling Fan Refurbishment and Preservation | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A | |
| 1077 | Replenishng Pump Electric Motor Refurbishment | 0 | $0 | $0 | 0 | $0 | $0 | $0 | $0 | A |
TOTAL CAT A 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00
Remarks: (provide the information in space below. Use separate sheet of paper if necessary.)
| * Enter hourly labor rate to be used for Growth - T&M CLIN 0002 | T&M CLIN 0002 Prime Labor | |
| *Prime Labor Rate | $0.00 | |
| ** Enter Material/Sub/Other handling % to be sued for Growth - T&M CLIN 0003 | Growth Labor Hrs | 3,925 |
| Total Labor NTE Ceiling | $0.00 | |
| T&M CLIN 0003 Material/Subs/Other | ||
| **Material Handling (%) | ||
| Growth Material/Subs/Other Costs | $250,460.11 | |
| Total Material/Sub/Other NTE Ceiling w/ a Markup | $250,460.11 | |
| Total T&M Growth CLINs NTE Ceiling | $250,460.11 |
| Total CAT A | $0.00 |
| Total T&M Ceiling | $250,460.11 |
| Total Price Proposal | $250,460.11 |