This is a Request for Specification Clarification document (Attachment J-5) containing questions and answers regarding a federal contract maintenance specification for USNS Puerto Rico.
The document addresses four primary specification clarifications. First, regarding Section 7.4.2 (Crane Maintenance - 1 Year), MSC concurs with the OEM's recommendation to remove Section 7.4.2(b), the Deck Crane Hydraulic Winch Tear Down Inspection, from the scope of work. The tear down inspection was identified as a copy-paste error since the crane was recently serviced with new winch oil in November 2025, and the winch manufacturer does not require a rebuild unless specific conditions exist (unknown repair history, oil contamination, undocumented invasive repairs, neglected maintenance, or leaking oil). Section 7.4.2(a), requiring lube oil sampling and analysis with oil replacement, remains required. Second, regarding Section 3.1.3 and 7.2 (Underwater Hull Clean & Paint - Spot Blast - 2.5 Year), MSC confirmed that all paint materials are CFM (not GFM) and that the paint material list is correct. For Section 7.2, the shipyard will provide the services of an International Interspeed 5640 Coating Representative and Sherwin-Williams SeaVoyage Coating representative as stated in the specification, with MSC also employing a NAVSEA Coating Inspector. Third, the document lists extensive reference files and drawings required for accurate quotation preparation across multiple work items (105, 110, 114, 120, 151-156A, 163-165, 199-201, 302A-351, 461, 503-515, 532, 801A-802, 910, 934, 1001, and 1003). Finally, regarding Work Item 515, the clarification identifies that Shipyard Work Item 523 (Stern Ramp Fiber Rope Replacement Interim Docking) is mentioned in Section 2.1 of WI-0515 specification but is not included in the work item list in the maintenance package, with reference drawings provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT J-5
REQUEST FOR SPECIFICATION CLARIFICATION
SPECIFICATION ITEM NO.: N6264926RL012 PARA. NO. 7.4.2
TITLE: CRANE MAINTENANCE (1 YR)
QUESTION:
Below is a clarification from OEM. Please confirm if MSC would like to proceed with the 7.4.2
Deck Crane Hydraulic Winch Tear Down Inspection
//QUOTE//
Item 7.4.2 – This appears to be a copy-n-past error. Crane was just serviced and winch oil changed November 2025. Winch manufacturer does not require a winch rebuild unless 1 of below criteria apply. If annual oil change practices are upheld and oil samples are ok, a winch rebuild would not be necessary. Appleton does not support this item and service quote does not reflect winch rebuild at this time.
MSC needs to be aware of this to avoid creating unnecessary repairs.
• Winch has an unknown history of repair and/or maintenance.
• Oil exceeds the acceptable contaminant criteria
• Undocumented invasive repairs
• If regular maintenance is not upheld (would not apply if winch is not used)
• Leaking oil
//UNQUOTE//
ANSWER: MSC concurs with the OEM's recommendation. Section 7.4.2 (b), Deck Crane
Hydraulic Winch Tear Down Inspection, is not required for this maintenance period.
Please remove this item 7.4.2 (b) from the scope of work.
b. A tear down inspection should include the hoist being completely disassembled, cleaned and inspected and replacement of all worn, cracked, corroded or distorted parts such as pins, bearings, shafts, gears, brake rotors, brake plates, drum and base. All seals and o-rings should be replaced during a tear down inspection.
Note that 7.4.2 (a) is still required.
a. Take a lube oil sample and send off for analysis. Drain and dispose of remaining oil.
Replace with new oil.
SPECIFICATION ITEM NO.: N6264926RL012 PARA. NO. 3.1.3 / 7.2
TITLE: UNDERWATER HULL CLEAN & PAINT - SPOT BLAST (2.5 YR)
3.1.3
a) Please confirm that all paint materials stated in Paragraph 3.1.3 shall be CFM / GFM??
b) Also please confirm if the paint materials listed in Paragraph 3.1.3 are correct.
7.2
Please confirm if shipyard will arrange Paint Representative. Based on past experience, MSC always arranged Paint Representative.
ANSWER:
3.1.3
a) Please confirm that all paint materials stated in Paragraph 3.1.3 shall be CFM / GFM??
b) Also please confirm if the paint materials listed in Paragraph 3.1.3 are correct.
a) All paint materials are CFM.
b) Paint material list is correct.
7.2
Please confirm if shipyard will arrange Paint Representative. Based on past experience, MSC always arranged Paint Representative.
7.2 Provide the services of an International Interspeed 5640 Coating representative and a
Sherwin-Williams SeaVoyage Coating representative to inspect the underwater hull coating system. MSC will also employ the services of a NAVSEA Coating Inspector for the duration of this item. Paint manufacturer representatives are required to be onsite at every stage of the coating processes to include but not limited to; DFT testing, profile inspections for repair areas, final coating inspections and any time as requested by the OMT REP. Hull Coating
Representatives are to attend daily production meeting and weekly progress meetings and additional meetings as required by the OMT REP.
Answer: Shipyard will provide the services of an International Interspeed 5640 Coating
Representative and Sherwin-Williams SeaVoyage Coating representative as stated in 7.2.
1. There are difficulties in preparing the quotation, and if you provide the reference files below, we will be able to make an accurate quotation.
2. Please verify red text in WI 461 & 515.
WI Reference
105 NAVSEA Drawing No. 588-001, Flight Deck Tie Down Numbering Scheme
105 T-EPF Flight Deck Tie Down (FDTD) Cup Fitting Colored Map
105 NAVSEA Drawing No. 8443387 Rev M, JHSV Paint Schedule
110 ABS Hull Supplement Survey Document (HSSD) for USNS PUERTO RICO
110 General Arrangement and Profile Drawing 8807534
114 TEPF11_USNS PTR Structural Deficiency Log Master_24DEC2025
114 SDL Inserts_24DEC2025
120 NAVSEA Drawing 8442884
120 NAVSEA Drawing 8443392
120 Dwg 8393682
151 Repair Plan PR-CCO-122-01, Potable Tank Repair Plan dtd 06 Feb 2025
151 DWG 8444516, Potable Water Tanks
152 DWG 2025-R-2800-100-1001, Bow Shell Repair Plan REVA
152 DWG 630-100-04-203 - Welding Details and Construction Tolerances, Rev D or later
153 NAVSEA Drawing No. 8443364 REV H missing
153 NAVSEA Drawing No. 8442862, 636-097-01-201-SRD Capacity Plan
153 Tank Survey Status Form
MSC Drawing #8614850, Frame 70, Main Deck, 11.5M OCL BHD Modifications &
374-IR-588-QC- collision bulkhead penetration
155 NAVSEA Drawing #8444192_E, BERPS and WERPS Arrangement and Details
NAVSEA Drawing #8442897_G, Structural Plan Main Deck (Ref 2.1.6) &
#8442923_G, Structural Plan Main Deck Hull Void 70-82 STBD
NAVSEA Drawing #8442891_L, Typical Structural Frames Hull Void 52-70 (Ref
2.1.4) & #8442899_H, Superstructure Structural Frames
155 MSC General Technical Requirements (GTR) No. 7081122
156A NAVSEA Drawing 492-8613222 Rev A_SRD Aviation Visual Landing Aid (VLA) and Lighting Arrangement
156A NAVSEA Drawing No. 803-1916300 / 804-1213717, Aircraft Securing Fittings
163 NAVSEA Drawing No. 588-8444203, Flight Deck Safety Net and Coaming Drawing
163 NAVAIRSYSCOM Air Capable Ship Aviation Facilities Bulletin No. 1
NAVSEA Drawing No. 804-8436625, Safety Nets, Deck Edge, Aluminum Frame, Synthetic Net
165 NAVSEA Drawing No. 8445660, Booklet of General Plans
199 MSC Drawing 613-8614649, Lifting Lug Arrangement Modifications
199 MSC Drawing 120-8614650, Structural Fire Protection Mission Bay Modifications
201 NAVSEA Tech Manual S9233-EM-MMC-010
201 NAVSEA Tech Manual S9560-ES-MMC-010
201 NAVSEA Tech Manual S9241-DA-MMC-010
201 NAVSEA Tech Manual TM-WJ-JHSV-02
302A NAVSEA Drawing No. 324-8445374, Power and Lighting System One-Line Diagram
320 NAVSEA Drawing No. 320-8443072, Electrical AC System Overview Line Diagram
351 NAVSEA Tech Manual S9324-LZ-MMC-010, Main Switchboard Model 630
351 NAVSEA Drawing No. 324-8443134
351 NAVSEA Drawing No. 324-8443135
MSFSC SWIRRR 020, Switchboard and Electrical Control Cabinet Survey, Cleaning and Repair
461 Not including Enclosure 2.2.1/2.2.2
NAVSEA Technical Manual S9593-FP-MMC-010, Sewage Treatment Plant, Type II
Model TW-HMX-6104
505 Tech Manual S9531-DK-MMC-010, Reverse Osmosis Desalination Plant
512 NAVSEA Final Technical Manual S9169-BE-MMC-010, Stern Ramp Model A07364
514 Drawing No. F165291
Work Item 523 is not included in the work item list in this ROH, but “Shipyard Work
Item 523 - Stern Ramp Fiber Rope Replacement Interim Docking” is mentioned in the para 2.1 of WI-0515 specification.
532 Drawing No. 8807528, Schematic – Bilge System
801A No. 512-8444465, Schematic Chilled Water System
801A S6230-CY-MMC-010, Air Conditioning Chilled Water Unit Model 146R-6KR
801A S9516-CE-MMC-010, Ship’s Stores Refrigeration System, Model ADR-234Q
802 512-8612640 Schematic – Machinery and Equipment Ventilation System
910 MSC Drawing No. 160-8443389, Anode Arrangement and Installation Drawing
910 MSC Drawing No. 182-8442909, Jet Duct Anode Arrangement
934 NAVSEA Drawing No. 256-8443038, Details - Sea Intakes
934 NAVSEA Drawing No. 256-8443037, Arrangement - Sea Intakes
934 NAVSEA Drawing No. 630-8443386, Corrosion Prevention and Control Plan
934 NAVSEA Drawing No. 526-8443242, Schematic - Deck Drains
1001 0978-LP-035-3010, Tech Manual Single Probe Fueling System
Drawing No. 492-8443197, Aviation Visual Landing (VLA) And Lighting
Arrangement
ANSWER: WI 0461: Not including Enclosure 2.2.1/2.2.2 – Drawings submitted as references.
SPECIFICATION ITEM NO.: 546 PARA. NO.7.4.2
TITLE: Clarification of para 7.4.2
1. Regarding para. No. 7.4.2, OEM’s thought an error that occurred within copy & paste.
Please identify this.
ANSWER: This was answered on 06/02/2026.
ANSWER: MSC concurs with the OEM's recommendation. Section 7.4.2 (b), Deck Crane
Hydraulic Winch Tear Down Inspection, is not required for this maintenance period.
Please remove this item 7.4.2 (b) from the scope of work.
b. A tear down inspection should include the hoist being completely disassembled, cleaned and inspected and replacement of all worn, cracked, corroded or distorted parts such as pins, bearings, shafts, gears, brake rotors, brake plates, drum and base. All seals and o-rings should be replaced during a tear down inspection.
Note that 7.4.2 (a) is still required.
a. Take a lube oil sample and send off for analysis. Drain and dispose of remaining oil.
Replace with new oil.