2.20 N6264926RA0310003 SF 30.pdf

PDF 575 KB Posted

Attached to
YCV-16 REPAIR, MAINTENANCE, AND PRESERVATION, YOKOSUKA, JAPAN
Solicitation number
N6264926RA031
Issued by

About this file

This is a Standard Form 30 (SF 30) Amendment of Solicitation for a naval maintenance and repair contract. Amendment 0003, effective 04 March 2026, addresses contractor questions submitted on 27 February 2026 regarding the maintenance and repair of CFAY YCV-16. The solicitation is issued by NAVSUP FLT LOG CTR YOKOSUKA (PSC 473 BOX 11, FPO AP 96349-1500) and administered through N62649. The amendment references solicitation N6264926RA031, dated 05 February 2026.

The contractor's three questions concern: (1) detailed documentation and drawings for zinc anode specifications and layout per Paragraph 4.2.6; (2) quantities and specifications of hatches, coaming systems, and gaskets requiring replacement per Paragraph 4.2.6.14; and (3) quantities and specifications of lifering stanchions, lifeline stanchions, connectors, support poles, Kevlar lifelines, chains, and shackles per Paragraph 4.2.6.15. The government responses indicate: (1) no layout drawings are available, but 104 zincs were replaced during the last overhaul; (2) 48 manhole cover gaskets were previously replaced; and (3) quantities will be confirmed during ship inspection. The amendment modifies Section J (List of Attachments) to reference the work specification for YCV-16 Maintenance and Repair, which includes NAVSEA standard drawings, non-standard drawings, and builder's drawings. Supplementary photos and references are available via DoD SAFE. The contracting officer is Peter Jommel S. Arrieta.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): Name of Vessel/Barge: CFAY YCV-16

The purpose of this solicitation amendment 0003 is to respond to the questions.

DATE OF REQUEST: 27 February 2026

CONTRACTOR QUESTION:

1. Paragraph 4.2.6 mentions the replacement of zinc anodes. Could you please provide detailed documentation and drawings showing the specifications and layout of the zinc anodes?

2. Could you please provide the quantities and specifications of all hatches, associated parts including the coaming system, and gaskets that need to be replaced, as described in Paragraph 4.2.6.14?

3. Could you please provide the quantities and specifications of all lifering stanchions, lifeline stanchions including base connectors, connector tabs, support poles, Kevlar lifelines, chains, and shackles that need to be replaced, as described in Paragraph 4.2.6.15?

GOVERNMENT RESPONSE:

1. We do not have drawings for layout of zincs on YCV-16. Based on the last overhaul there were 104 zincs replaced.

2. According to the previous overhaul, 48 manhole cover gaskets were replaced.

3. We can confirm quantity needing to be replaced during ship check.

Note: For further clarification, supplementary photos and references pertaining to these questions have been included in Section J and will be furnished upon request. These photos and references are provided via DoD SAFE.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Attachment (I) Work Specification(s) for SOW

SOW: YCV-16 MAINTENANCE AND REPAIR

Reference: NAVSEA Standard Drawings Military Standards

Non-Standard Drawings Builder's Drawings

Attachment (II) Proposal Breakdown Form (Contractor Response Required)

Attachment (III) Request for Information Sheet

Attachment (IV) Warranty Tracking Information

Attachment (V) Source of Repair Instruction

Attachment (VI) Quality Assurance Surveillance Plan (QASP)

Attachment (VII) Contracts Data Sheet

N6264926RA0310003

IDCode: J
Page: 1
Pages: 2
AmendNo: 0003
EffDate: 04 Mar 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N62649
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR YOKOSUKA

PSC 473 BOX 11, FPO AP 96349-1500

FPO, AP 96349-1500

UNITED STATES

KAZUYA IWANAGA, Email: kazuya.iwanaga.ln@us.navy.mil Telephone: 046-816-9974 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N6264926RA031
SolDate: 05 Feb 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Peter Jommel S. Arrieta
ContDate:
CODate: 04 Mar 2026

File details come from the government source that posted it. Updated .