About this file

This document contains a federal contract modification and the related federal contract opportunity. The modification amends solicitation N62478-20-R-4042 by revising Attachment A to include probing and grouting for a coral subgrade with potential cavities and voids as part of the work. The related opportunity is for project FY20 P-033 Magazine Consolidation, Phase 1 at Joint Base Pearl Harbor-Hickam to construct four standard earth covered Type D Box Magazines including electrical utilities and site improvements. The Naval Facilities Engineering Command seeks offers for this design-bid-build project with an estimated cost between $25-100 million. Offerors must register with SAM and submit pricing and technical proposals by June 8, 2020. Experience, safety, and past performance will be evaluated.

View the file

Other files

File Type Posted
Am4.pdf PDF
Am2.pdf PDF
Am1.pdf PDF
RFP Part 1.pdf PDF
FedBizOps Notice 1.pdf PDF
20 0318 P033 West Loch Magazine FINAL SIGNED.pdf PDF
P-033 Final Submittal Set - SIGNED.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT J 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Am-0003 05/29/20

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

NAVFAC Hawaii Construction Acquisition Division (OPHA2) 400 Marshall Road See Item 6 JBPHH, Hawaii 96860-3139

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

N62478-20-R-4042

X 9B. DATED (SEE ITEM 11)

22 Apr 20

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ]The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ ] is extended, [x ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required) NA

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR CLAUSE 52.243-4, CHANGES

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor [ ] is not, [ ] is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

N62478-20-R-4042, FY20 P-033 Magazine Consolidation, Phase 1, West Loch, Joint Base Pearl Harbor- Hickam (JBPHH), Oahu, Hawaii

See page 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Am-0003 Standard Form 30 Item No. 14 (Continued) Page 2 of 2

1. CHANGES TO THE SOLICITATION. Attached hereto is a revised page to the solicitation. The revision mark “(Am-0003)” is shown on each page.

a. REVISED SECTIONS/PROVISIONS/CLAUSES/PAGES/PARAGRAPHS/ITEMS. The following is a revised page to the solicitation. Changes are indicated in bold print. Although the entire Attachment A is being re-issued under Am-0003, only the following page/paragraph/item changed in the following Attachment A document.

Document 00110, Attachment A

Attachment A, Block 5.

2. The proposal due date of June 8, 2020, 2:00 P.M., Hawaiian Standard Time, remains unchanged.

(Am-0003)

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

ATTACHMENT A

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

DUNS Number:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number:

Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

Magazine Construction Installation of electrical utility poles and overhead medium voltage power lines Probing and grouting for a coral subgrade which may have cavities and voids

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

Complete Block 7 for Construction Projects.

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:______________________________________________

8. Not Used

(Am-0003)

SOURCE SELECTION SENSITIVE INFORMATION

DISCLOSURE LIMITATIONS AS OUTLINED IN FAR 2.101 & 3.104 APPLY

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). If design-build, include a description of the design-effort.

10. Provide a detailed description of what work your firm self-performed on this project:

11. Other Information:

SF 30
Document 00110, Attachment A

File details come from the government source that posted it. Updated .