This solicitation is for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) to provide renovation, repair, and new construction of medical facilities at various government installations located in California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington and Hawaii. The Naval Facilities Engineering Command (NAVFAC) seeks to award three or more contracts for a base year plus two three-year options, for a maximum duration of 96 months. The estimated maximum value for all contracts is $1 billion. Task orders will range from $15 million to $1 billion. The North American Industry Classification System code is 236220, with an annual size standard of $36.5 million. Price evaluation preference will be given to HUBZone firms. Selection will be based on evaluation of technical approach, construction experience, past performance, safety, technical solution, small business participation, and price for a sample task order. Award may be made to the offeror whose proposal represents the best value. The solicitation is available electronically from SAM.gov as of October 5, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247321R1411 Amendment 1.pdf | ||
| RFI Response Form 18 Oct.xlsx | XLSX spreadsheet | |
| RFI Form - 3MAR2021.xlsx | XLSX spreadsheet | |
| N6247321R1411.pdf | ||
| Surety Form.doc | DOC document | |
| RFI Form.doc | DOC document | |
| Exhibit E - Safety Data _ Narrative.docx | DOCX document | |
| Offerors Team Consent Form.doc | DOC document | |
| MACC Frequently Asked Questions.doc | DOC document | |
| N6247321R1411.pdf | ||
| Exhibit C - PPQ.doc | DOC document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit D - Past Performance - Small Business Utilization.docx | DOCX document | |
| Exhibit F - Small Business Participation Plan.docx | DOCX document | |
| Exhibit B - Contractor Experience Data Sheet.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI (pre-award) Form_For KTR
SOLICITATION: N62473-21-R-1411
Medical MACC / California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington and Hawaii DOCUMENT DATE: 28 Oct 2021
| TO BE FILLED OUT BY THE BIDDING KTR | TO BE FILLED OUT BY THE GOV'T | ||||||||||
| RFI # | RFP Part # | Chapter or Section | Sub-Section # | CLARIFICATION REQUEST | RFI reason from KTR's Perspective | Comment [fill out if "Other" was chosen, specify reason(s)] | RFI Topic most closely relevant to: | Government Response | DATE RECEIVED | DATE TO KTR | Amendment Number |
| 1 | Part 2 | Chapter-2 | FACTOR 2 | Given this MATOC will include design-build projects, please confirm designer projects can be presented in Factor 2. | Per RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. Design projects will not be considered relevant. Only renovation and construction projects will be considered relevant. | 10/6/21 | 10/18/21 | N/A | |||
| 2 | Part 2 | Chapter-2 | FACTOR 2 | Infection control considerations as identified in the evaluation criteria, wouldn’t factor into a new construction environment. We respectfully request the government revise the minimum submission requirements to reflect 4 renovation projects and 1 new construction project. | Minimum submission requirements will not be revised. Per RFP part 2 Factor 2, A single project may satisfy more than one of the Factor 2 minimum submission requirements. | 10/6/21 | 10/18/21 | N/A | |||
| 3 | Part 2 | Chapter-2 | FACTOR 2 | We respectfully request the government allow projects that are either at least 50% complete or completed within the past 8 years. | As stated in RFP Part 2 Factor 2, all projects shall be 100% complete within the past seven years of the date of issuance of this RFP. Projects which are not 100% complete as of the date of issuance of this RFP shall not be considered. | 10/6/21 | 10/18/21 | N/A | |||
| 4 | Part 2 | Chapter-2 | FACTOR 2 | To enable more participation by a diversity of business sizes, we respectfully request the government revise the minimum dollar value to $5 million. | Minimum task order dollar value will not be revised under this MACC. | 10/6/21 | 10/18/21 | N/A | |||
| 5 | Part 1 | if Others include info under Column E | Factor 1 | Section 00100: INSTRUCTIONS TO OFFERORS |
PHASE 1 / FACTOR 2: CONSTRUCTION EXPERIENCE
Paragraph 6, page 15 of 115
Would you consider changing the relevant project completion deadline for similar experience from projects completed within the past seven (7) years to projects completed within the past ten (10) years?
| Other; Please specify in the next column | More firms would be able to respond if the time frame were open to 10 years instead of the current 7 years. | Contracting | Relevant project completion deadline for this Solicitation will remain at seven (7) years. | 10/12/21 | 10/18/21 | N/A | |||||
| 6 | Part 1 | Chapter-1 | pg. 7, No. 4. | Please confirm the Financial Questionnaire isn’t required until Phase 2. | Contracting | As stated in RFP Part 1, Financial Questionnaire is a Phase 2 requirement. | 10/13/21 | 10/18/21 | N/A | ||
| 7 | Part 1 | Chapter-1 | pg. 14, FACTOR 1 | Please identify if any design firm(s) shall be identified in Factor 1: Technical Approach, given that some task orders may require design-build services. | Contracting | Per RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. There is no requirement for a design firm to be identified in Factor 1, Technical Approach. | 10/13/21 | 10/18/21 | N/A | ||
| 8 | Part 1 | pg. 15 FACTOR 2 | RFP page 15, Factor 2 requires that offerors provide applicable documentation on projects that were validated an/or certified through the USGBC. This appears to be a separate deliverable than the Exhibit B Data Sheet. Please confirm this documentation does not count against a page limit. | Contracting | Documentation backing up USGBC Certification does not count against page count. | 10/13/21 | 10/18/21 | N/A | |||
| 9 | Part 1 | Chapter-1 | NA | Please confirm electronic signatures are acceptable | Contracting | Electronic signatures are acceptable. | 10/13/21 | 10/18/21 | N/A | ||
| 10 | Part 1 | Chapter-1 | NA | Please confirm the use of tabs & Subtabs is acceptable to facilitate organization | Contracting | Tabs and subtabs on your electronic file sent through DoD SAFE is acceptable. | 10/13/21 | 10/18/21 | N/A | ||
| 11 | If "Others" - include info under Column E Clarification Request | Factor 2 Construction Experience, subparagraph (b) Basis of Evaluation states that “Offerors who submit relevant construction projects that best demonstrate self-performed (see definition) experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract may be considered more favorably than those that do not.” The definition referenced therein is in Section 00210 – Basis of Award and Evaluation Factors, Section 2 – and states “Refers to performing relevant and major construction trade work in-house without subcontractors. This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup). Relevant and major construction trade work is that which is the same or similar to the work that may be ordered under this contract.” |
This definition is not consistent with the definition in FAR 36.501 which states that “To assure adequate interest in and supervision of all work involved in larger projects, the contractor shall be required to perform a significant part of the contract work with its own forces.” And which further states that “Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally be considered in establishing the amount of work required to be performed by the contractor.”
Will the Navy please revise the definition of self-performance to align with FAR 36.501?
| Conflicting Information | Contracting | There is no conflict between . The evaluation factors and evaluation of the proposal is separate from the work to be performed in the future under this contract. Factor 2, Construction Experience, is looking more favorably at past projects, where the contractor self-performed. The Government wants to see projects that the contractor performed itself, not projects on which it subcontracted out the work. This is different and distinct from the “self-performance” required under the contract to be awarded. | 10/17/21 | 10/20/21 | N/A | ||||||
| 12 | If "Others" - include info under Column E Clarification Request | EXHIBIT “A” OFFEROR TEAM COMPOSITION AND MANAGEMENT instructions state to "Modify form as necessary to include all primary construction and design team members." Would the Government please confirm that design team member information is neither requested nor desired? | |||||||||
| Conflicting Information | Contracting | Design Team member information is not requested. | 10/17/21 | 10/20/21 | N/A | ||||||
| 13 | Part 2 | Chapter-2 | FACTOR 2 | Page 15 of 115 of the Phase 1 Solicitation states that Construction Experience projects submitted by the Offeror shall be 100% complete within the past seven (7) years of the date of issuance of this RFP. To provide the Government with the most relevant example projects for consideration, and to best respond to the intent of this solicitation, we would like to include Naval Hospital Camp Pendleton project, a highly relevant medical facility project for NAVFAC that Clark successfully delivered six months ahead of the date specified in the government’s solicitation. The contract documents specified a completion date of 1/7/14 with a warranty extending to 1/7/15, however our early completion pulls those dates forward. Please confirm the Camp Pendleton Hospital project may be included as one of our relevant experience projects based upon the contractual completion dates noted above. | Other; Please specify in the next column | Enables inclusion of highly relevant similar project | Contracting | Per RFP Part 2 Factor 2, Relevant projects are projects that have been completed in the past seven (7) years. | 10/19/21 | 10/26/21 | N/A |
| 14 | If "Others" - include info under Column E Clarification Request | if Others include info under Column E | Section 00100, Phase One Basis of Evaluation/Submission Requirements/Criteria Description, Factor 2: Construction Experience | The estimated task order range for this procurement is $15M to $100M. At the same time, the Government requests that Construction Experience be demonstrated with a minimum project value of $15M and 35,000 square feet (Factor 2, Page 15). This minimum project value is difficult for small business contractors in this NAICS code ($39.5M annual revenue) to meet, potentially making this unduly restrictive of competition. If the Government has concluded that a $15M project is relevant experience for the entire range of this procurement (that is, projects up to $100M), then a project of a lower value would be equally relevant for most of the range. In order to allow small business contractors in this NAICS code a reasonable opportunity to compete, we respectfully request that the Government reduce the minimum project value to $10M. | Other; Please specify in the next column | Small Business Opportunity to Compete | Other/Unsure | Minimum task order dollar value will not be revised under this MACC. | 10/21/21 | 10/26/21 | N/A |
| 15 | If "Others" - include info under Column E Clarification Request | if Others include info under Column E | Section 00100, Phase One Basis of Evaluation/Submission Requirements/Criteria Description, Factor 2: Construction Experience | The Government requests that Construction Experience be demonstrated using at least one project with a construction cost of $50M (Factor 2, Page 15). In this NAICS code, this minimum requirement all but eliminates small business competition. One project at this level would go a long way toward eliminating a contractor's small business status in this NAICS code. In order to ensure that small businesses can fully compete for this procurement, we respectfully request that the construction cost minimum for this requirement be reduced to $25M. | Other; Please specify in the next column | Small Business Opportunity to Compete | Other/Unsure | Construction Experience requirements will not be revised under this MACC. | 10/21/21 | 10/26/21 | N/A |
| 16 | If "Others" - include info under Column E Clarification Request | if Others include info under Column E | Section 00100, Phase One Basis of Evaluation/Submission Requirements/Criteria Description, Factor 2: Construction Experience | Factor 2, Page 15 indicates that the definition of medical treatment facilities is "hospitals, ambulatory care centers, medical and dental clinics, and medical research laboratories." Please clarify that this definition includes facility support systems, and that these facilities, as part of the medical treatment facility, can be considered new construction. | Intent needs clarification | Other/Unsure | Government cannot advise on project relevancy without assessing the full scope of the project. | 10/21/21 | 10/26/21 | N/A | |
| 17 | If "Others" - include info under Column E Clarification Request | if Others include info under Column E | Section 00100, Phase One Basis of Evaluation/Submission Requirements/Criteria Description, Factor 2: Construction Experience | Factor 2, Page 15, requires two projects for renovation and three projects for new construction. To enhance and increase competition, we respectfully request the Government merge the new construction and renovation requirements, due to the common traits and similar complexities/requirements of both at this dollar value, to allow offerors to present five projects that are either new construction or renovations. | Other; Please specify in the next column | Small Business Opportunity to Compete | Other/Unsure | A single project may satisfy more than one of the Factor 2 minimum submission requirements. Minimum submission requirements will not be revised. | 10/21/21 | 10/26/21 | N/A |
| 18 | Part 1 | if Others include info under Column E | Factor 3: Past Performance, a. Solicitation Submission Requirements | If the Offeror does not have a completed CPARS and has a Past Performance Questionnaire (PPQ-0) on file previously completed by the Client that matches all fields of the required Exhibit "C", may this be submitted in lieu of requesting a new PPQ specific to this solicitation? | Intent needs clarification | Other/Unsure | Per the MACC Frequently Asked Questions question #12, it is acceptable to submit previously completed past performance questionnaires as long as the evaluations assign an overall rating and cover the same criteria as the PPQ form included in this solicitation | 10/25/21 | 10/26/21 | N/A | |
| 19 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses incorporates by reference FAR 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data - however FAR 15.408(b) requires this clause in solicitations and contracts when it is contemplated that certified cost or pricing data will be required from the contractor or any subcontractor. Since it is anticipated that most task orders pursuant to the IDIQ contract will be made based on adequate price competition, is it the Government’s intention that FAR 52.215-10 will be operative only in the event that a task order is issued to a contractor on a sole source basis? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | FAR 52.215-10 will be applicable to orders placed that meet the prescritpions of this clause. | 10/25/21 | 10/26/21 | N/A | ||
| 20 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses incorporates by reference FAR 52.215-12 Subcontractor Certified Cost or Pricing Data - however FAR 15.408(b) requires this clause in solicitations and contracts when it is contemplated that certified cost or pricing data will be required from the contractor or any subcontractor. Since it is anticipated that most task orders pursuant to the IDIQ contract will be made based on adequate price competition, is it the Government’s intention that FAR 52.215-12 will be operative only in the event that a task order is issued to a contractor on a sole source basis? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | FAR 52.215-12 will be applicable to orders placed that meet the prescritpions of this clause. | 10/25/21 | 10/26/21 | N/A | ||
| 21 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.219-9 (AUG 2018), Deviation 2018-O0018, however the version of the clause that is currently in FAR is JUN 2020. Will the Government update this clause? | Other; Please specify in the next column | Outdated Reference | Contracting | FAR 52.219-9 (Aug 2018) Dev 2018-O0018 has been updated with the latest version, 52.219-9 AltII (Sep2021) | 10/25/21 | 10/26/21 | 1 | ||
| 22 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.219-13 Notice of Set Aside Orders which would allow the Government to set aside certain task orders for competition among small businesses. Is it the Government's intent that some of the orders pursuant to this IDIQ will be small business set aside orders? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | Whether future orders are set aside for small business will be determined during the preaward of each specific order placed under this MACC contract. Without knowing the business sizes of the offerors who will receive awards under this MACC or the scope of work on all possible future orders that will be issued under this MACC it is unknown if future orders may be set aside for small business. | 10/25/21 | 10/26/21 | N/A | ||
| 23 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.225-10 Notice of Buy American Requirement– Construction Materials (FEB 2009) Alternate I (MAY 2014); however the current clause in the FAR is MAY 2014. Will the Government update this clause? | Other; Please specify in the next column | Outdated Reference | Contracting | The FAR clause 52.225-10 on page 115 of this solicitation is the MAY 2014 version. No update required. | 10/25/21 | 10/26/21 | N/A | ||
| 24 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.225-12 Notice of Buy American Requirement – Construction Materials Under Trade Agreements (FEB 2009), Alternate I (MAY 2014) however the current clause in the FAR is MAY 2014. Will the Government update this clause? | Other; Please specify in the next column | Outdated Reference | Contracting | The FAR clause 52.225-12 and 52.225-12 Alt I on page 115 of this solicitation is the MAY 2014 version. No update required. | 10/25/21 | 10/26/21 | N/A | ||
| 25 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.228-13 Alternative Payment Protections , which is requried when the estimated value does not exceed $150,000. Since it is not anticipated that any orders issued pursuant to this IDIQ will be less than $150,000, will the Government please delete this clause? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | This clause will remain in the solicitation and will be applicable in the event an order will be placed that meet the prescritpions of this clause. | 10/25/21 | 10/26/21 | N/A | ||
| 26 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.228-15 Performance and Payment Bonds Construction (JUN 2020), however Class Deviation 2020-O0016 is still in effect. Will the Government please incorporate the Class Deviation? | Other; Please specify in the next column | Outdated Reference | Contracting | FAR 52.228-15 (DEV 2020-O0016) has been added to the solicitation | 10/25/21 | 10/26/21 | 1 | ||
| 27 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.244-2 Subcontracts, however this clause is required for cost-reimbursement contracts and not firm fixed price contracts. Will the Government please delete this clause? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | This clause will remain in the solicitation and will be applicable in the event an order meets the prescritpions of this clause. As prescribed in FAR 44.204, this clause applies to: (i) A cost-reimbursement contract; |
(ii) A letter contract that exceeds the simplified acquisition threshold;
(iii) A fixed-price contract that exceeds the simplified acquisition thresh old under which unpriced contract ac tions (including unpriced modifications or unpriced delivery orders) are antici pated;
(iv) A time-and-materials contract that exceeds the simplified acquisition threshold; or
| (v) A labor-hour contract that ex ceeds the simplified acquisition thresh old. | 10/25/21 | 10/26/21 | N/A | |||||||||
| 28 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.244-5 Competition in Subcontracting; however FAR 44.204(c) states that this clause should not be included in firm fixed price contracts awarded on the basis of adequte price competition. Since the orders pursuant to this IDIQ will be awarded based on adequate price competition, will the Government delete this clause? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | This clause will remain in the solicitation and will be applicable in the event an order will be placed that meet the prescritpions of this clause. | 10/25/21 | 10/26/21 | N/A | |||
| 29 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes FAR 52.244-6 Subcontracts for Commercial Items (Aug 2019) however the current clause is November 2020. Will the Government update this clause? | Other; Please specify in the next column | Outdated Reference | Contracting | FAR 52.244-6 has been updated with the latest version, 52.244-6 (Jul 2021) | 10/25/21 | 10/26/21 | 1 | |||
| 30 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes DFARS 252.219-7011 Notice to Delay Performance, which is applicable to 8(A) contracting. Since this solicitation and contract are not 8(A), will the Government delete this clause? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | Clause removed | 10/25/21 | 10/26/21 | 1 | |||
| 31 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes DFARS 252.239-7018 Supply Chain Risk which is required in solicitations for the acquisition of commercial items or information technology. Since this solicitation for construction services, will the Government delete this clause? | Other; Please specify in the next column | Intent Needs Clarification | Contracting | DFARS 252.23-7018 will remain in this solicitatoin. | 10/25/21 | 10/26/21 | N/A | |||
| 32 | If "Others" - include info under Column E Clarification Request | Page 46 of 115, Section 00700 - Contract Clauses includes DFARS 252.242-7004 Material Management and Accounting Systems which is required in fixed-price contracts with progress payments made on the basis of costs incurred by the contractor as work progresses under the contract. Since this contract will be for progress payments made on the basis of work performed, will the Government delete this clause? | ||||||||||
| Other; Please specify in the next column | Intent Needs Clarification | Contracting | DFARS 252.242-7004 will remain in this solicitation. | 10/25/21 | 10/26/21 | N/A |
Drop Down List
| RFI Topic Relevant to: | RFP Part # | RFI Reason (for QA) - from KTR perspecrive |
| Architectural-related | Part 1 | Outdated Reference |
| Civil Engineering | Part 2 | Conflicting Information |
| Contracting | Part 3 | Attachments are referenced but missing/not provided |
| Electrical Engineering | Part 4 | Intent needs clarification |
| Environmental | Part 5 | Typo |
| Fire Protection | Part 6 | Other; Please specify in the next column |
| Geotechnical Engineering | If "Others" - include info under Column E Clarification Request | |
| Interior Design | ||
| Landscape | ||
| Mechanical Engineering | ||
| Structural Engineering | ||
| Other/Unsure | ||
| SCIF/SAPF | ||
| Crane | ||
| Elevators | ||