This document is a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract for renovation, repair, and new construction of medical facility projects at various government installations located in California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington and Hawaii. The solicitation will use a two-phase selection process to award three or more IDIQ contracts for a base period of 24 months plus two option periods of 36 months each, for a maximum duration of 96 months. The estimated maximum value for all contracts combined is $1 billion. Task orders will range from $15 million to $100 million. Contractors must demonstrate a minimum $40 million aggregate bonding capacity. Price evaluation preference will be given to HUBZone small businesses. The solicitation will evaluate proposals based on technical approach, construction experience, past performance, safety, technical solution, small business participation, and price for a proposed initial task order.

View the file

Other files

File Type Posted
N6247321R1411 Amendment 1.pdf PDF
RFI Response Form 28 Oct.xlsx XLSX spreadsheet
RFI Response Form 18 Oct.xlsx XLSX spreadsheet
RFI Form - 3MAR2021.xlsx XLSX spreadsheet
Surety Form.doc DOC document
RFI Form.doc DOC document
Exhibit E - Safety Data _ Narrative.docx DOCX document
Offerors Team Consent Form.doc DOC document
MACC Frequently Asked Questions.doc DOC document
N6247321R1411.pdf PDF
Exhibit C - PPQ.doc DOC document
Exhibit A - Offeror Team Composition and Management.docx DOCX document
Exhibit D - Past Performance - Small Business Utilization.docx DOCX document
Exhibit F - Small Business Participation Plan.docx DOCX document
Exhibit B - Contractor Experience Data Sheet.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR123456789123

INDEFINITE DELIVERY INDEFINITE QUANTITY UNRESTRICTED MULTIPLE AWARD CONSTRUCTION CONTRACT FOR NEWCONSTRUCTION, REPAIR, AND RENOVATION OF MEDICAL TREATMENT FACILITY PROJECTS AT VARIOUS GOVERNMENT INSTALLATIONS LOCATED IN

CALIFORNIA, ARIZONA, NEVADA, UTAH, COLORADO, NEW MEXICO, WASHINGTON AND HAWAII

This is an unrestricted procurement. Price evaluatoin prefrence w ill be given to HUBZone SB firms, in accordance w iht FAR 52.219-4.

NAICS: 236220 Size Standard: $36.5 Million Maximum dollar amount for all contracts combined is $1,000,000,000 Estimated Task Order Range is $15,000,000 to $100,000,000.

Minimum Guarentee is $5,000

Offerors must demonstrate a minimum aggregate bonding capacity of $40 million to allow for the managenment of multiple, concurrent projects at the higher dollar magnitude w ithin the task order price range.

Construction Contract- Net 14 days for payment (FAR 52.232-27)

MICA CHRISTENE PAULSON 619-532-4433

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

05-Oct-2021

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

X

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______1 calendar days and complete it w ithin ________731 calendar days after receiving aw ard, notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Each TaskOrder

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________04 Nov 2021 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

NAVFAC SOUTHWEST

DESIGN & CONSTRUCTION CONTRACTING NAVY

CODE: DCNAV

750 PACIFIC HIGHWAY

SAN DIEGO CA 92132-0001

N62473

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

N6247321R1411 115

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

N6247321R1411

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1,000,000,000 Each Medical Treatment Facility MACC

FFP

This is an indefinite delivery indefinite quantity (IDIQ) contract with no pre-established fixed contract prices. The actual amount of work to be performed and the time of such performance will be determined by the Contracting Officer or his/her properly authorized representative, who will issue written task orders to the Contractor. Award of the task order will be on a firm-fixed price basis.

Maximum of $1,000,000,000 is for all contracts combined and will serve as the maximum/NTE amount of the entire contract period. The performance period for the basic contract will be for a two-year (24-month) base period. The Government has the option to extend the term of the contract for up to two (2) terms of 36-months each (for a total maxium duration of 96 months) by written notice to the Contractor within the performance period specified in the Schedule.

PURCHASE REQUEST NUMBER: ACQR123456789123

MAX

NET AMT

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0002 1 Each Proposed Task Order (PTO) 0001

FFP

FOB: Destination

PURCHASE REQUEST NUMBER: ACQR123456789123

MAX

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A Government 0002 N/A N/A N/A Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

SECTION 00100

INSTRUCTION TO OFFERORS

1. Inquiries

Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Request for Information (RFI) form provided as an attachment. The Point of Contact (POC) for inquiries is Mica Paulson at mica.c.paulson.civ@us.navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.

2. Proposal Submittal Requirements

A cover letter shall accompany the proposal. The cover letter shall include—

(a) The solicitation number;

(b) The name, address, telephone number, and email address of the Offeror;

(c) The DUNS Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;

(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(e) Names, titles, phone numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;

(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

Proposals submitted in response to this solicitation shall be formatted as follows:

Phase One:

Cover Letter First two pages of SF1442 - with blocks 14 through 20c completed Surety Form (provided as an attachment to the solicitation) Section 00600 – Representations and Certifications VETS-4212 Report Submission Confirmation (or Statement of Non-applicability) Tab 1 - Factor 1, Technical Approach (Exhibit “A” and Signed Copies of Agreements or Letters of

Commitment for Each Member of the Offeror’s Team) Tab 2 - Factor 2, Experience (Exhibits “B”) - Factor 3, Past Performance (Exhibit “C” or

CPARS/CCASS/ACASS evaluations) (Evaluations should immediately follow the project shown on Exhibit “B” to which they pertain)

Tab 3 - Factor 3, Past Performance (Exhibit “D” Past Performance – Small Business Participation)

- Offeror’s Team Consent Form for the Release of Past Performance Information to the Prime Contractor for major Subcontractors/Teaming Partners identified in the Offeror’s Proposal (provided as an attachment to the solicitation)

- Address any adverse past performance issues, if applicable

Phase One proposals shall be submitted electronically using the Department of Defense (DoD) Secure Access File Exchange (SAFE) service at https://safe.apps.mil, via the “Drop-off” feature. DoD SAFE is the only electronic commerce method authorized for the submission of Phase One proposals in response to this solicitation. Submissions outside of DoD SAFE will not be considered.

Instructions for submission of Phase One proposals using the DoD SAFE “Drop-off” feature are provided below:

1. There are no user accounts for DoD SAFE. In order to submit a proposal in response to this solicitation, Offerors shall submit their point of contact (POC) name and email address via email to both the Contract Specialist and Contracting Officer identified below to obtain a “Request Code” for DoD SAFE “Drop-off” of the Phase One proposal.

Contract Specialist: Mica Paulson Email: Mica.C.Paulson.civ@us.navy.mil Contracting Officer: Tina Collins Email: Tina.M.Collins6.civ@us.navy.mil

Note: The Government does not intend to respond to emails for drop-off request codes submitted less than 10 calendar days before the proposal due date shown in the solicitation.

2. No later than four (4) calendar days prior to the proposal due date, the Contract Specialist or Contracting Officer will send a “Request Code” to the Offeror’s specified POC via the email address provided. Only the Offeror’s identified POC will be able to drop off the proposal or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.

3. Offerors are instructed to submit their complete Phase One proposal in one (1) single file, formatted in Portable Document Format (PDF) with a .pdf file extension.

4. To submit the proposal, the Offeror will go to the DoD SAFE website at https://safe.apps.mil, accept the user agreement, click “Drop-off,” and enter the 12-digit “Request Code” that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Government recipient. The Offeror will then click to add their proposal file, or drag and drop the file. Click “Drop-off Files” to send the file to the Government recipient. Confirm that the file does not contain classified information and click “OK.” Once the file is uploaded, an email will be sent to the Government recipient notifying them of the “drop-off.” [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil/about.php]. The DoD SAFE system will record the date and time of proposal submission. The date and time of proposal submission recorded in DoD SAFE shall govern the timeliness of any proposal submission.

LATE SUBMISSIONS WILL NOT BE CONSIDERED.

It is an Offeror’s responsibility, when transmitting its proposal electronically, to ensure the proposal’s timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in Block 13 of the SF1442. Offerors shall allow adequate time to upload files, which may be slower for non-DoD users, and to avoid other technical difficulties that may be encountered. An Offeror risks the late receipt and rejection of a proposal where it delays transmitting its proposal until the last few minutes before the time set for receipt of proposals. Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors are responsible for submitting their proposal in the format specified, consistent with requirements stated elsewhere in this solicitation. Offerors are asked to submit only the information/exhibits required. Page limits, if stipulated, must be adhered to. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

The maximum allowable file size for DoD SAFE is 8GB. DoD SAFE recommends using Firefox, Chrome, or Edge browsers. Internet Explorer is not recommended. Please note that Internet Explorer limits uploads to 2GB.

THE FOLLOWING EVALUATION FACTORS ARE APPLICABLE ONLY TO THOSE OFFERORS

WHO ARE SELECTED TO PROCEED TO PHASE TWO OF THE SOURCE SELECTION PROCESS.

DO NOT SUBMIT TABS 5 THROUGH 7 IN PHASE ONE PROPOSALS.

PROPOSAL SUBMISSION INSTRUCTIONS FOR PHASE TWO WILL BE PROVIDED (VIA

AMENDMENT) TO THOSE OFFERORS SELECTED TO PROCEED TO PHASE TWO.

Phase Two:

Financial Questionnaire (to be completed and submitted by financial institution. This document is provided as an attachment to the solicitation) FAR 52.204-24 (to be completed and submitted as part of the Phase Two proposal) Tab 4 - Factor 4, Safety (Exhibit “E”) Tab 5 - Factor 5, Technical Solution (Narrative and Drawings) Tab 6 - Factor 6, Small Business Participation (Exhibit “F”) Tab 7 - Factor 7, Price (In sealed envelope in original proposal folder only) – The envelope shall contain the following original documents: SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Pricing Schedule for Proposed Task Order (PTO) 0001; Bid Bond (in the amount of 20% of the proposal price for PTO 0001 or $3,000,000, whichever is less)

Phase Two proposals shall be submitted electronically using the Department of Defense (DoD) Secure Access File Exchange (SAFE) service at https://safe.apps.mil, via the “Drop-off” feature. DoD SAFE is the only electronic commerce method authorized for the submission of Phase Two proposals in response to this solicitation. Submissions outside of DoD SAFE will not be considered.

Instructions for submission of Phase Two proposals using the DoD SAFE “Drop-off” feature are provided below:

1. There are no user accounts for DoD SAFE. In order to submit a proposal in response to this solicitation, Offerors shall submit their point of contact (POC) name and email address via email to both the Contract Specialist and Contracting Officer identified below to obtain a “Request Code” for DoD SAFE “Drop-off” of the Phase One proposal.

Contract Specialist: Mica Paulson Email: Mica.C.Paulson.civ@us.navy.mil

Contracting Officer: Tina Collins Email: Tina.M.Collins6.civ@us.navy.mil

Note: The Government does not intend to respond to emails for drop-off request codes submitted less than 10 calendar days before the proposal due date shown in the solicitation.

2. No later than four (4) calendar days prior to the proposal due date, the Contract Specialist or Contracting

Officer will send a “Request Code” to the Offeror’s specified POC via the email address provided. Only the Offeror’s identified POC will be able to drop off the proposal or proposal revisions in DoD SAFE. Failure to provide accurate POC information will preclude the Offeror from using DoD SAFE.

3. Offerors are instructed to submit their complete Phase Two proposal in two (2) separate files, formatted in

Portable Document Format (PDF) with a .pdf file extension, using DoD SAFE as follows:

File #1: FAR 52.204-24 (to be completed and submitted as part of the Phase Two proposal)

Tab 4 - Factor 4, Safety (Exhibit “E”) Tab 5 - Factor 5, Technical Solution (Narrative and Drawings) Tab 6 - Factor 6, Small Business Participation (Exhibit “F”)

File #2: Tab 7 - Factor 7, Price (SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Pricing Schedule for PTO 0001; Bid Bond (in the amount of 20% of the proposal price for PTO 0001 or $3,000,000, whichever is less))

4. To submit the Phase Two proposal, the Offeror will go to the DoD SAFE website at https://safe.apps.mil, accept the user agreement, click “Drop-off,” and enter the 12-digit “Request Code” that was provided by the Contract Specialist or Contracting Officer. The system will allow for inclusion of a short note to the Government recipient. The Offeror will then click to add their proposal file, or drag and drop the files. Click “Drop-off Files” to send the files to the Government recipient. Confirm that the files do not contain classified information and click “OK.” Once the files are uploaded, an email will be sent to the Government recipient notifying them of the “drop-off.” [Additional details can be viewed in the DoD SAFE User Guide available at https://safe.apps.mil/about.php]. The DoD SAFE system will record the date and time of proposal submission. The date and time of proposal submission recorded in DoD SAFE shall govern the timeliness of any proposal submission.

5. In addition, the Offeror must submit an original version of the price proposal (Tab 7 – Factor 7, Price) in a sealed envelope to the address below within five (5) business days after the Phase Two proposal due date.

The sealed envelope shall contain the following original documents: SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Pricing Schedule for PTO 0001; Bid Bond (in the amount of 20% of the proposal price for PTO 0001 or $3,000,000, whichever is less). The package/envelope must be clearly marked on the outside with the solicitation number.

Naval Facilities Engineering Systems Command Southwest Design and Construction Contracting Core- Navy / Code DCNAV Attention: Mica Paulson 750 Pacific Highway, 5th Floor San Diego, CA 92132-5190

LATE SUBMISSIONS WILL NOT BE CONSIDERED.

Note: It is recommended to use FedEx to ensure direct delivery. If the Contractor representative or courier will be hand delivering the sealed envelope with original documents to the reception area of building 750, please coordinate directly with the Contract Specialists, Mica Paulson (Email: Mica.C.Paulson.civ@us.navy.mil) at least seven (7) business days prior to hand delivery.

It is an Offeror’s responsibility, when transmitting its proposal electronically, to ensure the proposal’s timely delivery by transmitting the proposal sufficiently in advance of the time set for receipt of proposals to allow for timely receipt by the Government no later than the date and time stated in Block 13 of the SF1442. Offerors shall allow adequate time to upload files, which may be slower for non-DoD users, and to avoid other technical difficulties that may be encountered. An Offeror risks the late receipt and rejection of a proposal where it delays transmitting its proposal until the last few minutes before the time set for receipt of proposals. Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors are responsible for submitting their proposal in the format specified, consistent with requirements stated elsewhere in this solicitation. Offerors are asked to submit only the information/exhibits required. Page limits, if stipulated, must be adhered to. Files that cannot be opened, or are otherwise missing the required content are the responsibility of the Offeror.

The maximum allowable file size for DoD SAFE is 8GB. DoD SAFE recommends using Firefox, Chrome, or Edge browsers. Internet Explorer is not recommended. Please note that Internet Explorer limits uploads to 2GB.

Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated.

However, they will be considered in assessing the Offeror’s responsibility.

3. Pre-Proposal Conference

(a) Please see Part 1 of the seed project RFP for information regarding the site visit for PTO 0001.

(b) A list of Frequently-Asked-Questions (FAQ) with appropriate responses is provided as an attachment to the RFP. All firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

(c) Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation.

(d) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. Phase Two RFP amendments will be sent to all Phase Two Offerors via email. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should send the completed questionnaire via email directly to Mica Paulson (Email:

Mica.C.Paulson.civ@us.navy.mil). Please ensure the financial institution utilizes the form provided in order to submit the requested information. Links to websites and/or files with .zip file extensions may not be accepted.

Additionally, please ensure financial questionnaires are submitted by the Phase Two proposal due date.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. Surety Form

Offerors shall submit the Surety Form to report their surety bonding information, verifying aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent within the surety, is shown on the form.

If the Offeror is a joint venture, one Surety Form shall be submitted for the joint venture, not the individual partners.

6. System for Award Management

Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract.

In order to participate on this solicitation, contractors must also complete electronic representations and certifications. For more information and to complete the electronic Reps & Certs, see the SAM website at https://sam.gov/content/home. A contract cannot be awarded to a contractor not registered in SAM.

Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement.

Note: Offerors must complete and submit Section 00600 of the RFP as part of their proposal even if the Offeror is registered in SAM. Section 00600 of the RFP contains clauses which are not found in the electronic Reps & Certs in SAM; therefore, we require them to be completed and submitted as part of your proposal. The clauses found in Section 00600 of the RFP are also broken out as a separate form titled “Section 00600 – Representations and Certifications” which can be found with the other RFP Exhibits.

7. Federal Contractor Reporting

In accordance with Federal Acquisition Regulation (FAR) 22.13, any contractor or subcontractor with a contract or subcontract with the Federal Government of $150,000 or more that was entered into on or after October 1, 2015 (or $100,000 or more that was entered prior to October 1, 2015) must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212

Internet site at http://www.dol.gov/vets/vets4212.htm or employers may contact the VETS-4212 customer support at (866) 237- 0275 or e-mail at VETS4212-customersupport@dol.gov.

VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.

Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS- 4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

8. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

9. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

10. Mentor Protégé Agreements

Only Mentor Protégé Agreements formally approved by the SBA will be considered for this procurement.

Mentor Protégé Agreements approved by other agencies will not be considered. The proposal shall contain both the Joint Venture Agreement and the SBA letter of approval for the Mentor Protégé Agreement, showing the approval is valid as of the date of the proposal submission.

SECTION 00210

BASIS OF AWARD AND EVALUATION FACTORS

1. BASIS OF AWARD

Selection of contractor(s) will be accomplished using Source Selection Procedures on the basis of Best Value to the Government, using the tradeoff process as described in FAR 15.101-1. This process allows for a tradeoff between non-price factors and price and allows the Government to accept other than the lowest priced proposal or other than the highest technically rated proposal to achieve a best-value contract award.

Interested firms are expected to review the RFP and participate in a pre-proposal conference and site visit (if conducted), provide proposed prices for the initial project, and provide proposal information requested to evaluate their technical and past performance factors.

The Two Phase procedures of FAR 36.3 will be used for this procurement. Phase One of the solicitation is in accordance with FAR Part 36.3. Phase One evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase Two proposal. The maximum number of Offerors that will be selected to submit a Phase Two proposal is approximately eight (8). Phase Two of the solicitation shall require submission of technical and price proposals by the Offerors selected in Phase One, which will be evaluated separately in accordance with Part 15. The Government intends to evaluate proposals and award contract(s) without discussions.

The Government anticipates three or more multiple award construction contracts. Offerors are advised that those Offerors who are selected to proceed to Phase Two are not guaranteed receipt of a contract award.

Award of the basic multiple award construction contracts will be made to those responsible Offerors whose proposals conforming to the solicitation are determined to be the most advantageous to the Government considering past performance, technical, and price factors. The Government reserves the right to award three or more contracts under this solicitation or to award only the initial project (Proposed Task Order 0001) identified in the RFP as a single-action contract. The Government reserves the right not to award the Proposed Task Order 0001. The Government reserves the right to substitute or add other design-build projects that meet the scope of the MACC. Subject to the availability of funds, the Government reserves the right to delay or cancel the award of Proposed Task Order 0001 at time of the basic contract award. If the task order is not awarded with the basic award, the guaranteed minimum will be awarded.

The Government reserves the right to reject any or all basic contract offers at any time prior to award; to negotiate with any one or all Offerors; to award the contract to other than the Offeror submitting the lowest total price; and to award contracts to three or more Offerors submitting proposals determined by the Source Selection Authority to be the most advantageous to the Government.

OFFERORS ARE ADVISED THAT IT IS DEFINITELY POSSIBLE THAT AN AWARD MAY BE

MADE WITHOUT DISCUSSIONS OR ANY CONTACT CONCERNING THE PROPOSALS

RECEIVED. Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they would be contacted or afforded the opportunity to qualify, discuss, or revise their proposal. Firms participating in the pre-proposal conference and site visit (if conducted) will not be compensated for their participation.

Successful Offerors will receive the following contract awards:

The Offeror submitting the proposal, conforming to the RFP, determined to represent the Best Value receives award with a minimum guarantee and the initial project, if the Government chooses to award it.

Second, third, and any additional selected contractor will each receive award with a minimum guarantee, and selection will be based on the same criteria as the first selection.

2. DEFINITIONS

100% COMPLETE: The facility is completely constructed and ready for the intended use.

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

CONTRACTOR TEAMING ARRANGEMENT: An arrangement in which two or more companies form a partnership or joint venture to act as a potential prime contractor, or a potential prime contractor agrees with one or more companies to have them act as its subcontractor(s), under a specified Government contract or acquisition program. A proposed contractor teaming arrangement will be recognized by the Government provided the Offeror identifies, in its proposal, the type of arrangement, fully discloses company relationships, and provides a copy of the partnership, joint venture agreement, or teaming agreement with the proposal package.

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

DESIGN-BUILD: Refers to combining design and construction in a single contract with one contractor. Design-build projects require design of the project by a licensed professional (i.e.

engineer, architect). Projects that only require shop drawing level effort are not design- build projects.

DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for separately with two separate contracts and contractors; one for an A-E contract and one for a construction contract.

EXPERIENCE: Pertains to work performed by an Offeror and Offeror’s Team within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity. Experience is distinct from past performance (how well an Offeror has performed).

JOINT VENTURE (JV): An arrangement of two or more businesses (parties) to compete and perform as prime contractor for a contract.

MEANINGFUL INVOLVEMENT: Provision of, or reliance upon, the workforce, management, facilities, or other resources of an affiliate/subsidiary/parent/LLC/LTD, such that the affiliate/subsidiary/parent/LLC/LTD will be involved in the contract effort with the Offeror, and thereby affect the performance of the Offeror.

NEW CONSTRUCTION: Refers to projects creating entirely new facilities (or new expansions/additions to existing facilities where a new structure and/or foundation are provided as part of the expansion/addition).

OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror's name cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.

PAGE: Refers to one printed side of a piece of paper (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative). Font size and font style shall be clearly legible.

PAST PERFORMANCE: Relates to how well an Offeror and Offeror’s Team has performed; e.g., the quality of work accomplished, schedule compliance, customer satisfaction.

PROJECT: A construction activity or task, with a single starting point and a single ending point.

RENOVATION AND REPAIR PROJECT TYPES: Refers to projects where the work modifies existing structure. Projects that only modify supporting facilities (including but not limited to electrical, exterior utilities, sidewalks, roofing, HVAC repairs/replacements, and equipment replacements) will not be considered relevant.

SELF-PERFORMED: Refers to performing relevant and major construction trade work in-house without subcontractors. This does not include project administration or management functions (such as quality control or safety program) and miscellaneous work (such as housekeeping or cleanup). Relevant and major construction trade work is that which is the same or similar to the work that may be ordered under this contract.

SEVEN-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience, past performance, or for prior support for small business. The seven-year period is calculated by counting back seven years from the initial Request for Proposal (RFP) issuance date.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

SUSTAINABLE FEATURES: Features in the design, construction, and operation of facilities with the goal of conserving resources and minimizing adverse effects on the environment while enhancing occupant productivity, minimizing energy use, improving quality and durability of materials, increasing recycling and use of recycled products, waste reduction, etc. Relevant sustainable features are those that are the same or similar to those recognized by the Third Party Certification entities.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

3. RELATIVE IMPORTANCE OF THE EVALUATION FACTORS

The relative importance of the evaluation factors is as follows:

a. Phase One: Phase One shall consist of Factors 1, 2, and 3. Factor 1 (Technical Approach) will be rated as either Acceptable or Unacceptable. If an Offerer is rated Unacceptable for Factor 1, they will not be invited to participate in Phase Two. Factor 2 is of equal importance to the performance confidence assessment (Factor 3, Past Performance).

b. Phase two: Phase Two shall consist of Factors 4, 5, and 6. Factor 6 (Small Business Participation) will be rated as either Acceptable or Unacceptable. If an Offerer is rated Unacceptable for Factor 6, they will not be considered for award of a contract. In making the best value award decision in Phase Two, Factors 2 through 5 and price will be considered. The technical factors (2, 4, and 5) are of equal importance to each other and when combined, are of equal importance to the performance confidence assessment (Factor 3, Past Performance). The combined non-price factors are approximately equal to price.

The importance of price will increase if the Offerors’ non- price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.

According to FAR 15.304, the evaluation factors that apply to this acquisition are a part of this RFP and are evaluated individually. The applicable evaluation factors and submission requirements are identified below.

4. EVALUATION FACTORS

The evaluation factors for this procurement are:

Phase One:

Factor 1 – Technical Approach Factor 2 – Construction Experience

Factor 3 – Past Performance

Phase Two:

Factor 4 - Safety Factor 5 - Technical Solution - Based on Proposed Task Order 0001 Factor 6 - Small Business Participation Factor 7 - Price - Based on Proposed Task Order 0001

PHASE ONE Basis of Evaluation/Submission Requirements/Criteria Description

FACTOR 1: TECHNICAL APPROACH

a. Solicitation Submission Requirements:

The composition and management of the firms proposed for a typical team for this contract will be evaluated in this factor.

The Offeror shall submit the following information under Tab “1”:

(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a narrative describing the proposed primary construction firm(s) and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative.

The technical approach narrative (Exhibit A) shall be limited to one (1) double-sided page (or two (2) single-sided pages). The information requested in item (2) below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement, approved Mentor-Protégé agreement (MPA), or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.). If the Offeror is proposing as a Mentor-Protégé joint venture, the Offeror shall submit the SBA approved Mentor Protégé joint venture agreement with the SBA approval letter of the Mentor Protégé agreement and any subsequent extensions.

b. Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the teaming relationships (if any) proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.

FACTOR 2: CONSTRUCTION EXPERIENCE (See definition)

Submit Exhibit “B” (Construction Experience Project Data Sheet) under Tab “2.”

(1) Construction Experience:

The offeror shall submit a maximum of five (5) relevant construction projects that best demonstrate self-performed (see definition) experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract.

For purposes of this evaluation, relevant projects are further defined as renovation, and/or new construction of medical treatment facilities. For the purposes of this evaluation, “Medical Treatment Facilities” are hospitals, ambulatory care centers, medical and dental clinics, and medical research laboratories. The medical treatment facilities must consist of reinforced concrete or a structural steel frame with a construction cost of $15,000,000 or more and a minimum of 35,000 square feet.

Note: Renovation and phased projects under this contract will require contractors to work in or adjacent to facilities that will be in full operation. The contractor will be required to minimize interference with daily operation of the facilities and will be required to comply with requirements of a number of regulatory and accrediting bodies such as the Joint Commission and construction requirements such as infection control, life safety and applicable codes and Uniform Facilities Criteria (UFC).

Additional minimum submission requirements:

- At least two (2) relevant projects that demonstrate experience in performing primarily renovation (see definition) of existing medical treatment facilities.

- At least three (3) relevant projects that demonstrate experience in primarily new construction (see definition) of medical treatment facilities.

- At least two (2) relevant projects that demonstrate experience with infection control.

- At least one (1) relevant project with a construction cost of $50,000,000 or more for a medical treatment facility.

Note: A single project may satisfy more than one of the above minimum requirements.

Exhibit “B” must clearly address how the project meets the above requirements.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past seven (7) years of the date of issuance of this RFP. Projects which are not 100% complete as of the date of issuance of this RFP shall not be considered.

A project is defined as a construction project with a single starting point and a single ending point, performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (how the project meets the requirements listed above). In addition, the description shall also address any sustainable features (see definition) for the project, including specific descriptions of those features. Provide applicable documentation on projects that were validated and/or certified through U.S. Green Building Council (USGBC) or an equivalent organization or process. Projects that are not sufficiently described so as to demonstrate compliance with the above requirements may be deemed not relevant.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, relevant projects shall be submitted for each Joint Venture member. In accordance with 13 C.F.R. 125.8(e), if the joint venture is an SBA approved Mentor-Protégé joint venture, the partners of the joint venture in aggregate must demonstrate the relevant project experience necessary to perform the contract. With the exception of the SBA approved Mentor-Protégé joint venture, Offerors who fail to submit relevant experience for all Joint Venture members will be assigned a deficiency and will be rated Unacceptable.

Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name and address is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of this contract. Regarding any such submitted project, if the Offeror fails to demonstrate the affiliate/subsidiary/parent/LLC/LTD firm’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated.

The Offeror may NOT utilize experience of a subcontractor to demonstrate construction experience under this evaluation factor unless the following applies:

Applicable to Small Business Offerors only:

If a Small Business Offeror cannot independently demonstrate its own experience, the Small Business Offeror may utilize the experience of a first-tier Small Business subcontractor that will perform major or critical aspects of the requirement in order to demonstrate relevant construction experience under this evaluation factor. The Government will consider the submitted relevant experience of each first-tier Small Business subcontractor as the experience of the Small Business Offeror, provided that:

1) The Small Business Offeror submits a supporting partnership or teaming agreement for each first-tier Small Business subcontractor; and

2) The Small Business Offeror provides an explanation of the meaningful involvement that each first-tier Small Business subcontractor will have in performance of this contract.

Regarding any such submitted project(s), if the Small Business Offeror fails to include a supporting partnership or teaming agreement and/or fails to demonstrate the first-tier Small Business subcontractor’s meaningful involvement in the performance of this contract, the project(s) will not be considered relevant and will not be evaluated. Small Business Offerors are still limited to a total of five (5) projects combined.

b. Basis of Evaluation:

The basis of evaluation will include the Offeror’s Team’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s Team’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.

Offerors who submit relevant construction projects that best demonstrate self-performed (see definition) experience on projects that are similar in size, scope, and complexity to projects that may be ordered under this contract may be considered more favorably than those that do not. For Small Business Offerors, please refer to paragraph a. (1) statement on: “Applicable to Small Business Offerors only.”

Offerors who submit relevant projects that demonstrate additional experience with construction projects of $50,000,000 and above, beyond the one (1) required project, may be considered more favorably than those that do not.

Relevant projects that demonstrate experience in design-bid-build (see definition) construction may be considered more favorably than those that do not demonstrate experience in design-bid-build construction.

Relevant projects that demonstrate experience with infection control beyond the two (2) required projects may be considered more favorably than those that do not demonstrate additional infection control experience.

Relevant projects that demonstrate experience with sustainable features (see definition) may be considered more favorably than those that do not demonstrate experience with sustainable features.

FACTOR 3: PAST PERFORMANCE

Submit Past Performance Questionnaires (Exhibit “C”) and CCASS/ACASS/CPARS evaluations under Tab “2” immediately following each of the project data sheets to which they pertain. Submit any other past performance information under Tab “3.”

IF A COMPLETED CONSTRUCTION CONTRACTOR APPRAISAL SUPPORT SYSTEM (CCASS)

OR CONTRACTOR PERFORMANCE ASSESSMENT RATING SYSTEM (CPARS) EVALUATION IS

AVAILABLE, IT SHALL BE SUBMITTED WITH THE PROPOSAL FOR EACH PROJECT

INCLUDED IN FACTOR 2 FOR CONSTRUCTION EXPERIENCE. IF THERE IS NOT A

COMPLETED CCASS, ACASS, OR CPARS EVALUATION, the Past Performance Questionnaire (Exhibit “C”) is provided for the Offeror or its team members to submit to the client for each project included in Factor 2 for Construction Experience.