This solicitation is for an indefinite delivery indefinite quantity multiple award construction contract by the Naval Facilities Engineering Command to provide renovation, repair, and new construction of medical facility projects at various government installations in eight Western states. The contract has a base period of 24 months and includes two additional 36-month option periods for a maximum duration of 96 months. The total estimated value of all contracts awarded is $1 billion to be issued through task orders ranging from $15 million to $1 billion for design-build and design-bid-build services. A minimum of $5,000 will be guaranteed to each awardee, with selection based on technical approach, construction experience, past performance, safety, technical solution, and small business participation factors. Price will be evaluated for a sample task order, with award to the offeror providing the best overall value. Responses are due by checking the SAM.gov website daily for the solicitation and any amendments starting October 5, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247321R1411 Amendment 1.pdf | ||
| RFI Response Form 28 Oct.xlsx | XLSX spreadsheet | |
| RFI Response Form 18 Oct.xlsx | XLSX spreadsheet | |
| RFI Form - 3MAR2021.xlsx | XLSX spreadsheet | |
| N6247321R1411.pdf | ||
| Surety Form.doc | DOC document | |
| RFI Form.doc | DOC document | |
| Offerors Team Consent Form.doc | DOC document | |
| MACC Frequently Asked Questions.doc | DOC document | |
| N6247321R1411.pdf | ||
| Exhibit C - PPQ.doc | DOC document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit D - Past Performance - Small Business Utilization.docx | DOCX document | |
| Exhibit F - Small Business Participation Plan.docx | DOCX document | |
| Exhibit B - Contractor Experience Data Sheet.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT “E”
SAFETY DATA SHEET
N62473-21-R-1411
This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. DART rates and TCR shall not be submitted for subcontractors, except as noted (in Factor 4 – Safety) for Small Business Offerors utilizing first-tier Small Business subcontractor experience.
Joint Venture (JV) or Partnership: Complete Blocks 1 through 4 for each business entity who is part of the JV or partnership. Small Business Offerors utilizing first-tier Small Business subcontractor experience: Complete Blocks 1 – 4 for the Small Business Offeror and each first-tier Small Business subcontractor.
1. Offeror Name:
Name of JV member, partner, or first-tier Small Business subcontractor providing the information below (if applicable):
Offeror’s Five Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
| 2. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate |
| 2016 |
| 2017 |
| 2018 |
| 2019 |
| 2020 |
Instructions for calculating the DART rate can be found in the solicitation.
2a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:
2b. Explain any negative DART Rate trends and any corrective actions taken for improvement:
2c. If you do not have a DART Rate for a given year, state so here and explain why:
| 3. U.S. Dept. of Labor, OSHA Total Case Rate (TCR) | |
| 2016 | |
| 2017 | |
| 2018 | |
| 2019 | |
| 2020 |
Instructions for calculating the TCR can be found in the solicitation.
3a. For TCR of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:
3b. Explain any negative TCR trends and any corrective actions taken for improvement:
3c. If you do not have a TCR for a given year, state so here and explain why:
Note: Form may be expanded.
EXHIBIT “D” (continuation)
SAFETY NARRATIVE
N62473-12-R-XXXX
7. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed 2 pages. Any additional pages will not be considered.
Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:
Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels:
Note: Form may be expanded.
Exhibit “D” – Safety Data Sheet/Safety Narrative, Page 1 of 3
(Rev 12/12)
File details come from the government source that posted it. Updated .