About this file

This document contains a request for proposal for an indefinite delivery indefinite quantity multiple award construction contract for medical facility construction projects. The Naval Facilities Engineering Command seeks to award contracts to three or more contractors to provide renovation, repair, and new construction services for medical treatment facilities in California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington, and Hawaii. The contract has a maximum value of $1 billion over a potential term of 96 months. Individual task orders will range from $15 million to $1 billion. Offerors must submit responses to factors addressing technical approach, construction experience, past performance, safety, technical solution, small business participation, and price by the response date. Selection will be based on best value, and award is targeted without discussions.

View the file

Other files

File Type Posted
N6247321R1411 Amendment 1.pdf PDF
RFI Response Form 28 Oct.xlsx XLSX spreadsheet
RFI Form - 3MAR2021.xlsx XLSX spreadsheet
N6247321R1411.pdf PDF
Surety Form.doc DOC document
RFI Form.doc DOC document
Exhibit E - Safety Data _ Narrative.docx DOCX document
Offerors Team Consent Form.doc DOC document
MACC Frequently Asked Questions.doc DOC document
N6247321R1411.pdf PDF
Exhibit C - PPQ.doc DOC document
Exhibit A - Offeror Team Composition and Management.docx DOCX document
Exhibit D - Past Performance - Small Business Utilization.docx DOCX document
Exhibit F - Small Business Participation Plan.docx DOCX document
Exhibit B - Contractor Experience Data Sheet.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI (pre-award) Form_For KTR

SOLICITATION: N62473-21-R-1411

Medical MACC / California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington and Hawaii DOCUMENT DATE: 17 Oct 2021

TO BE FILLED OUT BY THE BIDDING KTRTO BE FILLED OUT BY THE GOV'T
RFI #RFP Part #Chapter or SectionSub-Section #CLARIFICATION REQUESTRFI reason from KTR's PerspectiveComment [fill out if "Other" was chosen, specify reason(s)]RFI Topic most closely relevant to:Government ResponseDATE RECEIVEDDATE TO KTRAmendment Number
1Part 2Chapter-2FACTOR 2Given this MATOC will include design-build projects, please confirm designer projects can be presented in Factor 2.Per RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. Design projects will not be considered relevant. Only renovation and construction projects will be considered relevant.10/6/2110/18/21N/A
2Part 2Chapter-2FACTOR 2Infection control considerations as identified in the evaluation criteria, wouldn’t factor into a new construction environment. We respectfully request the government revise the minimum submission requirements to reflect 4 renovation projects and 1 new construction project.Minimum submission requirements will not be revised. Per RFP part 2 Factor 2, A single project may satisfy more than one of the Factor 2 minimum submission requirements.10/6/2110/18/21N/A
3Part 2Chapter-2FACTOR 2We respectfully request the government allow projects that are either at least 50% complete or completed within the past 8 years.As stated in RFP Part 2 Factor 2, all projects shall be 100% complete within the past seven years of the date of issuance of this RFP. Projects which are not 100% complete as of the date of issuance of this RFP shall not be considered.10/6/2110/18/21N/A
4Part 2Chapter-2FACTOR 2To enable more participation by a diversity of business sizes, we respectfully request the government revise the minimum dollar value to $5 million.Minimum task order dollar value will not be revised under this MACC.10/6/2110/18/21N/A
5Part 1if Others include info under Column EFactor 1Section 00100: INSTRUCTIONS TO OFFERORS

PHASE 1 / FACTOR 2: CONSTRUCTION EXPERIENCE

Paragraph 6, page 15 of 115

Would you consider changing the relevant project completion deadline for similar experience from projects completed within the past seven (7) years to projects completed within the past ten (10) years?

Other; Please specify in the next columnMore firms would be able to respond if the time frame were open to 10 years instead of the current 7 years.ContractingRelevant project completion deadline for this Solicitation will remain at seven (7) years.10/12/2110/18/21N/A
6Part 1Chapter-1pg. 7, No. 4.Please confirm the Financial Questionnaire isn’t required until Phase 2.ContractingAs stated in RFP Part 1, Financial Questionnaire is a Phase 2 requirement.10/13/2110/18/21N/A
7Part 1Chapter-1pg. 14, FACTOR 1Please identify if any design firm(s) shall be identified in Factor 1: Technical Approach, given that some task orders may require design-build services.ContractingPer RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. There is no requirement for a design firm to be identified in Factor 1, Technical Approach.10/13/2110/18/21N/A
8Part 1pg. 15 FACTOR 2RFP page 15, Factor 2 requires that offerors provide applicable documentation on projects that were validated an/or certified through the USGBC. This appears to be a separate deliverable than the Exhibit B Data Sheet. Please confirm this documentation does not count against a page limit.ContractingDocumentation backing up USGBC Certification does not count against page count.10/13/2110/18/21N/A
9Part 1Chapter-1NAPlease confirm electronic signatures are acceptableContractingElectronic signatures are acceptable.10/13/2110/18/21N/A
10Part 1Chapter-1NAPlease confirm the use of tabs & Subtabs is acceptable to facilitate organizationContractingTabs and subtabs on your electronic file sent through DoD SAFE is acceptable.10/13/2110/18/21N/A

Drop Down List

RFI Topic Relevant to:RFP Part #RFI Reason (for QA) - from KTR perspecrive
Architectural-relatedPart 1Outdated Reference
Civil EngineeringPart 2Conflicting Information
ContractingPart 3Attachments are referenced but missing/not provided
Electrical EngineeringPart 4Intent needs clarification
EnvironmentalPart 5Typo
Fire ProtectionPart 6Other; Please specify in the next column
Geotechnical EngineeringIf "Others" - include info under Column E Clarification Request
Interior Design
Landscape
Mechanical Engineering
Structural Engineering
Other/Unsure
SCIF/SAPF
Crane
Elevators
ATFP