This document contains a request for proposal for an indefinite delivery indefinite quantity multiple award construction contract for medical facility construction projects. The Naval Facilities Engineering Command seeks to award contracts to three or more contractors to provide renovation, repair, and new construction services for medical treatment facilities in California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington, and Hawaii. The contract has a maximum value of $1 billion over a potential term of 96 months. Individual task orders will range from $15 million to $1 billion. Offerors must submit responses to factors addressing technical approach, construction experience, past performance, safety, technical solution, small business participation, and price by the response date. Selection will be based on best value, and award is targeted without discussions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6247321R1411 Amendment 1.pdf | ||
| RFI Response Form 28 Oct.xlsx | XLSX spreadsheet | |
| RFI Form - 3MAR2021.xlsx | XLSX spreadsheet | |
| N6247321R1411.pdf | ||
| Surety Form.doc | DOC document | |
| RFI Form.doc | DOC document | |
| Exhibit E - Safety Data _ Narrative.docx | DOCX document | |
| Offerors Team Consent Form.doc | DOC document | |
| MACC Frequently Asked Questions.doc | DOC document | |
| N6247321R1411.pdf | ||
| Exhibit C - PPQ.doc | DOC document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| Exhibit D - Past Performance - Small Business Utilization.docx | DOCX document | |
| Exhibit F - Small Business Participation Plan.docx | DOCX document | |
| Exhibit B - Contractor Experience Data Sheet.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI (pre-award) Form_For KTR
SOLICITATION: N62473-21-R-1411
Medical MACC / California, Arizona, Nevada, Utah, Colorado, New Mexico, Washington and Hawaii DOCUMENT DATE: 17 Oct 2021
| TO BE FILLED OUT BY THE BIDDING KTR | TO BE FILLED OUT BY THE GOV'T | ||||||||||
| RFI # | RFP Part # | Chapter or Section | Sub-Section # | CLARIFICATION REQUEST | RFI reason from KTR's Perspective | Comment [fill out if "Other" was chosen, specify reason(s)] | RFI Topic most closely relevant to: | Government Response | DATE RECEIVED | DATE TO KTR | Amendment Number |
| 1 | Part 2 | Chapter-2 | FACTOR 2 | Given this MATOC will include design-build projects, please confirm designer projects can be presented in Factor 2. | Per RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. Design projects will not be considered relevant. Only renovation and construction projects will be considered relevant. | 10/6/21 | 10/18/21 | N/A | |||
| 2 | Part 2 | Chapter-2 | FACTOR 2 | Infection control considerations as identified in the evaluation criteria, wouldn’t factor into a new construction environment. We respectfully request the government revise the minimum submission requirements to reflect 4 renovation projects and 1 new construction project. | Minimum submission requirements will not be revised. Per RFP part 2 Factor 2, A single project may satisfy more than one of the Factor 2 minimum submission requirements. | 10/6/21 | 10/18/21 | N/A | |||
| 3 | Part 2 | Chapter-2 | FACTOR 2 | We respectfully request the government allow projects that are either at least 50% complete or completed within the past 8 years. | As stated in RFP Part 2 Factor 2, all projects shall be 100% complete within the past seven years of the date of issuance of this RFP. Projects which are not 100% complete as of the date of issuance of this RFP shall not be considered. | 10/6/21 | 10/18/21 | N/A | |||
| 4 | Part 2 | Chapter-2 | FACTOR 2 | To enable more participation by a diversity of business sizes, we respectfully request the government revise the minimum dollar value to $5 million. | Minimum task order dollar value will not be revised under this MACC. | 10/6/21 | 10/18/21 | N/A | |||
| 5 | Part 1 | if Others include info under Column E | Factor 1 | Section 00100: INSTRUCTIONS TO OFFERORS |
PHASE 1 / FACTOR 2: CONSTRUCTION EXPERIENCE
Paragraph 6, page 15 of 115
Would you consider changing the relevant project completion deadline for similar experience from projects completed within the past seven (7) years to projects completed within the past ten (10) years?
| Other; Please specify in the next column | More firms would be able to respond if the time frame were open to 10 years instead of the current 7 years. | Contracting | Relevant project completion deadline for this Solicitation will remain at seven (7) years. | 10/12/21 | 10/18/21 | N/A | |||||
| 6 | Part 1 | Chapter-1 | pg. 7, No. 4. | Please confirm the Financial Questionnaire isn’t required until Phase 2. | Contracting | As stated in RFP Part 1, Financial Questionnaire is a Phase 2 requirement. | 10/13/21 | 10/18/21 | N/A | ||
| 7 | Part 1 | Chapter-1 | pg. 14, FACTOR 1 | Please identify if any design firm(s) shall be identified in Factor 1: Technical Approach, given that some task orders may require design-build services. | Contracting | Per RFP part 2 Factor 2, the offeror shall submit a maximum of five relevant construction projects. There is no requirement for a design firm to be identified in Factor 1, Technical Approach. | 10/13/21 | 10/18/21 | N/A | ||
| 8 | Part 1 | pg. 15 FACTOR 2 | RFP page 15, Factor 2 requires that offerors provide applicable documentation on projects that were validated an/or certified through the USGBC. This appears to be a separate deliverable than the Exhibit B Data Sheet. Please confirm this documentation does not count against a page limit. | Contracting | Documentation backing up USGBC Certification does not count against page count. | 10/13/21 | 10/18/21 | N/A | |||
| 9 | Part 1 | Chapter-1 | NA | Please confirm electronic signatures are acceptable | Contracting | Electronic signatures are acceptable. | 10/13/21 | 10/18/21 | N/A | ||
| 10 | Part 1 | Chapter-1 | NA | Please confirm the use of tabs & Subtabs is acceptable to facilitate organization | Contracting | Tabs and subtabs on your electronic file sent through DoD SAFE is acceptable. | 10/13/21 | 10/18/21 | N/A |
Drop Down List
| RFI Topic Relevant to: | RFP Part # | RFI Reason (for QA) - from KTR perspecrive |
| Architectural-related | Part 1 | Outdated Reference |
| Civil Engineering | Part 2 | Conflicting Information |
| Contracting | Part 3 | Attachments are referenced but missing/not provided |
| Electrical Engineering | Part 4 | Intent needs clarification |
| Environmental | Part 5 | Typo |
| Fire Protection | Part 6 | Other; Please specify in the next column |
| Geotechnical Engineering | If "Others" - include info under Column E Clarification Request | |
| Interior Design | ||
| Landscape | ||
| Mechanical Engineering | ||
| Structural Engineering | ||
| Other/Unsure | ||
| SCIF/SAPF | ||
| Crane | ||
| Elevators | ||
| ATFP |