AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

N62473-18-R-5003 Multiple Aw ard Service Contract (MASC)

Description of this amendment begins on page 2. Proposal due date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 11

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N6247318R5003

X 9B. DATED (SEE ITEM 11)

15-Feb-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Mar-2018

CODE

NAVFAC SOUTHWEST

PW CONTRACTS CORE - PPV

CODE RAQ10-PPV

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247318R5003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

The purpose of this amendment is to:

1. Provide responses to Requests for Information (RFIs);

2. Revise EXHIBIT “A” – OFFEROR EXPERIENCE PROJECT DATA SHEET, the revisions appear in red color font.

3. Revise EXHIBIT “C” – SAFETY DATA AND NARRATIVE, the revisions appear in red color font.

4. Revise EXHIBIT “D” – MANAGEMENT APPROACH, the revisions appear in red color font.

5. Incorporate a list of Frequently-Asked-Questions (FAQ) all firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

6. Extend the Request for Information due date to March 12, 2018 at 9:00 am Pacific Standard Time. The

Government does not intend to respond to inquiries after the RFI due date/time.

LATE SUBMITTALS WILL NOT BE CONSIDERED.

1. RFIs:

Question #1: We were unable to download the attachment for the seed project, it gave a file not found message, is there another means of attaching it so we can access it?

Answer #1: Solicitation and Associated documentation will be available in electronic Format Only. All documents are posted on the Navy Electronic Commerce Online (NECO) website at https://www.neco.navy.mil/ and the

Federal Business Opportunities (FBO) website at http://www.fbo.gov . The government attached the Proposed Task

Order (PTO) 0001 documents as separate files on NECO & FBO. It is the contractor’s responsibility to check the website daily for any amendments to this solicitation.

Question #2: We were unable to locate Attachment J, the inventory list. Can you please provide direction for finding it.

Answer #2: Attachment J is located under “See additional Documents” tab in NECO and FBO.

Question #3: Please clarify if Key Personnel resumes and an organization chart are to be submitted within 7 days after contract award as stated in PTO Annex 0200000 or with proposal submission. Factor 2: Management Approach states on page 13 of the RFP, “Provide a one-page resume that demonstrates experience and qualifications for the key personnel.” Similarly, there is no mention of a requirement to submit an organization chart with the proposal.

Tab #2: Factor 2- Management Approach, PTO Annex 0200000 Management and Administration

Answer# 3: Reference FAR 52.212-2 Evaluation – Commercial Items (OCT 2014), TAB #2 – Factor 2-

Management Approach (e) Corporate Management Plan, Page 13 of the RFP (Required): “Identify key personnel, such as the Senior Program Manager, responsible for performance oversight, inventory controls, contract capacity monitoring and all other contract management requirements. Provide a one-page resume that demonstrates experience and qualifications for the key personnel. Resumes shall include name, position title, position description, work history and applicable education and certifications”.

Clarification : *Post Award/ Task Orders, including but not limited to, Proposed Task Order (PTO) 0001, see Annex

0200000 Management and Administration, section 2.7.1 Key Personnel, page 57 of the RFP. PTO 0001- Camp

Pendleton: The Contractor shall submit to the COR, FSC Technical Writer and ACO/CS within seven (7) calendar days after award an Organizational Chart and the resumes of the Contractor’s Key Personnel for the specific Task

Order.

*Only require after award.

https://www.neco.navy.mil/ http://www.fbo.gov/

Question #4: Exhibit E. Instructions state that the financial institution completes the questionnaire and place it “in a sealed envelope showing the return address of the financial institution” Is email submission acceptable as long as the institution’s mailing address is shown upon receipt by the contractor?

Answer #4: No. Exhibit E shall be submitted with paper copy proposals.

Question #5: Exhibit D: Factor 2 – Management Approach.

Recommend the Government expand the page limitation for Exhibit D to 20 pages to allow each contractor to meet the 1-page resume requirement for each key personnel and include the required narrative.

Answer #5: The government increases the total page limit from five single-sided 8.5”x 11” to 10 single-sided 8.5”x

11”. The total page limit shall include the one page resumes for the key personnel for the Basic Award. See answer #3 for Key personnel above. Revised Exhibit D is attached; the revisions appear in red color font.

Question #6: 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014). Item (1) states that the NAICS code for this acquisition is 531120 Lessors of Nonresidential Buildings, which contradicts the SF1449 that lists NAICS code of 561210 (discrepancy). Please clarify which NAICS code applies to this acquisition.

Answer #6: The NAICS Code for this procurement is 561210 Facility Support Services. FAR

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) is updated; the revisions appear in red color font.

Question #7: Exhibit D Factor 2 – Management Approach states the contractor must fill out forms in “Times

Roman, 10 Pitch”. Based on this requirement there is no room to include an organizational chart that the Government requires. Recommend the Government amend the solicitation to instruct contractors on where to include the required

Organizational Chart, and, expand the page count to 20 pages.

Answer #7: See response for question #5 above.

Question #8: 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014). Item (2) states that the small business size standard is $27.5M, whereas the SF1449 states a figure of $37.5M. Please clarify which SB

Size Standard applies to this acquisition.

Answer #8: The Small Business Size Standard for this acquisition is $38.5 Million. FAR

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014) is updated, the revisions appear in red color font.

Question #9: Exhibit C: Safety Data and Narrative. Exhibit C is mandatory and used to submit safety information.

The safety narrative is limited to two (2) 8.5” x 11” pages. Recommend the Government expand the page count to 10 pages for the contractor to include all necessary required narratives/items, and remain compliant.

Answer #9: The government increases the total page limit from two single-sided 8.5”x 11” to eight single-sided

8.5”x 11”. Revised Exhibit C has been attached. Revised Exhibit C is attached, the revisions appear in red color font.

Question #10: Annex 1401000 Family Housing is generally privatized in San Diego. Recommend the Navy itemize the Family Housing sites that are NOT privatized, thus indicating the exact footprint the contractor is responsible for under this solicitation.

Answer #10: Annex 0100000, section 1.2 Project Location, Page 42 of the RFP. “The work shall be performed at various locations within the Area of Responsibility (AOR) of the Naval Facilities Engineering Command Southwest.

This area covers Naval And Marine Corps bases on West Coast states, which may include Arizona, California, Colorado, Nevada, New Mexico, and Utah.” Annex 1401000 is applicable to locations such as Barstow.

Question #11: Please clarify whether Family Housing is 100% Privatized, and if Annex 1401000 is applicable to this solicitation.

Answer #11: See answer to question #10

Question #12: Proposal Format/Submission Requirements. Please clarify if the table of contents, list of acronyms and list of tables, list of figures are excluded from page count limitations for each volume.

Answer #12: Table of contents, list of acronyms and list of tables, list of figures are excluded from page count limitations for each volume.

Question #13: Tab #4 – Factor 4, Past Performance states that PPQs shall be submitted to the Government POC below on or before the RFP issued date. Please clarify when PPQs are due as it is impossible for PPQs to be submitted before the RFP issue date of February 15, 2018 as it has already passed.

Answer #13: The Past Performance Questionnaire (PPQ) shall be submitted to the Government POC on or before the proposal due date, March 19, 2018 by 2:00pm (PST).

Question #14: 3.1 Service Orders (Annex 1502000 Facility Investment) Are there any trouble calls associated with this RFP? If so, please provide a list of trouble calls associated with this RFP.

Answer#14: Annex 1502000 Facility Investment, section 3.1 Service Orders, page 129 will be required at the Task

Order Level.

For PTO 0001 – Annex 1502000 Facility Investment, section 3.1 Service Orders, page 11 of the MCTSSA and

NEMTI HVAC maintenance contract attachment, No Service Orders are included in this task order.

Question #15: 2.7.1 Key Personnel (Basic), 2.7.1 Key Personnel (PTO 0001). Please clarify if contractors are to submit resumes for the Key Personnel found in Section 2.7.1 for the Basic RFP and PTO 0001 RFP. For example, Section 2.7.1.4 Environmental/Energy Manager is applicable to the Basic contract, but not applicable to Project

Task Order 0001 at Camp Pendleton. Are contractors required to submit resumes for both the basic and the task order with our proposal, or for just the basic, or for just the task order?

Answer #15: See answer to question #3 above.

Question #16: If the task order is awarded to five (5) contractors, could the government clarify how the task order will be allocated?

Answer #16: Reference Task Order Issuance Procedures, page 36-38 of the RFP for Competition, Task Order

Proposal submission and selection criteria.

Question #17: For clarification, will the government accept relevant work performed that is similar in size and scope as required in the solicitation performed as a subcontractor under a different task order?

Answer #17: No. 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) TAB #1 Factor 1 – Recent, Relevant Experience of the firm (1)(d)

Question #18: The Solicitation references the exhibits listed below. Can the Government provide these exhibits via an amendment?

EXHIBIT “A” – OFFEROR EXPERIENCE PROJECT DATA SHEET

EXHIBIT “B” – NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE

EXHIBIT “C” – SAFETY DATA AND NARRATIVE

EXHIBIT “D” – MANAGEMENT APPROACH

EXHIBIT “E” – FINANCIAL QUESTIONNAIRE

Answer#18: See answer for question #1 above.

EXHIBIT “A” – OFFEROR EXPERIENCE PROJECT DATA SHEET

Revised Exhibit A is attached; the revisions appear in red color font.

EXHIBIT “B” – NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE

EXHIBIT “C” – SAFETY DATA AND NARRATIVE

Revised Exhibit C is attached, the revisions appear in red color font.

EXHIBIT “D” – MANAGEMENT APPROACH

Revised Exhibit D is attached, the revisions appear in red color font.

EXHIBIT “E” – FINANCIAL QUESTIONNAIRE

Question #19: Can you provide the current maintenance schedule for the units in the seed project?

Answer#19: The maintenance schedule for the Equipment at NEMTI and MCTSSA have been serviced in the months of September, December, April, and August.

Question#20: Could the government clarify the total amount of positions required for this opportunity?

Answer#20: Reference 52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014) TAB #2 Management

Approach (2) Basis of Evaluation. “The Offeror’s proposal shall demonstrate to the Government that the Offeror has a plan and the ability to carry out that plan to manage and control the execution of work as outlined in the

Performance Work Statement (PWS).”

Question #21: 52.215-20, Requirements for cost or pricing data or information other than certified cost or pricing data. Are offerors required to submit certified cost or pricing data for PTO-0001 Seed Project?

Answer #21: Not required.

Question #22: Exhibit D, Tab#2: Factor 2 – Management Approach. Is Exhibit D itself not to exceed 5 pages or

Exhibit D including resumes not to exceed 5 pages total.

Answer#22: See response for question #5 above.

Question #23: The RFP requires Offerors to submit key personnel resumes as part of their Corporate Management

Plan. Can the Government confirm that they are requiring resumes for the Project Manager, Quality Manager, Site safety and Health Officer, and Environmental /Energy Manager?

Answer#23 See response for question #3 above.

Question #24: The RFP requires Offerors to submit key personnel resumes as part of their Corporate Management

Plan. Can the Government please confirm that the one-page resumes are excluded from the 5 page Management

Approach page limit?

Answer #24: See response for question #5 above.

Question #25: The Table of Contents and other parts of the solicitation refer to Exhibits A through F. However, it would appear that only Exhibit F – Request for Information has been provided. Would the government please provide Exhibits A through E?

Answer #25: See response for question #1 above.

Question #26: The Table of Contents and other parts of the solicitation refers to Exhibit D as the Management

Approach. However, the Excel file labeled N6247318R50030002Bid_Schedule_MCTSSA_and_NEMTI_HVAC.xls is also title Exhibit D. Please clarify.

Answer#26: Exhibit D - MANAGEMENT APPROACH, see page 13 of the RFP, Factor 2 under Tab #2 (1)

Solicitation Submittal Requirements.

Question #27: This paragraph states, in part, that a “Pre-proposal power point is posted as a separate document in

NECO and FedBizOps under this solicitation.” We cannot locate this file. Would you please identify the name of the file, or, if it is not posted, please post the file?

Answer #27: See response for question #1 and #2 above.

Question #28: References are made to “8” X 11”” paper. Please confirm that the Government is referring to standard letter-sized paper, which is 8.5” x 11.”

Answer #28: See Instruction to Offerors/General Information, section 3 Proposal Format/Submission requirements

(b) Paper pages shall be standard 8.5” X 11”. Technical Approach for safety, page 14 of the RFP is revised to reflect

(8.5” x11”).

Question# 29: Are CPARs and other documents and forms not prepared/generated by the Offeror excluded from the margin and font size requirements? Oftentimes, such documents employ different sized fonts and/or margins, but these are outside the Offeror’s control and cannot be changed.

Answer #29: Yes. CPARs are excluded from the margin and font size requirements.

Question #30: This Spec Item references PWO, ACQ, and FSCM. Would the Government please clarify what these acronyms represent?

Answer#30: PWO: Public Works Office, ACQ: Acquisition, FSCM: Facility Support Contract Manager. Acronyms list has been incorporated in this amendment as an attachment.

Question #31: Page 213 of the RFP. Is this page left blank intentionally? If not, would the Government please provide the missing data?

Answer #31: Page 213 is left blank intentionally.

Question #32: 1502000 – Facility Investment MCTSSA, NEMTI HVAC MAINTENANCE CONTRACT Spec

Item 3 states, The Contractor shall develop their Maintenance and Service Program using manufacturers’ recommended procedures and OEM standards. Paragraph 4, page 8. Question A: Does the Government have an expectation for frequency of service (quarterly, semiannual, annual), or is it strictly based on OEM recommendations? Question B: How many times a year is the current contractor servicing the equipment?

Answer #32: See answer for question #19 above.

Question #33: 52.212-2 Evaluation, TAB#3, Page 9 of 213 – Please provide an Exhibit E “Financial Questionnaire” form.

Answer #33: See answer to question #1. Exhibit E is attached herein.

Question #34: 52.212-2 Evaluation, TAB#1, Factor 1 (1), Page 11 of 213 – The required Exhibit A, Project Data

Sheets, please provide an Exhibit A form? Or are we to use the Attachment (2) Specialized Experience

Supplemental information form, that is focused on A/E Design services?

Answer #34: See answer to question #1 and #18. Exhibit A is attached herein.

Question #35:52.212-2 Evaluation, TAB#2, Factor 2 (1), Page 13 of 213 – The required Exhibit D “Management

Approach”, please provide an Exhibit D form?

Answer#35: See answer to question #1 and #18. Exhibit D is attached herein.

Question #36: 52.212-2 Evaluation, TAB#2, Factor 2 (1c), Page 13 of 213 – For the Key Management Resumes:

a) Please provide an Exhibit Form you would like for us to use?

b) Or are we to use the Attachment (3) Key Personnel Resume Supplemental Information form, that is focused on A/E Design services?

c) Can I assume that the Key Resumes pages are NOT included under the “Management Approach” total page limit; shall not exceed five single-sided 8.5” x 11” pages?

Answer #36:

a) Reference Tab #2 Factor 2 – Management Approach, (e) Corporate Management Plan. “Provide a one-page resume that demonstrates experience and qualifications for the key personnel. Resumes shall include name, position title, position description, work history and applicable education and certifications”

b) See answer to letter (a) above.

c) See response for question #5 above.

Question #37: 52.212-2 Evaluation, TAB#3, Factor 3 (1), Page 14 of 213 – The required Exhibit C “Safety”, please provide an Exhibit C form?

Answer#37: See answer to question #1 and #18. Exhibit C is attached herein.

Question #38 52.212-2 Evaluation, TAB#3, Factor 3 (1c), Page 14 of 213 – Can I assume that EMR and OSHA

Dart rate information is NOT included under the Technical Approach to Safety Narrative; limited to two pages (8” x

11”) limitation?

Answer#38: Reference Technical Approach for Safety, page 14 of the RFP. For EMR and OSA DART Rates “Any extenuating circumstances that affected the EMR, OSHA, DART, and TRC rate data negatively shall be addressed as part of this factor submission”

Question #39 52.212-2 Evaluation, TAB#4, Factor 4 (1), Page 15 of 213 – The required Exhibit B “PPQ”, please provide an Exhibit B form specific to this RFP?

Answer# 39: See answer to question #1 and #18. Exhibit B is attached herein.

Question #40:Attachment (1) OFFEROR INFORMATION – Is this form to be provided within the RFP response?

If so, please clarify as to Volume 1 or Volume 2.

Answer#40: Volume 1.

Question #41: Self-Performed: Refers to the offeror who performs relevant work that is the same or similar in size, scope and complexity of the work requirements in the solicitation, by in-house workforce and not by sub-contractor(s). This does not include administrative or management functions. Will subcontracted work performed by

“similarly situated” firms, i.e. “small business, 8(a), or Women Owned” businesses be counted the same as the prime, as has been confirmed in the latest SBA position, so that in this “small business” contract, subcontracts to other “small business” concerns are considered the same as self-performance?

Answer#41: No. NAVFAC subcontracting policy is regulated in accordance with FAR 52.219-14 Limitation on

Subcontracting (JAN 2017).

Question #42: Factor 1. Specifically, Tab #1, paragraph 1.c.v on page 11 of the solicitation implies that we must demonstrate experience in ALL technical annexes. However, under the Basis of Evaluation (paragraph 2(b) on page 12), the RFP indicates that projects submitted which demonstrate experience in all technical annexes will be rated higher. Is it in fact required to demonstrate technical experience in all technical annexes? Will proposals that don't demonstrate technical experience in all annexes be disqualified?

Answer #42: Reference Factor 1, (c)(v) Relevant projects shall demonstrate offeror’s experience in all technical annexes or a combination of the annex described in the solicitation. The offeror may submit experience, under a single project or multiple projects, so long as the offeror can demonstrate experience for all Annexes.

Reference Basis of Evaluation page 12 of the RFP, “b) Relevant projects submitted that demonstrate experience in all of the technical annexes described in the solicitation under a single project may be rated higher.”

Question #43: Delivery/Task Order minimum/maximum. Is it the governments’ intent that an offeror complete and submit these Schedule documents?

Answer #43: No. Delivery/Task Order Minimum/maximum quantity is $500- $7 Million.

The following have been modified:

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)

(a) Definitions. As used in this provision--

Economically disadvantaged women-owned small business (EDWOSB) concern means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the United States and who are economically disadvantaged in accordance with 13 CFR part 127. It automatically qualifies as a women-owned small business concern eligible under the WOSB Program.

Service-disabled veteran-owned small business concern--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and the size standard in paragraph (b) of this provision.

Small disadvantaged business concern, consistent with 13 CFR 124.1002, means a small business concern under the size standard applicable to the acquisition, that--

(1) Is at least 51 percent unconditionally and directly owned (as defined at 13 CFR 124.105) by--

(i) One or more socially disadvantaged (as defined at 13 CFR 124.103) and economically disadvantaged (as defined at 13 CFR 124.104) individuals who are citizens of the United States, and

(ii) Each individual claiming economic disadvantage has a net worth not exceeding $750,000 after taking into account the applicable exclusions set forth at 13 CFR 124.104(c)(2); and

(2) The management and daily business operations of which are controlled (as defined at 13 CFR 124.106) by individuals who meet the criteria in paragraphs (1)(i) and (ii) of this definition.

Veteran-owned small business concern means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

Women-owned small business concern means a small business concern--

(1) That is at least 51 percent owned by one or more women; or, in the case of any publicly owned business, at least

51 percent of the stock of which is owned by one or more women; and

(2) Whose management and daily business operations are controlled by one or more women.

Women-owned small business (WOSB) concern eligible under the WOSB Program (in accordance with 13 CFR part 127), means a small business concern that is at least 51 percent directly and unconditionally owned by, and the management and daily business operations of which are controlled by, one or more women who are citizens of the

United States.

(b)(1) The North American Industry Classification System (NAICS) code for this acquisition is 561210 Facility

Support Services

(2) The small business size standard is $38.5 Million

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(c) Representations. (1) The offeror represents as part of its offer that it [ ___ ] is, [ ___ ] is not a small business concern. (2) [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.] The offeror represents that it [ ___ ] is, [ ___ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.]

The offeror represents as part of its offer that it [ ___ ] is, [ ___ ] is not a women-owned small business concern.

(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. [Complete only if the offeror represented itself as a women-owned small business concern in paragraph (c)(3) of this provision.] The offeror represents as part of its offer that--

(i) It [ ___ ] is, [ ___ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ___ ] is, [ ___ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (c)(4)(i) of this provision is accurate for each WOSB concern eligible under the WOSB

Program participating in the joint venture. [The offeror shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: ___ --.] Each

WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.

(5) Economically disadvantaged women-owned small business (EDWOSB) concern. [Complete only if the offeror represented itself as a women-owned small business concern eligible under the WOSB Program in (c)(4) of this provision.] The offeror represents as part of its offer that--

(i) It [ ___ ] is, [ ___ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and

(ii) It [ ___ ] is, [ ___ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (c)(5)(i) of this provision is accurate for each EDWOSB concern participating in the joint venture. [The offeror shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___ --.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.

(6) [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.]

The offeror represents as part of its offer that it [ ___ ] is, [ ___ ] is not a veteran-owned small business concern.

(7) [Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph (c)(6) of this provision.] The offeror represents as part of its offer that it [ ___ ] is, [ ___ ] is not a service-disabled veteran-owned small business concern.

(8) [Complete only if the offeror represented itself as a small business concern in paragraph (c)(1) of this provision.]

The offeror represents, as part of its offer, that--

(i) It [ ___ ] is, [ ___ ] is not a HUBZone small business concern listed, on the date of this representation, on the

List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR Part 126; and

(ii) It [ ___ ] is, [ ___ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR Part 126, and the representation in paragraph (c)(8)(i) of this provision is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The offeror shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: ___ --.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.

(d) Notice.

(1) If this solicitation is for supplies and has been set aside, in whole or in part, for small business concerns, then the clause in this solicitation providing notice of the set-aside contains restrictions on the source of the end items to be furnished.

(2) Under 15 U.S.C. 645(d), any person who misrepresents a firm's status as a business concern that is small, HUBZone small, small disadvantaged, service-disabled veteran-owned small, economically disadvantaged women-owned small, or women-owned small eligible under the WOSB Program in order to obtain a contract to be awarded under the preference programs established pursuant to section 8, 9, 15, 31, and 36 of the Small Business Act or any other provision of Federal law that specifically references section 8(d) for a definition of program eligibility, shall—

(i) Be punished by imposition of fine, imprisonment, or both;

(ii) Be subject to administrative remedies, including suspension and debarment; and

(iii) Be ineligible for participation in programs conducted under the authority of the Act.

(End of provision)

(End of Summary of Changes)