Bid_Schedule_MCTSSA_and_NEMTI_HVAC.xls
XLS spreadsheet 114 KB Posted
- Solicitation number
- N6247318R5003
About this file
Bid_Schedule_MCTSSA_and_NEMTI_HVAC.xls
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE SUMMARY
| BID SCHEDULE | |
| N62473-18-R-5003 MASC | |
| BASE YEAR | |
| FFP | $ 17,100.00 |
| IDIQ | $ - 0 |
| TOTAL | $ 17,100.00 |
| 1ST OPTION YEAR | |
| FFP | $ 17,100.00 |
| IDIQ | $ - 0 |
| TOTAL | $ 17,100.00 |
| 2ND OPTION YEAR | |
| FFP | $ 17,100.00 |
| IDIQ | $ - 0 |
| TOTAL | $ 17,100.00 |
| 3RD OPTION YEAR | |
| FFP | $ 17,100.00 |
| IDIQ | $ - 0 |
| TOTAL | $ 17,100.00 |
| TOTAL BASE + OPTION YEARS | |
| FFP | $ 68,400.00 |
| IDIQ | $ - 0 |
| TOTAL | $ 68,400.00 |
BASE YEAR
| EXHIBIT A | |||||||
| BID SCHEDULE | |||||||
| BASE YEAR FIRM-FIXED PRICE -CLIN 0001 | |||||||
| PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. | |||||||
| ELINS FIRM FIXED PRICE WORK | |||||||
| ELINS | Description | Qty | Unit of Issue | Unit Price | Total Price | ||
| A001 | MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2018 - August 31, 2019 | ||||||
| A001AA | MCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | ||
| A001AB | MCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 1,175.00 | $ 14,100.00 | ||
| Sub -Total A001: | $ 14,100.00 | ||||||
| A002 | NEMTI Funded - HVAC Repair and Maintenance - September 1, 2018 - August 31, 2019 | ||||||
| A002AA | NEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | ||
| A002AB | NEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 250.00 | $ 3,000.00 | ||
| Sub-Total A002: | $ 3,000.00 | 0 | |||||
| A003 | Reserved | ||||||
| A004 | Reserved | ||||||
| A005 | Reserved | ||||||
| TOTAL OF ELINS A001 THROUGH A005 | $ 17,100.00 | ||||||
| BASE YEAR INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002 | |||||||
| PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK. | |||||||
| Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton. | |||||||
| ELIN | Short Description | Full Description | Qty | Unit of Issue | Unit Price | Total Price | |
| A006 | Emergency Service Calls | The Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status. | |||||
| A006AA | Level I | Perform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00) | 2 | EA | $ - 0 | $ - 0 | |
| A006AB | Level II | Perform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00) | 2 | EA | $ - 0 | $ - 0 | |
| A006AC | Level III | Perform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00) | 2 | EA | $ - 0 | $ - 0 | |
| A006AD | Level IV | Perform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00) | 2 | EA | $ - 0 | $ - 0 | |
| A006AE | Level V | Perform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00) | 2 | EA | $ - 0 | $ - 0 | |
| TOTAL | $ - 0 | ||||||
| NEGOTIATED WORK | |||||||
| A007 | Unit Priced Labor; Normal Working hours | The Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | |||||
| A007AA | Heating and Air Conditions Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 60 | HR | $ - 0 | $ - 0 | |
| A007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 60 | HR | $ - 0 | $ - 0 | |
| A007AC | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification. | 20 | HR | $ - 0 | $ - 0 | |
| TOTAL | $ - 0 | ||||||
| A008 | Unit Priced Labor Overtime | ||||||
| A008AA | Heating and Air Conditions Technician | 20 | HR | $ - 0 | $ - 0 | ||
| A008AB | DDC Technician | 20 | HR | $ - 0 | $ - 0 | ||
| A008AC | Electrician | 20 | HR | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | ||||||
| A009 | Materials and Equipment (in support of Composite Hour Labor Rate) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. | $ 75,000.00 | % | 0.00% | $ - 0 | |
| $35,000.00 + ($35,000.00 X ____*%) = | |||||||
| (Est Qty) (Est Qty) FBR | |||||||
| *Bidder inserts Fixed Burden Rate expressed as a percentage | |||||||
| TOTAL OF IDIQ WORK ELINS | $ - 0 | ||||||
| TOTAL BASE YEAR FFP A001 AND A005 | $ 17,100.00 | ||||||
| TOTAL BASE YEAR IDIQ ELINS A006 THROUGH A009 | $ - 0 | ||||||
| GRAND TOTAL OF BASE YEAR | $ 17,100.00 |
1ST OPT YEAR
| EXHIBIT B | ||||||
| BID SCHEDULE | ||||||
| 1ST OPTION YEAR FIRM-FIXED PRICE -CLIN 0001 | ||||||
| PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. | ||||||
| ELINS FIRM FIXED PRICE WORK | ||||||
| ELINS | Description | Qty | Unit of Issue | Unit Price | Total Price | |
| B001 | MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2019 - August 31, 2020 | |||||
| B001AA | MCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| B001AB | MCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 1,175.00 | $ 14,100.00 | |
| Sub -Total B001: | $ 14,100.00 | |||||
| B002 | NEMTI Funded - HVAC Repair and Maintenance - September 1, 2019 - August 31, 2020 | |||||
| B002AA | NEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| B002AB | NEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 250.00 | $ 3,000.00 | |
| Sub-Total B002: | $ 3,000.00 | |||||
| B003 | Reserved | |||||
| B004 | Reserved | |||||
| B005 | Reserved | |||||
| TOTAL OF ELINS B001 THROUGH B005 | $ 17,100.00 | |||||
| 1ST OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002 | ||||||
| PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK. | ||||||
| Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton. | ||||||
| ELIN | Short Description | Full Description | Qty | Unit of Issue | Unit Price | Total Price |
| B006 | Emergency Service Calls | The Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status. | ||||
| B006AA | Level I | Perform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00) | 2 | EA | $ - 0 | $ - 0 |
| B006AB | Level II | Perform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00) | 2 | EA | $ - 0 | $ - 0 |
| B006AC | Level III | Perform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00) | 2 | EA | $ - 0 | $ - 0 |
| B006AD | Level IV | Perform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00) | 2 | EA | $ - 0 | $ - 0 |
| B006AE | Level V | Perform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00) | 2 | EA | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| NEGOTIATED WORK | ||||||
| B007 | Unit Priced Labor; Normal Working hours | The Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | ||||
| B007AA | Heating and Air Conditions Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 60 | HR | $ - 0 | $ - 0 |
| B007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 60 | HR | $ - 0 | $ - 0 |
| B007AC | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification. | 20 | HR | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| B008 | Unit Priced Labor Overtime | |||||
| B008AA | Heating and Air Conditions Technician | 20 | HR | $ - 0 | $ - 0 | |
| B008AB | DDC Technician | 20 | HR | $ - 0 | $ - 0 | |
| B008AC | Electrician | 20 | HR | $ - 0 | $ - 0 | |
| TOTAL | $ - 0 | |||||
| B009 | Materials and Equipment (in support of Composite Hour Labor Rate) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. | $ 75,000.00 | % | 0.00% | $ - 0 |
| $35,000.00 + ($35,000.00 X ____*%) = | ||||||
| (Est Qty) (Est Qty) FBR | ||||||
| *Bidder inserts Fixed Burden Rate expressed as a percentage | ||||||
| TOTAL OF IDIQ WORK ELINS | $ - 0 | |||||
| TOTAL 1ST OPTION YEAR FFP B001 AND B005 | $ 17,100.00 | |||||
| TOTAL 1ST OPTION YEAR IDIQ ELINS B006 THROUGH B009 | $ - 0 | |||||
| GRAND TOTAL OF 1ST OPTION YEAR | $ 17,100.00 |
2ND OPT YEAR
| EXHIBIT C | ||||||
| BID SCHEDULE | ||||||
| 2ND OPTION YEAR FIRM-FIXED PRICE -CLIN 0001 | ||||||
| PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. | ||||||
| ELINS FIRM FIXED PRICE WORK | ||||||
| ELINS | Description | Qty | Unit of Issue | Unit Price | Total Price | |
| C001 | MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2020 - August 31, 2021 | |||||
| C001AA | MCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| C001AB | MCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 1,175.00 | $ 14,100.00 | |
| Sub -Total C001: | $ 14,100.00 | |||||
| C002 | NEMTI Funded - HVAC Repair and Maintenance - September 1, 2020 - August 31, 2021 | |||||
| C002AA | NEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| C002AB | NEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 250.00 | $ 3,000.00 | |
| Sub-Total C002: | $ 3,000.00 | |||||
| C003 | Reserved | |||||
| C004 | Reserved | |||||
| C005 | Reserved | |||||
| TOTAL OF ELINS C001 THROUGH C005 | $ 17,100.00 | |||||
| 2ND OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002 | ||||||
| PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK. | ||||||
| Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton. | ||||||
| ELIN | Short Description | Full Description | Qty | Unit of Issue | Unit Price | Total Price |
| C006 | Emergency Service Calls | The Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status. | ||||
| C006AA | Level I | Perform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00) | 2 | EA | $ - 0 | $ - 0 |
| C006AB | Level II | Perform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00) | 2 | EA | $ - 0 | $ - 0 |
| C006AC | Level III | Perform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00) | 2 | EA | $ - 0 | $ - 0 |
| C006AD | Level IV | Perform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00) | 2 | EA | $ - 0 | $ - 0 |
| C006AE | Level V | Perform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00) | 2 | EA | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| NEGOTIATED WORK | ||||||
| C007 | Unit Priced Labor; Normal Working hours | The Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | ||||
| C007AA | Heating and Air Conditions Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 60 | HR | $ - 0 | $ - 0 |
| C007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 60 | HR | $ - 0 | $ - 0 |
| C007AC | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification. | 20 | HR | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| C008 | Unit Priced Labor Overtime | |||||
| C008AA | Heating and Air Conditions Technician | 20 | HR | $ - 0 | $ - 0 | |
| C008AB | DDC Technician | 20 | HR | $ - 0 | $ - 0 | |
| C008AC | Electrician | 20 | HR | $ - 0 | $ - 0 | |
| TOTAL | $ - 0 | |||||
| C009 | Materials and Equipment (in support of Composite Hour Labor Rate) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. | $ 75,000.00 | % | 0.00% | $ - 0 |
| $35,000.00 + ($35,000.00 X ____*%) = | ||||||
| (Est Qty) (Est Qty) FBR | ||||||
| *Bidder inserts Fixed Burden Rate expressed as a percentage | ||||||
| TOTAL OF IDIQ WORK ELINS | $ - 0 | |||||
| TOTAL 2ND OPTION YEAR FFP C001 AND C005 | $ 17,100.00 | |||||
| TOTAL 2ND OPTION YEAR IDIQ ELINS C006 THROUGH C009 | $ - 0 | |||||
| GRAND TOTAL OF 2ND OPTION YEAR | $ 17,100.00 |
3RD OPT YEAR
| EXHIBIT D | ||||||
| BID SCHEDULE | ||||||
| 3RD OPTION YEAR FIRM-FIXED PRICE -CLIN 0001 | ||||||
| PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT. | ||||||
| ELINS FIRM FIXED PRICE WORK | ||||||
| ELINS | Description | Qty | Unit of Issue | Unit Price | Total Price | |
| D001 | MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2021 - August 31, 2022 | |||||
| D001AA | MCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| D001AB | MCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 1,175.00 | $ 14,100.00 | |
| Sub -Total D001: | $ 14,100.00 | |||||
| D002 | NEMTI Funded - HVAC Repair and Maintenance - September 1, 2021 - August 31, 2022 | |||||
| D002AA | NEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J. | 12 | M | $ - 0 | $ - 0 | |
| D002AB | NEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J. | 12 | M | $ 250.00 | $ 3,000.00 | |
| Sub-Total D002: | $ 3,000.00 | |||||
| D003 | Reserved | |||||
| D004 | Reserved | |||||
| D005 | Reserved | |||||
| TOTAL OF ELINS D001 THROUGH D005 | $ 17,100.00 | |||||
| 3RD OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002 | ||||||
| PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK. | ||||||
| Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton. | ||||||
| ELIN | Short Description | Full Description | Qty | Unit of Issue | Unit Price | Total Price |
| D006 | Emergency Service Calls | The Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status. | ||||
| D006AA | Level I | Perform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00) | 2 | EA | $ - 0 | $ - 0 |
| D006AB | Level II | Perform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00) | 2 | EA | $ - 0 | $ - 0 |
| D006AC | Level III | Perform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00) | 2 | EA | $ - 0 | $ - 0 |
| D006AD | Level IV | Perform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00) | 2 | EA | $ - 0 | $ - 0 |
| D006AE | Level V | Perform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00) | 2 | EA | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| NEGOTIATED WORK | ||||||
| D007 | Unit Priced Labor; Normal Working hours | The Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work. | ||||
| D007AA | Heating and Air Conditions Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers. | 60 | HR | $ - 0 | $ - 0 |
| D007AB | DDC Technician | The Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's. | 60 | HR | $ - 0 | $ - 0 |
| D007AC | Electrician | The Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification. | 20 | HR | $ - 0 | $ - 0 |
| TOTAL | $ - 0 | |||||
| D008 | Unit Priced Labor Overtime | |||||
| D008AA | Heating and Air Conditions Technician | 20 | HR | $ - 0 | $ - 0 | |
| D008AB | DDC Technician | 20 | HR | $ - 0 | $ - 0 | |
| D008AC | Electrician | 20 | HR | $ - 0 | $ - 0 | |
| TOTAL | $ - 0 | |||||
| D009 | Materials and Equipment (in support of Composite Hour Labor Rate) | Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job. | $ 75,000.00 | % | 0.00% | $ - 0 |
| $35,000.00 + ($35,000.00 X ____*%) = | ||||||
| (Est Qty) (Est Qty) FBR | ||||||
| *Bidder inserts Fixed Burden Rate expressed as a percentage | ||||||
| TOTAL OF IDIQ WORK ELINS | $ - 0 | |||||
| TOTAL 3RD OPTION YEAR FFP D001 AND D005 | $ 17,100.00 | |||||
| TOTAL 3RD OPTION YEAR IDIQ ELINS D006 THROUGH D009 | $ - 0 | |||||
| GRAND TOTAL OF 3RD OPTION YEAR | $ 17,100.00 |
File details come from the government source that posted it.