About this file

Bid_Schedule_MCTSSA_and_NEMTI_HVAC.xls

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE SUMMARY

BID SCHEDULE
N62473-18-R-5003 MASC
BASE YEAR
FFP$ 17,100.00
IDIQ$ - 0
TOTAL$ 17,100.00
1ST OPTION YEAR
FFP$ 17,100.00
IDIQ$ - 0
TOTAL$ 17,100.00
2ND OPTION YEAR
FFP$ 17,100.00
IDIQ$ - 0
TOTAL$ 17,100.00
3RD OPTION YEAR
FFP$ 17,100.00
IDIQ$ - 0
TOTAL$ 17,100.00
TOTAL BASE + OPTION YEARS
FFP$ 68,400.00
IDIQ$ - 0
TOTAL$ 68,400.00

BASE YEAR

EXHIBIT A
BID SCHEDULE
BASE YEAR FIRM-FIXED PRICE -CLIN 0001
PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.
ELINS FIRM FIXED PRICE WORK
ELINSDescriptionQtyUnit of IssueUnit PriceTotal Price
A001MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2018 - August 31, 2019
A001AAMCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
A001ABMCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 1,175.00$ 14,100.00
Sub -Total A001:$ 14,100.00
A002NEMTI Funded - HVAC Repair and Maintenance - September 1, 2018 - August 31, 2019
A002AANEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
A002ABNEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 250.00$ 3,000.00
Sub-Total A002:$ 3,000.000
A003Reserved
A004Reserved
A005Reserved
TOTAL OF ELINS A001 THROUGH A005$ 17,100.00
BASE YEAR INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002
PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK.
Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton.
ELINShort DescriptionFull DescriptionQtyUnit of IssueUnit PriceTotal Price
A006Emergency Service CallsThe Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status.
A006AALevel IPerform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00)2EA$ - 0$ - 0
A006ABLevel IIPerform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00)2EA$ - 0$ - 0
A006ACLevel IIIPerform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00)2EA$ - 0$ - 0
A006ADLevel IVPerform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00)2EA$ - 0$ - 0
A006AELevel VPerform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00)2EA$ - 0$ - 0
TOTAL$ - 0
NEGOTIATED WORK
A007Unit Priced Labor; Normal Working hoursThe Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
A007AAHeating and Air Conditions TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers.60HR$ - 0$ - 0
A007ABDDC TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's.60HR$ - 0$ - 0
A007ACElectricianThe Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification.20HR$ - 0$ - 0
TOTAL$ - 0
A008Unit Priced Labor Overtime
A008AAHeating and Air Conditions Technician20HR$ - 0$ - 0
A008ABDDC Technician20HR$ - 0$ - 0
A008ACElectrician20HR$ - 0$ - 0
TOTAL$ - 0
A009Materials and Equipment (in support of Composite Hour Labor Rate)Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job.$ 75,000.00%0.00%$ - 0
$35,000.00 + ($35,000.00 X ____*%) =
(Est Qty) (Est Qty) FBR
*Bidder inserts Fixed Burden Rate expressed as a percentage
TOTAL OF IDIQ WORK ELINS$ - 0
TOTAL BASE YEAR FFP A001 AND A005$ 17,100.00
TOTAL BASE YEAR IDIQ ELINS A006 THROUGH A009$ - 0
GRAND TOTAL OF BASE YEAR$ 17,100.00

1ST OPT YEAR

EXHIBIT B
BID SCHEDULE
1ST OPTION YEAR FIRM-FIXED PRICE -CLIN 0001
PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.
ELINS FIRM FIXED PRICE WORK
ELINSDescriptionQtyUnit of IssueUnit PriceTotal Price
B001MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2019 - August 31, 2020
B001AAMCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
B001ABMCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 1,175.00$ 14,100.00
Sub -Total B001:$ 14,100.00
B002NEMTI Funded - HVAC Repair and Maintenance - September 1, 2019 - August 31, 2020
B002AANEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
B002ABNEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 250.00$ 3,000.00
Sub-Total B002:$ 3,000.00
B003Reserved
B004Reserved
B005Reserved
TOTAL OF ELINS B001 THROUGH B005$ 17,100.00
1ST OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002
PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK.
Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton.
ELINShort DescriptionFull DescriptionQtyUnit of IssueUnit PriceTotal Price
B006Emergency Service CallsThe Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status.
B006AALevel IPerform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00)2EA$ - 0$ - 0
B006ABLevel IIPerform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00)2EA$ - 0$ - 0
B006ACLevel IIIPerform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00)2EA$ - 0$ - 0
B006ADLevel IVPerform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00)2EA$ - 0$ - 0
B006AELevel VPerform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00)2EA$ - 0$ - 0
TOTAL$ - 0
NEGOTIATED WORK
B007Unit Priced Labor; Normal Working hoursThe Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
B007AAHeating and Air Conditions TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers.60HR$ - 0$ - 0
B007ABDDC TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's.60HR$ - 0$ - 0
B007ACElectricianThe Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification.20HR$ - 0$ - 0
TOTAL$ - 0
B008Unit Priced Labor Overtime
B008AAHeating and Air Conditions Technician20HR$ - 0$ - 0
B008ABDDC Technician20HR$ - 0$ - 0
B008ACElectrician20HR$ - 0$ - 0
TOTAL$ - 0
B009Materials and Equipment (in support of Composite Hour Labor Rate)Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job.$ 75,000.00%0.00%$ - 0
$35,000.00 + ($35,000.00 X ____*%) =
(Est Qty) (Est Qty) FBR
*Bidder inserts Fixed Burden Rate expressed as a percentage
TOTAL OF IDIQ WORK ELINS$ - 0
TOTAL 1ST OPTION YEAR FFP B001 AND B005$ 17,100.00
TOTAL 1ST OPTION YEAR IDIQ ELINS B006 THROUGH B009$ - 0
GRAND TOTAL OF 1ST OPTION YEAR$ 17,100.00

2ND OPT YEAR

EXHIBIT C
BID SCHEDULE
2ND OPTION YEAR FIRM-FIXED PRICE -CLIN 0001
PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.
ELINS FIRM FIXED PRICE WORK
ELINSDescriptionQtyUnit of IssueUnit PriceTotal Price
C001MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2020 - August 31, 2021
C001AAMCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
C001ABMCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 1,175.00$ 14,100.00
Sub -Total C001:$ 14,100.00
C002NEMTI Funded - HVAC Repair and Maintenance - September 1, 2020 - August 31, 2021
C002AANEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
C002ABNEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 250.00$ 3,000.00
Sub-Total C002:$ 3,000.00
C003Reserved
C004Reserved
C005Reserved
TOTAL OF ELINS C001 THROUGH C005$ 17,100.00
2ND OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002
PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK.
Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton.
ELINShort DescriptionFull DescriptionQtyUnit of IssueUnit PriceTotal Price
C006Emergency Service CallsThe Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status.
C006AALevel IPerform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00)2EA$ - 0$ - 0
C006ABLevel IIPerform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00)2EA$ - 0$ - 0
C006ACLevel IIIPerform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00)2EA$ - 0$ - 0
C006ADLevel IVPerform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00)2EA$ - 0$ - 0
C006AELevel VPerform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00)2EA$ - 0$ - 0
TOTAL$ - 0
NEGOTIATED WORK
C007Unit Priced Labor; Normal Working hoursThe Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
C007AAHeating and Air Conditions TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers.60HR$ - 0$ - 0
C007ABDDC TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's.60HR$ - 0$ - 0
C007ACElectricianThe Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification.20HR$ - 0$ - 0
TOTAL$ - 0
C008Unit Priced Labor Overtime
C008AAHeating and Air Conditions Technician20HR$ - 0$ - 0
C008ABDDC Technician20HR$ - 0$ - 0
C008ACElectrician20HR$ - 0$ - 0
TOTAL$ - 0
C009Materials and Equipment (in support of Composite Hour Labor Rate)Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job.$ 75,000.00%0.00%$ - 0
$35,000.00 + ($35,000.00 X ____*%) =
(Est Qty) (Est Qty) FBR
*Bidder inserts Fixed Burden Rate expressed as a percentage
TOTAL OF IDIQ WORK ELINS$ - 0
TOTAL 2ND OPTION YEAR FFP C001 AND C005$ 17,100.00
TOTAL 2ND OPTION YEAR IDIQ ELINS C006 THROUGH C009$ - 0
GRAND TOTAL OF 2ND OPTION YEAR$ 17,100.00

3RD OPT YEAR

EXHIBIT D
BID SCHEDULE
3RD OPTION YEAR FIRM-FIXED PRICE -CLIN 0001
PROVIDE FIRM-FIXED PRICE TO PERFORM PREVENTIVE MAINTENANCE AND REPAIR AT HVAC UNITS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT.
ELINS FIRM FIXED PRICE WORK
ELINSDescriptionQtyUnit of IssueUnit PriceTotal Price
D001MCTSSA Funded - HVAC Repair and Maintenance - September 1, 2021 - August 31, 2022
D001AAMCTSSA: Perform scheduled PM on the HVAC systems located in the MCTSSA area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
D001ABMCTSSA: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 1,175.00$ 14,100.00
Sub -Total D001:$ 14,100.00
D002NEMTI Funded - HVAC Repair and Maintenance - September 1, 2021 - August 31, 2022
D002AANEMTI: Perform scheduled PM on the HVAC systems located in the NEMTI area to include monitoring, inspections, minor repairs, adjustments, calibration, and resets in accordance with the inventory provided in Attachment J.12M$ - 0$ - 0
D002ABNEMTI: Perform unscheduled maintenance and repairs to HVAC systems listed on the inventory list found in Attachment J.12M$ 250.00$ 3,000.00
Sub-Total D002:$ 3,000.00
D003Reserved
D004Reserved
D005Reserved
TOTAL OF ELINS D001 THROUGH D005$ 17,100.00
3RD OPTION INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) - CLIN 0002
PERFORM IDIQ WORK IN AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON IN ACCORDANCE WITH ANNEX 0200000, SPEC ITEM 2.17; ANNEX 1502000, SPEC ITEM 4; THE ELIN LONG DESCRIPTION; AND THE PROCUREMENT STATEMENT OF WORK.
Instructions to the Bidder: The bidder shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELINs below. The bidder shall fully burden all line items, to include all direct and indirect costs and overhead and profit. Burdened pricing will include but not be limited to General Conditions, management and administration, supervision, quality control management, safety management, subcontractor direct/indirect/overhead and profit, labor, testing, documentation, material, equipment, mobilization and demobilization, delivery, hauling, disposal fees, travel expenses, per diem, etc. Note: All removed system components shall become the property of the Contractor and shall be disposed of off of MCB Camp Pendleton. All maintenance and repair work shall be performed to the adopted building, electrical, mechanical and plumbing codes. All oily rags shall be disposed of properly off of MCB Camp Pendleton.
ELINShort DescriptionFull DescriptionQtyUnit of IssueUnit PriceTotal Price
D006Emergency Service CallsThe Contractor shall be available to perform emergency service calls. The Government will notify the RME per Annex 0200000, spec item 2.6.1. The Contractor shall perform emergency trouble calls beginning 1 hour before through 4 hours after normal working hours on normal work days. The Contractor shall respond to emergency trouble calls when notified outside the criteria as defined above within 1 hour before normal working hours of the following normal work day. The Contractor shall provide a detailed proposal using the fixed price labor ELIN and the fixed price FBR for material and equipment for any required repairs that exceeds the limitation of the specified routine service call. Travel time and expenses to and from the Contractor’s home portal to anywhere within the boundaries of MCB Camp Pendleton is included. The Contractor shall ensure the emergency is arrested and if possible place the system back into full operational status.
D006AALevel IPerform emergency service calls to include labor, materials, and equipment ($0.00 - $600.00)2EA$ - 0$ - 0
D006ABLevel IIPerform emergency service calls to include labor, materials, and equipment ($601.00 - $1000.00)2EA$ - 0$ - 0
D006ACLevel IIIPerform emergency service calls to include labor, materials, and equipment ($1001.00 - $1500.00)2EA$ - 0$ - 0
D006ADLevel IVPerform emergency service calls to include labor, materials, and equipment ($1501.00 - $2000.00)2EA$ - 0$ - 0
D006AELevel VPerform emergency service calls to include labor, materials, and equipment ($2001.00 - $2500.00)2EA$ - 0$ - 0
TOTAL$ - 0
NEGOTIATED WORK
D007Unit Priced Labor; Normal Working hoursThe Composite Unit Priced Labor Rate shall include all direct and indirect costs associated with performing an hour of work. Rate shall include all costs for preparation of cost proposal, job preparation, travel, pre-expended bin materials and supplies, ordering and stockpiling job material, additional material handling, standard items of equipment necessary to perform work, equipment set-up time, tools, profit, field and home office overhead, craft delay allowance, clerical support, supervision, inspections, fees, taxes, licenses, bonds, permits, insurance, etc. The Government shall not reimburse the Contractor for any restocking fees or material returned for canceled work.
D007AAHeating and Air Conditions TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, calibration, air balancing, charging of units with refrigerants, and other HVAC related work. The technician shall be qualified to work on HVAC equipment and components, electrical, controls, plumbing, natural and LPG gas, chiller systems, chemical feed, and the cleaning of cooling towers.60HR$ - 0$ - 0
D007ABDDC TechnicianThe Technician must perform maintenance, troubleshooting, repair and replacement, testing, and calibration of DDC's for HVAC systems and boilers. The Technician shall be qualified to work on DDC's.60HR$ - 0$ - 0
D007ACElectricianThe Electrician must perform electrical work in support of sustainment, restoration, and modernization of the services identified in the PWS. The electrician shall have a California Electrician's certification.20HR$ - 0$ - 0
TOTAL$ - 0
D008Unit Priced Labor Overtime
D008AAHeating and Air Conditions Technician20HR$ - 0$ - 0
D008ABDDC Technician20HR$ - 0$ - 0
D008ACElectrician20HR$ - 0$ - 0
TOTAL$ - 0
D009Materials and Equipment (in support of Composite Hour Labor Rate)Material / equipment rental prices shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor. The Contractor shall provide quotations from two suppliers of the required material/equipment. Reasonable costs for shipping may be included. Materials handling costs shall be built in the Composite Hourly Labor Rate. The total direct material/equipment costs will be multiplied by the Contractors *Fixed Burden Rate to determine the total burden material equipment cost for the job.$ 75,000.00%0.00%$ - 0
$35,000.00 + ($35,000.00 X ____*%) =
(Est Qty) (Est Qty) FBR
*Bidder inserts Fixed Burden Rate expressed as a percentage
TOTAL OF IDIQ WORK ELINS$ - 0
TOTAL 3RD OPTION YEAR FFP D001 AND D005$ 17,100.00
TOTAL 3RD OPTION YEAR IDIQ ELINS D006 THROUGH D009$ - 0
GRAND TOTAL OF 3RD OPTION YEAR$ 17,100.00

File details come from the government source that posted it.