Att 8 - RoofBid-SealBeach-Amended.xls

XLS spreadsheet 205 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Roofing
Solicitation number
N62473-14-R-2201
Issued by

About this file

Amended Attachment 8 - Roof Bid Schedule for Seal Beach

View the file

Other files

File Type Posted
Att 8 - RoofBid-CampPen-Amended.xls XLS spreadsheet
Attachment 14 - QAP.docx DOCX document
Exhibit C - Factor 3 NAVFAC PPQ Form.doc DOC document
Exhibit E - Financial Questionnaire.docx DOCX document
Exhibit A - Factor 1 Worksheet.docx DOCX document
AMD_0002.pdf PDF
Exhibit B - Factor 2.doc DOC document
Exhibit D - Factor 4 Worksheet.docx DOCX document
Preproposal_Conf_Brief.pdf PDF
Preproposal_SignIn_Sheet.pdf PDF
AMD_0001.pdf PDF
Exhibit B - Factor 2.doc DOC document
Exhibit E - Financial Questionnaire.docx DOCX document
Exhibit D - Factor 4 Worksheet.docx DOCX document
Exhibit F - Request For Information —
Exhibit A - Factor 1 Worksheet.docx DOCX document
Exhibit C - Factor 3 NAVFAC PPQ Form.doc DOC document
Att 1(j) - Base Access Form —
Att 8 - Roof Bid - Camp Pen.xls XLS spreadsheet
Exhibit_B_-_Factor_2_Worksheet_Offeror's_Team_Experience_Project_Data_Sheet.doc DOC document
Att 1(c) - Contractor Daily Production Report.doc DOC document
Exhibit_C_-_Factor_3_NAVFAC_Past_Performance_Questionnaire_(PPQ)_Form.doc DOC document
Att 1(k) - Visit Request —
Exhibit_D_-_Factor_4_Worksheet.docx DOCX document
Exhibit_E_-_Financial_Questionnaire.docx DOCX document
Att 13 - Rules and Regulations-NWS det Norco.pdf PDF
Att 1(i) - Safety Inspection Report.docx DOCX document
14-R-2201_-_IDIQ_Roofing_RFP.pdf PDF
Att 1(f) - Discrepancy Notice.doc DOC document
Exhibit_F_-_Request_For_Information_(RFI)_Format.doc DOC document
Att 1(e) - Utility Outage Request.doc DOC document
Exhibit_A_-_Factor_1_Worksheet.docx DOCX document
Att 10 - Camp Pendleton Requirements.pdf PDF
Att 1(h) - Contractor Significant Incident Report —
Att 1(g) - Contract Discrepancy Report.doc DOC document
Att 9 - Directions to ROICC Camp Pendleton.pdf PDF
Att 8 - Roof Bid - Seal Beach.xls XLS spreadsheet
Att 1(a) - Submittal Transmittal.xls XLS spreadsheet
Att 1(b) - Submittal Register Form.xlsx XLSX spreadsheet
Att 12 - Rules and Regulations-NWS Seal Beach.pdf PDF
Att 11 - Camp Pendleton BEAP.pdf PDF
Att 1(d) - Locating Request.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY IDIQ

SEAL BEACH
EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-14-R-2201
EXHIBIT F THROUGH EXHIBIT J - CLIN 0001
BASE YEAR$ - 0
1ST OPTION YEAR$ - 0
2ND OPTION YEAR$ - 0
3RD OPTION YEAR$ - 0
4TH OPTION YEAR$ - 0
TOTAL ALL YEARS$ - 0

BASE YEAR - EXHIBIT F IDIQ

EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-14-R-2201
EXHIBIT F - CLIN 0001
CLIN 0001 - BASE YEAR - INDEFINITE QUANTITY INDEFINITE DELIVERY (IDIQ)
PROVIDE PRICIES TO REPLACE AND REPAIR ROOF SYSTEMS AT VARIOUS LOCATIONS ABOARD NAVAL WEAPONS STATION SEAL BEACH , CA AND NAVAL SURFACE WAFFARE CENTER, CORONA, CA
The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below.
UNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
F001ASPHALT SHINGLE ROOFING SYSTEMS
F001AADemo and dispose of all shingle roofing system materials, to include multiple layers of shingles, roofing felts, membranes, sheet metal, nails, and staples completely down to the substrate. Includes disconnection of B-vent in the attic space, removal and re-connection. The Contractor QC shall verify that all re-connection of B-Vent is performed and that combustion gases are not be able to enter into attic or any other spaces. This ELIN is inclusive of all shingled roof system/layers.8,000SF$ - 0
F001ABInstall a complete 30 Year shingle roof system, to include roofing felt, starter strip and shingles necessary to provide a watertight installation. Closed valley flashing shall be installed unless otherwise specified.8,000SF$ - 0
F002PREFORMED METAL ROOF SYSTEMS
F002AADemo and dispose of metal panel roof systems, including metal panels, architectural sheet metal, flashings, counter flashings, gutter and downspout, and fasteners down to the supporting substrate or framework. This ELIN shall be used for repair and replacement of damaged sections of metal panel roof systems or complete metal panel roof replacement.8,000SF$ - 0
F002ABInstall complete Metal Panel Roof system to provide a watertight installation, to include all architectural sheet metal, fascia, flashings, counterflashings, trim, and gutter and downspout. Finish color coat in accordance with the BEAP.8,000SF$ - 0
F002ACRepair or replace sections of metal panel roofing systems with a like preformed panels to provide a watertight installation, to include all architectural sheet metal, flashings, counterflashings, trim, and gutter and downspout. Color of the roofing system is to match the existing metal panels.1,600SF$ - 0
F003ROOF SYSTEM COMPONENTS
F003AAInstall 2 ½ lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP.20EA$ - 0
F003ABInstall 4 lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP.20EA$ - 0
F003ACDemo and install new cast iron roof drain with adjustable extension sleeve, reversible collar, combined flashing clamp and gravel stop, with cast iron dome. Size range: 2-inches through 8-inches.5EA$ - 0
F003ADDemo and install new 2'-6" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches.3EA$ - 0
F003AEDemo and install new 3'-0" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches.1EA$ - 0
F003AFInstall bellows type expansion joint on buildings expansion joints. Do not paint.200LF$ - 0
F003AGDormer Vent, all sizes. Dormers shall be painted in accordance with the BEAP.5EA$ - 0
F003AHTurbine Ventilator and Adjustable Base; Size: to 10" Diameter.3EA$ - 0
F003AJTurbine Ventilator and Adjustable Base; Size: to 12" to 20" in Diameter.3EA$ - 0
F003AKTurbine Ventilator and Adjustable Base; Size: Over 20" in Diameter.3EA$ - 0
F003ALInstall galvanized steel scupper. All sizes. Primed and painted in accordance with the BEAP.40EA$ - 0
F004BUILT-UP ROOFING SYSTEMS
F004AADemo and dispose of built-up roofing system material, including but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. Includes up to 8-inches thick of insulation.12,000SF$ - 0
F004ABDemo and dispose of foam roof systems to include complete underlying built-up roof systems with insulation up to 8-iches thick, to include but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers.800SF$ - 0
F004ACInstall a 3-ply hot bituminous built-up roofing system to include base and ply sheets, backer sheets, flashing membrane, SBS Modified cap sheet, and accessories necessary to provide a watertight installation.8,000SF$ - 0
F004ADInstall ¾-inch Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Additional plies of Perlite Insulation Board to be added to prevent ponding as specified in a task order.8,000SF$ - 0
F004AEInstall Tapered Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Install tapered Perlite insulation board at pre-determined roof locations to prevent ponding and to provide proper drainage. This ELIN is inclusive of tapered Perlite insulation board tapered to 1/16 ", 1/8 ", 1/4 ", and 1/2 " per foot, and sheet size 4-foot x 4-foot.4,000SF$ - 0
F004AFInstall 3-inch thick Polyisocyanurate Insulation Board.8,000SF$ - 0
F004AGInstall felt base flashing on curbs, parapet walls, and vertical walls to make a watertight installation. Estimate per Linear foot to 3-feet high.2,000SF$ - 0
F004AHInstall 3-foot x 5-foot traffic pads as specified on built-up roofs.100EA$ - 0
F004AJInstall a 2-ply hot bituminous built-up roofing system, to include smooth SBS modified base sheet with minimum of 60 lbs per square foot and an SBS Modified cap sheet and accessories necessary to provide a watertight installation. Add perlite insulation.4,000SF$ - 0
F005ASBESTOS CONTAINING MATERIAL DEMO & ABATEMENT
F005AARemove and dispose of Asbestos Containing Materials (ACM), to include mastic and caulking. Includes, Asbestos Abatement Plan, PPE, regulatory requirements, associated South Coast AQMD fees, and transportation and disposal fees. Manifest through NWSSB Environmental Office.1,600SF$ - 0
F005ABProvide Industrial Hygienist Qualified Person to monitor and sample air, and to provide all necessary documentation asbestos abatements.5DAY$ - 0
F006SHEET METAL
All galvanized metal flashings and copings shall be etched, primed and painted with two color coats. Color coats shall be in accordance with the BEAP.
F006AAInstall new parapet cap flashing up to 14 inches wide. Parapet cap flashing shall be galvanized sheet metal, 24 gauge, primed and painted in accordance with the BEAP.600LF$ - 0
F006ABInstall gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 6-inches primed and painted in accordance with the BEAP.600LF$ - 0
F006ACInstall gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 7 to 14-inches primed and painted in accordance with the BEAP.600LF$ - 0
F006ADInstall reglets and counter flashing 24 gauge (all sizes and shapes) primed and painted in accordance with the BEAP.600LF$ - 0
F006AEDemo and dispose of gutter, downspout, and backsplash.400LF$ - 0
F006AFInstall Style 5 K. gutter, downspout, and fittings. Gutter shall be 0.027 gauge aluminum with a baked on enamel finish. The gutter shall be continuous aluminum. The downspout and fittings shall be 3” x 4” with a baked on enamel finish. Install strainers at each downspout drop. For estimating, miters and elbows shall be estimated as 1 linear foot each.600LF$ - 0
F006AGInstall downspout splash. Product to be made of 100% recyclable plastic. Colors: Green, Beige or Brown as specified.5EA$ - 0
F006AHInstall roof jacks/vent flashing. This ELIN is inclusive for pipe flashings
sizes ¾-inch to 4-inches and vent flashings up to 12-inches in diameter. Prime and paint to in accordance with the BEAP.25EA$ - 0
F006AJInstall metal drip edge to 2-inches by 3-inches or 18-inch valley flashing . For shingle roofs ONLY. Primed and painted in accordance with the BEAP.100LF$ - 0
F006AKDemo and install new B-Vent Cap. Sizes 3-inches through 6-inches diameter.4EA$ - 0
F006ALDemo and install new B-Vent. Sizes 3-inches through 6-inches diameter.5LF$ - 0
F006AMDemo and install new B-Vent Cap. Sizes 7-inch diameter through 12-inch diameter.2EA$ - 0
F006ANDemo and install new B-Vent. Sizes 7-inch diameter through 12-inch diameter.5LF$ - 0
F006APDemo and install new B-Vent roof jacks and storm collars. Sizes 3-inches through 12-inches diameter.12EA$ - 0
F006AQDemo and dispose of ductwork, all gauges with or without insulation. All sizes. Deliver recyclable metal to the NWS Seal Beach Recycle Center. If the Recycle Center rejects the delivery of the recyclable metal it shall become the property of the Contractor.200LF$ - 0
F006ARFabricate and Install Ductwork, to includes supports; 24 gauge galvanized for duct up to the sum of 30 inches for two sides.200LBS$ - 0
F006ASFabricate and Install Ductwork, to includes support; 22 gauge galvanized for duct up to the sum of 54 inches for two sides.200LBS$ - 0
F006ATFabricate and Install Ductwork, to includes supports; 20 gauge galvanized for duct up to the sum of 84 inches for two sides.100LBS$ - 0
F006AUInstall 1-inch noise absorbing duct liner Type R-4.2 with black pigmented coating on the airstream side, to include gluing and pinning. The quantities may be doubled when 2-inch insulation is required. Installation methods shall be in accordance with SMACNA.300SF$ - 0
F006AVInstall New Metal Hooded/Counter flashed Pitch Pockets.40EA$ - 0
F006AWInstall New T-Tops all sizes.3EA$ - 0
F007SEALANTS AND SKYLIGHTS
F007AARe-Sealing: Remove existing sealant, clean the surface area, install water-proof sealant/caulking/mastic in areas as specified on a task order. For maintenance applications only. Not for new installations. LF is defined as 1-foot long by 1-foot wide.1,000LF$ - 0
F007ABReseal/repair existing pitch pockets and refill with bitumen as specified on a task order. For maintenance applications only. Not for new installations.4EA$ - 0
F007ACDemo and install new fixed or operable translucent skylights. Do not paint. For estimating purposes, skylights are measured in square feet (SF) and the size of the skylight will be estimated in proportion to the opening. For example: an opening 2 feet wide by 4 feet long would equal 8 square feet. The estimated size is 8 square feet.200SF$ - 0
F008HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
The Contractor shall replace units with like or similar units, verify sizes, voltage, amperage and other data to ensure the right information is obtained before ordering replacement units. Submittals are required for approval by the Contracting Officer before ordering. Each unit shall be installed in accordance with all applicable codes. The Contractor shall perform a startup and operation checks of all installed units. Each unit shall be fully operation when placed into service, and come with a one-year installers warranty and the applicable manufacture's warranty. A copy of the Operations and Maintenance Manual shall be submitted to the COR within 5-calendar days after completion of the "Final Acceptance Inspection."
The Contractor shall install each unit using the existing applicable electrical, electronic, and plumbing terminations/connections, unless as specified differently in a task order. New parts, materials, or components shall be used to make connections from the new to the existing terminations. The Contractor is responsible for replacing fuses, checking circuits, vibrations springs and pads, similar or like thermostats as necessary, installing equipment supports, installing new curbs as necessary and installing new flex connections.
For ELINs 009AH and 009AJ apply a durable epoxy-phenolic coating on the condenser fins to provide protection in mildly corrosive coastal environments. The coating shall be applied to the aluminum fin stock prior to the fin stamping process to create an inert barrier between the aluminum fin and copper tube. Epoxy-phenolic barrier shall minimize galvanic action between dissimilar metals.
F008AADemo and install new centrifugal upblast or downblast exhaust unit, 75
CFM TO 500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
F008ABDemo and install new centrifugal upblast or downblast exhaust unit, 501
CFM TO 1,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
F008ACDemo and install new centrifugal upblast or downblast exhaust unit, 1,501 CFM TO 2,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
F008ADDemo and install new centrifugal upblast or downblast exhaust unit, 2,001 CFM TO 2,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
F008AEDemo and install new centrifugal upblast or downblast exhaust unit, 2,501 CFM TO 3,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
F008AFDemo and install new Gas-Fired Outdoor Packaged Unit Heater 125,000 - 225 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage,24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports.1EA$ - 0
F008AGDemo and install new Gas-Fired Outdoor Packaged Unit Heater 226,000 - 400 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage, 24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports.1EA$ - 0
F008AHDemo and install new Packaged Heat Pumps and Gas Pack 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy- efficient compressor with internal relief valve; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory-installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton.4TON$ - 0
F008AJDemo and install new Air Conditioning Unit 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy-efficient compressor; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory- installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder-paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton.4TON$ - 0
F009REPAIRS
F009AADemo and install new fascia or wood trim . Prime and paint all exposed surface areas in accordance with the BEAP. Prime surfaces that will be installed against concrete surfaces. Estimated in Board Feet (BF). Use the formula of 1-inch thick by 12-inches wide by 12-inches long to determine quantities.500BF$ - 0
F009ABDemo substrate.1,200SF$ - 0
F009ACInstall 1/2" OSB substrate.1,200SF$ - 0
F009ADInstall 5/8" OSB substrate.400SF$ - 0
F009AEDemo and install new treated wood nailers. For BUR systems. Dispose of deteriorated treated wood nailers off NWSSB and at an approved landfill. Note: Double the LF (quantity) of nailers to account for R-19 insulation.800BF$ - 0
F009AFDemo equipment conduit, conductors, safety disconnects, junction boxes, supports and disposal. Includes Lockout/Tagout.200LF$ - 0
F009AGInstall new 1/2" through 1" EMT conduit and conductors in accordance with the NEC. The conduit installation includes connectors, 6 fittings, termination ends, and up to four field bends. Conductors are sized up to a 30 amp circuit; single phase or three phase; 120/208/230 volts. This ELIN is for replacement of equipment. Quantified in 10-foot lengths. This ELIN is for replacement of equipment ONLY.20LENGTH$ - 0
F009AHInstall new fused or non-fused disconnect up to 30 amps; single phase or three phase; 120/208/230 volts in accordance with the NEC. Includes 6- foot liquidtight whip with conductors, weather proof box and cover, terminal ends, fuses and circuit breaker. This ELIN is for replacement of equipment ONLY.1EA$ - 0
F009AJDemo gas pipe up to 1-1/4 inches, to include disconnection from the equipment, Lockout/Tagout, all fittings and flex connections.40LF$ - 0
F009AKInstall new gas pipe sizes up to 1-1/4 inches, to include couplings or two fitting. This ELIN is for replacement of equipment ONLY.40LF$ - 0
F009ALInstall gas cock and gas flex line. The gas flex line shall be appropriately sized to the appliance. This ELIN is for replacement of equipment ONLY.1EA$ - 0
F009AMInstall nipples and additional fittings to fit gas pipe up to 1-1/4 inches.8EA$ - 0
F010BOOM LIFT AND CRANE
The use of the boom lift is for work on the multi-story facilities when replacing wood fascia, installing eave screening or cutting of tree limbs and branches. The boom lift is not to be used in conjunction with standard roof replacement operations.
F010AABoom lift to reach up to 60 fee high, rental per week.2EA$ - 0
F010ABBoom lift to reach above 60 feet, rental per week.2EA$ - 0
F010ACCrane to 80 Ton with crew: The unit price bid by the Contractor to provide one performance standard 8-hour of work-in-place day crew at the worksite. This ELIN is for removal and replacement of HVAC units only. Quantified per 8-hour day.2Day$ - 0
GENERAL
F011Trim tree branches and limbs that interfere roofing operations. A Category Exclusion (CATX) is required before any trimming procedures. Trim the overhanging or obstructing trees limbs and branches and dispose of trimmings. Quantified as per tree.7EA$ - 0
F012Demo and install hardware cloth under eaves and duct as specified on a task order.400SF$ - 0
F013Temporary Safety Fencing: Install temporary fencing with privacy screen around the safety zone in accordance with the approved Demolition Plan. Fencing shall be a minimum of 6’-0” high chain link fence with galvanized 2” diameter post at maximum 12’-0” on center. Includes ingress/egress gates.2,400LF$ - 0
F014Clean gutter and downspout of debris. Hose gutter and downspout out after debris has been removed. Properly dispose of debris. Clean up any residual spoils that have found their way onto the roof surface, wall surfaces, the ground and landscape. Add lift for multi-story facilities. Estimated per linear foot.1,200LF$ - 0
LABOR RATES FOR NORMAL WORKING HOURS
F015AARoofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015ABCarpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015ACElectrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015ADElectronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015AERefrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015AFSheet Metal Mechanic (DBA): The unit price bid by the Contractor to
provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015AGPlumber/Pipefitter (DBA): The unit price bid by the Contractor to provide
one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015AHWelder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
F015AJLaborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.32HR$ - 0
F016LABOR RATES FOR OVERTIME HOURS
F016AARoofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016ABCarpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016ACElectrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.4HR$ - 0
F016ADElectronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.4HR$ - 0
F016AERefrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016AFSheet Metal Mechanic (DBA): The unit price bid by the Contractor to
provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016AGPlumber/Pipefitter (DBA): The unit price bid by the Contractor to provide
one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016AHWelder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F016AJLaborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
F017Materials and Equipment: The Contractor's markup for this pre-priced ELIN is the sum of the Contractor's and subcontractors markups. Material and equipment prices, and rental charges shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor and subcontractor. The Contractor shall provide pricing from two suppliers for the proposed material and equipment in their quote. The Quote shall clearly show the material and equipment pricing , including discounts, that the Contractor or subcontractor receives from their suppliers. The FBR may then be applied to suppliers price. Costs for shipping shall be added to the FBR. Materials handling costs shall be built in the Composite Hourly Labor Rates. Example on how to apply the Fixed Burden Rate: $35,000.00 (Est. Qty) + ($35,000.00 (Est. QTY) x 20% (FBR)) = $42,000.00$20,000.00%$ - 0
Instruction to the Bidder: The Bidder is to insert their percentage markup (FBR) in Column "E", Row 141. Fo rexample, if the bidder wanted to propose a 35% FBR, the bidder must populate Column "E", Row 141 with 135.00%. The "Total Amount" in Column "F", Row 141 would be $270,000.00.
TOTAL FFP LINE ITEMS - F001 THROUGH F017$ - 0

The following alternatives may be used if the client desires to downgrade to a lower service level.

1ST OPT YEAR - EXHIBIT G IDIQ

EXHIBIT LINE ITEM NUMBERS
SOLICITATION/CONTRACT #N62473-14-R-2201
EXHIBIT G - CLIN 0001
CLIN 0001 - 1ST OPTION YEAR - INDEFINITE QUANTITY INDEFINITE DELIVERY (IDIQ)
PROVIDE PRICIES TO REPLACE AND REPAIR ROOF SYSTEMS AT VARIOUS LOCATIONS ABOARD NAVAL WEAPONS STATION SEAL BEACH , CA AND NAVAL SURFACE WAFFARE CENTER, CORONA,CA
The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below.
UNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
G001ASPHALT SHINGLE ROOFING SYSTEMS
G001AADemo and dispose of all shingle roofing system materials, to include multiple layers of shingles, roofing felts, membranes, sheet metal, nails, and staples completely down to the substrate. Includes disconnection of B-vent in the attic space, removal and re-connection. The Contractor QC shall verify that all re-connection of B-Vent is performed and that combustion gases are not be able to enter into attic or any other spaces. This ELIN is inclusive of all shingled roof system/layers.8,000SF$ - 0
G001ABInstall a complete 30 Year shingle roof system, to include roofing felt, starter strip and shingles necessary to provide a watertight installation. Closed valley flashing shall be installed unless otherwise specified.8,000SF$ - 0
G002PREFORMED METAL ROOF SYSTEMS
G002AADemo and dispose of metal panel roof systems, including metal panels, architectural sheet metal, flashings, counter flashings, gutter and downspout, and fasteners down to the supporting substrate or framework. This ELIN shall be used for repair and replacement of damaged sections of metal panel roof systems or complete metal panel roof replacement.8,000SF$ - 0
G002ABInstall complete Metal Panel Roof system to provide a watertight installation, to include all architectural sheet metal, fascia, flashings, counterflashings, trim, and gutter and downspout. Finish color coat in accordance with the BEAP.8,000SF$ - 0
G002ACRepair or replace sections of metal panel roofing systems with a like preformed panels to provide a watertight installation, to include all architectural sheet metal, flashings, counterflashings, trim, and gutter and downspout. Color of the roofing system is to match the existing metal panels.1,600SF$ - 0
G003ROOF SYSTEM COMPONENTS
G003AAInstall 2 ½ lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP.20EA$ - 0
G003ABInstall 4 lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP.20EA$ - 0
G003ACDemo and install new cast iron roof drain with adjustable extension sleeve, reversible collar, combined flashing clamp and gravel stop, with cast iron dome. Size range: 2-inches through 8-inches.5EA$ - 0
G003ADDemo and install new 2'-6" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches.3EA$ - 0
G003AEDemo and install new 3'-0" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches.1EA$ - 0
G003AFInstall bellows type expansion joint on buildings expansion joints. Do not paint.200LF$ - 0
G003AGDormer Vent, all sizes. Dormers shall be painted in accordance with the BEAP.5EA$ - 0
G003AHTurbine Ventilator and Adjustable Base; Size: to 10" Diameter.3EA$ - 0
G003AJTurbine Ventilator and Adjustable Base; Size: to 12" to 20" in Diameter.3EA$ - 0
G003AKTurbine Ventilator and Adjustable Base; Size: Over 20" in Diameter.3EA$ - 0
G003ALInstall galvanized steel scupper. All sizes. Primed and painted in accordance with the BEAP.40EA$ - 0
G004BUILT-UP ROOFING SYSTEMS
G004AADemo and dispose of built-up roofing system material, including but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. Includes up to 8-inches thick of insulation.12,000SF$ - 0
G004ABDemo and dispose of foam roof systems to include complete underlying built-up roof systems with insulation up to 8-iches thick, to include but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers.800SF$ - 0
G004ACInstall a 3-ply hot bituminous built-up roofing system to include base and ply sheets, backer sheets, flashing membrane, SBS Modified cap sheet, and accessories necessary to provide a watertight installation.8,000SF$ - 0
G004ADInstall ¾-inch Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Additional plies of Perlite Insulation Board to be added to prevent ponding as specified in a task order.8,000SF$ - 0
G004AEInstall Tapered Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Install tapered Perlite insulation board at pre-determined roof locations to prevent ponding and to provide proper drainage. This ELIN is inclusive of tapered Perlite insulation board tapered to 1/16 ", 1/8 ", 1/4 ", and 1/2 " per foot, and sheet size 4-foot x 4-foot.4,000SF$ - 0
G004AFInstall 3-inch thick Polyisocyanurate Insulation Board.8,000SF$ - 0
G004AGInstall felt base flashing on curbs, parapet walls, and vertical walls to make a watertight installation. Estimate per Linear foot to 3-feet high.2,000SF$ - 0
G004AHInstall 3-foot x 5-foot traffic pads as specified on built-up roofs.100EA$ - 0
G004AJInstall a 2-ply hot bituminous built-up roofing system, to include smooth SBS modified base sheet with minimum of 60 lbs per square foot and an SBS Modified cap sheet and accessories necessary to provide a watertight installation. Add perlite insulation.4,000SF$ - 0
G005ASBESTOS CONTAINING MATERIAL DEMO & ABATEMENT
G005AARemove and dispose of Asbestos Containing Materials (ACM), to include mastic and caulking. Includes, Asbestos Abatement Plan, PPE, regulatory requirements, associated South Coast AQMD fees, and transportation and disposal fees. Manifest through NWSSB Environmental Office.1,600SF$ - 0
G005ABProvide Industrial Hygienist Qualified Person to monitor and sample air, and to provide all necessary documentation asbestos abatements.5DAY$ - 0
G006SHEET METAL
All galvanized metal flashings and copings shall be etched, primed and painted with two color coats. Color coats shall be in accordance with the BEAP.
G006AAInstall new parapet cap flashing up to 14 inches wide. Parapet cap flashing shall be galvanized sheet metal, 24 gauge, primed and painted in accordance with the BEAP.600LF$ - 0
G006ABInstall gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 6-inches primed and painted in accordance with the BEAP.600LF$ - 0
G006ACInstall gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 7 to 14-inches primed and painted in accordance with the BEAP.600LF$ - 0
G006ADInstall reglets and counter flashing 24 gauge (all sizes and shapes) primed and painted in accordance with the BEAP.600LF$ - 0
G006AEDemo and dispose of gutter, downspout, and backsplash.400LF$ - 0
G006AFInstall Style 5 K. gutter, downspout, and fittings. Gutter shall be 0.027 gauge aluminum with a baked on enamel finish. The gutter shall be continuous aluminum. The downspout and fittings shall be 3” x 4” with a baked on enamel finish. Install strainers at each downspout drop. For estimating, miters and elbows shall be estimated as 1 linear foot each.600LF$ - 0
G006AGInstall downspout splash. Product to be made of 100% recyclable plastic. Colors: Green, Beige or Brown as specified.5EA$ - 0
G006AHInstall roof jacks/vent flashing. This ELIN is inclusive for pipe flashings
sizes ¾-inch to 4-inches and vent flashings up to 12-inches in diameter. Prime and paint to in accordance with the BEAP.25EA$ - 0
G006AJInstall metal drip edge to 2-inches by 3-inches or 18-inch valley flashing . For shingle roofs ONLY. Primed and painted in accordance with the BEAP.100LF$ - 0
G006AKDemo and install new B-Vent Cap. Sizes 3-inches through 6-inches diameter.4EA$ - 0
G006ALDemo and install new B-Vent. Sizes 3-inches through 6-inches diameter.5LF$ - 0
G006AMDemo and install new B-Vent Cap. Sizes 7-inch diameter through 12-inch diameter.2EA$ - 0
G006ANDemo and install new B-Vent. Sizes 7-inch diameter through 12-inch diameter.5LF$ - 0
G006APDemo and install new B-Vent roof jacks and storm collars. Sizes 3-inches through 12-inches diameter.12EA$ - 0
G006AQDemo and dispose of ductwork, all gauges with or without insulation. All sizes. Deliver recyclable metal to the NWS Seal Beach Recycle Center. If the Recycle Center rejects the delivery of the recyclable metal it shall become the property of the Contractor.200LF$ - 0
G006ARFabricate and Install Ductwork, to includes supports; 24 gauge galvanized for duct up to the sum of 30 inches for two sides.200LBS$ - 0
G006ASFabricate and Install Ductwork, to includes support; 22 gauge galvanized for duct up to the sum of 54 inches for two sides.200LBS$ - 0
G006ATFabricate and Install Ductwork, to includes supports; 20 gauge galvanized for duct up to the sum of 84 inches for two sides.100LBS$ - 0
G006AUInstall 1-inch noise absorbing duct liner Type R-4.2 with black pigmented coating on the airstream side, to include gluing and pinning. The quantities may be doubled when 2-inch insulation is required. Installation methods shall be in accordance with SMACNA.300SF$ - 0
G006AVInstall New Metal Hooded/Counter flashed Pitch Pockets.40EA$ - 0
G006AWInstall New T-Tops all sizes.3EA$ - 0
G007SEALANTS AND SKYLIGHTS
G007AARe-Sealing: Remove existing sealant, clean the surface area, install water-proof sealant/caulking/mastic in areas as specified on a task order. For maintenance applications only. Not for new installations. LF is defined as 1-foot long by 1-foot wide.1,000LF$ - 0
G007ABReseal/repair existing pitch pockets and refill with bitumen as specified on a task order. For maintenance applications only. Not for new installations.4EA$ - 0
G007ACDemo and install new fixed or operable translucent skylights. Do not paint. For estimating purposes, skylights are measured in square feet (SF) and the size of the skylight will be estimated in proportion to the opening. For example: an opening 2 feet wide by 4 feet long would equal 8 square feet. The estimated size is 8 square feet.200SF$ - 0
G008HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)
The Contractor shall replace units with like or similar units, verify sizes, voltage, amperage and other data to ensure the right information is obtained before ordering replacement units. Submittals are required for approval by the Contracting Officer before ordering. Each unit shall be installed in accordance with all applicable codes. The Contractor shall perform a startup and operation checks of all installed units. Each unit shall be fully operation when placed into service, and come with a one-year installers warranty and the applicable manufacture's warranty. A copy of the Operations and Maintenance Manual shall be submitted to the COR within 5-calendar days after completion of the "Final Acceptance Inspection."
The Contractor shall install each unit using the existing applicable electrical, electronic, and plumbing terminations/connections, unless as specified differently in a task order. New parts, materials, or components shall be used to make connections from the new to the existing terminations. The Contractor is responsible for replacing fuses, checking circuits, vibrations springs and pads, similar or like thermostats as necessary, installing equipment supports, installing new curbs as necessary and installing new flex connections.
For ELINs 009AH and 009AJ apply a durable epoxy-phenolic coating on the condenser fins to provide protection in mildly corrosive coastal environments. The coating shall be applied to the aluminum fin stock prior to the fin stamping process to create an inert barrier between the aluminum fin and copper tube. Epoxy-phenolic barrier shall minimize galvanic action between dissimilar metals.
G008AADemo and install new centrifugal upblast or downblast exhaust unit, 75
CFM TO 500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
G008ABDemo and install new centrifugal upblast or downblast exhaust unit, 501
CFM TO 1,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
G008ACDemo and install new centrifugal upblast or downblast exhaust unit, 1,501 CFM TO 2,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
G008ADDemo and install new centrifugal upblast or downblast exhaust unit, 2,001 CFM TO 2,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
G008AEDemo and install new centrifugal upblast or downblast exhaust unit, 2,501 CFM TO 3,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint.3EA$ - 0
G008AFDemo and install new Gas-Fired Outdoor Packaged Unit Heater 125,000 - 225 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage,24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports.1EA$ - 0
G008AGDemo and install new Gas-Fired Outdoor Packaged Unit Heater 226,000 - 400 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage, 24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports.1EA$ - 0
G008AHDemo and install new Packaged Heat Pumps and Gas Pack 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy- efficient compressor with internal relief valve; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory-installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton.4TON$ - 0
G008AJDemo and install new Air Conditioning Unit 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy-efficient compressor; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory- installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder-paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton.4TON$ - 0
G009REPAIRS
G009AADemo and install new fascia or wood trim . Prime and paint all exposed surface areas in accordance with the BEAP. Prime surfaces that will be installed against concrete surfaces. Estimated in Board Feet (BF). Use the formula of 1-inch thick by 12-inches wide by 12-inches long to determine quantities.500BF$ - 0
G009ABDemo substrate.1,200SF$ - 0
G009ACInstall 1/2" OSB substrate.1,200SF$ - 0
G009ADInstall 5/8" OSB substrate.400SF$ - 0
G009AEDemo and install new treated wood nailers. For BUR systems. Dispose of deteriorated treated wood nailers off NWSSB and at an approved landfill. Note: Double the LF (quantity) of nailers to account for R-19 insulation.800BF$ - 0
G009AFDemo equipment conduit, conductors, safety disconnects, junction boxes, supports and disposal. Includes Lockout/Tagout.200LF$ - 0
G009AGInstall new 1/2" through 1" EMT conduit and conductors in accordance with the NEC. The conduit installation includes connectors, 6 fittings, termination ends, and up to four field bends. Conductors are sized up to a 30 amp circuit; single phase or three phase; 120/208/230 volts. This ELIN is for replacement of equipment. Quantified in 10-foot lengths. This ELIN is for replacement of equipment ONLY.20LENGTH$ - 0
G009AHInstall new fused or non-fused disconnect up to 30 amps; single phase or three phase; 120/208/230 volts in accordance with the NEC. Includes 6- foot liquidtight whip with conductors, weather proof box and cover, terminal ends, fuses and circuit breaker. This ELIN is for replacement of equipment ONLY.1EA$ - 0
G009AJDemo gas pipe up to 1-1/4 inches, to include disconnection from the equipment, Lockout/Tagout, all fittings and flex connections.40LF$ - 0
G009AKInstall new gas pipe sizes up to 1-1/4 inches, to include couplings or two fitting. This ELIN is for replacement of equipment ONLY.40LF$ - 0
G009ALInstall gas cock and gas flex line. The gas flex line shall be appropriately sized to the appliance. This ELIN is for replacement of equipment ONLY.1EA$ - 0
G009AMInstall nipples and additional fittings to fit gas pipe up to 1-1/4 inches.8EA$ - 0
G010BOOM LIFT AND CRANE
The use of the boom lift is for work on the multi-story facilities when replacing wood fascia, installing eave screening or cutting of tree limbs and branches. The boom lift is not to be used in conjunction with standard roof replacement operations.
G010AABoom lift to reach up to 60 fee high, rental per week.2EA$ - 0
G010ABBoom lift to reach above 60 feet, rental per week.2EA$ - 0
G010ACCrane to 80 Ton with crew: The unit price bid by the Contractor to provide one performance standard 8-hour of work-in-place day crew at the worksite. This ELIN is for removal and replacement of HVAC units only. Quantified per 8-hour day.2Day$ - 0
GENERAL
G011Trim tree branches and limbs that interfere roofing operations. A Category Exclusion (CATX) is required before any trimming procedures. Trim the overhanging or obstructing trees limbs and branches and dispose of trimmings. Quantified as per tree.7EA$ - 0
G012Demo and install hardware cloth under eaves and duct as specified on a task order.400SF$ - 0
G013Temporary Safety Fencing: Install temporary fencing with privacy screen around the safety zone in accordance with the approved Demolition Plan. Fencing shall be a minimum of 6’-0” high chain link fence with galvanized 2” diameter post at maximum 12’-0” on center. Includes ingress/egress gates.2,400LF$ - 0
G014Clean gutter and downspout of debris. Hose gutter and downspout out after debris has been removed. Properly dispose of debris. Clean up any residual spoils that have found their way onto the roof surface, wall surfaces, the ground and landscape. Add lift for multi-story facilities. Estimated per linear foot.1,200LF$ - 0
LABOR RATES FOR NORMAL WORKING HOURS
G015AARoofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015ABCarpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015ACElectrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015ADElectronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015AERefrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015AFSheet Metal Mechanic (DBA): The unit price bid by the Contractor to
provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015AGPlumber/Pipefitter (DBA): The unit price bid by the Contractor to provide
one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015AHWelder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.16HR$ - 0
G015AJLaborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.32HR$ - 0
G016LABOR RATES FOR OVERTIME HOURS
G016AARoofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016ABCarpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016ACElectrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.4HR$ - 0
G016ADElectronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.4HR$ - 0
G016AERefrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016AFSheet Metal Mechanic (DBA): The unit price bid by the Contractor to
provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016AGPlumber/Pipefitter (DBA): The unit price bid by the Contractor to provide
one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016AHWelder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G016AJLaborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite.8HR$ - 0
G017Materials and Equipment: The Contractor's markup for this pre-priced ELIN is the sum of the Contractor's and subcontractors markups. Material and equipment prices, and rental charges shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor and subcontractor. The Contractor shall provide pricing from two suppliers for the proposed material and equipment in their quote. The Quote shall clearly show the material and equipment pricing , including discounts, that the Contractor or subcontractor receives from their suppliers. The FBR may then be applied to suppliers price. Costs for shipping shall be added to the FBR. Materials handling costs shall be built in the Composite Hourly Labor Rates. Example on how to apply the Fixed Burden Rate: $35,000.00 (Est. Qty) + ($35,000.00 (Est. QTY) x 20% (FBR)) = $42,000.00$20,000.00%$ - 0
Instruction to the Bidder: The Bidder is to insert their percentage markup (FBR) in Column "E", Row 141. Fo rexample, if the bidder wanted to propose a 35% FBR, the bidder must populate Column "E", Row 141 with 135.00%. The "Total Amount" in Column "F", Row 141 would be $270,000.00.
TOTAL FFP LINE ITEMS - G001 THROUGH G017$ - 0

The following alternatives may be used if the client desires to downgrade to a lower service level.

2ND OPT…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .