Att 1(c) - Contractor Daily Production Report.doc

DOC document 69 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity Roofing
Solicitation number
N62473-14-R-2201
Issued by

About this file

Attachment 1(c) - Contractor Daily Production Report

View the file

Other files

File Type Posted
Att 8 - RoofBid-CampPen-Amended.xls XLS spreadsheet
Attachment 14 - QAP.docx DOCX document
Exhibit C - Factor 3 NAVFAC PPQ Form.doc DOC document
Exhibit E - Financial Questionnaire.docx DOCX document
Exhibit A - Factor 1 Worksheet.docx DOCX document
AMD_0002.pdf PDF
Att 8 - RoofBid-SealBeach-Amended.xls XLS spreadsheet
Exhibit B - Factor 2.doc DOC document
Exhibit D - Factor 4 Worksheet.docx DOCX document
Preproposal_Conf_Brief.pdf PDF
Preproposal_SignIn_Sheet.pdf PDF
AMD_0001.pdf PDF
Exhibit B - Factor 2.doc DOC document
Exhibit E - Financial Questionnaire.docx DOCX document
Exhibit D - Factor 4 Worksheet.docx DOCX document
Exhibit F - Request For Information —
Exhibit A - Factor 1 Worksheet.docx DOCX document
Exhibit C - Factor 3 NAVFAC PPQ Form.doc DOC document
Att 1(j) - Base Access Form —
Att 8 - Roof Bid - Camp Pen.xls XLS spreadsheet
Exhibit_B_-_Factor_2_Worksheet_Offeror's_Team_Experience_Project_Data_Sheet.doc DOC document
Exhibit_C_-_Factor_3_NAVFAC_Past_Performance_Questionnaire_(PPQ)_Form.doc DOC document
Att 1(k) - Visit Request —
Exhibit_D_-_Factor_4_Worksheet.docx DOCX document
Exhibit_E_-_Financial_Questionnaire.docx DOCX document
Att 13 - Rules and Regulations-NWS det Norco.pdf PDF
Att 1(i) - Safety Inspection Report.docx DOCX document
14-R-2201_-_IDIQ_Roofing_RFP.pdf PDF
Att 1(f) - Discrepancy Notice.doc DOC document
Exhibit_F_-_Request_For_Information_(RFI)_Format.doc DOC document
Att 1(e) - Utility Outage Request.doc DOC document
Exhibit_A_-_Factor_1_Worksheet.docx DOCX document
Att 10 - Camp Pendleton Requirements.pdf PDF
Att 1(h) - Contractor Significant Incident Report —
Att 1(g) - Contract Discrepancy Report.doc DOC document
Att 9 - Directions to ROICC Camp Pendleton.pdf PDF
Att 8 - Roof Bid - Seal Beach.xls XLS spreadsheet
Att 1(a) - Submittal Transmittal.xls XLS spreadsheet
Att 1(b) - Submittal Register Form.xlsx XLSX spreadsheet
Att 12 - Rules and Regulations-NWS Seal Beach.pdf PDF
Att 11 - Camp Pendleton BEAP.pdf PDF
Att 1(d) - Locating Request.doc DOC document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE:

CONTRACT NO:

TITLE AND LOCATION:

REPORT NO:

CONTRACTOR:

SUPERINTENDENT:

AM WEATHER:

PM WEATHER:

MAX TEMP.

MIN TEMP.

WORK PERFORMED TODAY

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

JOB SAFETY MEETING HELD THIS DATE? FORMCHECKBOX

YES FORMCHECKBOX

NO

(if YES attach copy of the meeting minutes)

TOTAL WORK

HOURS FROM THIS SIDE:

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? FORMCHECKBOX

YES FORMCHECKBOX

NO

(if YES attach copy of completed OSHA report)

WAS TRENCHING/SCAFFOLD/HV ELECTRICAL/HIGH WORK DONE? FORMCHECKBOX

NO

(if YES attach statement or checklist showing inspection performed)

CUMULATIVE TOTAL OF WORK HRS FROM PREVIOUS REPORT:

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? FORMCHECKBOX

NO

(if YES attach description of incident and proposed action)

TOTAL WORK HOURS FROM START OF CONSTRUCTION:

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED:
FORMCHECKBOX

EQUIPMENT/MATERIAL RECEIVED TO BE INCORPORATED IN WORK

CONSTRUCTION AND PLANT EQUIPMENT ON WORK SITE TODAY (INCLUDE NUMBER OF HOURS USED TODAY):

REMARKS:

CONTRACTOR/SUPERINTENDENT DATE

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

PHASE
(BLANK NOT APPLICABLE)
YES
NO
IDENTIFY SPECIFICATION SECTION, DEFINABLE FEATURE OF WORK, LOCATION AND LIST PERSONNEL PRESENT
PREPARATORY
PLANS AND SPECS HAVE BEEN REVIEWED
FORMCHECKBOX

FORMCHECKBOX

THE SUBMITTALS HAVE BEEN APPROVED
FORMCHECKBOX

FORMCHECKBOX

MATERIALS COMPLY WITH APPROVED SUBMITTALS
FORMCHECKBOX

FORMCHECKBOX

MATERIALS STORED PROPERLY
FORMCHECKBOX

FORMCHECKBOX

PRELIMINARY WORK WAS DONE CORRECTLY
FORMCHECKBOX

FORMCHECKBOX

TESTING PLAN HAS BEEN REVIEWED
FORMCHECKBOX

FORMCHECKBOX

WORK METHOD AND SCHEDULE DISCUSSED
FORMCHECKBOX

FORMCHECKBOX

JOB SAFETY/HAZARD ANALYSIS ADDRESSED
FORMCHECKBOX

FORMCHECKBOX

INITIAL
PRELIMINARY WORK WAS DONE CORRECTLY
FORMCHECKBOX

FORMCHECKBOX

TESTING PERFORMED & WHO PERFORMED TEST

SAMPLE HAS BEEN PREPARED/APPROVED
FORMCHECKBOX

FORMCHECKBOX

WORKMANSHIP IS SATISFACTORY
FORMCHECKBOX

FORMCHECKBOX

TEST RESULTS ARE ACCEPTABLE
FORMCHECKBOX

FORMCHECKBOX

WORK IS IN COMPLIANCE WITH THE CONTRACT
FORMCHECKBOX

FORMCHECKBOX

WORK COMPLIES WITH SAFETY REQUIREMENTS
FORMCHECKBOX

FORMCHECKBOX

FOLLOW-UP
WORK COMPLIES WITH CONTRACT AS APPROVED INITIAL PHASE
FORMCHECKBOX

FORMCHECKBOX

TESTING PERFORMED & WHO PERFORMED TEST

WORK COMPLIES WITH SAFETY REQUIREMENTS
FORMCHECKBOX

FORMCHECKBOX

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS)

REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

REMARKS

On behalf of the contractor, I certify that this report is completed and correct and equipment and material used and work performed during this reporting _______________________________________ ________ period is in compliance with the contract drawings and specifications to the AUTHORIZED QC MANAGER AT SITE DATE best of my knowledge except as noted in this report.

GOVERNMENT QUALITY ASSURANCE REPORT
DATE

QUALITY ASSURANCE REPRESENTATIVES REMARKS AND/OR EXCEPTIONS TO THE REPORT

GOVERNMENT QUALITY ASSURANCE MANAGER DATE

NAVFAC 4296/1 (7/96) (BACK) SHEET 2 OF 2

File details come from the government source that posted it. Updated .