SUMMARY IDIQ
| CAMP PENDLETON TOTALS | SEAL BEACH & NORCO TOTALS | ALL AOR TOTAL | |||
| EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS | EXHIBIT LINE ITEM NUMBERS | |||
| SOLICITATION/CONTRACT #N62473-14-R-2201 | SOLICITATION/CONTRACT #N62473-14-R-2201 | SOLICITATION/CONTRACT #N62473-14-R-2201 | |||
| EXHIBIT A THROUGH EXHIBIT E - CLIN 0001 | EXHIBIT F THROUGH EXHIBIT J - CLIN 0001 | EXHIBIT A - E and EXHIBIT F - J - CLIN 0001 | |||
| BASE YEAR, Exhibit A | $ - 0 | BASE YEAR, Exhibit F | $ - 0 | BASE YEAR TOTAL | $ - 0 |
| 1ST OPTION YEAR, Exhibit B | $ - 0 | 1ST OPTION YEAR, Exhibit G | $ - 0 | 1ST OPTION YEAR TOTAL | $ - 0 |
| 2ND OPTION YEAR, Exhibit C | $ - 0 | 2ND OPTION YEAR, Exhibit H | $ - 0 | 2ND OPTION YEAR TOTAL | $ - 0 |
| 3RD OPTION YEAR, Exhibit D | $ - 0 | 3RD OPTION YEAR, Exhibit I | $ - 0 | 3RD OPTION YEAR TOTAL | $ - 0 |
| 4TH OPTION YEAR, Exhibit E | $ - 0 | 4TH OPTION YEAR, Exhibit J | $ - 0 | 4TH OPTION YEAR TOTAL | $ - 0 |
| TOTAL ALL YEARS, Camp Pendleton | $ - 0 | TOTAL ALL YEARS, Seal Beach & Norco | $ - 0 | TOTAL ALL YEARS | $ - 0 |
BASE YEAR - EXHIBIT A IDIQ
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-14-R-2201 | ||||||
| EXHIBIT A - CLIN 0001 | ||||||
| CLIN 0001 - BASE YEAR - INDEFINITE QUANTITY INDEFINITE DELIVERY (IDIQ) | ||||||
| PROVIDE PRICIES TO REPLACE AND REPAIR ROOF SYSTEMS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON, CA AND NAVAL WEAPONS STATION SEAL BEACH FALLBROOK DETACHMENT, CA | ||||||
| The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below. | ||||||
| UNIT OF | UNIT | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT | |
| A001 | ASPHALT SHINGLE ROOFING SYSTEMS | |||||
| A001AA | Demo and dispose of all shingle roofing system materials, to include multiple layers of shingles, roofing felts, membranes, sheet metal, nails, and staples completely down to the substrate. Includes disconnection of B-vent in the attic space, removal and re-connection. The Contractor QC shall verify that all re-connection of B-Vent is performed and that combustion gases are not be able to enter into attic or any other spaces. This ELIN is inclusive of all shingled roof system/layers. | 8,000 | SF | $ - 0 | ||
| A001AB | Install a complete 30 Year shingle roof system, to include roofing felt, starter strip and shingles necessary to provide a watertight installation. Closed valley flashing shall be installed unless otherwise specified. | 8,000 | SF | $ - 0 | ||
| A002 | PREFORMED METAL ROOF SYSTEMS | |||||
| A002AA | Demo and dispose of metal panel roof systems, including metal panels, architectural sheet metal, flashings, counter flashings, gutter and downspout, and fasteners down to the supporting substrate or framework. This ELIN shall be used for repair and replacement of damaged sections of metal panel roof systems or complete metal panel roof replacement. | 8,000 | SF | $ - 0 | ||
| A002AB | Install complete Metal Panel Roof system to provide a watertight installation, to include all architectural sheet metal, fascia, flashings, counterflashings, trim, and gutter and downspout. Finish color coat in accordance with the BEAP. | 8,000 | SF | $ - 0 | ||
| A002AC | Repair or replace sections of metal panel roofing systems with a like preformed panels to provide a watertight installation, to include all architectural sheet metal, flashings, counterflashings, trim, and gutter and downspout. Color of the roofing system is to match the existing metal panels. | 4,000 | SF | $ - 0 | ||
| A003 | ROOF SYSTEM COMPONENTS | |||||
| A003AA | Install 2 ½ lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP. | 200 | EA | $ - 0 | ||
| A003AB | Install 4 lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP. | 200 | EA | $ - 0 | ||
| A003AC | Demo and install new cast iron roof drain with adjustable extension sleeve, reversible collar, combined flashing clamp and gravel stop, with cast iron dome. Size range: 2-inches through 8-inches. | 50 | EA | $ - 0 | ||
| A003AD | Demo and install new 2'-6" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches. | 25 | EA | $ - 0 | ||
| A003AE | Demo and install new 3'-0" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches. | 10 | EA | $ - 0 | ||
| A003AF | Install bellows type expansion joint on buildings expansion joints. Do not paint. | 2,000 | LF | $ - 0 | ||
| A003AG | Dormer Vent, all sizes. Dormers shall be painted in accordance with the BEAP. | 50 | EA | $ - 0 | ||
| A003AH | Turbine Ventilator and Adjustable Base; Size: to 10" Diameter. | 25 | EA | $ - 0 | ||
| A003AJ | Turbine Ventilator and Adjustable Base; Size: to 12" to 20" in Diameter. | 25 | EA | $ - 0 | ||
| A003AK | Turbine Ventilator and Adjustable Base; Size: Over 20" in Diameter. | 25 | EA | $ - 0 | ||
| A003AL | Install galvanized steel scupper. All sizes. Primed and painted in accordance with the BEAP. | 48 | EA | $ - 0 | ||
| A004 | BUILT-UP ROOFING SYSTEMS | |||||
| A004AA | Demo and dispose of built-up roofing system material, including but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. Includes up to 8-inches thick of insulation. | 120,000 | SF | $ - 0 | ||
| A004AB | Demo and dispose of foam roof systems to include complete underlying built-up roof systems with insulation up to 8-iches thick, to include but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. | 8,000 | SF | $ - 0 | ||
| A004AC | Install a 3-ply hot bituminous built-up roofing system to include base and ply sheets, backer sheets, flashing membrane, SBS Modified cap sheet, and accessories necessary to provide a watertight installation. | 80,000 | SF | $ - 0 | ||
| A004AD | Install ¾-inch Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Additional plies of Perlite Insulation Board to be added to prevent ponding as specified in a task order. | 80,000 | SF | $ - 0 | ||
| A004AE | Install Tapered Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Install tapered Perlite insulation board at pre-determined roof locations to prevent ponding and to provide proper drainage. This ELIN is inclusive of tapered Perlite insulation board tapered to 1/16 ", 1/8 ", 1/4 ", and 1/2 " per foot, and sheet size 4-foot x 4-foot. | 40,000 | SF | $ - 0 | ||
| A004AF | Install 3-inch thick Polyisocyanurate Insulation Board. | 80,000 | SF | $ - 0 | ||
| A004AG | Install felt base flashing on curbs, parapet walls, and vertical walls to make a watertight installation. Estimate per Linear foot to 3-feet high. | 20,000 | SF | $ - 0 | ||
| A004AH | Install 3-foot x 5-foot traffic pads as specified on built-up roofs. | 1,000 | EA | $ - 0 | ||
| A004AJ | Install a 2-ply hot bituminous built-up roofing system, to include smooth SBS modified base sheet with minimum of 60 lbs per square foot and an SBS Modified cap sheet and accessories necessary to provide a watertight installation. Add perlite insulation. | 40,000 | SF | $ - 0 | ||
| A005 | ASBESTOS CONTAINING MATERIAL DEMO & ABATEMENT | |||||
| A005AA | Remove and dispose of Asbestos Containing Materials (ACM), to include mastic and caulking. Includes, Asbestos Abatement Plan, PPE, regulatory requirements, associated SDAPCD fees, and transportation and disposal fees. Manifest through MCB Camp Pendleton Environmental Security Office. | 8,000 | SF | $ - 0 | ||
| A005AB | Provide Industrial Hygienist Qualified Person to monitor and sample air, and to provide all necessary documentation asbestos abatements. | 24 | DAY | $ - 0 | ||
| A006 | SHEET METAL | |||||
| All galvanized metal flashings and copings shall be etched, primed and painted with two color coats. Color coats shall be in accordance with the BEAP. | ||||||
| A006AA | Install new parapet cap flashing up to 14 inches wide. Parapet cap flashing shall be galvanized sheet metal, 24 gauge, primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| A006AB | Install gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 6-inches primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| A006AC | Install gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 7 to 14-inches primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| A006AD | Install reglets and counter flashing 24 gauge (all sizes and shapes) primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| A006AE | Demo and dispose of gutter, downspout, and backsplash. | 4,000 | LF | $ - 0 | ||
| A006AF | Install Style 5 K. gutter, downspout, and fittings. Gutter shall be 0.027 gauge aluminum with a baked on enamel finish. The gutter shall be continuous aluminum. The downspout and fittings shall be 3” x 4” with a baked on enamel finish. Install strainers at each downspout drop. For estimating, miters and elbows shall be estimated as 1 linear foot each. | 6,000 | LF | $ - 0 | ||
| A006AG | Install downspout splash. Product to be made of 100% recyclable plastic. Colors: Green, Beige or Brown as specified. | 24 | EA | $ - 0 | ||
| A006AH | Install roof jacks/vent flashing. This ELIN is inclusive for pipe flashings | |||||
| sizes ¾-inch to 4-inches and vent flashings up to 12-inches in diameter. Prime and paint to in accordance with the BEAP. | 250 | EA | $ - 0 | |||
| A006AJ | Install metal drip edge to 2-inches by 3-inches or 18-inch valley flashing . For shingle roofs ONLY. Primed and painted in accordance with the BEAP. | 1,000 | LF | $ - 0 | ||
| A006AK | Demo and install new B-Vent Cap. Sizes 3-inches through 6-inches diameter. | 36 | EA | $ - 0 | ||
| A006AL | Demo and install new B-Vent. Sizes 3-inches through 6-inches diameter. | 48 | LF | $ - 0 | ||
| A006AM | Demo and install new B-Vent Cap. Sizes 7-inch diameter through 12-inch diameter. | 12 | EA | $ - 0 | ||
| A006AN | Demo and install new B-Vent. Sizes 7-inch diameter through 12-inch diameter. | 48 | LF | $ - 0 | ||
| A006AP | Demo and install new B-Vent roof jacks and storm collars. Sizes 3-inches through 12-inches diameter. | 24 | EA | $ - 0 | ||
| A006AQ | Demo and dispose of ductwork, all gauges with or without insulation. All sizes. Deliver recyclable metal to the MCB Camp Pendleton Recycle Center. If the Recycle Center rejects the delivery of the recyclable metal it shall become the property of the Contractor. | 400 | LF | $ - 0 | ||
| A006AR | Fabricate and Install Ductwork, to includes supports; 24 gauge galvanized for duct up to the sum of 30 inches for two sides. | 2,000 | LBS | $ - 0 | ||
| A006AS | Fabricate and Install Ductwork, to includes support; 22 gauge galvanized for duct up to the sum of 54 inches for two sides. | 2,000 | LBS | $ - 0 | ||
| A006AT | Fabricate and Install Ductwork, to includes supports; 20 gauge galvanized for duct up to the sum of 84 inches for two sides. | 1,000 | LBS | $ - 0 | ||
| A006AU | Install 1-inch noise absorbing duct liner Type R-4.2 with black pigmented coating on the airstream side, to include gluing and pinning. The quantities may be doubled when 2-inch insulation is required. Installation methods shall be in accordance with SMACNA. | 3,000 | SF | $ - 0 | ||
| A006AV | Install New Metal Hooded/Counter flashed Pitch Pockets. | 400 | EA | $ - 0 | ||
| A006AW | Install New T-Tops all sizes. | 30 | EA | $ - 0 | ||
| A007 | SEALANTS AND SKYLIGHTS | |||||
| A007AA | Re-Sealing: Remove existing sealant, clean the surface area, install water-proof sealant/caulking/mastic in areas as specified on a task order. For maintenance applications only. Not for new installations. LF is defined as 1-foot long by 1-foot wide. | 10,000 | LF | $ - 0 | ||
| A007AB | Reseal/repair existing pitch pockets and refill with bitumen as specified on a task order. For maintenance applications only. Not for new installations. | 36 | EA | $ - 0 | ||
| A007AC | Demo and install new fixed or operable translucent skylights. Do not paint. For estimating purposes, skylights are measured in square feet (SF) and the size of the skylight will be estimated in proportion to the opening. For example: an opening 2 feet wide by 4 feet long would equal 8 square feet. The estimated size is 8 square feet. | 2,000 | SF | $ - 0 | ||
| A008 | HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) | |||||
| The Contractor shall replace units with like or similar units, verify sizes, voltage, amperage and other data to ensure the right information is obtained before ordering replacement units. Submittals are required for approval by the Contracting Officer before ordering. Each unit shall be installed in accordance with all applicable codes. The Contractor shall perform a startup and operation checks of all installed units. Each unit shall be fully operation when placed into service, and come with a one-year installers warranty and the applicable manufacture's warranty. A copy of the Operations and Maintenance Manual shall be submitted to the COR within 5-calendar days after completion of the "Final Acceptance Inspection." | ||||||
| The Contractor shall install each unit using the existing applicable electrical, electronic, and plumbing terminations/connections, unless as specified differently in a task order. New parts, materials, or components shall be used to make connections from the new to the existing terminations. The Contractor is responsible for replacing fuses, checking circuits, vibrations springs and pads, similar or like thermostats as necessary, installing equipment supports, installing new curbs as necessary and installing new flex connections. | ||||||
| For ELINs 009AH and 009AJ apply a durable epoxy-phenolic coating on the condenser fins to provide protection in mildly corrosive coastal environments. The coating shall be applied to the aluminum fin stock prior to the fin stamping process to create an inert barrier between the aluminum fin and copper tube. Epoxy-phenolic barrier shall minimize galvanic action between dissimilar metals. | ||||||
| A008AA | Demo and install new centrifugal upblast or downblast exhaust unit, 75 | |||||
| CFM TO 500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | |||
| A008AB | Demo and install new centrifugal upblast or downblast exhaust unit, 501 | |||||
| CFM TO 1,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | |||
| A008AC | Demo and install new centrifugal upblast or downblast exhaust unit, 1,501 CFM TO 2,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| A008AD | Demo and install new centrifugal upblast or downblast exhaust unit, 2,001 CFM TO 2,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| A008AE | Demo and install new centrifugal upblast or downblast exhaust unit, 2,501 CFM TO 3,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| A008AF | Demo and install new Gas-Fired Outdoor Packaged Unit Heater 125,000 - 225 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage,24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports. | 6 | EA | $ - 0 | ||
| A008AG | Demo and install new Gas-Fired Outdoor Packaged Unit Heater 226,000 - 400 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage, 24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports. | 6 | EA | $ - 0 | ||
| A008AH | Demo and install new Packaged Heat Pumps and Gas Pack 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy- efficient compressor with internal relief valve; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory-installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton. | 40 | TON | $ - 0 | ||
| A008AJ | Demo and install new Air Conditioning Unit 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy-efficient compressor; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory- installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder-paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton. | 40 | TON | $ - 0 | ||
| A009 | REPAIRS | |||||
| A009AA | Demo and install new fascia or wood trim . Prime and paint all exposed surface areas in accordance with the BEAP. Prime surfaces that will be installed against concrete surfaces. Estimated in Board Feet (BF). Use the formula of 1-inch thick by 12-inches wide by 12-inches long to determine quantities. | 5,000 | BF | $ - 0 | ||
| A009AB | Demo substrate. | 12,000 | SF | $ - 0 | ||
| A009AC | Install 1/2" OSB substrate. | 12,000 | SF | $ - 0 | ||
| A009AD | Install 5/8" OSB substrate. | 4,000 | SF | $ - 0 | ||
| A009AE | Demo and install new treated wood nailers. For BUR systems. Dispose of deteriorated treated wood nailers off MCB Camp Pendleton and at an approved landfill. Note: Double the LF (quantity) of nailers to account for R-19 insulation. | 8,000 | BF | $ - 0 | ||
| A009AF | Demo equipment conduit, conductors, safety disconnects, junction boxes, supports and disposal. Includes Lockout/Tagout. | 2,000 | LF | $ - 0 | ||
| A009AG | Install new 1/2" through 1" EMT conduit and conductors in accordance with the NEC. The conduit installation includes connectors, 6 fittings, termination ends, and up to four field bends. Conductors are sized up to a 30 amp circuit; single phase or three phase; 120/208/230 volts. This ELIN is for replacement of equipment. Quantified in 10-foot lengths. This ELIN is for replacement of equipment ONLY. | 200 | LENGTH | $ - 0 | ||
| A009AH | Install new fused or non-fused disconnect up to 30 amps; single phase or three phase; 120/208/230 volts in accordance with the NEC. Includes 6- foot liquidtight whip with conductors, weather proof box and cover, terminal ends, fuses and circuit breaker. This ELIN is for replacement of equipment ONLY. | 10 | EA | $ - 0 | ||
| A009AJ | Demo gas pipe up to 1-1/4 inches, to include disconnection from the equipment, Lockout/Tagout, all fittings and flex connections. | 400 | LF | $ - 0 | ||
| A009AK | Install new gas pipe sizes up to 1-1/4 inches, to include couplings or two fitting. This ELIN is for replacement of equipment ONLY. | 400 | LF | $ - 0 | ||
| A009AL | Install gas cock and gas flex line. The gas flex line shall be appropriately sized to the appliance. This ELIN is for replacement of equipment ONLY. | 12 | EA | $ - 0 | ||
| A009AM | Install nipples and additional fittings to fit gas pipe up to 1-1/4 inches. | 80 | EA | $ - 0 | ||
| A010 | BOOM LIFT AND CRANE | |||||
| The use of the boom lift is for work on the multi-story facilities when replacing wood fascia, installing eave screening or cutting of tree limbs and branches. The boom lift is not to be used in conjunction with standard roof replacement operations. | ||||||
| A010AA | Boom lift to reach up to 60 fee high, rental per week. | 12 | EA | $ - 0 | ||
| A010AB | Boom lift to reach above 60 feet, rental per week. | 12 | EA | $ - 0 | ||
| A010AC | Crane to 80 Ton with crew: The unit price bid by the Contractor to provide one performance standard 8-hour of work-in-place day crew at the worksite. This ELIN is for removal and replacement of HVAC units only. Quantified per 8-hour day. | 12 | Day | $ - 0 | ||
| GENERAL | ||||||
| A011 | Trim tree branches and limbs that interfere roofing operations. A Category Exclusion (CATX) is required before any trimming procedures. Trim the overhanging or obstructing trees limbs and branches and dispose of trimmings. Quantified as per tree. | 36 | EA | $ - 0 | ||
| A012 | Demo and install hardware cloth under eaves and duct as specified on a task order. | 2,000 | SF | $ - 0 | ||
| A013 | Temporary Safety Fencing: Install temporary fencing with privacy screen around the safety zone in accordance with the approved Demolition Plan. Fencing shall be a minimum of 6’-0” high chain link fence with galvanized 2” diameter post at maximum 12’-0” on center. Includes ingress/egress gates. | 12,000 | LF | $ - 0 | ||
| A014 | Clean gutter and downspout of debris. Hose gutter and downspout out after debris has been removed. Properly dispose of debris. Clean up any residual spoils that have found their way onto the roof surface, wall surfaces, the ground and landscape. Add lift for multi-story facilities. Estimated per linear foot. | 6,000 | LF | $ - 0 | ||
| LABOR RATES FOR NORMAL WORKING HOURS | ||||||
| A015AA | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| A015AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| A015AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| A015AD | Electronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| A015AE | Refrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| A015AF | Sheet Metal Mechanic (DBA): The unit price bid by the Contractor to | |||||
| provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | |||
| A015AG | Plumber/Pipefitter (DBA): The unit price bid by the Contractor to provide | |||||
| one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | |||
| A015AH | Welder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| A015AJ | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| A016 | LABOR RATES FOR OVERTIME HOURS | |||||
| A016AA | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AD | Electronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AE | Refrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AF | Sheet Metal Mechanic (DBA): The unit price bid by the Contractor to | |||||
| provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | |||
| A016AG | Plumber/Pipefitter (DBA): The unit price bid by the Contractor to provide | |||||
| one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | |||
| A016AH | Welder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A016AJ | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| A017 | Materials and Equipment: The Contractor's markup for this pre-priced ELIN is the sum of the Contractor's and subcontractors markups. Material and equipment prices, and rental charges shall be the lowest prices available considering the availability and time constraints of the job, and shall include any discounts and/or rebates accrued to or for the Contractor and subcontractor. The Contractor shall provide pricing from two suppliers for the proposed material and equipment in their quote. The Quote shall clearly show the material and equipment pricing , including discounts, that the Contractor or subcontractor receives from their suppliers. The FBR may then be applied to suppliers price. Costs for shipping shall be added to the FBR. Materials handling costs shall be built in the Composite Hourly Labor Rates. Example on how to apply the Fixed Burden Rate: $35,000.00 (Est. Qty) + ($35,000.00 (Est. QTY) x 20% (FBR)) = $42,000.00 | $200,000.00 | % | $ - 0 | ||
| Instruction to the Bidder: The Bidder is to insert their percentage markup (FBR) in Column "E", Row 141. Fo rexample, if the bidder wanted to propose a 35% FBR, the bidder must populate Column "E", Row 141 with 135.00%. The "Total Amount" in Column "F", Row 141 would be $270,000.00. | ||||||
| TOTAL FFP LINE ITEMS - A001 THROUGH A017 | $ - 0 |
The following alternatives may be used if the client desires to downgrade to a lower service level.
1ST OPT YEAR - EXHIBIT B IDIQ
| EXHIBIT LINE ITEM NUMBERS | ||||||
| SOLICITATION/CONTRACT #N62473-14-R-2201 | ||||||
| EXHIBIT B - CLIN 0001 | ||||||
| CLIN 0001 - 1ST OPTION YEAR - INDEFINITE QUANTITY INDEFINITE DELIVERY (IDIQ) | ||||||
| PROVIDE PRICIES TO REPLACE AND REPAIR ROOF SYSTEMS AT VARIOUS LOCATIONS ABOARD MCB CAMP PENDLETON, CA AND NAVAL WEAPONS STATION SEAL BEACH FALLBROOK DETACHMENT, CA | ||||||
| The Contractor shall populate the "Unit Price" column and the extended "Total Amount" column for each of the IDIQ ELIN below. | ||||||
| UNIT OF | UNIT | TOTAL | ||||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT | |
| B001 | ASPHALT SHINGLE ROOFING SYSTEMS | |||||
| B001AA | Demo and dispose of all shingle roofing system materials, to include multiple layers of shingles, roofing felts, membranes, sheet metal, nails, and staples completely down to the substrate. Includes disconnection of B-vent in the attic space, removal and re-connection. The Contractor QC shall verify that all re-connection of B-Vent is performed and that combustion gases are not be able to enter into attic or any other spaces. This ELIN is inclusive of all shingled roof system/layers. | 8,000 | SF | $ - 0 | ||
| B001AB | Install a complete 30 Year shingle roof system, to include roofing felt, starter strip and shingles necessary to provide a watertight installation. Closed valley flashing shall be installed unless otherwise specified. | 8,000 | SF | $ - 0 | ||
| B002 | PREFORMED METAL ROOF SYSTEMS | |||||
| B002AA | Demo and dispose of metal panel roof systems, including metal panels, architectural sheet metal, flashings, counter flashings, gutter and downspout, and fasteners down to the supporting substrate or framework. This ELIN shall be used for repair and replacement of damaged sections of metal panel roof systems or complete metal panel roof replacement. | 8,000 | SF | $ - 0 | ||
| B002AB | Install complete Metal Panel Roof system to provide a watertight installation, to include all architectural sheet metal, fascia, flashings, counterflashings, trim, and gutter and downspout. Finish color coat in accordance with the BEAP. | 8,000 | SF | $ - 0 | ||
| B002AC | Repair or replace sections of metal panel roofing systems with a like preformed panels to provide a watertight installation, to include all architectural sheet metal, flashings, counterflashings, trim, and gutter and downspout. Color of the roofing system is to match the existing metal panels. | 4,000 | SF | $ - 0 | ||
| B003 | ROOF SYSTEM COMPONENTS | |||||
| B003AA | Install 2 ½ lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP. | 200 | EA | $ - 0 | ||
| B003AB | Install 4 lb. sheet lead vent flashing. vent pipe sizes up to 4-inches in diameter. Prime and apply color coat in accordance with the BEAP. | 200 | EA | $ - 0 | ||
| B003AC | Demo and install new cast iron roof drain with adjustable extension sleeve, reversible collar, combined flashing clamp and gravel stop, with cast iron dome. Size range: 2-inches through 8-inches. | 50 | EA | $ - 0 | ||
| B003AD | Demo and install new 2'-6" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches. | 25 | EA | $ - 0 | ||
| B003AE | Demo and install new 3'-0" by 3'-0" Aluminum Roof Hatch. Do not paint roof hatches. | 10 | EA | $ - 0 | ||
| B003AF | Install bellows type expansion joint on buildings expansion joints. Do not paint. | 2,000 | LF | $ - 0 | ||
| B003AG | Dormer Vent, all sizes. Dormers shall be painted in accordance with the BEAP. | 50 | EA | $ - 0 | ||
| B003AH | Turbine Ventilator and Adjustable Base; Size: to 10" Diameter. | 25 | EA | $ - 0 | ||
| B003AJ | Turbine Ventilator and Adjustable Base; Size: to 12" to 20" in Diameter. | 25 | EA | $ - 0 | ||
| B003AK | Turbine Ventilator and Adjustable Base; Size: Over 20" in Diameter. | 25 | EA | $ - 0 | ||
| B003AL | Install galvanized steel scupper. All sizes. Primed and painted in accordance with the BEAP. | 48 | EA | $ - 0 | ||
| B004 | BUILT-UP ROOFING SYSTEMS | |||||
| B004AA | Demo and dispose of built-up roofing system material, including but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. Includes up to 8-inches thick of insulation. | 120,000 | SF | $ - 0 | ||
| B004AB | Demo and dispose of foam roof systems to include complete underlying built-up roof systems with insulation up to 8-iches thick, to include but not limited to, all bitumens, aggregates, roofing felts, membranes, insulation, fasteners, architectural sheet metal, sheet metal flashings, counter flashings, lead flashing and scuppers. | 8,000 | SF | $ - 0 | ||
| B004AC | Install a 3-ply hot bituminous built-up roofing system to include base and ply sheets, backer sheets, flashing membrane, SBS Modified cap sheet, and accessories necessary to provide a watertight installation. | 80,000 | SF | $ - 0 | ||
| B004AD | Install ¾-inch Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Additional plies of Perlite Insulation Board to be added to prevent ponding as specified in a task order. | 80,000 | SF | $ - 0 | ||
| B004AE | Install Tapered Perlite Board Insulation on top of the Polyisocyanurate Board Insulation. Install tapered Perlite insulation board at pre-determined roof locations to prevent ponding and to provide proper drainage. This ELIN is inclusive of tapered Perlite insulation board tapered to 1/16 ", 1/8 ", 1/4 ", and 1/2 " per foot, and sheet size 4-foot x 4-foot. | 40,000 | SF | $ - 0 | ||
| B004AF | Install 3-inch thick Polyisocyanurate Insulation Board. | 80,000 | SF | $ - 0 | ||
| B004AG | Install felt base flashing on curbs, parapet walls, and vertical walls to make a watertight installation. Estimate per Linear foot to 3-feet high. | 20,000 | SF | $ - 0 | ||
| B004AH | Install 3-foot x 5-foot traffic pads as specified on built-up roofs. | 1,000 | EA | $ - 0 | ||
| B004AJ | Install a 2-ply hot bituminous built-up roofing system, to include smooth SBS modified base sheet with minimum of 60 lbs per square foot and an SBS Modified cap sheet and accessories necessary to provide a watertight installation. Add perlite insulation. | 40,000 | SF | $ - 0 | ||
| B005 | ASBESTOS CONTAINING MATERIAL DEMO & ABATEMENT | |||||
| B005AA | Remove and dispose of Asbestos Containing Materials (ACM), to include mastic and caulking. Includes, Asbestos Abatement Plan, PPE, regulatory requirements, associated SDAPCD fees, and transportation and disposal fees. Manifest through MCB Camp Pendleton Environmental Security Office. | 8,000 | SF | $ - 0 | ||
| B005AB | Provide Industrial Hygienist Qualified Person to monitor and sample air, and to provide all necessary documentation asbestos abatements. | 24 | DAY | $ - 0 | ||
| B006 | SHEET METAL | |||||
| All galvanized metal flashings and copings shall be etched, primed and painted with two color coats. Color coats shall be in accordance with the BEAP. | ||||||
| B006AA | Install new parapet cap flashing up to 14 inches wide. Parapet cap flashing shall be galvanized sheet metal, 24 gauge, primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| B006AB | Install gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 6-inches primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| B006AC | Install gravel stop. Gravel stop shall be galvanized sheet metal, 24 gauge, 6- inches by 7 to 14-inches primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| B006AD | Install reglets and counter flashing 24 gauge (all sizes and shapes) primed and painted in accordance with the BEAP. | 6,000 | LF | $ - 0 | ||
| B006AE | Demo and dispose of gutter, downspout, and backsplash. | 4,000 | LF | $ - 0 | ||
| B006AF | Install Style 5 K. gutter, downspout, and fittings. Gutter shall be 0.027 gauge aluminum with a baked on enamel finish. The gutter shall be continuous aluminum. The downspout and fittings shall be 3” x 4” with a baked on enamel finish. Install strainers at each downspout drop. For estimating, miters and elbows shall be estimated as 1 linear foot each. | 6,000 | LF | $ - 0 | ||
| B006AG | Install downspout splash. Product to be made of 100% recyclable plastic. Colors: Green, Beige or Brown as specified. | 24 | EA | $ - 0 | ||
| B006AH | Install roof jacks/vent flashing. This ELIN is inclusive for pipe flashings | |||||
| sizes ¾-inch to 4-inches and vent flashings up to 12-inches in diameter. Prime and paint to in accordance with the BEAP. | 250 | EA | $ - 0 | |||
| B006AJ | Install metal drip edge to 2-inches by 3-inches or 18-inch valley flashing . For shingle roofs ONLY. Primed and painted in accordance with the BEAP. | 1,000 | LF | $ - 0 | ||
| B006AK | Demo and install new B-Vent Cap. Sizes 3-inches through 6-inches diameter. | 36 | EA | $ - 0 | ||
| B006AL | Demo and install new B-Vent. Sizes 3-inches through 6-inches diameter. | 48 | LF | $ - 0 | ||
| B006AM | Demo and install new B-Vent Cap. Sizes 7-inch diameter through 12-inch diameter. | 12 | EA | $ - 0 | ||
| B006AN | Demo and install new B-Vent. Sizes 7-inch diameter through 12-inch diameter. | 48 | LF | $ - 0 | ||
| B006AP | Demo and install new B-Vent roof jacks and storm collars. Sizes 3-inches through 12-inches diameter. | 24 | EA | $ - 0 | ||
| B006AQ | Demo and dispose of ductwork, all gauges with or without insulation. All sizes. Deliver recyclable metal to the MCB Camp Pendleton Recycle Center. If the Recycle Center rejects the delivery of the recyclable metal it shall become the property of the Contractor. | 400 | LF | $ - 0 | ||
| B006AR | Fabricate and Install Ductwork, to includes supports; 24 gauge galvanized for duct up to the sum of 30 inches for two sides. | 2,000 | LBS | $ - 0 | ||
| B006AS | Fabricate and Install Ductwork, to includes support; 22 gauge galvanized for duct up to the sum of 54 inches for two sides. | 2,000 | LBS | $ - 0 | ||
| B006AT | Fabricate and Install Ductwork, to includes supports; 20 gauge galvanized for duct up to the sum of 84 inches for two sides. | 1,000 | LBS | $ - 0 | ||
| B006AU | Install 1-inch noise absorbing duct liner Type R-4.2 with black pigmented coating on the airstream side, to include gluing and pinning. The quantities may be doubled when 2-inch insulation is required. Installation methods shall be in accordance with SMACNA. | 3,000 | SF | $ - 0 | ||
| B006AV | Install New Metal Hooded/Counter flashed Pitch Pockets. | 400 | EA | $ - 0 | ||
| B006AW | Install New T-Tops all sizes. | 30 | EA | $ - 0 | ||
| B007 | SEALANTS AND SKYLIGHTS | |||||
| B007AA | Re-Sealing: Remove existing sealant, clean the surface area, install water-proof sealant/caulking/mastic in areas as specified on a task order. For maintenance applications only. Not for new installations. LF is defined as 1-foot long by 1-foot wide. | 10,000 | LF | $ - 0 | ||
| B007AB | Reseal/repair existing pitch pockets and refill with bitumen as specified on a task order. For maintenance applications only. Not for new installations. | 36 | EA | $ - 0 | ||
| B007AC | Demo and install new fixed or operable translucent skylights. Do not paint. For estimating purposes, skylights are measured in square feet (SF) and the size of the skylight will be estimated in proportion to the opening. For example: an opening 2 feet wide by 4 feet long would equal 8 square feet. The estimated size is 8 square feet. | 2,000 | SF | $ - 0 | ||
| B008 | HEATING, VENTILATION, AND AIR CONDITIONING (HVAC) | |||||
| The Contractor shall replace units with like or similar units, verify sizes, voltage, amperage and other data to ensure the right information is obtained before ordering replacement units. Submittals are required for approval by the Contracting Officer before ordering. Each unit shall be installed in accordance with all applicable codes. The Contractor shall perform a startup and operation checks of all installed units. Each unit shall be fully operation when placed into service, and come with a one-year installers warranty and the applicable manufacture's warranty. A copy of the Operations and Maintenance Manual shall be submitted to the COR within 5-calendar days after completion of the "Final Acceptance Inspection." | ||||||
| The Contractor shall install each unit using the existing applicable electrical, electronic, and plumbing terminations/connections, unless as specified differently in a task order. New parts, materials, or components shall be used to make connections from the new to the existing terminations. The Contractor is responsible for replacing fuses, checking circuits, vibrations springs and pads, similar or like thermostats as necessary, installing equipment supports, installing new curbs as necessary and installing new flex connections. | ||||||
| For ELINs 009AH and 009AJ apply a durable epoxy-phenolic coating on the condenser fins to provide protection in mildly corrosive coastal environments. The coating shall be applied to the aluminum fin stock prior to the fin stamping process to create an inert barrier between the aluminum fin and copper tube. Epoxy-phenolic barrier shall minimize galvanic action between dissimilar metals. | ||||||
| B008AA | Demo and install new centrifugal upblast or downblast exhaust unit, 75 | |||||
| CFM TO 500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | |||
| B008AB | Demo and install new centrifugal upblast or downblast exhaust unit, 501 | |||||
| CFM TO 1,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | |||
| B008AC | Demo and install new centrifugal upblast or downblast exhaust unit, 1,501 CFM TO 2,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| B008AD | Demo and install new centrifugal upblast or downblast exhaust unit, 2,001 CFM TO 2,500 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| B008AE | Demo and install new centrifugal upblast or downblast exhaust unit, 2,501 CFM TO 3,000 CFM. Replace the existing exhaust fan with a direct replacement, i.e. the same curb size, direct drive or belt driven, same voltage, ampacity, horse power, and CFM/RPM. Provide lockout/tagout. Do not paint. | 24 | EA | $ - 0 | ||
| B008AF | Demo and install new Gas-Fired Outdoor Packaged Unit Heater 125,000 - 225 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage,24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports. | 6 | EA | $ - 0 | ||
| B008AG | Demo and install new Gas-Fired Outdoor Packaged Unit Heater 226,000 - 400 BTUH: 80% Efficiency; Can be rooftop (curb) mounted or ducted; Natural Gas or Propane; Spark-ignited intermittent pilot and a single stage, 24-volt gas valve; has all the required limit and safety controls including a venter pressure switch which verifies power vent flow prior to allowing operation of the gas valve; wired for field connection to a remote 24-volt thermostat; weatherized galvalume steel cabinet with interlocking joint construction and a full curb cap for mounting on a roof curb or supports. | 6 | EA | $ - 0 | ||
| B008AH | Demo and install new Packaged Heat Pumps and Gas Pack 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy- efficient compressor with internal relief valve; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory-installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton. | 40 | TON | $ - 0 | ||
| B008AJ | Demo and install new Air Conditioning Unit 2-1/2 through 5 Ton Units: 13 SEER or better; Roof (curb) mounted or ducted; Energy-efficient compressor; Copper tube/aluminum fin coil; totally enclosed, permanently lubricated condenser fan motor; fully charged R-22 system; Factory- installed bi-flow liquid line filter dryer; heavy-gauge galvanized-steel cabinet with attractive manufacturer's powder-paint finish; fully insulated blower compartment that has convenient access panels; louvered or screened condenser coil protection. Quantified per ton; units in required in 1/2 ton shall rounded up to the next ton. | 40 | TON | $ - 0 | ||
| B009 | REPAIRS | |||||
| B009AA | Demo and install new fascia or wood trim . Prime and paint all exposed surface areas in accordance with the BEAP. Prime surfaces that will be installed against concrete surfaces. Estimated in Board Feet (BF). Use the formula of 1-inch thick by 12-inches wide by 12-inches long to determine quantities. | 5,000 | BF | $ - 0 | ||
| B009AB | Demo substrate. | 12,000 | SF | $ - 0 | ||
| B009AC | Install 1/2" OSB substrate. | 12,000 | SF | $ - 0 | ||
| B009AD | Install 5/8" OSB substrate. | 4,000 | SF | $ - 0 | ||
| B009AE | Demo and install new treated wood nailers. For BUR systems. Dispose of deteriorated treated wood nailers off MCB Camp Pendleton and at an approved landfill. Note: Double the LF (quantity) of nailers to account for R-19 insulation. | 8,000 | BF | $ - 0 | ||
| B009AF | Demo equipment conduit, conductors, safety disconnects, junction boxes, supports and disposal. Includes Lockout/Tagout. | 2,000 | LF | $ - 0 | ||
| B009AG | Install new 1/2" through 1" EMT conduit and conductors in accordance with the NEC. The conduit installation includes connectors, 6 fittings, termination ends, and up to four field bends. Conductors are sized up to a 30 amp circuit; single phase or three phase; 120/208/230 volts. This ELIN is for replacement of equipment. Quantified in 10-foot lengths. This ELIN is for replacement of equipment ONLY. | 200 | LENGTH | $ - 0 | ||
| B009AH | Install new fused or non-fused disconnect up to 30 amps; single phase or three phase; 120/208/230 volts in accordance with the NEC. Includes 6- foot liquidtight whip with conductors, weather proof box and cover, terminal ends, fuses and circuit breaker. This ELIN is for replacement of equipment ONLY. | 10 | EA | $ - 0 | ||
| B009AJ | Demo gas pipe up to 1-1/4 inches, to include disconnection from the equipment, Lockout/Tagout, all fittings and flex connections. | 400 | LF | $ - 0 | ||
| B009AK | Install new gas pipe sizes up to 1-1/4 inches, to include couplings or two fitting. This ELIN is for replacement of equipment ONLY. | 400 | LF | $ - 0 | ||
| B009AL | Install gas cock and gas flex line. The gas flex line shall be appropriately sized to the appliance. This ELIN is for replacement of equipment ONLY. | 12 | EA | $ - 0 | ||
| B009AM | Install nipples and additional fittings to fit gas pipe up to 1-1/4 inches. | 80 | EA | $ - 0 | ||
| B010 | BOOM LIFT AND CRANE | |||||
| The use of the boom lift is for work on the multi-story facilities when replacing wood fascia, installing eave screening or cutting of tree limbs and branches. The boom lift is not to be used in conjunction with standard roof replacement operations. | ||||||
| B010AA | Boom lift to reach up to 60 fee high, rental per week. | 12 | EA | $ - 0 | ||
| B010AB | Boom lift to reach above 60 feet, rental per week. | 12 | EA | $ - 0 | ||
| B010AC | Crane to 80 Ton with crew: The unit price bid by the Contractor to provide one performance standard 8-hour of work-in-place day crew at the worksite. This ELIN is for removal and replacement of HVAC units only. Quantified per 8-hour day. | 12 | Day | $ - 0 | ||
| GENERAL | ||||||
| B011 | Trim tree branches and limbs that interfere roofing operations. A Category Exclusion (CATX) is required before any trimming procedures. Trim the overhanging or obstructing trees limbs and branches and dispose of trimmings. Quantified as per tree. | 36 | EA | $ - 0 | ||
| B012 | Demo and install hardware cloth under eaves and duct as specified on a task order. | 2,000 | SF | $ - 0 | ||
| B013 | Temporary Safety Fencing: Install temporary fencing with privacy screen around the safety zone in accordance with the approved Demolition Plan. Fencing shall be a minimum of 6’-0” high chain link fence with galvanized 2” diameter post at maximum 12’-0” on center. Includes ingress/egress gates. | 12,000 | LF | $ - 0 | ||
| B014 | Clean gutter and downspout of debris. Hose gutter and downspout out after debris has been removed. Properly dispose of debris. Clean up any residual spoils that have found their way onto the roof surface, wall surfaces, the ground and landscape. Add lift for multi-story facilities. Estimated per linear foot. | 6,000 | LF | $ - 0 | ||
| LABOR RATES FOR NORMAL WORKING HOURS | ||||||
| B015AA | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| B015AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| B015AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| B015AD | Electronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| B015AE | Refrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| B015AF | Sheet Metal Mechanic (DBA): The unit price bid by the Contractor to | |||||
| provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | |||
| B015AG | Plumber/Pipefitter (DBA): The unit price bid by the Contractor to provide | |||||
| one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | |||
| B015AH | Welder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 80 | HR | $ - 0 | ||
| B015AJ | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 160 | HR | $ - 0 | ||
| B016 | LABOR RATES FOR OVERTIME HOURS | |||||
| B016AA | Roofer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AB | Carpenter (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AC | Electrician (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AD | Electronics Technician, Controls (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AE | Refrigeration Mechanic (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AF | Sheet Metal Mechanic (DBA): The unit price bid by the Contractor to | |||||
| provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | |||
| B016AG | Plumber/Pipefitter (DBA): The unit price bid by the Contractor to provide | |||||
| one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | |||
| B016AH | Welder (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 | ||
| B016AJ | Laborer (DBA): The unit price bid by the Contractor to provide one performance standard hour of work-in-place per tradesman at the worksite. | 40 | HR | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .