Specification Revisions_Amendment 0005.pdf
PDF 38 MB Posted
- Solicitation number
- N6247026R0015
About this file
This file is an amendment (Amendment 0005) to the Specification Revisions for a Military Construction (MILCON) Design-Bid-Build solicitation for Electrical Distribution System Upgrades at Norfolk Naval Shipyard's Gosport Substation in Portsmouth, Virginia. The amendment extends the proposal due date and makes significant revisions to the solicitation and contract requirements, including modifications to FAR Clause 52.211-12 (Liquidated Damages-Construction) and FAR Clause 52.211-10 (Commencement, Prosecution, and Completion of Work). Additionally, the amendment revises Factor 3 (Schedule) evaluation criteria, updates Attachment G (Price Proposal Form), and revises the technical specifications and project drawings. The contracting office is the Naval Facilities Engineering Command, with Daniel Rocha serving as the Contract Specialist for specification requests and Pre-Proposal Inquiries (PPIs).
All prospective contractors must request complete specifications via email from the Contract Specialist and submit all PPIs to the designated contact. This solicitation is being issued under a Design-Bid-Build delivery method, and previous amendments removed the Project Labor Agreement (PLA) requirement. Notably, while the proposal due date is extended, the PPI submission period remains unchanged and is not extended concurrent with the solicitation deadline. The file addresses contract conditions, evaluation criteria, and technical requirements rather than providing standalone specification content, representing a comprehensive amendment to clarify contractual obligations and evaluation standards for this federal construction project.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .