Attachment B - Construction Experience Project Data.docx
DOCX document 21 KB Posted
- Solicitation number
- N6247026R0015
About this file
Attachment B is a Construction Experience Project Data Sheet template designed for contractors to document their past project experience for a federal solicitation. The form requires detailed information about a construction project, including identification of the firm (prime or subcontractor), contract details, project type, and specific project characteristics such as award amount, contract type, and performance specifics.
Key sections include spaces to describe project type (new construction - in water or land-based), contract structure (firm-fixed price, cost/time and material), project delivery method (design-build, design-bid-build), and comprehensive project descriptions. The template is specifically related to the Naval Facilities Engineering Command (NAVFAC) solicitation N6247026R0015 for Electrical Distribution System Upgrades at Norfolk Naval Shipyard, requiring contractors to demonstrate relevant construction experience through a structured, detailed documentation process.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT B - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
Project No. (check one) : |_| CON #1 |_| CON #2 |_| CON #3 |_| CON #4 |_| CON #5
1. Experience for: |_| Offeror |_| Joint-Venture |_| Other (Explain)
Firm Name:
Address:
Phone Number:
DUNS Number:
Point of Contact: Contact Phone Number:
2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain)
Percent of project work performed:
If subcontractor, who was prime (Name/Phone #):
3. Contract Number: Delivery/Task Order Number:
Title:
Location:
4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):
Design Completion Date (mm/dd/yy):
5. Type of work:
|_| New Construction – In Water |_| New Construction – Land Based |_| Other (explain):
6. Type of Contract/Task Order: (Check ALL that apply)
|_| Firm-Fixed Price |_| Cost/Time and Material |_| Other (explain):
Complete Block 7 for Construction Projects. Complete Block 8 for Design Projects.
7. Construction Project:
Award Amount: Final Price:
Type of Contract/Task Order: (Check ALL that apply)
|_| Design-Build |_| Design-Bid-Build |_| Delivery/Task Order (IDIQ) |_| Other (explain):
If Design-Build, identify the Lead Design Firm:______________________________________________
8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods), including any sustainable features or USGBC LEED certifications. If design-build, include a description of the design-effort.
9. Provide a detailed description of what work your firm self-performed on this project:
10. Other Information
File details come from the government source that posted it. Updated .