Attachment G - Price Proposal form_Amendment 0005.pdf
PDF 108 KB Posted
- Solicitation number
- N6247026R0015
About this file
This is a Price Schedule for the P-732 Electrical Distribution System Upgrades project at Gosport Tie Station. The document requests line item pricing for a comprehensive electrical infrastructure upgrade project structured as a base price with multiple optional items.
The base price (Line Item 1) covers the entire work for the Gosport Tie Station electrical distribution system upgrades in accordance with specified drawings and specifications. This is further broken down into subtotals for: (1A) work complete to the 5-foot line outside the building; (1B) sitework outside the facility's 5-foot line; (1C) substantial completion allowing energizing for joint testing and commissioning; and (1D) establishment of full functional capability and higher capacity service connections. Additionally, unit prices are requested for: (1E) foundation piling at 3,570 linear feet; (1F) pile load testing for 2 units; (1G) removal and disposal of contaminated stockpiled soils at 900 cubic yards; and (1H) provision and compaction of replacement fill at 225 cubic yards. Three optional line items are included: (2) microtunneling work and associated manholes; (3) Electronic Security System equipment, testing, and training including intrusion detection, access control, and video systems with supporting infrastructure; and (4) VPDES General Permit discharge coverage application and treatment system construction for dewatering activities at contaminated sites. All pricing is requested on a per-unit basis with subtotals and total price columns to be completed by the contractor.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
Line
Item
Description Quantity Unit Unit Price Sub-Total Total Price
1 BASE PRICE: Total Price for the entire work for P-732
Electrical Distribution System
Upgrades Gosport Tie Station in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line
Item.
1 EA $_____________
1A Subtotal of Base Price for the entire work for Gosport Tie
Station complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item
1 EA $__________
1B Subtotal of Base Price for the entire project sitework, outside the facility 5-foot line, complete in accordance with the drawings and specifications, but excluding work described in another line
Item.
1 EA $__________
1C Subtotal of Base Price for
Substantial completion of
Gosport Tie Station and new service connections, controls, and facilities sufficient to allow energizing for Joint Testing and Commissioning with servicing utility.
1 EA $__________
1D Subtotal of Base Price to establish functional capability of the Gosport Tie Station and connections for full loading at new higher capacity service on new equipment, including completion of joint testing and commissioning, cutover, and acceptance.
1 EA $__________
1E Unit Price for providing
Foundation Piling complete in accordance with the drawings and specifications, but
3570 LF $________ $__________
excluding work provided in another line item.
1F Unit Price for providing Pile
Load Test, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
2 EA $________ $__________
1G Unit Price for removal and disposal of contaminated stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in another line item.
900 CY $________ $__________
1H Unit Price for provision and compaction of fill in place of removed contaminated soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item.
225 CY $________ $__________
2 Option Item No. 1: Price for providing all work in connection with microtunneling (sheets CU210, CU211, and CU212) and microtunneling manholes
(sheets ES101, ES102, ES201, C2/ES502, ES512, ES514, ES516, ES517) and specification sections 33 05 23 and 33 51 43, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item.
1 EA $__________
3 Option Item No. 2: Price for providing Electronic Security
System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item. The
ESS includes, but is not limited to, Intrusion Detection System
(IDS), Access Control System
(ACS), and Video Systems
1 EA $__________
complete in accordance with the drawings and specifications. Equipment includes items such as Premise
Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together.
Include the price for supporting, permanent infrastructure under the Base
Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door-hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.
4 Option Item No. 3: Price to apply for discharge coverage under the VPDES General
Permit for Dewatering
Activities of Contaminated
Sites (VAG83). Include the price to build a treatment system as specified in Section
01 75 00 capable of meeting effluent discharge maximums of VAG83 per 9VAC25-120-
80.
1 EA $__________