PRICE SCHEDULE
Provide line item prices, where indicated by blank underlines, for the following items:
| Line Item |
| Description |
| Quantity |
| Unit |
| Unit Price |
| Sub-Total |
| Total Price |
| 1 |
| BASE PRICE: Total Price for the entire work for P-732 Electrical Distribution System Upgrades Gosport Tie Station in accordance with the drawings and specifications, complete, but excluding work provided in another Priced line Item. |
| 1 |
| EA |
| 1A |
| Subtotal of Base Price for the entire work for Gosport Tie Station complete to the 5-foot line outside of the building in accordance with the drawings and specifications, but excluding work provided in another line item |
| 1 |
| EA |
| 1B |
| Subtotal of Base Price for the entire project sitework, outside the facility 5-foot line, complete in accordance with the drawings and specifications, but excluding work described in another line Item. |
| 1 |
| EA |
| 1D |
| Unit Price for providing Foundation Piling complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 3570 |
| LF |
| $________ |
| $__________ |
| 1E |
| Unit Price for providing Pile Load Test, complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 2 |
| EA |
| $________ |
| $__________ |
| 1M |
| Unit Price for removal and disposal of contaminated stockpiled soils complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 900 |
| CY |
| $________ |
| $__________ |
| 1N |
| Unit Price for provision and compaction of fill in place of removed contaminated soil, complete in accordance with the drawings and specifications, but excluding work provided in another line item. |
| 225 |
| CY |
| $________ |
| $__________ |
| 2 |
| Option Item No. 1: Price for providing all work in connection with microtunneling (sheets CU210, CU211, and CU212) and microtunneling manholes (sheets ES101, ES102, ES201, C2/ES502, ES512, ES514, ES516, ES517) and specification sections 33 05 23 and 33 51 43, complete in accordance with the drawings and specifications, but excluding work provided in another Priced line item. |
| 1 |
| EA |
| 3 |
| Option Item No. 2: Price for providing Electronic Security System (ESS) equipment, testing, and associated training, but excluding work provided in another Priced line item. The ESS includes, but is not limited to, Intrusion Detection System (IDS), Access Control System (ACS), and Video Systems complete in accordance with the drawings and specifications. Equipment includes items such as Premise Control Units (PCU), central processing units, field panels, sensors, card readers, keypads, cameras, switches, video recorders, workstations, and the communication cabling connecting these devices together. |
Include the price for supporting, permanent infrastructure under the Base Price. Interior supporting infrastructure includes items such as conduit, junction boxes, electronic door strikes, door-hardware, mounting hardware, and power connections. Exterior supporting infrastructure includes items such as exterior duct banks, manholes, utility poles, utility connections, and power connections.
| 4 |
| Option Item No. 3: Price to apply for discharge coverage under the VPDES General Permit for Dewatering Activities of Contaminated Sites (VAG83). Include the price to build a treatment system as specified in Section 01 75 00 capable of meeting effluent discharge maximums of VAG83 per 9VAC25-120-80. |
| 1 |
| EA |