This document is a pricing schedule for a federal contract opportunity focused on switchgear and related electrical infrastructure components for the Gosport Tie Station. The schedule lists nine resource categories with specific technical descriptions, including prefabricated medium voltage switchgear buildings, medium voltage copper cables (35 kV), conduit, structural concrete, uninterruptible power systems, and steel pipe piles. The total quantities range from 1 to 46,900 units across different line items, measured in units such as each (EA), cubic yards (CY), linear feet (LF), and vertical linear feet (VLF). The document instructs offerors to provide unit costs excluding indirect costs and profit, with the note that proposing a unit cost makes that item subject to potential price adjustments under FAR 52.216-4, and that offerors are not required to propose on all listed materials/commodities.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offerors shall include a unit cost (excluding indirect costs and profit) for any commodity in the schedule in column F. Note: Offeror does not have to propose on any or all material/commodities listed. Only those materials/commodities that the Offeror proposes a unit cost will be subject to adjustments in accordance with FAR 52.216-4. If a unit cost is not proposed, adjustments will not be allowed. FAR 52.211-18 Variation in Estimated Quantity does not apply to Attachment AF. The estimated quantities are strictly for the purpose of administering the clause. Price adjustments subject to FAR 52.216-4 are limited to, at a maximum, the quantities listed below.
CATEGORY RESOUCE
CODE DESCRIPTION TOTAL QUANTITY UNIT Unit Price (Excludes costs and profit)
SWITCHGEAR SW 1
Prefabricated Medium Voltage switchgear building, Gosport Tie Station
1.00
EA
SWITCHGEAR SW 2
Medium-cable single cable, copper, XLP shielding, grounded neutral, 35 kV, 750 46,900.00
CLF
SWITCHGEAR SW 3
Medium-cable single cable, copper, XLP shielding, grounded neutral, 35 kV, 350 kcmil, 24,000.00
CLF
SWITCHGEAR SW 4 CONDUIT RTRC 6" diameter 23,660.00 LF
SWITCHGEAR SW 5
Structural concrete, ready mix, heavyweight, 5000 psi, includes local aggregate, sand, Portland cement (Type I) and water, delivered, excludes all additives and treatments
3,711.00
CY
SWITCHGEAR SW 6
Uninterruptible power system, 3 phase, 480 V input, 3 phase 277/480 V output, 60 Hz, 50 kVA, incl static transfer switch and mechanical bypass switch
1.00 EA
SWITCHGEAR SW 8
Steel piles, steel, pipe piles, concrete filled 3' deep per pile, 60' long, 14" diameter, 46 lb./L.F., excludes mobilization or demobilization
4,488.00 VLF
SWITCHGEAR SW 9
Prefabricated Medium Voltage switchgear building, Gosport Tie Station
1.00
EA