The file's text, extracted by GovTribe without its formatting.
ATTACHMENT A
PRICING EXHIBIT
Submit the signed SF 33 and provide prices for all labor Categories in the Pricing Exhibit. Offeror shall furnish prices for each item shown in the Pricing Exhibit. Rates shall be fully burdened.
DIRECT RATES:
Direct labor rates per the exhibits below are to be fully burdened including profit. Direct labor rates for additional labor categories not listed will be negotiated on individual task orders for one time use or via contract modifications. Direct labor rates for additional labor categories will be negotiated using fully burdened rates.
INDIRECT RATES
No indirect rate mark-ups will be applied to subcontractors, other direct costs, or travel expenses.
TRAVEL
Travel costs shall be allowed in accordance with DoD Joint Travel Regulations current at the time of task order negotiations. No profit or indirect rates (e.g., overhead or G&A) will be allowed on travel expenses.
EXHIBIT A BASE YR PRICING A001-A0044
| ELIN# |
| EXHIBIT A BASE YR PRICING |
A001-A0044
| Loaded Rate |
| Estimated Hours |
| Extended Price |
| A001 |
| Administrative Assistant |
| $ |
| 1920 |
| $ |
| A002 |
| Acoustician/Acoustical Engineer |
| $ |
| 1920 |
| $ |
| A003 |
| Architect Technician |
| $ |
| 1920 |
| $ |
| A005 |
| Architect - Senior |
| $ |
| 1920 |
| $ |
| A006 |
| Business Analyst |
| $ |
| 1920 |
| $ |
| A007 |
| CAD/BIM Manager |
| $ |
| 1920 |
| $ |
| A008 |
| Extreme Weather Hazards and Geological Hazards Resilience Specialist |
| $ |
| 1920 |
| $ |
| A009 |
| Civil Engineer |
| $ |
| 1920 |
| $ |
| A010 |
| Civil Engineer - Senior |
| $ |
| 1920 |
| $ |
| A011 |
| Civil (Structural) Engineering Technician |
| $ |
| 1920 |
| $ |
| A012 |
| Civil Engineer (Structural) |
| $ |
| 1920 |
| $ |
| A013 |
| Civil Engineer (Structural) – Senior |
| $ |
| 1920 |
| $ |
| A014 |
| Construction Scheduler |
| $ |
| 1920 |
| $ |
| A015 |
| Construction Scheduler – Senior |
| $ |
| 3840 |
| $ |
| A016 |
| Construction Engineering Technician |
| $ |
| 15360 |
| $ |
| A017 |
| Construction Engineering Technician 2nd Shift |
| $ |
| 17280 |
| $ |
| A018 |
| Construction Manager |
| $ |
| 1920 |
| $ |
| A019 |
| Construction Support Cost Engineer |
| $ |
| 1920 |
| $ |
| A020 |
| Cost Engineer |
| $ |
| 1920 |
| $ |
| A021 |
| Electrical Engineering Technician |
| $ |
| 1920 |
| $ |
| A022 |
| Electrical Engineer |
| $ |
| 1920 |
| $ |
| A023 |
| Electrical Engineer – Senior |
| $ |
| 1920 |
| $ |
| A024 |
| Fire Protection Engineer Technician |
| $ |
| 1920 |
| $ |
| A025 |
| Fire Protection Engineer |
| $ |
| 1920 |
| $ |
| A026 |
| Fire Protection Engineer – Senior |
| $ |
| 1920 |
| $ |
| A027 |
| General Engineer |
| $ |
| 1920 |
| $ |
| A028 |
| General Engineer - Senior |
| $ |
| 1920 |
| $ |
| A029 |
| Geotechnical Engineer |
| $ |
| 1920 |
| $ |
| A030 |
| Geotechnical Engineer – Senior |
| $ |
| 1920 |
| $ |
| A031 |
| GIS Analyst |
| $ |
| 1920 |
| $ |
| A032 |
| Instructional Design Project Manager |
| $ |
| 1920 |
| $ |
| A033 |
| Interior Designer |
| $ |
| 1920 |
| $ |
| A034 |
| Landscape Architect |
| $ |
| 1920 |
| $ |
| A035 |
| Landscape Architect - Senior |
| $ |
| 1920 |
| $ |
| A036 |
| Mechanical Engineering Technician |
| $ |
| 1920 |
| $ |
| A037 |
| Mechanical Engineer |
| $ |
| 1920 |
| $ |
| A038 |
| Mechanical Engineer – Senior |
| $ |
| 1920 |
| $ |
| A039 |
| Motion Graphics Designer/Animator |
| $ |
| 1920 |
| $ |
| A041 |
| Program Analyst |
| $ |
| 1920 |
| $ |
| A042 |
| Project Risk Analysis |
| $ |
| 1920 |
| $ |
| A043 |
| SharePoint & Power Platform Developer |
| $ |
| 1920 |
| $ |
| A044 |
| Strategic Planner |
| $ |
| 1920 |
| $ |
TOTAL
Base YR, Period of Performance, Date TBD
EXHIBIT B BASE YR PRICING B001-B0044
| ELIN# |
| EXHIBIT B BASE YR PRICING |
B001-B0044
| Loaded Rate |
| Estimated Hours |
| Extended Price |
| B001 |
| Administrative Assistant |
| $ |
| 1920 |
| $ |
| B002 |
| Acoustician/Acoustical Engineer |
| $ |
| 1920 |
| $ |
| B003 |
| Architect Technician |
| $ |
| 1920 |
| $ |
| B005 |
| Architect - Senior |
| $ |
| 1920 |
| $ |
| B006 |
| Business Analyst |
| $ |
| 1920 |
| $ |
| B007 |
| CAD/BIM Manager |
| $ |
| 1920 |
| $ |
| B008 |
| Extreme Weather Hazards and Geological Hazards Resilience Specialist |
| $ |
| 1920 |
| $ |
| B009 |
| Civil Engineer |
| $ |
| 1920 |
| $ |
| B010 |
| Civil Engineer - Senior |
| $ |
| 1920 |
| $ |
| B011 |
| Civil (Structural) Engineering Technician |
| $ |
| 1920 |
| $ |
| B012 |
| Civil Engineer (Structural) |
| $ |
| 1920 |
| $ |
| B013 |
| Civil Engineer (Structural) – Senior |
| $ |
| 1920 |
| $ |
| B014 |
| Construction Scheduler |
| $ |
| 1920 |
| $ |
| B015 |
| Construction Scheduler – Senior |
| $ |
| 3840 |
| $ |
| B016 |
| Construction Engineering Technician |
| $ |
| 15360 |
| $ |
| B017 |
| Construction Engineering Technician 2nd Shift |
| $ |
| 17280 |
| $ |
| B018 |
| Construction Manager |
| $ |
| 1920 |
| $ |
| B019 |
| Construction Support Cost Engineer |
| $ |
| 1920 |
| $ |
| B020 |
| Cost Engineer |
| $ |
| 1920 |
| $ |
| B021 |
| Electrical Engineering Technician |
| $ |
| 1920 |
| $ |
| B022 |
| Electrical Engineer |
| $ |
| 1920 |
| $ |
| B023 |
| Electrical Engineer – Senior |
| $ |
| 1920 |
| $ |
| B024 |
| Fire Protection Engineer Technician |
| $ |
| 1920 |
| $ |
| B025 |
| Fire Protection Engineer |
| $ |
| 1920 |
| $ |
| B026 |
| Fire Protection Engineer – Senior |
| $ |
| 1920 |
| $ |
| B027 |
| General Engineer |
| $ |
| 1920 |
| $ |
| B028 |
| General Engineer - Senior |
| $ |
| 1920 |
| $ |
| B029 |
| Geotechnical Engineer |
| $ |
| 1920 |
| $ |
| B030 |
| Geotechnical Engineer – Senior |
| $ |
| 1920 |
| $ |
| B031 |
| GIS Analyst |
| $ |
| 1920 |
| $ |
| B032 |
| Instructional Design Project Manager |
| $ |
| 1920 |
| $ |
| B033 |
| Interior Designer |
| $ |
| 1920 |
| $ |
| B034 |
| Landscape Architect |
| $ |
| 1920 |
| $ |
| B035 |
| Landscape Architect - Senior |
| $ |
| 1920 |
| $ |
| B036 |
| Mechanical Engineering Technician |
| $ |
| 1920 |
| $ |
| B037 |
| Mechanical Engineer |
| $ |
| 1920 |
| $ |
| B038 |
| Mechanical Engineer – Senior |
| $ |
| 1920 |
| $ |
| B039 |
| Motion Graphics Designer/Animator |
| $ |
| 1920 |
| $ |
| B041 |
| Program Analyst |
| $ |
| 1920 |
| $ |
| B042 |
| Project Risk Analysis |
| $ |
| 1920 |
| $ |
| B043 |
| SharePoint & Power Platform Developer |
| $ |
| 1920 |
| $ |
| B044 |
| Strategic Planner |
| $ |
| 1920 |
| $ |
TOTAL
Option Year 1, Period of Performance, Date TBD
EXHIBIT C BASE YR PRICING C001-C0044
| ELIN# |
| EXHIBIT C BASE YR PRICING |
C001-C0044
| Loaded Rate |
| Estimated Hours |
| Extended Price |
| C001 |
| Administrative Assistant |
| $ |
| 1920 |
| $ |
| C002 |
| Acoustician/Acoustical Engineer |
| $ |
| 1920 |
| $ |
| C003 |
| Architect Technician |
| $ |
| 1920 |
| $ |
| C005 |
| Architect - Senior |
| $ |
| 1920 |
| $ |
| C006 |
| Business Analyst |
| $ |
| 1920 |
| $ |
| C007 |
| CAD/BIM Manager |
| $ |
| 1920 |
| $ |
| C008 |
| Extreme Weather Hazards and Geological Hazards Resilience Specialist |
| $ |
| 1920 |
| $ |
| C009 |
| Civil Engineer |
| $ |
| 1920 |
| $ |
| C010 |
| Civil Engineer - Senior |
| $ |
| 1920 |
| $ |
| C011 |
| Civil (Structural) Engineering Technician |
| $ |
| 1920 |
| $ |
| C012 |
| Civil Engineer (Structural) |
| $ |
| 1920 |
| $ |
| C013 |
| Civil Engineer (Structural) – Senior |
| $ |
| 1920 |
| $ |
| C014 |
| Construction Scheduler |
| $ |
| 1920 |
| $ |
| C015 |
| Construction Scheduler – Senior |
| $ |
| 3840 |
| $ |
| C016 |
| Construction Engineering Technician |
| $ |
| 15360 |
| $ |
| C017 |
| Construction Engineering Technician 2nd Shift |
| $ |
| 17280 |
| $ |
| C018 |
| Construction Manager |
| $ |
| 1920 |
| $ |
| C019 |
| Construction Support Cost Engineer |
| $ |
| 1920 |
| $ |
| C020 |
| Cost Engineer |
| $ |
| 1920 |
| $ |
| C021 |
| Electrical Engineering Technician |
| $ |
| 1920 |
| $ |
| C022 |
| Electrical Engineer |
| $ |
| 1920 |
| $ |
| C023 |
| Electrical Engineer – Senior |
| $ |
| 1920 |
| $ |
| C024 |
| Fire Protection Engineer Technician |
| $ |
| 1920 |
| $ |
| C025 |
| Fire Protection Engineer |
| $ |
| 1920 |
| $ |
| C026 |
| Fire Protection Engineer – Senior |
| $ |
| 1920 |
| $ |
| C027 |
| General Engineer |
| $ |
| 1920 |
| $ |
| C028 |
| General Engineer - Senior |
| $ |
| 1920 |
| $ |
| C029 |
| Geotechnical Engineer |
| $ |
| 1920 |
| $ |
| C030 |
| Geotechnical Engineer – Senior |
| $ |
| 1920 |
| $ |
| C031 |
| GIS Analyst |
| $ |
| 1920 |
| $ |
| C032 |
| Instructional Design Project Manager |
| $ |
| 1920 |
| $ |
| C033 |
| Interior Designer |
| $ |
| 1920 |
| $ |
| C034 |
| Landscape Architect |
| $ |
| 1920 |
| $ |
| C035 |
| Landscape Architect - Senior |
| $ |
| 1920 |
| $ |
| C036 |
| Mechanical Engineering Technician |
| $ |
| 1920 |
| $ |
| C037 |
| Mechanical Engineer |
| $ |
| 1920 |
| $ |
| C038 |
| Mechanical Engineer – Senior |
| $ |
| 1920 |
| $ |
| C039 |
| Motion Graphics Designer/Animator |
| $ |
| 1920 |
| $ |
| C041 |
| Program Analyst |
| $ |
| 1920 |
| $ |
| C042 |
| Project Risk Analysis |
| $ |
| 1920 |
| $ |
| C043 |
| SharePoint & Power Platform Developer |
| $ |
| 1920 |
| $ |
| C044 |
| Strategic Planner |
| $ |
| 1920 |
| $ |
TOTAL
Option Year 2, Period of Performance, Date TBD
EXHIBIT D BASE YR PRICING D001-D0044
| ELIN# |
| EXHIBIT D BASE YR PRICING |
D001-D0044
| Loaded Rate |
| Estimated Hours |
| Extended Price |
| D001 |
| Administrative Assistant |
| $ |
| 1920 |
| $ |
| D002 |
| Acoustician/Acoustical Engineer |
| $ |
| 1920 |
| $ |
| D003 |
| Architect Technician |
| $ |
| 1920 |
| $ |
| D005 |
| Architect - Senior |
| $ |
| 1920 |
| $ |
| D006 |
| Business Analyst |
| $ |
| 1920 |
| $ |
| D007 |
| CAD/BIM Manager |
| $ |
| 1920 |
| $ |
| D008 |
| Extreme Weather Hazards and Geological Hazards Resilience Specialist |
| $ |
| 1920 |
| $ |
| D009 |
| Civil Engineer |
| $ |
| 1920 |
| $ |
| D010 |
| Civil Engineer - Senior |
| $ |
| 1920 |
| $ |
| D011 |
| Civil (Structural) Engineering Technician |
| $ |
| 1920 |
| $ |
| D012 |
| Civil Engineer (Structural) |
| $ |
| 1920 |
| $ |
| D013 |
| Civil Engineer (Structural) – Senior |
| $ |
| 1920 |
| $ |
| D014 |
| Construction Scheduler |
| $ |
| 1920 |
| $ |
| D015 |
| Construction Scheduler – Senior |
| $ |
| 3840 |
| $ |
| D016 |
| Construction Engineering Technician |
| $ |
| 15360 |
| $ |
| D017 |
| Construction Engineering Technician 2nd Shift |
| $ |
| 17280 |
| $ |
| D018 |
| Construction Manager |
| $ |
| 1920 |
| $ |
| D019 |
| Construction Support Cost Engineer |
| $ |
| 1920 |
| $ |
| D020 |
| Cost Engineer |
| $ |
| 1920 |
| $ |
| D021 |
| Electrical Engineering Technician |
| $ |
| 1920 |
| $ |
| D022 |
| Electrical Engineer |
| $ |
| 1920 |
| $ |
| D023 |
| Electrical Engineer – Senior |
| $ |
| 1920 |
| $ |
| D024 |
| Fire Protection Engineer Technician |
| $ |
| 1920 |
| $ |
| D025 |
| Fire Protection Engineer |
| $ |
| 1920 |
| $ |
| D026 |
| Fire Protection Engineer – Senior |
| $ |
| 1920 |
| $ |
| D027 |
| General Engineer |
| $ |
| 1920 |
| $ |
| D028 |
| General Engineer - Senior |
| $ |
| 1920 |
| $ |
| D029 |
| Geotechnical Engineer |
| $ |
| 1920 |
| $ |
| D030 |
| Geotechnical Engineer – Senior |
| $ |
| 1920 |
| $ |
| D031 |
| GIS Analyst |
| $ |
| 1920 |
| $ |
| D032 |
| Instructional Design Project Manager |
| $ |
| 1920 |
| $ |
| D033 |
| Interior Designer |
| $ |
| 1920 |
| $ |
| D034 |
| Landscape Architect |
| $ |
| 1920 |
| $ |
| D035 |
| Landscape Architect - Senior |
| $ |
| 1920 |
| $ |
| D036 |
| Mechanical Engineering Technician |
| $ |
| 1920 |
| $ |
| D037 |
| Mechanical Engineer |
| $ |
| 1920 |
| $ |
| D038 |
| Mechanical Engineer – Senior |
| $ |
| 1920 |
| $ |
| D039 |
| Motion Graphics Designer/Animator |
| $ |
| 1920 |
| $ |
| D041 |
| Program Analyst |
| $ |
| 1920 |
| $ |
| D042 |
| Project Risk Analysis |
| $ |
| 1920 |
| $ |
| D043 |
| SharePoint & Power Platform Developer |
| $ |
| 1920 |
| $ |
| D044 |
| Strategic Planner |
| $ |
| 1920 |
| $ |
TOTAL
Option Year 3, Period of Performance, Date TBD
EXHIBIT E BASE YR PRICING E001-E0044
| ELIN# |
| EXHIBIT E BASE YR PRICING |
E001-E0044
| Loaded Rate |
| Estimated Hours |
| Extended Price |
| E001 |
| Administrative Assistant |
| $ |
| 1920 |
| $ |
| E002 |
| Acoustician/Acoustical Engineer |
| $ |
| 1920 |
| $ |
| E003 |
| Architect Technician |
| $ |
| 1920 |
| $ |
| E005 |
| Architect - Senior |
| $ |
| 1920 |
| $ |
| E006 |
| Business Analyst |
| $ |
| 1920 |
| $ |
| E007 |
| CAD/BIM Manager |
| $ |
| 1920 |
| $ |
| E008 |
| Extreme Weather Hazards and Geological Hazards Resilience Specialist |
| $ |
| 1920 |
| $ |
| E009 |
| Civil Engineer |
| $ |
| 1920 |
| $ |
| E010 |
| Civil Engineer - Senior |
| $ |
| 1920 |
| $ |
| E011 |
| Civil (Structural) Engineering Technician |
| $ |
| 1920 |
| $ |
| E012 |
| Civil Engineer (Structural) |
| $ |
| 1920 |
| $ |
| E013 |
| Civil Engineer (Structural) – Senior |
| $ |
| 1920 |
| $ |
| E014 |
| Construction Scheduler |
| $ |
| 1920 |
| $ |
| E015 |
| Construction Scheduler – Senior |
| $ |
| 3840 |
| $ |
| E016 |
| Construction Engineering Technician |
| $ |
| 15360 |
| $ |
| E017 |
| Construction Engineering Technician 2nd Shift |
| $ |
| 17280 |
| $ |
| E018 |
| Construction Manager |
| $ |
| 1920 |
| $ |
| E019 |
| Construction Support Cost Engineer |
| $ |
| 1920 |
| $ |
| E020 |
| Cost Engineer |
| $ |
| 1920 |
| $ |
| E021 |
| Electrical Engineering Technician |
| $ |
| 1920 |
| $ |
| E022 |
| Electrical Engineer |
| $ |
| 1920 |
| $ |
| E023 |
| Electrical Engineer – Senior |
| $ |
| 1920 |
| $ |
| E024 |
| Fire Protection Engineer Technician |
| $ |
| 1920 |
| $ |
| E025 |
| Fire Protection Engineer |
| $ |
| 1920 |
| $ |
| E026 |
| Fire Protection Engineer – Senior |
| $ |
| 1920 |
| $ |
| E027 |
| General Engineer |
| $ |
| 1920 |
| $ |
| E028 |
| General Engineer - Senior |
| $ |
| 1920 |
| $ |
| E029 |
| Geotechnical Engineer |
| $ |
| 1920 |
| $ |
| E030 |
| Geotechnical Engineer – Senior |
| $ |
| 1920 |
| $ |
| E031 |
| GIS Analyst |
| $ |
| 1920 |
| $ |
| E032 |
| Instructional Design Project Manager |
| $ |
| 1920 |
| $ |
| E033 |
| Interior Designer |
| $ |
| 1920 |
| $ |
| E034 |
| Landscape Architect |
| $ |
| 1920 |
| $ |
| E035 |
| Landscape Architect - Senior |
| $ |
| 1920 |
| $ |
| E036 |
| Mechanical Engineering Technician |
| $ |
| 1920 |
| $ |
| E037 |
| Mechanical Engineer |
| $ |
| 1920 |
| $ |
| E038 |
| Mechanical Engineer – Senior |
| $ |
| 1920 |
| $ |
| E039 |
| Motion Graphics Designer/Animator |
| $ |
| 1920 |
| $ |
| E041 |
| Program Analyst |
| $ |
| 1920 |
| $ |
| E042 |
| Project Risk Analysis |
| $ |
| 1920 |
| $ |
| E043 |
| SharePoint & Power Platform Developer |
| $ |
| 1920 |
| $ |
| E044 |
| Strategic Planner |
| $ |
| 1920 |
| $ |
TOTAL
Option Year 4, Period of Performance, Date TBD