AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 3
AMENDMENT NO. 0005 07/13/20 19-0038
ROICC81
OFFICER IN CHARGE OF CONSTRUCTION FLORENCE
NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC
1121 HAMMOND ROAD
CAMP LEJEUNE, NC 28547-2521
See Item 6
✘ N6247020R6012
05/15/20
N6247020R6012 Renovation & Addition to Protestant Chapel, 16 & 16A
The date and the hour for the receipt of proposals is extended to 24 July 2020 no later than 2:00 pm (EST).
See continuation page(s).
19-0038, Renovation & Addition to Protestant Chapel, 16 & 16A Solicitation N6247020R6012 Marine Corps Base Camp Lejeune, North Carolina Amendment 0005
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. The purpose of this amendment is to incorporate to the following updated attachments:
a. Protestant Chapel Revision 02 Combined Drawings 071020
b. 60025763A
B. The revised drawings reflect the following revisions:
a. CIVIL
i. Added demolition of additional sidewalk.
ii. Deleted new sidewalk to annex building.
iii. Modified site grading slightly due to demolished annex building.
iv. Rerouted water service to mechanical building.
b. STRUCTURAL
i. Added a gable end wall with a new foundation where the Fellowship was removed.
c. ARCHITECTURAL
i. Existing Fellowship Hall, Building 16A, will be demolished in its entirety.
Including all walls, ceilings, cabinetry, roof, structure, slab, and foundation.
ii. The northwest wall of the Chapel will no longer receive a new door, and the opening from the removed door will be infilled.
iii. A new unisex head will be added in the northwest corner of the building with furred walls at the existing building perimeter, metal stud and gypsum board wall in the vestibule, tile walls, and floor, suspended gypsum board ceiling, new plumbing accessories and fixtures. An additional door was added for the head.
iv. The new metal canopy and brick/steel columns on the northwest side of the building has been removed from the contract.
v. A new CMU and brick cavity wall was added at the north side of the new mechanical room.
d. PLUMBING
i. Removed all sanitary waste, vent, and CW & HW piping in the Fellowship Hall. Removed all plumbing fixtures in Fellowship Hall. Removed waste and cold water back to 5 feet outside the building. Waste will be demolished completely.
ii. The 1” cold water line that served the Fellowship Hall will be reconnected to serve the outdoor chiller, the baptistery, and the 10 gallon water heater now located in the Chapel mechanical room and the unisex restroom that was added. There is a 3/4" HW line from the Chapel mechanical room to
19-0038, Renovation & Addition to Protestant Chapel, 16 & 16A Solicitation N6247020R6012 Marine Corps Base Camp Lejeune, North Carolina Amendment 0005 feed the P-8 lavatory. Also 4” waste piping and 2” vent piping was added to serve the restroom.
e. MECHANICAL
i. AHU-2 serving the demolished Fellowship Hall has been removed. AHU- 3 has subsequently been renamed to AHU-2 in all schedules, flow diagrams, and control diagrams.
ii. Chiller capacity has been lowered, and schedule has been updated to reflect electrical characteristics of chiller with integral pumps. New chilled water flow rate has been noted on chilled water flow diagram.
iii. Hot water flow rates have lowered. Pump schedule, boiler schedule, and air control schedule have been updated accordingly.
iv. All associated ductwork and piping for the removed AHU has been deleted.
v. Roof Vent, RV-1, has been resized for reduced airflow.
vi. Exhaust Fan, EF-1, and Louver, L-1, have been moved from their place in the now demolished Fellowship Hall to the new unisex bathroom in the Chapel.
vii. Gas meter, splash block, and DSS-1B have been relocated from the east side of the now demolished Fellowship Hall to the north side of the mechanical building. Piping to these items was modified accordingly.
viii. Chilled water piping previously routed through the Fellowship Hall has been modified.
f. ELECTRICAL/TELECOM
i. Deleted all new work associated with the Fellowship Hall, revised equipment connections for revised equipment from deleting Fellowship Hall, and revised power and lighting for addition of toilet to main Sanctuary.
g. FIRE PROTECTION
i. Removed all devices associated with the Fellowship Hall. Removed pull station that was in old vestibule area, added a speaker/strobe to new unisex bathroom.
C. All other contract terms and conditions remain unchanged.