Industry Question and Answer Form_17July2023.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
RFP for AVIATION TRAINING ANALYSIS AND EVALUATION PRODUCTS (ATAEP) Federal contract opportunity
Solicitation number
N6134023R0065
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to RFP for AVIATION TRAINING ANALYSIS AND EVALUATION PRODUCTS (ATAEP), newest first.
File Type Posted
ATAEP RFP Amendment 4 Mod Document.docx DOCX document
ATAEP RFP Amendment 4 Conformed Copy.docx DOCX document
ATAEP RFP Amendment 3 Conformed Copy.pdf PDF
ATAEP RFP Amendment 3 Mod Document.pdf PDF
Atch L-10 CCM submission instructions.pdf PDF
Atch (l-1) ATAEP Q_and_A_Form RFP 6_23_23 amendment 2.xlsx XLSX spreadsheet
N6134023R0065 Amendment 2 6.23.23.pdf PDF
Attachment 1 - ATAEP IDIQ SOW_V3.docx DOCX document
ATAEP Q_and_A_Form from RFP 6_21_23.xlsx XLSX spreadsheet
N6134023R0065-00001ATAEP RFP Amendment 1-6-15-23.docx DOCX document
N6134023R0065_Conformed_after_Amd_0001-6-15-23.docx DOCX document
Attachment 1 - ATAEP IDIQ SOW_V2.docx DOCX document
Atch (L-9) SAMPLE DOL BLS Pricing Sheet-Rev1-6-15-23.xlsx XLSX spreadsheet
Atch (L-4) Training Task Selection_V2.xlsx XLSX spreadsheet
Atch (L-7) CLIN Pricing Sheet-Rev1_15Jun23.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question #SubjectReference (i.e. RFP, SOW, Attachment, etc.)Specific QuestionDate SubmittedGovernment Response
1Attachment L-3Section 2.1 Master Task List Approach1. Is the attachment of the GPSMAP 64 Series / GPSMAP 64X Series Owner's Manual (attachment L-3) intended to be the correct reference document for the creation of the MTL?
2. If not, could you please provide the correct reference document or specify the required information for creating the MTL?7/12/23The GPSMAP 64 Series / GPSMAP 64X Series Owner's Manual (Attachment L-3) is the correct reference to support the development of the Master Task List in accordance with Section L, Part B, 2.1.1
2RFP Section LSection L, 3.4(c)Section L, 3.4(c) currently states, “Furthermore, if the Offeror or principal subcontractor submits a Past Performance Contract Reference where the Offeror or principal subcontractor performed as a subcontractor, the Offeror or principal subcontractor shall instead forward one (1) copy of Attachment L-5 CPAQ, to the Past Performance Contract Reference Prime contractor Program Manager. A past performance contract’s CPAR completed on a prime contractor will not be considered for the Offeror or principal subcontractor performing as a subcontractor.” Question: Will the Government evaluation team consider PPQ comments from the Government representative as well as the Prime contractor?7/14/23RFP Amendment 4 was submitted to SAM.gov to revise the Section L, 3.4(c) language to accept the Attachment L-5 CPAQ from Government representatives and the Prime Contractor for past performance references, as opposed to only being allowed from just the Prime contractor.
3
4
5
6
7
8

Attachment L-1 Question and Answer Form N61340-23-R-0065