RRL FY21 CC PreSol Conf - Final.pptx

PPTX presentation 11 MB Posted

Attached to
Pre-Solicitation Conference Event for FY21 Content Conversion
Solicitation number
N61340-20-R-0037_PreSolicitationConference
Issued by

About this file

This document contains slides from a pre-solicitation conference for a forthcoming indefinite delivery indefinite quantity contract to provide content conversion services for the Department of the Navy's Sailor 2025 Readiness and Leadership program. The conference overview provides details on the scope of the upcoming procurement, including media types and levels of instruction to be developed, evaluation criteria, and pricing requirements. Offerors will be evaluated on technical approach, past performance, and total evaluated price. The solicitation is expected to be released in late April 2020, with orders issued over two one-year ordering periods using fixed-price contract line items. Questions are due by 26 February 2020. The pre-solicitation conference slides provide relevant information to potential offerors on the agency's upcoming requirements and acquisition strategy.

View the file

Other files

File Type Posted
Atch L-9 Draft RFP GFI Request Form-rev1.docx DOCX document
Atch (1)_APPENDIX C Terms and Definitions - 16 Jan 2020.docx DOCX document
Exhibit B_FY21 RRL CONTENT CONVERSION (B00X) Admin CDRLS - Draft 10 Feb 2020.docx DOCX document
Atch (1)_APPENDIX K S2025 xAPI Requirements - 04 Mar 2020.docx DOCX document
Atch (1)_APPENDIX E Risk Assessment Example Format - 06 Dec 2019.pptx PPTX presentation
Atch (1)_APPENDIX H Sailor 2025 RRL Use of Blooms Taxonomy Action Verbs - 06 Dec 20199.odt ODT document
Exhibit A_FY21 RRL CONTENT CONVERSION (A00X) Engineering CDRLs - Draft 16 Mar 2020.docx DOCX document
FY21 RRL CC PreSol_QuestionsAnswers.xlsx XLSX spreadsheet
Atch (1)_APPENDIX J Mobile Learning Roadmap - 06 Dec 2019.docx DOCX document
Atch (1)_APPENDIX L NETC RRL Single User Gaming and Simulation Guidance - 06 Dec 2019.odt ODT document
Atch (1)_APPENDIX B Acronym List - 03 Feb 2020.docx DOCX document
Atch (1)_APPENDIX I Sailor 2025 RRL Content Conversion Media Type Characteristics - 18 Feb 2020.odt ODT document
Atch L-9 Draft RFP GFI Request Form.docx DOCX document
N61340-20-R-0037 - Section B.docx DOCX document
Atch (1)_APPENDIX M NETC RRL Video Streaming Guidance - 06 Dec 2019.odt ODT document
Atch (1)_APPENDIX G Sailor 2025 RRL Operational Engaging Instructional Strategies - 06 Dec 2019.docx DOCX document
Atch (1)_APPENDIX D CDRL List - 26 Feb 2020.docx DOCX document
Exhibit F_FY21 RRL CONTENT CONVERSION (F00X) Training CDRLs -16 Mar 2020.docx DOCX document
Atch (1)_APPENDIX F Sailor 2025 RRL Content Delivery Modes - 06 Dec 2019.odt ODT document
Atch (1)_FY21CC IDIQ SOW - RFP Draftv2 - 18Mar 2020.docx DOCX document
FY21 CC Industry Day Attendee List.docx DOCX document
N6134020R0037_Pre-Solicitation_Conference_Announcement.doc DOC document
P2-3ParkingMap_2018.docx DOCX document
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sailor 2025 RRL FY21 Content Conversion Pre-Solicitation Conference 12 February 2020

Presented to: Industry Partners Presented by: FY21 RRL Acquisition Team

Kathleen

Please silence all devices No recordings Restroom Please sign in

Welcome

CAPT Rob GallagherTraining Systems Program Manager (TSPM)
Mary DriskelDeputy TSPM
Eric PfefferkornExecution Lead
Eric SmithFY21 IPT Lead
Kathleen DoughertyTSPM Acquisitions Lead
Christina WelchTSPM ISD Lead
Randy McRaeAcquisition ISD Lead
Ricardo EliasProcuring Contracting Officer
Audrey RollandContract Specialist

Government Team

WelcomeKathleen Dougherty
RRL Program OverviewEric Pfefferkorn
Ground Rules/Pre-SolicitationRicardo Elias

Activities

Solicitation OverviewAudrey Rolland
TechnicalRandy McRae
Past PerformanceAudrey Rolland
Price/AdminAudrey Rolland
Small BusinessAudrey Rolland
Typical Proposal IssuesRicardo Elias
GFI/Requirements ExplanationChristina Welch
Wrap-up/Q&AsRRL Team

Agenda

Presented by Eric Pfefferkorn RRL Program Overview

Eric P

Primary Purpose – understanding the content of the draft solicitation All information released to date and during this conference is to be considered draft and for informational purposes only.

Internal source selection plans and procedures will not be discussed.

Today’s remarks by Government officials involved in the RRL FY21 Content Conversion procurement should not be considered a guarantee of the Government’s course of action in proceeding with the project.

The information shared today reflects current Government intentions and is subject to change based on a variety of circumstances, including internal and external comments. The formal (final) solicitation is the only document that should be relied upon in determining the Government’s requirements.

Ground Rules

Ricardo

The Government may answer questions as the presentation progresses.

All questions may not be answered today due to time constraints.

After today, questions should be submitted to Audrey Rolland via email at audrey.rolland@navy.mil.

Do not wait for final RFP release to submit questions and concerns It is the Government’s intention to formally release answers to draft RFP questions. If necessary, changes will be made via the final RFP release.

Ground Rules

Pre-Solicitation Activities Completed Reverse Industry Days (Aug/Sept 2019) IDIQ Announcement (Dec 2019) Monthly PALTs and Industry Days during Training Systems Industry Released draft RFP, with Sections L&M (10 Feb 2020) Pre-solicitation Conference scheduled (12 Feb 2020)

Planned Draft RFP questions due (26 Feb 2020) Release of final RFP (late Apr 2020)

Contract Type: Single Award Indefinite Delivery Indefinite Quantity (IDIQ), predominately Firm Fixed Price (FFP) CLINs

Unrestricted Competition under FAR Part 15

Evaluation Factors Technical (including Small Business Participation) Past Performance Price Solicitation/Contract

Audrey

Solicitation Highlights

Estimated CLIN Quantities will be provided at RFP release Ceiling amount of the IDIQ Contract will be identified at the time of the Final RFP based on final Government Estimate.

Section B

Section F IDIQ will consist of two ordering periods 1000 series CLINs POP: Date of contract award – 12 months 2000 series CLINs POP: 12 months after contract award – 24 months

Orders will be placed utilizing the FFP unit prices within the corresponding ordering period Example: DO 2, awarded 2 months after IDIQ award, will utilize Ordering Period 1 CLINs (1000 series CLINs) for the, while DO 6 is awarded 14 months after IDIQ award and will utilize Ordering Period 2 CLINs (2000 series CLINs).

Ordering Procedures The Government will provide the FY21 RRL Content Conversion contractor with a Delivery Order Statement of Work to include the quantity of hours of Interactive Media Instruction (IMIs), by level/type and the Functional Requirements Document (FRD) (Appendix A) that is available for the rating.

Approximately 30 days to award of DO Train the Trainer, Pilot and Additional Complex Media added as FFP CLINs via modification and negotiated separately Section H

Notional Ordering Schedule

Evaluation Criteria

Factor 1: TECHNICAL

Subfactor 1:Technical Approach
Subfactor 2:Small Business Participation

Elements within Subfactor 1 are not weighted and will not be rated.

Factor 2: PAST PERFORMANCE

Factor 3: PRICE

The Past Performance Factor is more important than the Technical Factor. When combined, all non-price factors are significantly more important than the Price Factor.

Evaluation Criteria - Technical

Subfactor 1 – Design Approach High-level course/module/lesson structure Timing of training delivery along Sailor career path Modernized technologies/media Courses, modules and lessons to be reused or repurposed Instructional design approach Lesson Design – IFIT IMI 2 and SDIT IMI 3 Non-proprietary development software Customer delivery system in which lesson is designed to run Intended design for user interactions, audiovisual media, menus/navigation paths, learning activities, practice exercises, assessments and feedback that meets the media characteristics for the level of IMI Student actions to be tracked

Randy

Evaluation Criteria - Technical

Subfactor 1 – Schedule Approach to accomplishing all program requirements IMS using a proposed WBS to Level IV or lower level, as necessary Data dictionary that defines custom fields and their content

Security On-site regulations related to Government installation and facility access Personnel security clearance requirements Approach to safeguard classified information and meet security requirements for each rating at time of basic contract award

Subfactor 2 – Small Business Participation – Proposed Goal is 25% of IDIQ contract value.

Strategies for utilizing SB Provide SB Subcontracting Plan

Randy

Evaluation Criteria – Past Performance

Establish a Performance Confidence Assessment Rating that will reflect the government’s confidence that the offeror will successfully perform the requirements in the solicitation, based upon the offeror’s recent and relevant past and present performance record.

Two aspects to Past Performance Assessment:

Relevancy Demonstrated Past Performance

Up to 5 references Up to three (3) of the five (5) most relevant government or commercial past performance contract references may be from principal subcontractors, with a maximum of two (2) references provided for a single principal subcontractor.

Principal Subcontractor = least 20% of the total contract price Recency is defined as performance occurring within five (5) years of the RFP release date

Relevancy Scope - Supporting SOW paragraphs Instructional Media Design Package (SOW 3.5.1) IMI Media Types (SOW 3.5.2) Performance Support and Structured On-the-Job Training Media Types (SOW 3.5.3) Complex Media Types (SOW 3.5.4) Train the Trainer (SOW 3.5.6) Course Pilot (SOW 3.5.7)

Magnitude: The prime or principal subcontractor shall compare the total relevant dollar amount of the past performance contract reference to the amount it is proposing to complete for the instant solicitation requirement (this amount shall match the amount identified in Section L Part B Volume 3 (Price) 3.1(a)(i) Offeror Summary Table.

Past Performance Relevancy Ratings Very Relevant Relevant Somewhat Relevant Not Relevant

Demonstrated Past Performance CPARS – Contractor Performance Assessment Reports CPAQs – Contractor Performance Assessment Questionnaires

Once the Gov’t has compiled assessments of the relevance and demonstrated Past Performance for each submitted contract reference, the Gov’t will assign a Performance Confidence Assessment Rating.

Performance Confidence Assessment Ratings:

Substantial Confidence Satisfactory Confidence Unknown Confidence (Neutral) Limited Confidence No Confidence

Required Attachments L-3, Vol 2 PPCR: Past Performance Contract Reference Worksheet L-4, Vol 2 CPAQ: Contractor Performance Assessment Questionnaire L-5, Vol 2 Rel_Info_PP: Vol 2 Past Performance Relevancy Info L-8, Vol 2 PP Vol Ack: Past Performance Volume Acknowledgement

Evaluation Criteria – Price/Admin

Offeror Summary Table

Contractor Name
(Indicate Prime, JV Team Member, or Sub)CAGE CODE/DUNS #Brief Work Description and/or Program Responsibility% of Total Proposed Price
e.g. ABC Inc., $20,000,00012345ICW Courseware Development20% (assumes $100M total proposed price)

Provide FFP Unit Pricing by IMI type Complete Attachments L-6 CLIN Pricing Form

The sum of the prices for each CLIN as outlined in Attachment L-6 CLIN Pricing Form will represent the Total Evaluated Price for evaluation purposes.

Complete Attachment L-7 DO Pricing Form

Unit Pricing inputted in L-7 DO Pricing Form shall match unit pricing inputted in L-6 CLIN Pricing Form.

Administrative Requirements Exceptions and Deviations

Price Reasonableness Anticipated to result based on adequate price competition

Balanced Pricing Proposals will be evaluated to determine if CLINs are materially unbalanced IAW with solicitation

Completeness Evaluation to ensure all information requested in Section L Part B 3.0 requested is provided

Proposal Instructions are not followed Information not provided as requested Too much information that wasn’t requested or desired

Statements in the proposal are not well supported

Proposals are not well organized Does not follow Proposal Instructions structure and makes the evaluator hunt for the information

Past Performance POCs are not current

Not signing RFP or acknowledging all amendments

Typical Proposal Issues

Presented by Christina Welch GFI/Requirements Explanation

Christina

RRL Design & Media Model

RRL Content Conversion Goal a

Design Considerations Design is paramount inside or outside of simulation

Program misconception

Technology insertion = automagical increase in training effectiveness

Truth

Modernization is the infusion of proven learning strategies with technology to bolster the Sailor’s experience

Appropriate Media

Technology Insertion

Modern Design

Training Effectiveness

Media Characteristics RRL Media/Fidelity Model Incorporates innovative data output with more specificity Sum of ICW/IMI levels provided to give high level view of scope Ultimate requirements are media characteristics per LO Allow for development efficiencies

Sum of Current Training Duration (hours)Column Labels
Row LabelsActual Equipment (assumes IMI 2)Complex Media (w/ Instructor)Complex Media with HardwareIMI 1IMI 2IMI 3Grand Total
IFIT##############
IFIT
including PS materials##############
SDIT##############
SDIT
including PS materials##############
Grand Total##############

Sum of ICW/IMI Levels in RFP

Aviation Boatswain’s Mate Aircraft Handling A School

Familiarization of Carrier Flight Deck Operations

E28 Land-Based Emergency Arresting Gear Maintenance

Flight Deck Handler Operations

LCS Mobicon Operations

Where to Find Media Characteristics in GFI

FRD Report

Appendix A: Supporting Data Workbook
Overall Recommendations Tab

RRL Team

Provide written questions to Audrey.Rolland@navy.mil by close of business 26 February 2020.

Wrap Up and Q&A image3.emf

Instructions

L-5 CLIN Pricing Form

Offerors shall complete cells with the yellow shading only

CLIN Description Type Quantity Unit of Issue Unit Price Extended Price

1010 IFIT - IMI1 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1011 IFIT - IMI2 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1012 IFIT - IMI3 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1013 IFIT - Complex Media (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1014 SDIT - IMI1 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1015 SDIT - IMI2 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1016 SDIT - IMI3 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

1017 Production Support - Train the Trainer UNCLASSIFIED/Classified/TS FFP TBN Each NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

1018 Production Support - Pilot UNCLASSIFIED/Classified/TS FFP TBN Each NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

1019 Travel in support of IMI Development UNCLASSIFIED/Classified/TS Cost 1 LOT NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

1020 Technical Data NSP - N/A NSP NSP

1021 IFIT - Complex Media Change Proposal - UNCLASSIFIED/Classified/TS FFP TBN NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

Ordering Period 1 Total

2010 IFIT - IMI1 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2011 IFIT - IMI2 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2012 IFIT - IMI3 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2013 IFIT - Complex Media (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2014 SDIT - IMI1 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2015 SDIT - IMI2 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2016 SDIT - IMI3 (Includes Performance Support Materials) UNCLASSIFIED/Classified/TS FFP TBD Each (Per hour of IMI) Insert the unit price IAW SOW Calculated automatically

2017 Production Support - Train the Trainer UNCLASSIFIED/Classified/TS FFP TBN Each NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

2018 Production Support - Pilot UNCLASSIFIED/Classified/TS FFP TBN Each NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

2019 Travel in support of IMI Development UNCLASSIFIED/Classified/TS Cost 1 LOT NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

2020 Technical Data NSP - N/A NSP Calculated automatically

2021 IFIT - Complex Media Change Proposal - UNCLASSIFIED/Classified/TS FFP TBN NEED ESTIMATED AMOUNT FROM 4.2 Calculated automatically

Ordering Period 2 Total

Sum of all Ordering Periods and proposed Total Evaluated Price Calculated automatically

CLIN Pricing Form

L-5 CLIN Pricing Form

CLIN Description Type Quantity Unit Price Extended Price

0001 Post Award Conference FFP 1

1010 IFIT - IMI1 (Includes Performance Support Materials) FFP TBD

1011 IFIT - IMI2 (Includes Performance Support Materials) FFP TBD

1012 IFIT - IMI3 (Includes Performance Support Materials) FFP TBD

1013 IFIT - Complex Media (Includes Performance Support Materials) FFP TBD

1014 SDIT - IMI1 (Includes Performance Support Materials) FFP TBD

1015 SDIT - IMI2 (Includes Performance Support Materials) FFP TBD

1016 SDIT - IMI3 (Includes Performance Support Materials) FFP TBD

1017 Production Support - Train the Trainer FFP 1 TBN

1018 Production Support - Pilot FFP 1 TBN

1019 Travel in support of IMI Development Cost 1 TBN

1020 Technical Data NSP TBD NSP

1021 IFIT - Complex Media Change Proposal FFP TBD TBN

2010 IFIT - IMI1 (Includes Performance Support Materials) FFP TBD

2011 IFIT - IMI2 (Includes Performance Support Materials) FFP TBD

2012 IFIT - IMI3 (Includes Performance Support Materials) FFP TBD

2013 IFIT - Complex Media (Includes Performance Support Materials) FFP TBD

2014 SDIT - IMI1 (Includes Performance Support Materials) FFP TBD

2015 SDIT - IMI2 (Includes Performance Support Materials) FFP TBD

2016 SDIT - IMI3 (Includes Performance Support Materials) FFP TBD

2017 Production Support - Train the Trainer FFP 1

2018 Production Support - Pilot FFP 1 TBN

2019 Travel in support of IMI Development Cost 1 TBN

2020 Technical Data NSP TBD TBN

2021 IFIT - Complex Media Change Proposal FFP TBD NSP

TBN

Sum of all Ordering Periods and proposed Total Evaluated Price image4.emf

Sheet1

FY21 FY22

CC Contract Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

MA DO1

AD

F/A-18E/F DO2 A-School

F414 F/A-18E/F

ARS ARS

A-School F414

H-60 DO2 Mod H-60

T700 T700

E-6B E-6B

E-2D O-Level E-2D O-Level

T-56-A-425/427 T-56-A-425/427

IT

A-School DO3 A-School

H04A H04A

746A 746A

ETV

SSBN DO4 SSBN

SSN SSN

AM

ACM DO5 ACM

E-2D E-2D

H-60 H-60

E-6B E-6B

A-School A-School

F/A-18E/F F/A-18E/F

FT DO6

MN DO7

CTM Inc-F DO8 (FY22 Ob)

CA

Sheet2

Sheet3 image5.emf image6.emf image7.emf image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.jpeg image18.png image19.png image1.png image2.png

File details come from the government source that posted it. Updated .