.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.docx

DOCX document 154 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
Solicitation number
N61340-20-R-0005
Issued by
Department of the Navy Naval Air Systems Command

About this file

This request for proposal outlines requirements for contractor operation and maintenance services for surface fire fighter and damage control training systems located at multiple commands. Key details include the following:

The solicitation seeks proposals for a firm-fixed-price contract with four one-year options to provide labor, materials, consumables, equipment, tools, transportation, and maintenance to keep training systems and equipment fully operational at seven commands in six locations. Performance will take place in Mayport and Norfolk, Virginia; Newport, Rhode Island; San Diego, California; Pearl Harbor, Hawaii; and Great Lakes, Illinois. The applicable NAICS code is 541330 with a $41.5 million size standard. This is a 100% small business set-aside. Proposals are due on the date specified in block 9 of the RFP SF 33. The Navy is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services, newest first.
File Type Posted
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_4 Dec 2019_TrkChgs.docx DOCX document
.N61340-20-R-0005 Amendment 0001.docx DOCX document
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_4 Dec 2019.xlsx XLSX spreadsheet
ATCH 10C_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.pdf PDF
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.pdf PDF
Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes_1 Oct 2019.docx DOCX document
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (4) Data Item Transmittal_Acceptance_Rejection_ Form.pdf PDF
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.DOCX DOCX document
Att (L-13F) CDRL A005 RTC Great Lakes_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10C_WD 15-5635 (Rev.-11) San Diego.pdf PDF
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (1D) Appendix D_Surf FF-DC_Newport_1 Oct 2019.docx DOCX document
.FFDC COMS MOPAS Redacted.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_20 Nov 2019.docx DOCX document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10F_WD 15-4935 (Rev.-11) Great Lakes.pdf PDF
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-16F) RTC Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (2) CDRL Addressee List_23 Oct 2019.docx DOCX document
Att (L-13C) CDRL A005 San Diego_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-16D) Newport Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (11) Excess Repair_Replacement Form_2 Jul 2019.doc DOC document
Att (1A) Appendix A_Surf FF-DC_Mayport_1 Oct 2019.docx DOCX document
Att (5B) Premium Time Hours Log_15 Oct 2019.xls XLS spreadsheet
Att (L-16A) Mayport Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_7 Oct 2019.xlsx XLSX spreadsheet
ATCH 10D_WD 15-4089 (Rev.-11) Newport.pdf PDF
.Announcement_FinalRFP_11.20.2019.docx DOCX document
Att (L-18) Contractor Performance Assessment Questionnaire May 2016.msg.pdf PDF
ATCH 10A_WD 15-4539 (Rev.-9) Mayport.pdf PDF
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_1 Oct 2019.docx DOCX document
Att (L-16E) Pearl Harbor Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A1) CDRL A001 CFSR w attach_FF_DC COMS_23 Oct 2019.doc DOC document
Exhibit (A2) CDRL A002 Conference Minutes_FF_DC COMS_23 Oct 2019.doc DOC document
Show all 50

Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6134020R0005

Section B - Supplies or Services and Prices

B1. PREMIUM TIME

This contract allows for Premium Time as defined in the Performance Work Statement (PWS). A Premium Time hour equates to an additional work-hour of effort and is a composite rate, which does not reflect the rate of any one labor category; therefore, the rates are not subject to a DOL adjustment as provided for under FAR 52.222-43. CLINs 1017, 2017, 3017, 4017 and 5017 will reflect composite rates for each site listed in the PWS within the CLIN description. The Government will fund Premium Time as needed/approved via funding SLINs.

For the purpose of proposal preparations, offerors shall assume no more than 25 hours per site per year.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Months

Mobilization: SWOS

FFP

IAW PWS, Attachment 1

FOB: Destination J069

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Months

Mobilization: MSC

MSC San Diego, CA: IAW PWS, Attachment 1

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
2
Months

Mobilization: NTSC

IAW PWS, Attachment 1

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

SWOS COMS & Supply Support - Mayport, FL

Att (1A) Appendix A_Surf FF-DC_Mayport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

SWOS COMS & Supply Support - Norfolk, VA

Att (1B) Appendix B_Surf FF-DC_Norfolk

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

SOWS COMS & Supply Support San Diego, CA

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

MSC COMS & Supply Support -San Diego, CA

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

NTSC COMS OTC & SupplySupport Newport,RI

Att (1D) Appendix D_Surf FF-DC_Newport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

SWOS COMS & SupplySuppt Pearl Harbor, HI

Att (1E) Appendix E_Surf FF-DC_Pearl Harbor

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

NTSC COMS RTC & Supply Support, GLks, IL

Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
10
Months

SWOS COMSSWOSU & SupplySupport G.Lks, IL

Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot

Consumables: SWOS

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot

Consumables: SWOS (Fuel)

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot

Consumables: MSC

MSC San Diego, CA

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot

Consumables: OTC

OTC-Newport, RI

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot

Consumables: RTC

RTC Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

Premium Time

SWOS Mayport, FL at the rate of $TBD SWOS Norfolk, VA at the rate of $TBD SWOS San Diego, CA at the rate of $TBD SOWS Pearl Harbor, HI at the rate of $TBD SWOSU Great Lakes, IL at the rate of $TBD OTC-Newport, RI at the rate of $TBD RTC Great Lakes, IL at the rate of $TBD MSC San Diego, CA at the rate of $TBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

OAWR

Over and Above Work Request: Each request will specify its own price and delivery terms IAW NAVAIR Clause 5252.217-9507

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Contract Data Requirements List (CDRL)

In accordance Exhibits A1- A6, the Contractor shall provide data as required by Contract Data Requirements List (CDRL) deliverables.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Mayport, FL

FFP

Att (1A) Appendix A_Surf FF-DC_Mayport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Norfolk, VA

FFP

Att (1B) Appendix B_Surf FF-DC_Norfolk

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SOWS COMS & Supply Support San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
MSC COMS & Supply Support -San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS OTC & SupplySupport Newport,RI

FFP

Att (1D) Appendix D_Surf FF-DC_Newport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & SupplySuppt Pearl Harbor, HI

FFP

Att (1E) Appendix E_Surf FF-DC_Pearl Harbor

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS RTC & Supply Support, GLks, IL

FFP

Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMSSWOSU & SupplySupport G.Lks, IL

FFP

Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS (Fuel)

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: MSC

COST

MSC San Diego, CA

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: OTC

COST

OTC-Newport, RI

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: RTC

COST

RTC Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA SWOS

FFP

SWOS Mayport, FL DOL/CBA SWOS Norfolk, VA DOL/CBA SWOS San Diego, CA DOL/CBA SOWS Pearl Harbor, HI DOL/CBA SWOSU Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA NTSC

FFP

OTC-Newport, RI DOL/CBA RTC Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA MSC

FFP

MSC San Diego, CA DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
Premium Time

FFP

SWOS Mayport, FL at the rate of $TBD SWOS Norfolk, VA at the rate of $TBD SWOS San Diego, CA at the rate of $TBD SOWS Pearl Harbor, HI at the rate of $TBD SWOSU Great Lakes, IL at the rate of $TBD OTC-Newport, RI at the rate of $TBD RTC Great Lakes, IL at the rate of $TBD MSC San Diego, CA at the rate of $TBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

OPTION
OAWR

FFP

Over and Above Work Request: Each request will specify its own price and delivery terms IAW NAVAIR Clause 5252.217-9507

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List (CDRL)

In accordance Exhibits A1- A6, the Contractor shall provide data as required by Contract Data Requirements List (CDRL) deliverables.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Mayport, FL

FFP

Att (1A) Appendix A_Surf FF-DC_Mayport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Norfolk, VA

FFP

Att (1B) Appendix B_Surf FF-DC_Norfolk

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SOWS COMS & Supply Support San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
MSC COMS & Supply Support -San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS OTC & SupplySupport Newport,RI

FFP

Att (1D) Appendix D_Surf FF-DC_Newport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & SupplySuppt Pearl Harbor, HI

FFP

Att (1E) Appendix E_Surf FF-DC_Pearl Harbor

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS RTC & Supply Support, GLks, IL

FFP

Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMSSWOSU & SupplySupport G.Lks, IL

FFP

Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS (Fuel)

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: MSC

COST

MSC San Diego, CA

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: OTC

COST

OTC-Newport, RI

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: RTC

COST

RTC Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA SWOS

FFP

SWOS Mayport, FL DOL/CBA SWOS Norfolk, VA DOL/CBA SWOS San Diego, CA DOL/CBA SOWS Pearl Harbor, HI DOL/CBA SWOSU Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA NTSC

FFP

OTC-Newport, RI DOL/CBA RTC Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA MSC

FFP

MSC San Diego, CA DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
Premium Time

FFP

SWOS Mayport, FL at the rate of $TBD SWOS Norfolk, VA at the rate of $TBD SWOS San Diego, CA at the rate of $TBD SOWS Pearl Harbor, HI at the rate of $TBD SWOSU Great Lakes, IL at the rate of $TBD OTC-Newport, RI at the rate of $TBD RTC Great Lakes, IL at the rate of $TBD MSC San Diego, CA at the rate of $TBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

OPTION
OAWR

FFP

Over and Above Work Request: Each request will specify its own price and delivery terms IAW NAVAIR Clause 5252.217-9507

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List (CDRL)

In accordance Exhibits A1- A6, the Contractor shall provide data as required by Contract Data Requirements List (CDRL) deliverables.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Mayport, FL

FFP

Att (1A) Appendix A_Surf FF-DC_Mayport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Norfolk, VA

FFP

Att (1B) Appendix B_Surf FF-DC_Norfolk

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SOWS COMS & Supply Support San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
MSC COMS & Supply Support -San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS OTC & SupplySupport Newport,RI

FFP

Att (1D) Appendix D_Surf FF-DC_Newport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & SupplySuppt Pearl Harbor, HI

FFP

Att (1E) Appendix E_Surf FF-DC_Pearl Harbor

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS RTC & Supply Support, GLks, IL

FFP

Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMSSWOSU & SupplySupport G.Lks, IL

FFP

Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS (Fuel)

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: MSC

COST

MSC San Diego, CA

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: OTC

COST

OTC-Newport, RI

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: RTC

COST

RTC Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA SWOS

FFP

SWOS Mayport, FL DOL/CBA SWOS Norfolk, VA DOL/CBA SWOS San Diego, CA DOL/CBA SOWS Pearl Harbor, HI DOL/CBA SWOSU Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA NTSC

FFP

OTC-Newport, RI DOL/CBA RTC Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA MSC

FFP

MSC San Diego, CA DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
Premium Time

FFP

SWOS Mayport, FL at the rate of $TBD SWOS Norfolk, VA at the rate of $TBD SWOS San Diego, CA at the rate of $TBD SOWS Pearl Harbor, HI at the rate of $TBD SWOSU Great Lakes, IL at the rate of $TBD OTC-Newport, RI at the rate of $TBD RTC Great Lakes, IL at the rate of $TBD MSC San Diego, CA at the rate of $TBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

OPTION
OAWR

FFP

Over and Above Work Request: Each request will specify its own price and delivery terms IAW NAVAIR Clause 5252.217-9507

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List (CDRL)

In accordance Exhibits A1- A6, the Contractor shall provide data as required by Contract Data Requirements List (CDRL) deliverables.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Mayport, FL

FFP

Att (1A) Appendix A_Surf FF-DC_Mayport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & Supply Support - Norfolk, VA

FFP

Att (1B) Appendix B_Surf FF-DC_Norfolk

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SOWS COMS & Supply Support San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
MSC COMS & Supply Support -San Diego, CA

FFP

Att (1C) Appendix C_Surf FF-DC_San Diego

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS OTC & SupplySupport Newport,RI

FFP

Att (1D) Appendix D_Surf FF-DC_Newport

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMS & SupplySuppt Pearl Harbor, HI

FFP

Att (1E) Appendix E_Surf FF-DC_Pearl Harbor

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
NTSC COMS RTC & Supply Support, GLks, IL

FFP

Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
SWOS COMSSWOSU & SupplySupport G.Lks, IL

FFP

Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes

NET AMT

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: SWOS (Fuel)

COST

SWOS Mayport, FL SWOS Norfolk, VA SWOS San Diego, CA SWOS Pearl Harbor, HI SWOSU Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: MSC

COST

MSC San Diego, CA

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: OTC

COST

OTC-Newport, RI

MAX COST

ITEM NO
SUPPLIES/SERVICES
MAX QUANTITY
UNIT
UNIT PRICE
MAX AMOUNT
UNDEFINED
Lot
OPTION
Consumables: RTC

COST

RTC Great Lakes, IL

MAX COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA SWOS

FFP

SWOS Mayport, FL DOL/CBA SWOS Norfolk, VA DOL/CBA SWOS San Diego, CA DOL/CBA SOWS Pearl Harbor, HI DOL/CBA SWOSU Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA NTSC

FFP

OTC-Newport, RI DOL/CBA RTC Great Lakes, IL DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12
Months
OPTION
DOL/CBA MSC

FFP

MSC San Diego, CA DOL/CBA

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
Premium Time

FFP

SWOS Mayport, FL at the rate of $TBD SWOS Norfolk, VA at the rate of $TBD SWOS San Diego, CA at the rate of $TBD SOWS Pearl Harbor, HI at the rate of $TBD SWOSU Great Lakes, IL at the rate of $TBD OTC-Newport, RI at the rate of $TBD RTC Great Lakes, IL at the rate of $TBD MSC San Diego, CA at the rate of $TBD

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

OPTION
OAWR

FFP

Over and Above Work Request: Each request will specify its own price and delivery terms IAW NAVAIR Clause 5252.217-9507

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Contract Data Requirements List (CDRL)

In accordance Exhibits A1- A6, the Contractor shall provide data as required by Contract Data Requirements List (CDRL) deliverables.

NET AMT

Section C - Descriptions and Specifications

C.1 DESCRIPTION/SPECIFICATION/WORK STATEMENT

The specific requirements of this Contract are identified in Attachment (1), PWS Addendum A Contractor Operation and Maintenance Services (COMS) (including Appendices A, B, C, D, E, F and G) for theFire Fighter and Damage Control Training devices located at: Surface Warfare Officer School (SWOS) Mayport, FL, Surface Warfare Officer School (SWOS) Norfolk, VA, Surface Warfare Officer School (SWOS) San Diego, CA, Officer Training Command (OTC-N), Newport, RI, Surface Warfare Officer School (SWOS) Pearl Harbor, HI, Recruit Training Command (RTC) Great Lakes, IL, and Surface Warfare Officer School Unit (SWOSU) Great Lakes, IL. Contract Data Requirements Lists (CDRLs) are provided at Exhibit A.

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9509INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)
The Contractor's Technical Proposal Number [Enter technical proposal number], dated [Enter document date], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal.
C-TXT-ECMRAREQUIRED ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING
APPLICATION (ECMRA) INFORMATION (NOV 2017)
The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) D, Automatic Data Processing and Telecommunications, IT and Telecom - Telecommunications Transmission (D304) and Internet (D322) ONLY.
(5) S, Utilities ONLY;
(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address "https://www.ecmra.mil".

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at "https://www.ecmra.mil".

Section D - Packaging and Marking

5252.247-9507PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508PROHIBITED PACKING MATERIALS (NAVAIR)(JUN 1998)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited. In addition, loose fill polystyrene is prohibited for shipboard use.
5252.247-9514TECHNICAL DATA PACKING INSTRUCTIONS (NAVAIR)(SEP 1999)
Technical Data and Information shall be packed and packaged for domestic shipment in accordance with best commercial practices. The package or envelope should be clearly marked with any special markings specified in this contract (or delivery/task order), e.g., Contract Number, CLIN, Device No., and document title must be on the outside of the package. Classified reports, data and documentation, if applicable, shall be prepared for shipment in accordance with Defense Industrial Manual for Safeguarding Classified Information, DoD 5220.22M.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
1002
Destination
Government
Destination
Government
1003
Destination
Government
Destination
Government
1004
Destination
Government
Destination
Government
1005
Destination
Government
Destination
Government
1006
Destination
Government
Destination
Government
1007
Destination
Government
Destination
Government
1008
Destination
Government
Destination
Government
1009
Destination
Government
Destination
Government
1010
Destination
Government
Destination
Government
1011
Destination
Government
Destination
Government
1012
Destination
Government
Destination
Government
1013
Destination
Government
Destination
Government
1017
Destination
Government
Destination
Government
1018
Destination
Government
Destination
Government
1019
N/A
N/A
N/A
N/A
2001
Destination
Government
Destination
Government
2002
Destination
Government
Destination
Government
2003
Destination
Government
Destination
Government
2004
Destination
Government
Destination
Government
2005
Destination
Government
Destination
Government
2006
Destination
Government
Destination
Government
2007
Destination
Government
Destination
Government
2008
Destination
Government
Destination
Government
2009
Destination
Government
Destination
Government
2010
Destination
Government
Destination
Government
2011
Destination
Government
Destination
Government
2012
Destination
Government
Destination
Government
2013
Destination
Government
Destination
Government
2014
Destination
Government
Destination
Government
2015
Destination
Government
Destination
Government
2016
Destination
Government
Destination
Government
2017
Destination
Government
Destination
Government
2018
Destination
Government
Destination
Government
2019
N/A
N/A
N/A
N/A
3001
Destination
Government
Destination
Government
3002
Destination
Government
Destination
Government
3003
Destination
Government
Destination
Government
3004
Destination
Government
Destination
Government
3005
Destination
Government
Destination
Government
3006
Destination
Government
Destination
Government
3007
Destination
Government
Destination
Government
3008
Destination
Government
Destination
Government
3009
Destination
Government
Destination
Government
3010
Destination
Government
Destination
Government
3011
Destination
Government
Destination
Government
3012
Destination
Government
Destination
Government
3013
Destination
Government
Destination
Government
3014
Destination
Government
Destination
Government
3015
Destination
Government
Destination
Government
3016
Destination
Government
Destination
Government
3017
Destination
Government
Destination
Government
3018
Destination
Government
Destination
Government
3019
N/A
N/A
N/A
N/A
4001
Destination
Government
Destination
Government
4002
Destination
Government
Destination
Government
4003
Destination
Government
Destination
Government
4004
Destination
Government
Destination
Government
4005
Destination
Government
Destination
Government
4006
Destination
Government
Destination
Government
4007
Destination
Government
Destination
Government
4008
Destination
Government
Destination
Government
4009
Destination
Government
Destination
Government
4010
Destination
Government
Destination
Government
4011
Destination
Government
Destination
Government
4012
Destination
Government
Destination
Government
4013
Destination
Government
Destination
Government
4014
Destination
Government
Destination
Government
4015
Destination
Government
Destination
Government
4016
Destination
Government
Destination
Government
4017
Destination
Government
Destination
Government
4018
Destination
Government
Destination
Government
4019
N/A
N/A
N/A
N/A
5001
Destination
Government
Destination
Government
5002
Destination
Government
Destination
Government
5003
Destination
Government
Destination
Government
5004
Destination
Government
Destination
Government
5005
Destination
Government
Destination
Government
5006
Destination
Government
Destination
Government
5007
Destination
Government
Destination
Government
5008
Destination
Government
Destination
Government
5009
Destination
Government
Destination
Government
5010
Destination
Government
Destination
Government
5011
Destination
Government
Destination
Government
5012
Destination
Government
Destination
Government
5013
Destination
Government
Destination
Government
5014
Destination
Government
Destination
Government
5015
Destination
Government
Destination
Government
5016
Destination
Government
Destination
Government
5017
Destination
Government
Destination
Government
5018
Destination
Government
Destination
Government
5019
N/A
N/A
N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.246-5
Inspection Of Services Cost-Reimbursement
APR 1984
5252.246-9512INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by [Contracting Officer Representative (COR)].
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9514INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form, See SECTION J attachments]. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.

Section F - Deliveries or Performance

DELIVERY DATE INFORMATION

INSTRUCTION: The Delivery Date Information is dependent upon the award date; the DELIVERY INFORMATION will be added at the time of award. The following information has been provided to show the months, for proposal purposes, as follows:

CLINs

Dates / Period of Performance

0001 – 0003
Mobilization
60 days after date of award
1001 – 1018
Base Year CLINs
10 months after mobilization
2001 – 2018
OY1 CLINs
a 12 month period after Base Year
3001 – 3018
OY2 CLINs
a 12 month period after OY1
4001 – 4018
OY3 CLINs
a 12 month period after OY2
5001 – 5018
OY4 CLINs
a 12 month period after OY3

F1. INSTRUCTION

The Delivery Date Information is dependent upon the award date; the DELIVERY INFORMATION will be added at the time of award. The following information has been provided to show the months, for proposal purposes, as follows:

CLINs

Dates / Period of Performance

0001 – 0003
Mobilization
60 days after date of award
1001 – 1019
Base Year CLINs
10 months after mobilization
2001 – 2019
OY1 CLINs
a 12 month period after Base Year
3001 – 3019
OY2 CLINs
a 12 month period after OY1
4001 – 4019
OY3 CLINs
a 12 month period after OY2
5001 – 5019
OY4 CLINs
a 12 month period after OY3

For the purpose of proposal preparation, offerors shall assume an award date on or abour April 2020.

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
N/A
N/A
N/A
N/A
0002
N/A
N/A
N/A
N/A
0003
N/A
N/A
N/A
N/A
1001
N/A
N/A
N/A
N/A
1002
N/A
N/A
N/A
N/A
1003
N/A
N/A
N/A
N/A
1004
N/A
N/A
N/A
N/A
1005
N/A
N/A
N/A
N/A
1006
N/A
N/A
N/A
N/A
1007
N/A
N/A
N/A
N/A
1008
N/A
N/A
N/A
N/A
1009
N/A
N/A
N/A
N/A
1010
N/A
N/A
N/A
N/A
1011
N/A
N/A
N/A
N/A
1012
N/A
N/A
N/A
N/A
1013
N/A
N/A
N/A
N/A
1017
N/A
N/A
N/A
N/A
1018
N/A
N/A
N/A
N/A
1019
N/A
N/A
N/A
N/A
2001
N/A
N/A
N/A
N/A
2002
N/A
N/A
N/A
N/A
2003
N/A
N/A
N/A
N/A
2004
N/A
N/A
N/A
N/A
2005
N/A
N/A
N/A
N/A
2006
N/A
N/A
N/A
N/A
2007
N/A
N/A
N/A
N/A
2008
N/A
N/A
N/A
N/A
2009
N/A
N/A
N/A
N/A
2010
N/A
N/A
N/A
N/A
2011
N/A
N/A
N/A
N/A
2012
N/A
N/A
N/A
N/A
2013
N/A
N/A
N/A
N/A
2014
N/A
N/A
N/A
N/A
2015
N/A
N/A
N/A
N/A
2016
N/A
N/A
N/A
N/A
2017
N/A
N/A
N/A
N/A
2018
N/A
N/A
N/A
N/A
2019
N/A
N/A
N/A
N/A
3001
N/A
N/A
N/A
N/A
3002
N/A
N/A
N/A
N/A
3003
N/A
N/A
N/A
N/A
3004
N/A
N/A
N/A
N/A
3005
N/A
N/A
N/A
N/A
3006
N/A
N/A
N/A
N/A
3007
N/A
N/A
N/A
N/A
3008
N/A
N/A
N/A
N/A
3009
N/A
N/A
N/A
N/A
3010
N/A
N/A
N/A
N/A
3011
N/A
N/A
N/A
N/A
3012
N/A
N/A
N/A
N/A
3013
N/A
N/A
N/A
N/A
3014
N/A
N/A
N/A
N/A
3015
N/A
N/A
N/A
N/A
3016
N/A
N/A
N/A
N/A
3017
N/A
N/A
N/A
N/A
3018
N/A
N/A
N/A
N/A
3019
N/A
N/A
N/A
N/A
4001
N/A
N/A
N/A
N/A
4002
N/A
N/A
N/A
N/A
4003
N/A
N/A
N/A
N/A
4004
N/A
N/A
N/A
N/A
4005
N/A
N/A
N/A
N/A
4006
N/A
N/A
N/A
N/A
4007
N/A
N/A
N/A
N/A
4008
N/A
N/A
N/A
N/A
4009
N/A
N/A
N/A
N/A
4010
N/A
N/A
N/A
N/A
4011
N/A
N/A
N/A
N/A
4012
N/A
N/A
N/A
N/A
4013
N/A
N/A
N/A
N/A
4014
N/A
N/A
N/A
N/A
4015
N/A
N/A
N/A
N/A
4016
N/A
N/A
N/A
N/A
4017
N/A
N/A
N/A
N/A
4018
N/A
N/A
N/A
N/A
4019
N/A
N/A
N/A
N/A
5001
N/A
N/A
N/A
N/A
5002
N/A
N/A
N/A
N/A
5003
N/A
N/A
N/A
N/A
5004
N/A
N/A
N/A
N/A
5005
N/A
N/A
N/A
N/A
5006
N/A
N/A
N/A
N/A
5007
N/A
N/A
N/A
N/A
5008
N/A
N/A
N/A
N/A
5009
N/A
N/A
N/A
N/A
5010
N/A
N/A
N/A
N/A
5011
N/A
N/A
N/A
N/A
5012
N/A
N/A
N/A
N/A
5013
N/A
N/A
N/A
N/A
5014
N/A
N/A
N/A
N/A
5015
N/A
N/A
N/A
N/A
5016
N/A
N/A
N/A
N/A
5017
N/A
N/A
N/A
N/A
5018
N/A
N/A
N/A
N/A
5019
N/A
N/A
N/A
N/A
52.242-15
Stop-Work Order
AUG 1989
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
5252.211-9507PERIOD OF PERFORMANCE (NAVAIR)(SEP 2013)
(a) The contract shall commence on the date of contract award and shall continue for 60 months to include options. However, the period of performance may be extended in accordance with the option provisions contained herein.
(b) If DFAR Clause 252.216-7006, "Ordering", is incorporated into this contract, then the period in which the Government can issue orders under the contract will be extended at the exercise of an option, and extended to the end of that option period.
5252.247-9505TECHNICAL DATA AND INFORMATION (NAVAIR)(FEB 1995)
Technical Data and Information shall be delivered in accordance with the requirements of the Contract Data Requirements List, DD Form 1423, Exhibit [A001-A006], attached hereto, and the following:
(a) The contractor shall concurrently deliver technical data and information per DD Form 1423, Blocks 12 and 13 (date of first/subsequent submission) to all activities listed in Block 14 of the DD Form 1423 (distribution and addresses) for each item. Complete addresses for the abbreviations in Block 14 are shown in paragraph (g) below. Additionally, the technical data shall be delivered to the following cognizant codes, who are listed in Block 6 of the DD Form 1423.
(1) PCO, Code GT26000
(2) ACO, Code TBD
(b) Partial delivery of data is not acceptable unless specifically authorized on the DD Form 1423, or unless approved in writing by the PCO.
(c) The Government review period provided on the DD Form 1423 for each item commences upon receipt of all required data by the technical activity designated in Block 6.
(d) A copy of all other correspondence addressed to the Contracting Officer relating to data item requirements (i.e., status of delivery) shall also be provided to the codes reflected above and the technical activity responsible for the data item per Block 6, if not one of the activities listed above.
(e) The PCO reserves the right to issue unilateral modifications to change the destination codes and addresses for all technical data and information at no additional cost to the Government.
(f) Unless otherwise specified in writing, rejected data items shall be resubmitted within thirty (30) days after receipt of notice of rejection.
(g) DD Form 1423, Block 14 Mailing Addresses:

Naval Air Warfare Center Training Systems Division (NAWCTSD) Attn: (To be updated at time of award) 12211 Science Drive Orlando, FL 32826

Contracting Officer Representative (COR) To be determined at award

Location
COR/ACOR

Name

Phone
Email
Address
Mayport, FL
TBD
Norfolk, VA
TBD
San Diego, CA
TBD
Newport, RI
TBD
Pearl Harbor, HI
TBD
Great Lakes, IL RTS
TBD
Great Lake, IL SWOSU
TBD

Section G - Contract Administration Data

G.1 PREMIUM TIME – CONTRACTOR OPERATION AND MAINTENANCE SERVICES (COMS)

(a) Premium Time is that time required by the Government to accomplish a COMS requirement, other than makeup training, defined in the PWS. Premium Time is conducted outside the work schedule defined in the PWS for tasks such as to provide additional training time, some Government directed modifications and inspections. Other Premium Time tasking may occur within the work schedule defined in the PWS such as In-Service Engineering Office (ISEO) support and Physical Configuration Audits (PCA). Premium Time may also be used to extend coverage at an Access Control point. Reimbursement to the Contractor for Premium Time will be made at the hourly Premium Time rate specified in Section B of the contract. A Premium Time hour equates to an additional work-hour of effort and is a composite rate, which does not reflect the rate of any one labor category; therefore, the rates will not be subject to the adjustment provided for under FAR 52.222-43.

(b) The COR will inform the Contractor, at least 24 hours in advance, when the Government needs the Contractor to perform Premium Time. THE COR WILL NOT, UNDER ANY CIRCUMSTANCES, AUTHORIZE OR HAVE THE AUTHORITY TO AUTHORIZE THE CONTRACTOR TO WORK PREMIUM TIME IF SUFFICIENT FUNDS HAVE NOT BEEN OBLIGATED ON THE CONTRACT. The COR will specify a not-to-exceed (NTE) limit on the number of man-hours the Contractor may expend on providing Premium Time services. Each time the COR specifies a NTE, the COR will establish a sequence number for that effort on the attached Premium Time Hours Log (Attachment 5A). At the same time, the COR will ensure that the top portion of the attached COMS Premium Time Request/Authorization/Completed Services Form (Attachment 5B) is completed to show:

(i) which Government representative, other than the COR, established the requirement for which Premium Time was necessary (e.g., training officer),

(ii) the purpose of the Premium Time effort,

(iii) when the effort was to occur, and

(iv) the number of NTE hours required. The COR will transfer the information provided on the Premium Time Request Form onto the Premium Time Log. Completing the Premium Time Log will help ensure that the COR does not authorize more hours than there are funds available.

(c) Upon completion of the Premium Time services, the Contractor shall complete the bottom portion of the Premium Time Request/Authorization/Completed Services Form and submit the form to the COR within one working day. Upon receipt, the COR will complete the actual hours, actual dollars and final remaining balance portions of the Premium Time Log for each sequence number.

(d) No more than once a month, the Contractor may submit a DD Form 250 to the COR for acceptance of Premium Time services performed. The DD Form 250 shall specify the total actual number of Premium Time hours expended and when the hours were expended. If the COR concurs that the Contractor expended the number of hours specified on the DD Form 250, the COR will sign the DD Form 250 and keep a copy in the COR files. The COR will return the original DD Form 250 to the Contractor for distribution and payment. If the COR does not concur, the COR will return the DD Form 250 to the Contractor for resubmission.

(e) The PCO may at any time unilaterally obligate or de-obligate funds placed against the Premium Time line items by issuing a contract modification. Additionally, if the type of funds used for Premium Time requires that new line items be established, the PCO may unilaterally issue a contract modification. The PCO will telephonically notify the COR when urgent obligations or de-obligations are to be made to a Premium Time line item.

G.2 WAGE DETERMINATION PRICE ADJUSTMENTS

As referenced in Section I, FAR Clauses 52.222-41 (Service Contract Act of 1965, as Amended) and 52.222-43 (Fair Labor Standards Act and Service Contract Act – Price Adjustment) apply to contracts unless the contract specifically states that they do not apply. Applicable Wage Determinations and/or Collective Bargaining Agreements (CBA) will be contained as attachments to this contract. The contractor shall determine and submit any proposed DOL price adjustments using the procedures and form found at Attachment 6, SCA Price Adjustments Request Form.

G.3 NOTICE OF EXISTING COLLECTIVE BARGAINING AGREEMENTS (CBAS)

Reference is made to the Service Contract Act (SCA), 41 U.S.C. §§ 351-358, and Title 29 Code of Federal Regulations, Part 4, “Labor Standards for Federal Service Contracts.”

Section 4 (c) of the SCA provides that a successor Contractor must pay wages and fringe benefits (including accrued wages and benefits and prospective increases) to service employees at least equal to those agreed upon by a predecessor contractor under a CBA. The obligation applies independently to the base period and each subsequent option to this Contract. See Attachment 10 for the current CBAs.

The obligation of the successor contractor (except the incumbent contractor who is a signatory to incorporated CBAs) is limited to the wage and fringe benefit requirements of the predecessor’s CBA and does not extend to other items such as seniority, grievance procedures, work rules, overtime, etc.

G.4 CONSUMABLES REIMBURSEMENT

Consumables are expended at a rate that is directly connected to the amount of training courses within a time period. Therefore, consumable CLINs will be funded as the need arises, and at various times within a particular fiscal year. The contractor is to notify the government personnel before the contractor purchases the consumables. The process will be as follows: the contractor will inform the Contracting Officer Representative, Program Manager and Contract Specialist of the type and quantity of consumable to be replenished. This funding amount will then be added to the contract via a modification. The contractor will then purchase the consumables and invoice against the specific SLIN using actual invoices of the total spent on the specific consumable.

252.204-7006
Billing Instructions
OCT 2005
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.201-7000CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.
(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

FFP CLINS use WAWF “combo” document type to create a combination of invoice and receiving report in one step

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

FFP CLINS use WAWF “combo” document type to create a combination of invoice and receiving report in one step

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF
Data to be entered in WAWF
Pay Official DoDAAC
TBD
Issue By DoDAAC
N61340
Admin DoDAAC**
TBD
Inspect By DoDAAC
N61340
Ship To Code
N61340
Ship From Code
N/A
Mark For Code
N/A
Service Approver (DoDAAC)
N/A
Service Acceptor (DoDAAC)
N61340
Accept at Other DoDAAC
N/A
LPO DoDAAC
N/A
DCAA Auditor DoDAAC
N/A
Other DoDAAC(s)
N/A

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.

Will be determined upon contract award.

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

252.232-7007LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014)
(a) Contract line item(s) [Contracting Officer insert after negotiations] is/are incrementally funded. For this/these item(s), the sum of $---[Contracting Officer insert after negotiations] of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For item(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government’s convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled “Termination for Convenience of the Government.” As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit, and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor’s best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for a subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor’s notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled “Termination for Convenience of the Government.”
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraphs (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled “Disputes.”
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled “Default.” The provisions of this clause are limited to the work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract is fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) and (e) of this clause.
(h) Nothing in this clause affects the right of the Government to terminate this contract pursuant to the clause of this contract entitled “Termination for Convenience of the Government.”
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract$ ________
(month) (day), (year)$ ________
(month) (day), (year)$ ________
(month) (day), (year)$ ________
5252.201-9500TECHNICAL POINT OF CONTACT (TPOC)(NAVAIR)(SEP 2012)

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .