Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_20 Nov 2019.docx

DOCX document 90 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
Solicitation number
N61340-20-R-0005
Issued by
Department of the Navy Naval Air Systems Command

About this file

This is a request for proposal for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. The Department of the Navy seeks proposals to provide operation and maintenance services for firefighting and damage control trainers at seven Navy commands located in Mayport, FL; Norfolk, VA; Newport, RI; San Diego, CA; Pearl Harbor, HI; Great Lakes, IL; and SWOSU Great Lakes, IL. The acquisition is a firm-fixed price contract with a one year base period and four one year option periods, with cost reimbursable lines for trainer consumables. The solicitation is a 100% small business set-aside with a NAICS code of 541330 and size standard of $41.5M. The document provides an overview of the requirement and instructions for proposal submission with a due date listed in the RFP.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services, newest first.
File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.pdf PDF
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.pdf PDF
Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes_1 Oct 2019.docx DOCX document
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (4) Data Item Transmittal_Acceptance_Rejection_ Form.pdf PDF
.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.docx DOCX document
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.DOCX DOCX document
Att (L-13F) CDRL A005 RTC Great Lakes_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10C_WD 15-5635 (Rev.-11) San Diego.pdf PDF
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-17) Past Performance Information Form Mar 2017.pdf PDF
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_Feb 2018 - Jan 2019.xlsx XLSX spreadsheet
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
FFDC COMS MOPAS for RFP posting.pdf PDF
Exhibit (A6) CDRL A006 Quality System Plan (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (6) SCA Price Adjustment Form_10 Oct 19.xls XLS spreadsheet
ATCH 10B_WD 15-4341 (Rev.-12) Norfolk.pdf PDF
Att (L-14) Solicitation QuestionResponse Form_10 Oct 19.xlsx XLSX spreadsheet
Att (3) Quality Assurance Surveillance Plan_2 Jul 2019.doc DOC document
Exhibit (A5) CDRL A005 Inventory Report (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A4-1) Samplet Rpt for Annex of Exhibit A004_23 Oct 2019.xlsx XLSX spreadsheet
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (1D) Appendix D_Surf FF-DC_Newport_1 Oct 2019.docx DOCX document
.FFDC COMS MOPAS Redacted.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Show all 50

Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

ATTACHMENT 5

TRAINER SUPPORT GEAR

SWOS LEARNING SITE PEARL HARBOR, HI

PART I - TRAINING SYSTEMS OR EQUIPMENT INFORMATION

1. TRAINING SYSTEMS OR EQUIPMENT.

The following are the Training Systems or Equipment (TS/E) attachments to this appendix: Each attachment provides description, location, normal operating hours and scheduling requirements, subsystems/assemblies not subject to supply support, major hardware list Degraded Capability Matrix (DCM).

ATCH
TS/E
S/N
TITLE
QTY
1
19F6
1
Advanced Fire Fighting Trainer-Main Machinery Building
1
2
19F6
2
Aviation Fire Fighting Trainer - Aviation Building
1
3
20C28
1
Surface Damage Control Trainer
1
4
FOM
-
Facilities
Lot
5
TSG
-
Trainer Support Gear
Lot

PART II - SITE OPERATIONS AND MATERIAL SUPPORT PACKAGE (MSP) INFORMATION

1. TRAINING SYSTEMS & EQUIPMENT (TS/E) NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

1.1 Government Scheduled Use (GSU).

Government Scheduled Use (GSU) can be found in each attachment for each trainer under paragraph 3, Normal Operating Hours and Scheduling Requirements.

2. MATERIAL SUPPORT PACKAGE (MSP).

2.1 Specific Inventories.

Inventory listings of these items are available at each training system and equipment location. Specific Inventories of all GFP, physically verified by the Government and Contractor, shall be formally turned over to the Contractor on or about the CSD for a given training system and equipment, for which the Contractor shall sign for and accept their custody. These inventories shall reflect both the existence and condition of these assets, and shall become the baseline inventory and the standard against which the Contractor is measured when the GFP is returned to the Government. (See PWS, Part 4, Paragraph 4.50, Material Support Package.)

2.3 Government Furnished Facilities (GFF).

2.3.1 GFF Coverage.

GFF consist of maintenance, storage, office, and trainer spaces.

2.3.2 GFF Square Feet and Contractor Custody.

The following GFF is intended to be placed in the custody of the Contractor for the term of the contract:

BUILDING
ROOM
DESCRIPTION
MEASUREMENT
1431
Garage
Maintenance/Store Room
400/189
1431
Office
COMS Office
210
1431
SCBA
SCBA Charging/Maintenance
420
1427
Laundry
Laundry Room
135
1426
ALL
Trainer Area - 19F6 (Main Machinery Building)
1271
1429
ALL
Trainer Area - 19F6 (Aviation Building)
4800
1428
ALL
Trainer Area - 20C28
1984

3. CONSUMABLES.

3.1 Contactor Responsibility.

The Contractor shall purchase and account for the consumables necessary for firefighting and damage control training. Note: Excludes consumables required for scheduled maintenance. Consumables include the following:

CONSUMABLES FOR FIRE FIGHTING TRAINERS

Propane
Smoke generation fluid

Nitrogen for smoke generator

CO2

SCBA consumable parts

SCBA Batteries (AAA, AA)
Anti-pilferage seals

CONSUMABLES FOR DAMAGE CONTROL WET TRAINER

Soda ash
Muriatic Acid
Chlorine tablets
Battle Lantern Batteries (6V)

Refer to the Unified Facilities Criteria (UFC) 4-179-01 dated 16 January 2004, Appendix A (MIL-HDBK 1027/1B) for additional information regarding agent surrogates.

Contractor will be reimbursed for these items.

3.2 Fire Fighting Preventive Maintenance Gases.

Contractor must procure at its expense all items, materials, gases, etc. required to perform all preventive maintenance actions necessary for calibration and alignment (e.g., span and zero gas used for calibration of the propane detection system). These items include, but are not limited to, certain test gases that are expensive. Exception: if the government requires the use of the contractor procured test gases when performing a re-host or other modification to the trainers, then the contractor may request reimbursement through the consumables contract line item.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

APPENDIX E

SWOS LEARNING SITE PEARL HARBOR, HI

E-21

1. DESCRIPTION.

1.1 General.

The training system and equipment MMR is a basic Shipboard Fire Fighter Trainer which simulates Class B, and C shipboard fire emergencies in a realistic environment, using live, computer-controlled, propane-fueled fires. These simulated fire emergencies are staged, under program control in structures called fireplaces that are built to resemble equipment or locations aboard ship where actual fires can occur. Fireplaces simulating shipboard components are as follows: (1) Class B Fireplaces (Oil Based): Oil Spray/Bilge, and (2) Class C Fireplaces (Electrical): electrical panel; (3) Trainer smoke for the fires is simulated, non-polluting, non-toxic smoke and is provided under operator or scenario control for realistic training in a visibility impaired environment.

1.2 Trainee Station.

The trainee stations are located within the training compartments and consist of locations where fires are generated in mockups which duplicate actual shipboard fires. The configuration allows the trainee to track a fire and extinguish it while having to maneuver around obstacles surrounding the area. Staging areas sized to hold at least 15 people as well as storage for on-site firefighting and protection equipment are located outside of and adjacent to the training compartment.

1.3 Operator Interface Panel (OIP).

The operator interface panel (OIP) and hand held pendant is used to control the firefighting equipment.

1.4 Computer System.

The live fire training systems are automatically controlled utilizing programmable logic controllers (PLC), a scenario control panel, and handheld control unit. The PLC has its control components distributed among all fire control equipment as necessary to provide individual control of each fire as well as a safety interface to monitor the entire trainer for safety conditions and shut down trainer operation if required. This includes monitoring the trainer’s gas detection and emergency stop systems, and monitoring and controlling the trainer’s gas supply and ventilation system. The scenario control panel permits the operator to set up, initiate and monitor training exercises, and to monitor trainer safety conditions and systems. Handheld control unit connectors are located at each burn building.

1.5 Other.

N/A

2. LOCATION.

Building: 1426 Description: Trainer Area 1271 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 19F6
SERIAL #: 1
LOCATION: Pearl Harbor, HI
TITLE: Advanced FFT - Main Machinery Building
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
Task
OHPD
From:
To:
From:
To:
From:
To:
01
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note: Local climate temperatures fluctuate during the summer. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
NTE

QUANTITY

Trainer Support Gear except for SCBA requirements
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
Operator Interface Panel (OIP Computer, Programmable Logic Controller)
1
b.
Manual Emergency Shutdown (E-Stops)
3
c.
Block and Vent System
1
d.
Temperature Monitor System
1
e.
Burner Units
3
f.
Burner Control Racks
3
g.
Agent Detectors
3
h.
Smoke (Fog) Generation System (including controls, pumps, fog heads, piping, wiring, etc.)
2
i.
Pendanat
1
j.
Mock-ups of Ship Compartments, Bilge Fire, Electrical Power Pane, oil spray
3
k.
Fireplaces
2
l.
Fire Pilots
3
m.
Fire Pilot Monitor System
3
n.
Sample Draw Units
2
o.
Propane Calibration Units
2

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components.

6 . LINES OF DEMARCATION

In building 1426(MMR), Propane lines and electronic equipment in direct support of the fire trainer which includes, but not limited to Fireplace Hardware Module (FHM1), Vent Fan Controller(VFC1), Smoke generator(SG1), Remote Burner Control(RBC1/RBC2), Fuel Regulation and Control Station(FRC1), Block and vent, solenoid valves, pilot boxes, water pit, and hose reels are the maintenance responsibility of the contractor.

7. DEGRADED CAPABILITY MATRIX (DCM).

The following user trainer operability designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

CONTROL SYSTEM/IOS

No IOS

PLC/PC AND RELATED ELECTRICAL SYSTEMS
100
MONITOR
N/A
OIP CONTROLS
100
FIREPLACE HARDWARE MODULE (FHM1)
100
OIP
100

PROPANE SYSTEM

BLOCK AND VENT SUBSYSTEM
100
TRAINER PROPANE SYSTEM
100
PROPANE DETECTION AND MONITORING
100
PILOT FLAME SYSTEM (EACH FIREPLACE)
15
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED
MAIN FLAME SYSTEM (EACH FIREPLACE)
20
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED

HEATING, VENTILATION, AIR CONDITIONING SYSTEM (HVAC) SYSTEM

TRAINER VENTILATION SYSTEM (FANS)
25

WATER SUPPLY SYSTEM

WATER TANK
100
PROCESS WATER PUMP (EACH)
20
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.
FIRE HOSE STATION (EACH)
5
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.

AIR COMPRESSION SYSTEM

LOW PRESSURE AIR COMPRESSOR
20

WASTE WATER SYSTEM

RECIRCULATION VALVE
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
EFFLUENT PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.

SCBA AIR SYSTEM AND FIRE EXTINGUISHER REFILL SYSTEM

AIR COMPRESSOR
20
ONLY IF ENOUGH SCBA’S ARE AVAILABLE FOR TRAINING.

STRUCTURAL AND OTHER

SMOKE GENERATING SYSTEM
10
LIMITED TO WHETHER USER CAN TRAIN WITHOUT SMOKE UNTIL REPAIRS ARE MADE
GRATING
10
PERMIT WARRANTY, CERTIFICATIONS
10
UNLESS CERTIFICATION IS REQUIRED BEFORE TRAINING IS ALLOWED.
WATER COLLECTION/AGENT SENSING SYSTEM
10
MOCK UPS
5

COMMUNICATIONS EQUIPMENT

PORTABLE RADIO
5
BATTERY CHARGER
10

Failure of any fireplace subsystem shall the render the affected fireplace not operable. These include pilot and main flame assemblies, agent detection assemblies. Refer to the table above for further details.

Failure of any system or subsystem to be in the propane piping and propane assemblies shall render the entire trainer not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire trainer not operable. Refer to the table above for further details.

Failure of the Processing Water Systems will make the trainer inoperable.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

ATTACHMENT 1

ADVANCED FFT - MAIN MACHINERY BUILDING

19F6

1.1 General.

Training system and equipment Flight Deck Trainer was designed to simulate aircraft fires onboard ship. It consists of an open training deck measuring 80 feet x 60 feet. The training deck is constructed of concrete. The burn area is 23 x 58 feet. The deck burn areas are water decks. A Generic mockup representing a helicopter is placed in the center of the deck area. The training deck is designed as a standard training floor. Two (2) flush deck nozzles are installed in the water deck below the grating. The minimum operating temperature of the water deck is 32 degrees (dry bulb) Fahrenheit. The water required to operate the fireplace is capable of being drained or refilled in less than one (1) hour. The fireplace is completely surrounded by gratings to allow the drainage of excess water.

1.2 Trainee Station and Mockups.

1.2.1 Trainee Station.

The Generic mockup is a continuous structure six (6) feet, three (3) inches high and fourteen (14) feet long to represent a helicopter. The mockup has two (2) access points configured to allow for the rescue of mannequins from the pilot and copilot areas of the helicopter configuration.

1.2.2 Weapon mockups. One (1) bomb mockup located on the flight deck. Mannequins-for-rescue: One (1) mannequin-for-rescue (GFE) is designed, fabricated, and furnished with the trainer. It is positioned in the Generic mockup as a member would be in an operational aircraft. During firefighting training exercises, the mannequin-for-rescue are lifted from the mockup by trainee fire fighters in the same way that crew personnel would be rescued during an operational disaster.

1.3 Operator Interface Panel (OIC).

The operator interface panel (OIP) and hand held pendant is used to control the firefighting equipment.

1.4 Computer System.

The live fire training systems are automatically controlled utilizing programmable logic controllers (PLC), a scenario control panel, and handheld control unit. The PLC has its control components distributed among all fire control equipment as necessary to provide individual control of each fire as well as a safety interface to monitor the entire trainer for safety conditions and shut down trainer operation if required. This includes monitoring the trainer’s gas detection and emergency stop systems, and monitoring and controlling the trainer’s gas supply and ventilation system. The scenario control panel permits the operator to set up, initiate and monitor training exercises, and to monitor trainer safety conditions and systems. Handheld control unit connector is located under the OIP.

2.LOCATION.
Building: 1429Description: Trainer Area4,800 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 19F6
SERIAL #: 1
LOCATION: Pearl Harbor, Hi
TITLE: Aviation FFT - Aviation Building
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
TASK
OHPD
From:
To:
From:
To:
From:
To:
02
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note: Local climate temperatures fluctuate during the summer. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
NTE

QUANTITY

Trainer Support Gear except for SCBA requirements
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
Operator Interface Panel (OIP Computer Programmable Logic Controller)
1
b.
Manual Emergency Shutdown (E-Stops)
2
c.
Block and Vent System
1
d.
Burner Units
6
e.
Burner Control Racks
1
f.
Agent Detectors
1
g.
Smoke (Fog) Generation System (including controls, pumps, piping, wiring, etc.)
1
h.
Mock-ups
2
i.
Fireplaces (Deck, Electrical)
2
j.
Fire Pilots
4
k.
Fire Pilot Monitor System
4
l.
Sample Draw Units
2
m.
Propane Calibration Units
2
n.
Temp Monitor System
1
o.
Pendant
1

6. LINES OF DEMARCATION

In building 1429 (AV), Propane lines and electronic equipment in direct support of the fire trainer which includes, but not limited to Electronic Enclosure (EE1), Vent Fan Controller (VFC1), Smoke Generator (SG1), Burner Control Assembly (BCA), Block and vent, solenoid valves, Motorized valves, pilot boxes, water pit, and hose reels are the maintenance responsibility of the contractor.

7. DEGRADED CAPABILITY MATRIX (DCM).

The following user trainer operability designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

CONTROL SYSTEM/IOS

No IOS

PLC/PC AND RELATED ELECTRICAL SYSTEMS
100
MONITOR
N/A
EE1/OIP
100

PROPANE SYSTEM

BLOCK AND VENT SUBSYSTEM
100
TRAINER PROPANE SYSTEM
100
PROPANE DETECTION AND MONITORING
100
PILOT FLAME SYSTEM (EACH FIREPLACE)
15
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED
MAIN FLAME SYSTEM (EACH FIREPLACE)
20
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED

HEATING, VENTILATION, AIR CONDITIONING SYSTEM (HVAC) SYSTEM

TRAINER VENTILATION SYSTEM (FANS)
25

WATER SUPPLY SYSTEM

WATER TANK
100
FIRE PUMP (EACH)
20
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.
FIRE HOSE STATION (EACH)
5
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.

AIR COMPRESSION SYSTEM

LOW PRESSURE AIR COMPRESSOR
20

WASTE WATER SYSTEM

EFFLUENT PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.

SCBA AIR SYSTEM AND FIRE EXTINGUISHER REFILL SYSTEM

AIR COMPRESSOR
20
ONLY IF ENOUGH SCBA’S ARE AVAILABLE FOR TRAINING.

STRUCTURAL AND OTHER

SMOKE GENERATING SYSTEM
10
LIMITED TO WHETHER USER CAN TRAIN WITHOUT SMOKE UNTIL REPAIRS ARE MADE
GRATING
10
PERMIT WARRANTY, CERTIFICATIONS
10
UNLESS CERTIFICATION IS REQUIRED BEFORE TRAINING IS ALLOWED.
GENT SENSING SYSTEM
10
MOCK UPS
5

COMMUNICATIONS EQUIPMENT

PORTABLE RADIO
5
BATTERY CHARGER
10

Failure of any fireplace subsystem shall the render the affected fireplace not operable. These include pilot and main flame assemblies, agent detection assemblies. Refer to the table above for further details.

Failure of any system or subsystem to be in the propane piping and propane assemblies shall render the entire trainer not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire trainer not operable. Refer to the table above for further details.

Failure of the Processing Water Systems will make the trainer inoperable.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

ATTACHMENT 2

AVIATION FFT - AVIATION BUILDING

19F6

1.1 General.

The Damage Control Wet Trainer (DCWT) is utilized to train and evaluate damage control team performance in the identification, reporting, and repair of flooding casualties resulting from piping ruptures and ship collision. In addition, the training system has the capability to familiarize students with the physical characteristics of ship’s compartmentation, and procedures for controlling flooding / progressive flooding. The environmental simulation includes typical sounds as well as sounds of pump operation through the startup, running, and shutdown phases. Ship damage will result in flooding the simulated compartment. Shipboard type communication and alarm systems, and battle lanterns are used by the trainees to effectively react to the damage situation. A classroom is provided where trainees are given preliminary instructions in damage control and is later used to review and critique the trainees' damage control performance. Primary consideration has been given to the safety of personnel. An emergency drain system is provided to rapidly empty any flooded compartment in the event of an emergency. All potentially hazardous electric circuits are kept above the maximum level of the flooded compartment.

1.2 Trainee Station.

The trainee station is a getwet compartment in a water-tight steel structure configured to represent a shipboard environment. Ladders, and equipment mockups, battle lanterns, communications equipment, loud speakers and other equipment complete the illusion of an operating ship. The trainer contains hull valve controls, submersible pump connections, communications equipment, loud speakers, and damage control equipment lockers.

1.3 Instructor Operator Station.

The Instructor station is located on the East side first deck of the trainer. The instructors are able to monitor activities in the get wet compartments through the individual space port holes.

1.4 Computer System.

N/A

1.5 Other.

1.5.1 Water Chemistry.

The DCWT includes all necessary water flow, lighting and ventilation to the training compartments. Additionally, it includes automatic filtration and chemical treatment to maintain the water chemistry within NAVMED P-5010-4 (Rev. 6-2002) standards.

The contractor shall maintain preventative and corrective maintenance to the water treatment system which includes, but not limited to: the chlorinator, pump, piping, and valves. Chlorinator maintenance includes monthly inspection and chemical replenishment as needed:

Water Chemistry. Contractor shall maintain water chemistry, to include: mixing chemicals and adding chemicals to maintain required chemical balance and chlorine levels, in accordance with Manual of Naval Preventative Medicine, Chapter 4 Swimming Pools and Bath Places 4 (NAVMED P-5010-4). Contractor shall perform System Readiness Test (SRT) with water chemical testing results reported daily before and after each training evolution to the COR office. When water chemistry is out of established acceptable range of ph of 7.2- 8.0, Free available chlorine (FC) of 0.5-3.0 ppm, Total available chlorine (TC) .5-3.0 ppm, and Combined chlorine at 0 ppm, the trainer is considered out of commission (OOC). The Contractor shall procure chemicals and other items needed to test the water used for training. The Contractor shall submit a summary of the daily results in the monthly report in the format provided. If a deviation occurs on any day of the month, immediate notification of the COR is required.

2. LOCATION.

Building: 1428 Description: Trainer Area 1984 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 20C28
SERIAL #: 1
LOCATION: Pearl Harbor, HI
TITLE: Surface Damage Control Trainer
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
TASK
OHPD
From:
To:
From:
To:
From:
To:
3
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note: Local climate temperatures fluctuate during the summer. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
NTE

QUANTITY

Trainer Support Gear
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
Main Control Panel Assembly
1
b.
Auxiliary Control Panel Assembly
1
c.
E-STOP Switch Assembly
6
d.
Emergency Drain Switch
2
e.
Sound System
1
f.
Exhaust Fan
1
g.
Battle Lantern
19
h.
Portable Battle Lantern
9
i.
Maintenance Light
11
j.
Water Storage Tank (22,000 Gallon) (Water Distribution System)
1
k.
Water Supply Pump/Motor Assembly (Water Distribution System)
1
l.
Water Return Pump (Water Distribution System)
1
m.
Basket Strainer (Water Distribution System)
1
n.
Water Distribution Filter (Water Distribution System)
1
o.
Floor Drain Valve (Water Distribution System)
2
p.
Emergency Drain Valve (Water Distribution System)
7
q.
Circulation Pump (Water Treatment System)
1
r.
Water Treatment Filter (Water Treatment System)
1
s.
Water Chiller (Water Treatment System)
1
t.
Water Chemistry Subsystem (Water Treatment System)
1
u.
Motorized Valve (Sprung Door Simulated Damage)
1
v.
Manual Butterfly Valve (Sprung Door Simulated Damage)
1
w.
Damage Watertight Door (Sprung Door Simulated Damage)
1
x.
Motorized Valve (Sprung Hatch Simulated Damage)
1
y.
Manual Butterfly Valve (Sprung Hatch Simulated Damage)
1
z.
Damage Hatch (Sprung Hatch Simulated Damage)
1
aa.
Motorized Valve (Split Bulkhead Seam Simulated Damage)
1
ab.
Manual Butterfly Valve (Split Bulkhead Seam Simulated Damage)
1
ac.
Split Bulkhead Seam (Split Bulkhead Seam Simulated Damage)
1
ad.
Motorized Valve (Damage Pipes Simulated Damage)
1
ae.
Manual Butterfly Valve (Damage Pipes Simulated Damage)
1
af.
Damaged Pipe (Damage Pipes Simulated Damage)
2
ag.
Motorized Valve (Large Bulkhead Hole Simulated Damage)
1
ah.
Manual Butterfly Valve (Large Bulkhead Hole Simulated Damage)
1
ai.
Large Bulkhead Hole (Large Bulkhead Hole Simulated Damage)
1
aj.
Motorized Valve (Small Bulkhead Holes Simulated Damage)
1
ak.
Manual Butterfly Valve (Small Bulkhead Holes Simulated Damage)
1
al.
Small Bulkhead Holes (Small Bulkhead Holes Simulated Damage)
1
am.
Ceiling Crack (Ceiling Crack Simulated Damage)
1
an.
Peri-Jet Eductor
1

6. LINES OF DEMARCATION

In building 1428 (DCWT), water fill, suction and electronic equipment in direct support of the wet trainer, which includes, but is not limited to, supply pump, return pump. Filtration system, piping system and actuator valves are the maintenance responsibility of the Contractor.

7. DAMAGE CONTROL (DC) DEGRADED CAPABILITY MATRIX (DCM).

The following user Damage Control (DC) Degraded Capability Matrix (DCM) designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

INSTRUCTOR OPERATOR STATION

Valves
20
Gauges
20
Lighting Controls
15
Weather conditions must allow adequate visibility.
Emergency Stops
20
Viewing Ports
10
Requires safety observers instead.
Indicator Instruments
10
Only if indicator is not directly safety related and there are other means to measure performance of the system/subsystem.

WATER TREATMENT SYSTEM

Chlorinator
20
Pump
25
Piping
20
Valves
20

HARDWARE

Battle Lanterns
15
Weather conditions must allow adequate visibility and skills training are limited to what is available.
Water Tight Hatches (WTH)
25
Trainers
Sound Powered Phones
N/A
PHARS
10
PHARS is located outside of the trainer, but still a part of device 20C28.
1 1/2 Tri-Gates
10
Skills training are limited to what is available.
1 1/2 Fire Hose
10
Skills training are limited to what is available.

MAIN WATER SUPPLY SYSTEM

Pump Controllers
30
Supply Pump
100
Trainer can’t run without pump
Water Return Pump
100
Trainer can’t run without pump
Recirculation Pumps
30
Filtration Systems
20
Piping
20
Valves
20

VENTILATION SYSTEM

Fans
10
Must provide other means for proper ventilation.
Fan Control
15
Must provide other means for proper ventilation.

Failure of the Water Treatment system shall the render the DCWT not operable. These include chlorinator, sensor, pump, piping and main valves. Refer to the table above for further details.

Failure of any system or subsystem in the water supply shall render the entire DCWT not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire DCWT not operable. Refer to the table above for further details.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

ATTACHMENT 3

SURFACE DAMAGE CONTROL TRAINER

20C28

1. FACILITIES.

This section identifies the major facility systems and equipment the Contractor shall be responsible for operational, preventative, and/or corrective maintenance.

1.1. The Contractor shall be responsible for operational (DORT) and preventative maintenance for the below systems.

1.1.1. Air Compression System.

NOMENCLATURE
NTE

QUANTITY

a.
Low Pressure Air Compressor
2
b.
Low Pressure Air Tank
1
c.
Air Dryer
1

· System include, but is not limited to: receivers, dryers, regulators, filters, separators, heat exchangers, valves, piping, wiring, mounting hardware, compressors, reducers, fittings, tubing, indicators, controls, transducers, and all specific controls and tubing for HVAC control.

1.1.2. Propane System. The Contractor shall also provide refilling of the propane tanks to support all training evolutions.

NOMENCLATURE
NTE

QUANTITY

a.
Storage Tanks: 12,000 gals each
1

· System include, but is not limited to: piping, gauges, valves, strainers, wiring and electrical controls.

NOTE: NAVFAC is responsible for the propane farm to the block and vent since it is class 2 property. The FFT COMS contractor shall be responsible for operational maintenance and reporting any corrective and preventative maintenance and cathodic protection concerns to the TA and COR.

1.1.3. Process Water Supply System.

NOMENCLATURE
NTE

QUANTITY

a.
Process Water Pumps (P103/104)
2
b.
Fire Hose Stations
4
c.
Water Tank: 12,000 gal
1

· System include, but is not limited to: all valves, fittings, piping, meters, gauges, mounting hardware, insulation, filters, strainers and hydrants.

1.1.4. Process Waste Water System.

NOMENCLATURE
NTE

QUANTITY

a.
Effluent Pumps (P107)
1

· System include, but is not limited to: all piping, fittings, valves, storage containers, mounting hardware, floor drains, insulation, traps, separators, wiring and electrical controllers.

NOTE: A daily of all sampling data and chemical additions will be maintained by the system operator. A monthly report, summarizing sampling data, is required.

1.2. The Contractor shall be responsible for operational (DORT), preventative, and corrective maintenance for the below systems.

1.2.1. Air Pack Charging System. Compressor may be used by firefighter staff for filling of user’s bottles.

NOMENCLATURE
NTE

QUANTITY

a.
SCBA Air Compressor
2

· System include, but is not limited to: cascading fill system, storage bottles, fill station and carbon monoxide monitor. Compressor may be used by firefighter staff for filling of user’s bottles.

· Quarterly air sampling required in accordance with (IAW) ANSI/CGA G-7.1 1989, Table 1 Grade D.

· Periodic bottle hydro testing required.

1.2.2. Electrical System.

· System include, but is not limited to: breaker panels, data terminal cabinets, controls, indicators, alarms, relays, receptacles, fixtures, bulbs, switches, wiring and cabling back to the main breaker of the component in question, conduit and fittings, mounting hardware and equipment, fuses, breakers, motors, controllers, lighting, wiring, clocks, magnetic contactor panels, lighting control and transformers.

1.2.3. Eyewash/Showers. The Contractor is responsible for all eyewash/shower stations.

2.0 LINES OF DEMARCATION

2.1 General.

This section identifies the major dividing points between Contractor and Government responsibilities relating to utility services. Generally, Contractor’s responsibilities for maintenance shall begin at the earliest leg off a main for the purpose of use to the trainer or to areas designated for the contractor use of maintenance. Differences in maintenance responsibility as referenced in equipment categories and/or lines of demarcation may be encountered. In such cases where differences occur, the site COR with support of the Surface FF/DC COMS Government IPT, shall render appropriate maintenance responsibility guidance as required.

2.2 Air Compression System. : The Contractor is responsible for the operational (DORT) and preventive maintenance to the Air Compression System.

2.3 Facility Water. Not applicable.

2.4 Trainer and Facility Electrical.

The Contractor is responsible for trainer specific electrical systems. The Contractor is responsible for all equipment and components being supplied as part of the trainer starting at the load side of the breaker.

2.5 Heating, Air Conditioning, and Ventilation System. The Contractor is responsible for operational (DORT) and preventive maintenance of the trainer Ventilation System.

2.6 Process Water Waste. The Contractor is responsible for operational and preventive maintenance of the Process Water Waste System. A wastewater log shall be maintained to indicate pumping times and operator notification at the treatment plant prior to pumping. Industrial Waste Water Discharge Certificate shall be current at all times.

2.7 Process Water Supply System. The Contractor is responsible for operational and preventive maintenance of the Process Water Supply System. Demarcation for FFT fire hose stations shall commence at the fire hose connection point.

2.8 Propane System. The Contractor is responsible for the refilling of the propane tank and operational (DORT) maintenance of the propane system. The FFT COMS contractor shall inform the COR and TA of any maintenance and cathodic protection concerns.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-045220 Nov 2019

ATTACHMENT 4

FACILITIES

1. TRAINER SUPPORT GEAR.

The items identified in the below subparagraphs will be Government furnished and maintained by the Contractor. Replacement of these items will be provided by the Government.

NOTES:

(1) Contractor must have a program in place in order to properly monitor maintenance requirements. This program must be detailed, accurate and holding contractors accountable for all maintenance requirements. This program will be able to track all SCBA’s, SCBA bottles, and all training support gear within the FFTs and DCWT compound. Including, Fire Protective Gear (FPG), gloves, helmets, P-100’s, Portable Exothermic Cutting Unit (PECU), firefighting helmets, etc.

(2) Quantity* required is the number of each item required to be available in a Fully Operational Condition for each Government scheduled use.

1.1 Extinguishers.

NOMENCLATURE
NTE

QUANTITY*

CO2 Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect Hydrostatic Test

1.2 Self-Contained Breathing Apparatus (SCBA).

NOMENCLATURE
NTE

QUANTITY*

Composite Cylinders Fill Pre-stage in Training Areas Inspect Repair Hydrostatic Test and Certify SCBA airpack bottles

SAR SCBA

Inspect Repair Hydrostatic Test

9 MSA

8 Scott

Packs (frame, belts, harnesses, regulator, hoses) Pre-stage in Training Areas Inspect Repair Certify (Flow Test) Air Quality Test SCBA air packs and systems used to fill bottles

SCBA Laptop

PM

CM

Install Patches, etc.

SCBA Notes:

(1) Double classes are a special convening and only occur as necessary for courses 0018/19, which will require two bottles per student for that day. A two (2) week notice will be given on double class convening’s.

(2) See paragraph 4.3.2.3 (Self-Contained Breathing Apparatus) of Addendum A.

1.3 Personal Protection Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Protection Gear (FPG) Pre-stage in Training Areas Clean/Launder and Dry Inspect Repair

Fire Fighter Helmets Pre-stage in Training Areas Inspect Repair

Flight Deck Cranial Pre-stage in Training Areas Clean/Launder and Dry Inspect

Fire Fighter Flash Hoods Pre-stage in Training Areas Launder and Dry Inspect Maintain

Fire Fighter Gloves Launder and Dry Inspect Maintain 50 pair

Fire Fighter Boots Pre-stage in Training Areas Inspect Maintain Repair 40 pair

Fire Fighter Coveralls Pre-stage in Training Areas Launder and Dry Inspect Maintain Repair

Fire Fighter Instructor Turnouts Launder and Dry Inspect Maintain

Damage Control Proximity Suits Pre-stage in Training Areas Launder and Dry Inspect Maintain

Damage Control Helmets Pre-stage in Training Areas Clean and Dry Inspect Maintain Repair

Diver Gloves Pre-stage in Training Areas Launder and Dry Inspect Maintain

Flash Gloves Pre-stage in Training Areas Launder and Dry Inspect Maintain

1.4 Fire Fighting/Damage Control Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Hoses Pre-stage in Training Areas Inspect Maintain Repair Hydrostatic Test 12 – 1 ½:

4 – 2 ½:

Fire Hose Nozzles Pre-stage in Training Areas Inspect Repair

AFFF Hose Reels Maintain Pre-stage Certify Repair

P-100 Portable Fire Hose/De-Water Pumps Fill oil & fuel Pre-stage in Training Areas Inspect Repair

Portable Sound Powered Telephones (SPT) Inspect & Repair

Sound Powered Telephone Reels (X-40-J) Inspect & Repair

Naval Firefighter Thermal Imager (NFTI) Pre-stage in Training Areas Inspect & Repair

Portable Exothermic Cutting Unit (PECU) Maintain battery charge Fill (Oxygen) Pre-stage in Training Areas Repair

Portable Hydraulic Recovery and Access Equipment Pre-stage in Training Areas Maintain proper fuel levels Inspect Repair

Hand Held Radios Pre-stage in Training Areas Inspect Maintain Repair

Portable Battle Lanterns Pre-stage in Training Areas Inspect Maintain Repair

Plug/Patch Kits Pre-stage in Training Areas Inspect Maintain Repair

PAS/RASP Systems Test Internal relief valve and adjust regulator Calibrate PASP Pressure Gages Perform Escape SCBA functional test Hydrostatic test on Bottles (60/15 minute) Overhaul Apparatus

2 RASP

3 PAS

1.5 Miscellaneous (Other).

Commercial Industrial Clothes Washer and Dryer Maintain Inspect Repair

Fan – Water Drive (RAM Fan) Maintain Inspect Repair