Att (L-16F) RTC Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf
PDF 273 KB Posted
- Solicitation number
- N61340-20-R-0005
About this file
This document provides monthly maintenance reports for Surface Fire Fighter and Damage Control trainer systems at Recruit Training Command Great Lakes from August 2019 through September 2018. The reports detail corrective maintenance actions, mean time to repair, and repair or replacement of parts. Information includes the contract number, specific trainer systems and components addressed, timelines for failures and repairs, part numbers, and inventory status of replaced parts. Details are reported on a monthly basis regarding maintenance tasks completed, parts usage, and any outstanding repairs or part replacements needed.
The other document is a solicitation for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services across multiple Navy locations. The services require providing all labor, materials, and equipment to maintain training systems and equipment in a fully operational state. The performance-based firm-fixed-price contract includes cost reimbursement for consumables. The small business set-aside is for engineering services with a size standard of $41.5 million. Proposals are due based on the date specified in the RFP. The requirement may expand to include Yokosuka, Japan in the future.
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CDRL A004 ~ Monthly Report
(DI-MISC-81392)
Section IV - MAINTENANCE ACTIONS
CDRL AOO4 ~ Mthly Sect IV - Maintenance Actions
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Aug-19
Command: RTC Great Lakes, IL Report Date: 3-Sep-19
SECTION IV ~ MAINTENANCE ACTIONS
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 2 8 24 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 2 8 24
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 9220 9220 1.00 9220 0 0
730 830 730
19F5 Side 1 Bilge Vari-Nozzle 9242 9242 0.50 9242 0 0
830 900 830
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
CDRL A004 - Monthly Report (DI-MISC-81392) Sect IV: Maintenance Actions (con't)
CDRL A004 ~ Sect IV Mthly Report Maint Actions (con't)
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Aug-19
Command: RTC Great Lakes, IL Report Date: 3-Sep-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 1 Port Bilge Water intrusion in pipes 8/8/2019 8/8/2019 0 2 19F5 1 Vari- Nozzle 4210-00-465-1906 8/30/2019 8/30/2019 0
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jul-19
Command: RTC Great Lakes, IL Report Date: 1-Aug-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 8 2 22 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 8 2 14
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Side 1 Electrical Panel Pilot 9189 9189 1.00 9189 0 0
Replaced ignitor/Flame Rod 1030 1130 1030
19F5 Side 1 Bilge - pilot Cover 9191 9191 1.00 9191 0 0
Cover Broke/New One Installed 600 700 600
19F5 Side 1 Bilge - Pilot(Water Intrusion) 9193 9193 2.00 9193 0 0
Cleared Pipes 700 900 700
19F5 Side 2 Bilge/ No Pilot 9203 9203 2.00 9203 0 0
Adjust/Cleaned Flame Rod 600 800 600
19F5 Side 1 Electrical Panel Pilot 9203 9203 3.00 9203 0 0
Replaced ignitor/Flame Rod 600 900 600
19F5 Side 1 Electrical Panel Pilot 9204 9205 9.00 9204 0 0
Found ignition suseptible to RFI 600 1200 600
19F5 Side 1 Bilge (No pilot) 9207 9207 1.50 9207 0 0
Water Intrusion/Adjusted Pilot 730 900 730 19F5 Pilot/ But no main side 1 Bilge 9211 9211 1.5 9211 0 0
Water Intrusion, Used wet/vac tightened cap 730 900 730 DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL
AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jul-19
Command: RTC Great Lakes, IL Report Date: 1-Aug-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Electrical Panel Pilot Replaced Flame Rod FRS-6 7/8/2019 7/8/2019 0 Spare 2 19F5 Side 1 Bilge - pilot Cover Had a new cover manufactured 7/10/2019 7/10/2019 0 New flame pilot cover manufactured 3 19F5 Side 1 Bilge - Pilot not operating H2O intrusion in pilot air/propane pipe 7/12/2019 7/12/2019 0 4 19F5 Side 2 Bilge/ No Pilot Water Intrusion, cleared pipes 7/22/2019 7/22/2019 0 5 19F5 Side 1 Electrical Panel Pilot Replaced ignitor/Flame Rod 7/22/2019 7/22/2019 0 Stock 6 19F5 Side 1 Electrical Panel Pilot 30' New igniton wire 7/23/2019 7/24/2019 1 7 19F5 Side 1 Bilge (No pilot) Water Intrusion, adjusted pilot 7/26/2019 7/26/2019 0 8 19F5 Pilot/ But no main Used wet/vac to clear all water, tightened 7/30/2019 7/30/2019 0 flame pilot cap and water deflector
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Jun-19
Command: RTC Great Lakes, IL Report Date: 1-Jul-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 2 3 14 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 2 3 14
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Trainer Lighting 9154 9154 0.50 9154 0 0
800 830 800
19F5 Trainer Lighting 9162 9162 0.25 9162 0 0
730 745 730
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Jun-19
Command: RTC Great Lakes, IL Report Date: 1-Jul-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Light cover ring fell off Replaced ring 6/3/2019 6/3/2019 0 Stock Item, Non-Inventory 2 19F5 Side 2 Egress Light Replaced bulb in egress 6/11/2019 6/11/2019 0 Non-Inventory
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-May-19
Command: RTC Great Lakes, IL Report Date: 3-Jun-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 3 3 12 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 3 3 12
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Side 1 Electrical Panel 9135 9135 0.50 9135 0 0
730 800
19F5 Fan Belts 9136 9136 2.00 9136 0 0
700 900
19F5 2A27 Sample Cabiner 9141 9141 1.50 9141 0 0
612 745
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-May-19
Command: RTC Great Lakes, IL Report Date: 3-Jun-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Electrical Panel - No Pilot Cleaned flame rod and ignitor 5/15/2019 5/15/2019 0 No Parts Used 2 19F5 Roof Fan Replaced fan belts 5/16/2019 5/16/2019 0 Spares 3 19F5 2A27 Sample Cabinet SNR321 - Catalytic Sensor 5/21/2019 5/21/2019 0 Spares
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Apr-19
Command: RTC Great Lakes, IL Report Date: 1-May-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 3 4 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 3 4 9
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Lighting 9094 9094 0.50 9094 0.0 Hours 0.0 Hours
1030 1100 1030 0 Days 0 Days
19F5 Side 1 Electrical Panel 9116 9116 0.50 9116 0.0 Hours 0.0 Hours
1000 1030 1000 0 Days 0 Days
19F5 Side 1 Electrical Panel 9119 9119 1.00 9119 0.0 Hours 0.0 Hours
700 800 700 0 Days 0 Days
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Apr-19
Command: RTC Great Lakes, IL Report Date: 1-May-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Lighting - Crawl Space Flourescent Light bulb 4/1/2019 4/1/2019 0 Non-Inventory item
2 19F5 Side 1 Electrical Panel Cleaned Flame Rod, worked failed in training 4/26/2019 4/26/2019 0
3 19F5 Side 1 Electrical Panel FRS-2, adjusted propane down 4/29/2019 4/29/2019 0
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Mar-19
Command: RTC Great Lakes, IL Report Date: 1-Apr-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 4 2 6 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 4 2 6
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Port Blocking Valve 9056 9066 1.5 Hours 9056 1.5 Hours 0.0 Hours
9:00 9:00 9:00
19F5 Side 2 Sample Cabinet 2A25 9073 9073 2.0 Hours 9073 2.0 Hours 0.0 Hours
6:00 8:00 6:00
19F5 Sample Cabinet Side 1 1A25 9078 9078 2.0 Hours 9078 2.0 Hours 0.0 Hours
6:00 8:00 6:00
19F5 IOS/UPS System 9084 9084 .5 Hours 9084 .5 Hours 0.0 Hours
10:00 10:30 10:00
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Mar-19
Command: RTC Great Lakes, IL Report Date: 1-Apr-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 2 Blocking Valve Maxon 5000 Electronic Valve 2/26/2019 On order 12 week lead time 2 19F5 Side 2 Sample Cabinet 2A25 SNR-321 3/14/2019 3/14/2019 0 Non Inventory item 3 19F5 Side 1 Sample Cabinet 1A25 SNR-321 3/19/2019 3/19/2019 0 Non Inventory item 4 19F5 UPS System Batteries Qty 8 - HR 1234W F2 3/25/2019 3/25/2019 0 Non Inventory item/Petty Cash Purchase Local
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 28-Feb-19
Command: RTC Great Lakes, IL Report Date: 1-Mar-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 2 1 2 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 2 1 2
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Port Deluge system 9043 9043 2.0 Hours 9043 2.0 Hours 0.0 Hours
9:00 11:00 9:00
19F5 Port Blocking Valve 9052 9052 1.5 Hours 9052 1.5 Hours 0.0 Hours
10:30 12:00 10:30
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 28-Feb-19
Command: RTC Great Lakes, IL Report Date: 1-Mar-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Deluge System 1" Black Pipe corroded, Leaks 2/12/2019 2/12/2019 0 Petty Cash Purchase, Local 2 19F5 Block Valve - Port IC1-001-406 Shut Off Valve 2/21/2019 2/21/2019 0 Bench Tested Sat
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jan-19
Command: RTC Great Lakes, IL Report Date: 1-Feb-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 1 2 13 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 1 2 13
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Side 1 Electrical Panel 9015 9015 2.50 9015 0 hrs 0 Hrs
8:30 10:00 8:30 0 Days 0 Days
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jan-19
Command: RTC Great Lakes, IL Report Date: 1-Feb-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Electrical Panel - No Pilot Replaced ignitor Auburn I-6 1/15/2019 1/15/2019 0 Spare
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Dec-18
Command: RTC Great Lakes, IL Report Date: 2-Jan-19
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 2 1 12 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 2 1 12
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F5 Wheel Valve Trashcan Side 1 8338 8338 1.50 8338 0 hrs 0 Hrs
8:30 10:00 8:30 0 Days 0 Days
19F5 Side 1 Electrical Panel 8351 8351 2.00 8351 0 hrs 0 Hrs
7:00 9:00 7:00 0 Days 0 Days
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Dec-18
Command: RTC Great Lakes, IL Report Date: 2-Jan-19
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Gate Valve not closing Replaced cotter pin, tested 12/4/2018 12/4/2018 0 2 19F5 Side 1 Electrical Panel - No Pilot cleaned and adjusted ignitor/AF Ratio 12/17/2018 12/17/2018 0
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Nov-18
Command: RTC Great Lakes, IL Report Date: 3-Dec-18
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 1 0 10 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 1 0 10
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
19F Side 1 Trashcan Fireplace 8323 88323 1.00 8323 0 hrs 0 Hrs
10:30 11:30 1.00 10:30 0 Days 0 Days
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Nov-18
Command: RTC Great Lakes, IL Report Date: 3-Dec-18
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Trashcan Estop would Broken wire 8323 10:30 8323 11:30 0 Not clear, Broken wire
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Oct-18
Command: RTC Great Lakes, IL Report Date: 1-Nov-18
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 0 0 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 0 0 9
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Oct-18
Command: RTC Great Lakes, IL Report Date: 1-Nov-18
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Section IV - MAINTENANCE ACTIONS
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Sep-18
Command: RTC Great Lakes, IL Report Date: 1-Oct-18
(1) CORRECTIVE MAINTENANCE ACTIONS
Corrective Maintenance Actions Current Month Previous Month Fiscal Year
To-Date
On-Site 0 2 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0
Totals: 0 2 9
(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)
Training System Major-Subsystem / Assembly Julian Date & Time Failed
Julian Date & Time Restored
Time to Repair (Hours)
Julian Date/Time
Last Failure Average MTTR Todate (Hours)
Average MTBF Todate (Hours)
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Sep-18
Command: RTC Great Lakes, IL Report Date: 1-Oct-18
Section IV - Maintenance Actions (con't)
(3) REPAIR or REPLENISH
Seq No.
Training System or
Equip S/N Description Failed Repairable or Repair Part
(Part # & Nomenclature)
Date Repairable or Repair Part
Failed
Date Repaired or Replenished
# Days to Repair or Replenish
Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide
* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.
DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.
| CDRL A004 RTC Great Lakes August 2019 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes July 2019 |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes June 2019 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes May 2019 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes April 2019 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes March 2019 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes February 2019 |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes January 2019 |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes December 2018 |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes November 2018 |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes October 2018 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
| CDRL A004 RTC Great Lakes September 2018 Signed |
| RTC Great Lakes ~ Sect IV |
| RTC Great Lakes-Sect IV (cont) |
File details come from the government source that posted it. Updated .