This document provides monthly maintenance reports for Surface Fire Fighter and Damage Control trainer systems at Recruit Training Command Great Lakes from August 2019 through September 2018. The reports detail corrective maintenance actions, mean time to repair, and repair or replacement of parts. Information includes the contract number, specific trainer systems and components addressed, timelines for failures and repairs, part numbers, and inventory status of replaced parts. Details are reported on a monthly basis regarding maintenance tasks completed, parts usage, and any outstanding repairs or part replacements needed.

The other document is a solicitation for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services across multiple Navy locations. The services require providing all labor, materials, and equipment to maintain training systems and equipment in a fully operational state. The performance-based firm-fixed-price contract includes cost reimbursement for consumables. The small business set-aside is for engineering services with a size standard of $41.5 million. Proposals are due based on the date specified in the RFP. The requirement may expand to include Yokosuka, Japan in the future.

View the file

Other files

File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_4 Dec 2019_TrkChgs.docx DOCX document
.N61340-20-R-0005 Amendment 0001.docx DOCX document
ATCH 10L_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_11 Dec 2019 Amend 1.xlsx XLSX spreadsheet
ATCH 10G_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10C_WD 15-5636 (Rev.-11) San Diego.pdf PDF
ATCH 10C_CBA_San Diego - SDAMP - FINAL.PDF PDF
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_4 Dec 2019.xlsx XLSX spreadsheet
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (L-14) Consolidated Solicitation Question_5 Dec 2019 FINAL.xlsx XLSX spreadsheet
ATCH 10A_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10A_WD 15-4539 (Rev.-9) Mayport.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_7 Oct 2019.xlsx XLSX spreadsheet
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_1 Oct 2019.docx DOCX document
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10D_WD 15-4089 (Rev.-11) Newport.pdf PDF
Att (5B) Premium Time Hours Log_15 Oct 2019.xls XLS spreadsheet
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-18) Contractor Performance Assessment Questionnaire May 2016.msg.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A004 ~ Monthly Report

(DI-MISC-81392)

Section IV - MAINTENANCE ACTIONS

CDRL AOO4 ~ Mthly Sect IV - Maintenance Actions

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Aug-19

Command: RTC Great Lakes, IL Report Date: 3-Sep-19

SECTION IV ~ MAINTENANCE ACTIONS

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 2 8 24 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 2 8 24

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 9220 9220 1.00 9220 0 0

730 830 730

19F5 Side 1 Bilge Vari-Nozzle 9242 9242 0.50 9242 0 0

830 900 830

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

CDRL A004 - Monthly Report (DI-MISC-81392) Sect IV: Maintenance Actions (con't)

CDRL A004 ~ Sect IV Mthly Report Maint Actions (con't)

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Aug-19

Command: RTC Great Lakes, IL Report Date: 3-Sep-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 1 Port Bilge Water intrusion in pipes 8/8/2019 8/8/2019 0 2 19F5 1 Vari- Nozzle 4210-00-465-1906 8/30/2019 8/30/2019 0

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jul-19

Command: RTC Great Lakes, IL Report Date: 1-Aug-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 8 2 22 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 8 2 14

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Side 1 Electrical Panel Pilot 9189 9189 1.00 9189 0 0

Replaced ignitor/Flame Rod 1030 1130 1030

19F5 Side 1 Bilge - pilot Cover 9191 9191 1.00 9191 0 0

Cover Broke/New One Installed 600 700 600

19F5 Side 1 Bilge - Pilot(Water Intrusion) 9193 9193 2.00 9193 0 0

Cleared Pipes 700 900 700

19F5 Side 2 Bilge/ No Pilot 9203 9203 2.00 9203 0 0

Adjust/Cleaned Flame Rod 600 800 600

19F5 Side 1 Electrical Panel Pilot 9203 9203 3.00 9203 0 0

Replaced ignitor/Flame Rod 600 900 600

19F5 Side 1 Electrical Panel Pilot 9204 9205 9.00 9204 0 0

Found ignition suseptible to RFI 600 1200 600

19F5 Side 1 Bilge (No pilot) 9207 9207 1.50 9207 0 0

Water Intrusion/Adjusted Pilot 730 900 730 19F5 Pilot/ But no main side 1 Bilge 9211 9211 1.5 9211 0 0

Water Intrusion, Used wet/vac tightened cap 730 900 730 DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL

AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jul-19

Command: RTC Great Lakes, IL Report Date: 1-Aug-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Electrical Panel Pilot Replaced Flame Rod FRS-6 7/8/2019 7/8/2019 0 Spare 2 19F5 Side 1 Bilge - pilot Cover Had a new cover manufactured 7/10/2019 7/10/2019 0 New flame pilot cover manufactured 3 19F5 Side 1 Bilge - Pilot not operating H2O intrusion in pilot air/propane pipe 7/12/2019 7/12/2019 0 4 19F5 Side 2 Bilge/ No Pilot Water Intrusion, cleared pipes 7/22/2019 7/22/2019 0 5 19F5 Side 1 Electrical Panel Pilot Replaced ignitor/Flame Rod 7/22/2019 7/22/2019 0 Stock 6 19F5 Side 1 Electrical Panel Pilot 30' New igniton wire 7/23/2019 7/24/2019 1 7 19F5 Side 1 Bilge (No pilot) Water Intrusion, adjusted pilot 7/26/2019 7/26/2019 0 8 19F5 Pilot/ But no main Used wet/vac to clear all water, tightened 7/30/2019 7/30/2019 0 flame pilot cap and water deflector

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Jun-19

Command: RTC Great Lakes, IL Report Date: 1-Jul-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 2 3 14 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 2 3 14

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Trainer Lighting 9154 9154 0.50 9154 0 0

800 830 800

19F5 Trainer Lighting 9162 9162 0.25 9162 0 0

730 745 730

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Jun-19

Command: RTC Great Lakes, IL Report Date: 1-Jul-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Light cover ring fell off Replaced ring 6/3/2019 6/3/2019 0 Stock Item, Non-Inventory 2 19F5 Side 2 Egress Light Replaced bulb in egress 6/11/2019 6/11/2019 0 Non-Inventory

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-May-19

Command: RTC Great Lakes, IL Report Date: 3-Jun-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 3 3 12 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 3 3 12

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Side 1 Electrical Panel 9135 9135 0.50 9135 0 0

730 800

19F5 Fan Belts 9136 9136 2.00 9136 0 0

700 900

19F5 2A27 Sample Cabiner 9141 9141 1.50 9141 0 0

612 745

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-May-19

Command: RTC Great Lakes, IL Report Date: 3-Jun-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Electrical Panel - No Pilot Cleaned flame rod and ignitor 5/15/2019 5/15/2019 0 No Parts Used 2 19F5 Roof Fan Replaced fan belts 5/16/2019 5/16/2019 0 Spares 3 19F5 2A27 Sample Cabinet SNR321 - Catalytic Sensor 5/21/2019 5/21/2019 0 Spares

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Apr-19

Command: RTC Great Lakes, IL Report Date: 1-May-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 3 4 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 3 4 9

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Lighting 9094 9094 0.50 9094 0.0 Hours 0.0 Hours

1030 1100 1030 0 Days 0 Days

19F5 Side 1 Electrical Panel 9116 9116 0.50 9116 0.0 Hours 0.0 Hours

1000 1030 1000 0 Days 0 Days

19F5 Side 1 Electrical Panel 9119 9119 1.00 9119 0.0 Hours 0.0 Hours

700 800 700 0 Days 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Apr-19

Command: RTC Great Lakes, IL Report Date: 1-May-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Lighting - Crawl Space Flourescent Light bulb 4/1/2019 4/1/2019 0 Non-Inventory item

2 19F5 Side 1 Electrical Panel Cleaned Flame Rod, worked failed in training 4/26/2019 4/26/2019 0

3 19F5 Side 1 Electrical Panel FRS-2, adjusted propane down 4/29/2019 4/29/2019 0

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Mar-19

Command: RTC Great Lakes, IL Report Date: 1-Apr-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 4 2 6 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 4 2 6

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Port Blocking Valve 9056 9066 1.5 Hours 9056 1.5 Hours 0.0 Hours

9:00 9:00 9:00

19F5 Side 2 Sample Cabinet 2A25 9073 9073 2.0 Hours 9073 2.0 Hours 0.0 Hours

6:00 8:00 6:00

19F5 Sample Cabinet Side 1 1A25 9078 9078 2.0 Hours 9078 2.0 Hours 0.0 Hours

6:00 8:00 6:00

19F5 IOS/UPS System 9084 9084 .5 Hours 9084 .5 Hours 0.0 Hours

10:00 10:30 10:00

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Mar-19

Command: RTC Great Lakes, IL Report Date: 1-Apr-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 2 Blocking Valve Maxon 5000 Electronic Valve 2/26/2019 On order 12 week lead time 2 19F5 Side 2 Sample Cabinet 2A25 SNR-321 3/14/2019 3/14/2019 0 Non Inventory item 3 19F5 Side 1 Sample Cabinet 1A25 SNR-321 3/19/2019 3/19/2019 0 Non Inventory item 4 19F5 UPS System Batteries Qty 8 - HR 1234W F2 3/25/2019 3/25/2019 0 Non Inventory item/Petty Cash Purchase Local

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 28-Feb-19

Command: RTC Great Lakes, IL Report Date: 1-Mar-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 2 1 2 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 2 1 2

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Port Deluge system 9043 9043 2.0 Hours 9043 2.0 Hours 0.0 Hours

9:00 11:00 9:00

19F5 Port Blocking Valve 9052 9052 1.5 Hours 9052 1.5 Hours 0.0 Hours

10:30 12:00 10:30

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 28-Feb-19

Command: RTC Great Lakes, IL Report Date: 1-Mar-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Deluge System 1" Black Pipe corroded, Leaks 2/12/2019 2/12/2019 0 Petty Cash Purchase, Local 2 19F5 Block Valve - Port IC1-001-406 Shut Off Valve 2/21/2019 2/21/2019 0 Bench Tested Sat

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jan-19

Command: RTC Great Lakes, IL Report Date: 1-Feb-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 1 2 13 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 1 2 13

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Side 1 Electrical Panel 9015 9015 2.50 9015 0 hrs 0 Hrs

8:30 10:00 8:30 0 Days 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Jan-19

Command: RTC Great Lakes, IL Report Date: 1-Feb-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Electrical Panel - No Pilot Replaced ignitor Auburn I-6 1/15/2019 1/15/2019 0 Spare

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Dec-18

Command: RTC Great Lakes, IL Report Date: 2-Jan-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 2 1 12 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 2 1 12

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F5 Wheel Valve Trashcan Side 1 8338 8338 1.50 8338 0 hrs 0 Hrs

8:30 10:00 8:30 0 Days 0 Days

19F5 Side 1 Electrical Panel 8351 8351 2.00 8351 0 hrs 0 Hrs

7:00 9:00 7:00 0 Days 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Dec-18

Command: RTC Great Lakes, IL Report Date: 2-Jan-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Gate Valve not closing Replaced cotter pin, tested 12/4/2018 12/4/2018 0 2 19F5 Side 1 Electrical Panel - No Pilot cleaned and adjusted ignitor/AF Ratio 12/17/2018 12/17/2018 0

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Nov-18

Command: RTC Great Lakes, IL Report Date: 3-Dec-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 1 0 10 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 1 0 10

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F Side 1 Trashcan Fireplace 8323 88323 1.00 8323 0 hrs 0 Hrs

10:30 11:30 1.00 10:30 0 Days 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Nov-18

Command: RTC Great Lakes, IL Report Date: 3-Dec-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, 1 19F5 Side 1 Trashcan Estop would Broken wire 8323 10:30 8323 11:30 0 Not clear, Broken wire

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Oct-18

Command: RTC Great Lakes, IL Report Date: 1-Nov-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 0 0 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 0 0 9

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 31-Oct-18

Command: RTC Great Lakes, IL Report Date: 1-Nov-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Section IV - MAINTENANCE ACTIONS

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Sep-18

Command: RTC Great Lakes, IL Report Date: 1-Oct-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month Fiscal Year

To-Date

On-Site 0 2 9 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 0 2 9

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time

Last Failure Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

Contract: N61339-10-D-2002 TO# 0002 Month Ending: 30-Sep-18

Command: RTC Great Lakes, IL Report Date: 1-Oct-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

Training System or

Equip S/N Description Failed Repairable or Repair Part

(Part # & Nomenclature)

Date Repairable or Repair Part

Failed

Date Repaired or Replenished

# Days to Repair or Replenish

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOTreplenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

CDRL A004 RTC Great Lakes August 2019 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes July 2019
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes June 2019 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes May 2019 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes April 2019 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes March 2019 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes February 2019
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes January 2019
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes December 2018
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes November 2018
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)
CDRL A004 RTC Great Lakes October 2018 Signed
RTC Great Lakes ~ Sect IV
RTC Great Lakes-Sect IV (cont)