Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_1 Oct 2019.docx

DOCX document 86 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services
Solicitation number
N61340-20-R-0005
Issued by

About this file

This request for proposal solicits proposals for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services at multiple Navy locations. The services include providing all labor, materials, consumables, equipment, tools, test equipment, and transportation necessary to maintain training systems and equipment in a fully operational condition and facilitate user training. Performance will take place at locations in Mayport, FL; Norfolk, VA; Newport, RI; San Diego, CA; Pearl Harbor, HI; Naval Station Great Lakes, IL; and the Surface Warfare Officers School Unit in Great Lakes, IL. The government seeks a firm-fixed-price contract with one-year base and four one-year options, as well as cost-reimbursable lines for consumables. This is a 100% small business set-aside with a size standard of $41.5 million. Proposals are due by the date specified in Block 9 of the RFP SF 33. Points of contact and the internal Management and Oversight Process for the Acquisition of Services documentation are included.

View the file

Other files

File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_4 Dec 2019_TrkChgs.docx DOCX document
.N61340-20-R-0005 Amendment 0001.docx DOCX document
ATCH 10L_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_11 Dec 2019 Amend 1.xlsx XLSX spreadsheet
ATCH 10G_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10C_WD 15-5636 (Rev.-11) San Diego.pdf PDF
ATCH 10C_CBA_San Diego - SDAMP - FINAL.PDF PDF
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_4 Dec 2019.xlsx XLSX spreadsheet
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (L-14) Consolidated Solicitation Question_5 Dec 2019 FINAL.xlsx XLSX spreadsheet
ATCH 10A_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10A_WD 15-4539 (Rev.-9) Mayport.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_7 Oct 2019.xlsx XLSX spreadsheet
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10D_WD 15-4089 (Rev.-11) Newport.pdf PDF
Att (5B) Premium Time Hours Log_15 Oct 2019.xls XLS spreadsheet
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-18) Contractor Performance Assessment Questionnaire May 2016.msg.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (3) Quality Assurance Surveillance Plan_2 Jul 2019.doc DOC document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 4

DAMAGE CONTROL WET TRAINER

SURFACE WARFARE OFFICERS SCHOOL UNIT (SWOSU) GREAT LAKES, IL

PART I - TRAINING SYSTEMS OR EQUIPMENT INFORMATION

1. TRAINING SYSTEMS OR EQUIPMENT.

The following are the Training Systems or Equipment (TS/E) attachments to this appendix: Each trainer attachment provides description, location, normal operating hours and scheduling requirements, subsystems/assemblies not subject to supply support, and major hardware list Degraded Capability Matrix (DCM).

ATCH
TS/E
S/N
TITLE
QTY
1
19F3C
2
Multipurpose Fire Fighting Trainer
1
2
FOM
-
Facilities
Lot
3
TSG
-
Trainer Support Gear
Lot
4
DCWT
-
Damage Control Wet Trainer
1

PART II - SITE OPERATIONS AND MATERIAL SUPPORT PACKAGE (MSP) INFORMATION

1. TRAINING SYSTEMS & EQUIPMENT (TS/E) NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

1.1 Government Scheduled Use (GSU).

Government Scheduled Use (GSU) can be found in each attachment for each trainer under paragraph 3, Normal Operating Hours and Scheduling Requirements.

2. MATERIAL SUPPORT PACKAGE (MSP).

2.1 Specific Inventories.

Inventory listings of these items are available at each training system and equipment location. Specific Inventories of all GFP, physically verified by the Government and Contractor, shall be formally turned over to the Contractor on or about the CSD for a given training system and equipment, for which the Contractor shall sign for and accept their custody. These inventories shall reflect both the existence and condition of these assets, and shall become the baseline inventory and the standard against which the Contractor is measured when the GFP is returned to the Government. (See PWS, Part 4, Paragraph 4.50, Material Support Package.)

2.2 Government Furnished Facilities (GFF).

2.2.1 GFF Coverage.

GFF consist of maintenance, storage, office, and trainer spaces.

2.2.2 GFF Square Feet and Contractor Custody.

The following GFF is intended to be placed in the custody of the Contractor for the term of the contract:

BUILDING
ROOM
DESCRIPTION
MEASUREMENT
510
128
Office
165
510
132
Tank Filling Room and Maintenance Space
644
510
B07
Storage Room
819
510
B09
Laundry Room
266
510
147
DCWT Storage Space
80
510
156
Storeroom
425
510
107
Maintenance Room
530

3. CONSUMABLES.

3.1 Training Support Consumables

The Contractor shall purchase and account for the following consumables necessary for firefighting and damage control training. Contractor will be reimbursed for these items.

CONSUMABLES FOR FIRE FIGHTING TRAINERS

Propane
Smoke generation fluid
Nitrogen for smoke generator
PKP surrogate (Siliconized Sodium Bicarbonate)
AFFF surrogate (detergent)
CO2
Sulfuric acid (70%)
CO2 extinguisher cartridges with seals
PKP extinguisher cartridges with seals
Foam control agent for waste water treatment

(Polydimethylsiloxane or equivalent anti-foam agent)

SCBA consumable parts

Chlorine

Bauer Fill Containment Station Parts

CONSUMABLES FOR DAMAGE CONTROL WET TRAINER

Water Chemistry Testing Supplies

Chlorine LC-15 for water Chemistry

Cyanuric Acid for water Chemistry

Refer to the Unified Facilities Criteria (UFC) 4-179-01 dated 16 January 2004, Appendix A (MIL-HDBK 1027/1B) for additional information regarding agent surrogates.

3.2 Fire Fighting Preventive Maintenance Gases.

Contractor must procure at its expense all items, materials, gases, etc. required to perform all preventive maintenance actions necessary for calibration and alignment (e.g., span and zero gas used for calibration of the propane detection system). These items include, but are not limited to, certain test gases that are expensive. Exception: if the government requires the use of the contractor procured test gases when performing a re-host or other modification to the trainers, then the contractor may request reimbursement through the consumables contract line item.

4. CALIBRATION.

4.1 TSC Cal Lab.

The TSC Cal Lab shall be used to conduct any necessary calibration for all FF / DC gages. The Contractor shall coordinate the calibration of the gages with TSC Cal Lab as required.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

APPENDIX G

SURFACE WARFARE OFFICERS SCHOOL UNIT (SWOSU) GREAT LAKES, IL

G-2

1. DESCRIPTION.

1.1 General.

The training system simulates Class A (Combustibles), B (Oil Based), and C (Electrical) shipboard fire emergencies in a realistic environment, using live, computer-controlled propane-fueled fires. These simulated fire emergencies are staged, under program control in structures called fireplace compartments that are built to resemble equipment or locations aboard ship where actual fires can occur. The fires can be controlled from a smoldering state to full involvement, and to respond realistically to the trainee’s application of extinguishing agents. Each fireplace consists of a mock-up of the item that is involved in the fire, one or more burner head assemblies, and agent collector/detector sensors. A propane burner control assembly in an adjoining room provides a controlled source of propane to each burner head assembly. A standard agent collector/detector sensor assembly is used for all fireplaces, augmented by additional sensors, as required for special purposes. In addition, trainer smoke for the fireplaces is simulated, non-polluting, non-toxic and is provided under operator or scenario control for realistic training in a visibility-impaired environment.

1.2 Trainee Station.

There are fourteen (14) trainee stations located within the nine (9) training compartments where fires are generated in mockups which duplicate actual shipboard fires. The configuration allows the trainee to attack a fire and extinguish it while having to maneuver around obstacles surrounding the area.

Compartment 1: Oil Spray/Bilge Fireplace
Compartment 2: Shaft Bilge Fireplace
Compartment 3: Dryer and Electric Panel Fireplaces
Compartment 4: Deep Fat Fryer and Wire Bundle Fireplaces
Compartment 5: Storage Compartment Fireplace
Compartment 6: Berthing Compartment (Mattress and Locker Fireplaces)
Compartment 7: Vent Duct and Motor Generator Fireplaces
Compartment 8: Trash Can and Radar Fireplaces
Compartment 9: Pit Fireplace

1.3 Instructor Operator Station.

There are two (2) Instructor Operator Stations (IOS) located in the firefighting trainer’s control room; each IOS is equipped with a monitor, a trackball, and a keyboard, for controlling their associated compartment fires, and monitoring of the environment to prevent unsafe conditions. In addition, indicators showing the results of trainee operation of simulated equipment are located on these monitors. Controls are provided for introduction and cessation of fire, smoke, and ventilation fans. All fuel flow ignition controls can be secured in an emergency at the IOS or at remote locations within the trainer. Temperature and propane alert levels for each training compartment are monitored at the IOS. An audio system allows for communications between the IOS operator and personnel located within the trainer.

1.4 Computer System.

The original Personal Computer (PC) based design of the trainer control system has been replaced by a PACSystems RX3i manufactured by GE Intelligent Platforms (GE-IP) for a PLC System based design. This PLC System design has been integrated into the existing peripheral systems and provide complete control of all inputs and outputs of the trainer through an integrated IOS. The software used to read inputs from the fireplaces and CCPs, compute fireplace states, and drive outputs to control the training scenarios run on a single PLC System that has Input/Output (I/O) nodes in each compartment (including Pit Fireplaces) or group of compartments. The fireplace control, trainer control, and trainer safety code from the baseline Ada software was converted to Function Block Diagrams (FBD) to run on the PLC System.

2. LOCATION.

Building: 510 Description: Trainer Area 33,048 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 19F3C
SERIAL #: 2
LOCATION: Great Lakes, IL
TITLE: Multipurpose Fire Fighting Trainer
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
Task
OHPD
From:
To:
From:
To:
From:
To:
01
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

PMS is to be performed when students are not in the trainer or on a not to interfere bases. The basic requirement is support on a one (1) shift only (first shift).

Note: Local climate temperatures fluctuate during the summer. If the local temperature measured inside the trainer exceeds 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will discontinue training. The final approval is by the Directorate or SWOSU CO. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
QUANTITY
Trainer Support Gear
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
QUANTITY
a.
Instructor Operator Station (with computer, monitor, displays, printer, and associated control equipment)
2
b.
Primary Control Panel
1
c.
Training Compartments (firefighting training and ship equipment mock-ups)
9
d.
Training Compartment Fireplaces
14
e.
Compartment Control Panels
9
f.
Burner Control Assemblies (including associated piping, valves, and regulators)
19
g.
Burner Assemblies (including associated piping, pilots, and burner elements)
19
h
Agent Detectors (Water, PKP, AFFF)
19
i.
Propane Detection System (including sensors, drawn sample units, intake filters, and calibration units)
9
j.
Smoke (Fog) Generation System – Central Pump System (CPS)
1
k.
Fog Generation System - Secondary Pressure Systems (SPS)
2
l.
Fog Generation System – Central Control Systems (CCSs)
4
m.
Fog Generation System - Fog Head Modules (FHMs
18
n.
Local Control Node (LCN) (control equipment)
5
o.
Sound Powered Telephone System (handsets, call stations, SPT relay, jacks, and wiring)
16
p.
Trainer Communications (1MC) System (including speakers, microphones, headsets, amplifiers, jacks, and wiring)
1
q.
Manual Emergency Shutdown (E-Stop) System
19
r.
Propane Block and Vent Assembly
1
s.
Temperature Monitoring System Wet/Dry Tank Assemblies
9
t.
Trainer Lighting System (switches, hazard lights, emergency lights (battle lanterns), and maintenance lights)
ALL
u.
Surge Suppressor Panel Assembly
1
v.
Transient Voltage Surge Suppressor
1
w.
Filter Cabinet Assembly
1
x.
Power Securement Panel
1
y.
Engineering Work Station (PLC Maintenance Laptop)
1

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components. The items include: wiring, speakers, microphones, handsets, call stations, amplifiers and jacks: all must be tested.

6. DEGRADED CAPABILITY MATRIX (DCM).

The following user trainer operability designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS
Instructor Operator Station
50
Loss of either IOS PLC renders the fireplaces controlled by that IOS non-functional
Primary Control Panel
100
Training Compartments (firefighting training equipment and ship equipment mock-ups)
5
Training Compartment Fireplaces
5
Compartment Control Panels
5
Burner Control Assemblies
5
Burner Assemblies
5
Agent Detectors (Water, PKP, AFFF)
5
Propane Detection System
20
Fog Generation System – Central Pump System (CPS)
20
Fog Generation System - Secondary Pressure Systems (SPS)
20
Fog Generation System – Central Control Systems (CCSs)
15
Fog Generation System - Fog Head Modules (FHMs
5
Local Control Node (LCN) (control equipment)
15
Sound Powered Telephone System
10
Trainer Communications (1MC) System
10
Manual Emergency Shutdown (E-Stop) System
30
Propane Block and Vent Assembly
100
Temperature Monitoring System Wet/Dry Tank Assemblies
75
Trainer emergency Lighting System (switches, hazard lights, emergency lights (battle lanterns), and maintenance lights)
25
Surge Suppressor Panel Assembly
100
Transient Voltage Surge Suppressor
100
Filter Cabinet Assembly
100
Power Securement Panel
10
Fire Pump
20

Failure of any fireplace subsystem shall the render the affected fireplace not operable. These include pilot and main flame assemblies, agent detection assemblies. Refer to the table above for further details.

Failure of any system or subsystem in the propane piping and propane assemblies shall render the entire trainer not operable.

Failure of any safety system in shall render the entire trainer not operable.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 1

MULTIPURPOSE FIRE FIGHTING TRAINER

19F3C

SURFACE WARFARE OFFICERS SCHOOL UNIT (SWOSU) GREAT LAKES, IL

Failure of any system that prevents the execution of training shall render the entire trainer not operable and degradation at 100%.

G-19

1. FACILITIES.

This section identifies the major facility systems and equipment the Contractor will be responsible for for daily operational readiness test (DORT) and shall report any corrective and preventative maintenance concerns to the TA/COR.

1.1 Heating, Ventilation, Air Conditioning (HVAC) System. – The Contractor shall report any corrective and / or preventative maintenance concerns to the TA / COR

NOMENCLATURE
QUANTITY
a.
Packaged Roof Top Air Conditioning Units
2
b.
Heating and Ventilation Units (HVUs)
7
c.
Exhaust Fans
14
d.
Dampers (Crawlspace/Ventilation/Walkways)
54
e.
Unit Hot Water Heaters
48
f.
Data Terminal Cabinet (including graphic display monitor)
1
g
Variable Frequency Distribution VFD
5

1.2 Propane System - The Contractor shall provide refueling of the propane tanks and operational (DORT) support only of the propane system to support all training evolutions.

NOMENCLATURE
QUANTITY
a.
Storage Tanks, 12,000 gals each
2
b.
Propane Vaporizers
2
c.
Gas Meter and Block & Vent Assembly
1
d.
Cathodic Protection System
1

NOTE: NAVFAC is responsible for the propane farm to the block and vent since it is class 2 property. The FFT COMS contractor shall be responsible for operational maintenance and reporting any corrective and preventative maintenance and cathodic protection concerns to the TA and COR.

1.3 Water Supply System. The Contractor shall report any corrective and / or preventative maintenance concerns to the TA / COR.

NOMENCLATURE
QUANTITY
a.
Water Tank, 52,000 gals (Preventative Maintenance Only)
1
b.
Fire Pumps
2
c.
Fire Hose Stations
6
d.
Safety Sprinkler System (Fireplace Compartments) (Preventative Maintenance Only)
3

· System includes: all valves, fittings, piping, meters, gauges, mounting hardware, insulation, filters and strainers.

1.4 Waste Water System. The Contractor shall report any corrective and / or preventative maintenance concerns to the TA / COR.

NOMENCLATURE
QUANTITY
a.
Waste Treatment Basin, 65,000 gals (Preventative Maintenance Only)
2
b.
Recirculation Pumps
2
c.
Effluent Pumps
2
d.
pH Monitoring System
1
e.
Chemical Metering Pumps
4
f.
Agitation Pumps
2
g.
Equalization Basin
2

· System includes: all piping, fittings, valves, storage containers, mounting hardware, floor drains, insulation, traps, separators, wiring and electrical controllers.

NOTE: A daily log of all sampling data and chemical additions will be maintained by the system operator. A Class K operator is required. A monthly report, summarizing sampling data, is required.

1.5 CO2 Transfer and Recharge System.

NOMENCLATURE
QUANTITY
a.
CO2 Tank, 3.75 tons (Preventative Maintenance Only)
1
b.
CO2 Refill Station
1

· System includes: funnels, scales, charging adapters, piping, fittings, valves, indicators, controls, hoses, gauges and other auxiliary equipment.

· Includes all consumable supplies to refill CO2 fire extinguishers used for training.

1.6 Dry Chemical Fire Extinguisher Refill System

NOMENCLATURE
QUANTITY
PKP Refill System
1

System includes: funnels, scales, charging adapters, piping, fittings, valves, indicators, controls, hoses, gauges and other auxiliary equipment.

Includes all consumable supplies to refill PKP surrogate chemical fire extinguishers used for training.

1.7 Eyewash/Showers.

The Contractor is responsible for maintaining all Eyewash/Showers at the operational, cleanliness and PMS level.

2.0 LINES OF DEMARCATION.

2.1 General.

This section identifies the major dividing points between Contractor and Government responsibilities relating to utility services. The COR will provide the Contractor with further clarification on these interfaces. Generally, Contractor’s responsibilities for maintenance shall begin at the Block and Vent and include all systems within the trainer in support of FFT training.

2.2 Control Air System.

Contractor is responsible for operation of those items identified heretofore that are connected to components of previously discussed subsystems and are required for the control air system to function.

2.3 Electrical.

Contractor shall be responsible for the lighting and power distribution system for the training system and equipment, Responsibility will commence at the load side of the load side of the breaker panels and include all equipment and components supplied by the distribution system.

SPACE
NAME
CIRCUIT
PANEL #
BREAKER #
B09
LAUNDRY ROOM
WASHER #1
RPB-1
13,15,17
WASHER #2
RPB-1
14,16,18
WASHER #3
RPB-1
19,21,23
DRYER
PPB-1
DRYER
PPB-1
DRYER
PPB-1
DRYER
PPB-1
131
TANK FILLING
CO2 REFRIG PUMP
PP1-1
PP28
CO2 REFRIG PUMP
PP1-1
PP29
AFFF TRANS PUMP
PP1-1
PP25A
AFFF TRANS PUMP
PP1-1
PP25B
PUMP ROOM
DC TRAINING BASEMENT
PWW PUMP
PPB-3
PP1
PWW PUMP
PPB-3
PP1
PWW DISCHARGE PUMP
PPB-2
PP5
PWW CIRCULATING PUMP
PPB-2
PP6
PWW CIRCULATING PUMP
PPB-2
PP7
PWW DISCHARGE PUMP
PPB-2
PP8
pH ADJUSTER (+) PUMP
RPB-2
PP14a/12
DE-FOAMING ADDITIVE PUMP
RPB-2
PP12/14
pH ADJUSTER (-) PUMP
RPB-2
PP13a/14

2.4 Process Water.

All water utilities will become the responsibility of the Contractor to commence at and include cross connect valves V1, V2, V4-A and V5-A (see construction drawing P2-3 provided by the COR) and continue until termination within the FFTS area.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 2

FACILITIES

-SURFACE WARFARE OFFICERS SCHOOL UNIT (SWOSU) GREAT LAKES, IL

1. TRAINER SUPPORT GEAR.

The items identified in the below subparagraphs will be Government furnished and maintained by the Contractor. Replacement of these items will be provided by the Government.

NOTES:

(1) Contractor must have a program in place in order to properly monitor and conduct maintenance requirements. This program must be detailed, accurate and holding contractors accountable for all maintenance requirements. This program will be able to track all SCBA’s, SCBA bottles, and all training support gear within the FFTs and DCWT compound as reflected in paragraphs 1.1 – 1.4 that follows and has a quantity listed in the table.

(2) Quantity* required is the number of each item required to be available in a Fully Operational Condition for each Government scheduled use.

(3) All equipment maintenance will be conducted IAW the Maintenance Requirement Card (MRC) and manufactures specifications.

1.1 Extinguishers.

NOMENCLATURE
QUANTITY*

CO2 Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect Hydrostatic Test

PKP Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect

AFFF Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect

1.2 Self-Contained Breathing Apparatus (SCBA).

NOMENCLATURE
QUANTITY*

Composite Cylinders Fill Pre-stage in Training Areas Inspect Repair Hydrostatic Test

Packs (frame, belts, harnesses, regulator, hoses) Pre-stage in Training Areas Inspect/maintain Repair Testing (Flow test) and other manufacturer requirements for testing

SCBA Testing – Level I, II & III Sperian-Biosystems POSI 3 USB 5500 Assy/Test Bench Inspect/maintain Repair

Scott POSI 3 USB Interface Kit 805381-05 Inspect/maintain Repair

New Inspiron 17, 5000 series laptop with sleeve Pentium 4 Processor 2.0GHz 50Mb Inspect/maintain Repair

SCBA Note: Double classes will be convened at least two (2) to three (3) times a month for course 0416, which will require two (2) bottles per student for that day. A two (2) week notice will be given on double convening.

1.3 Personal Protection Equipment.

NOMENCLATURE
QUANTITY*

Fire Protection Gear (FPG) Pre-stage in Training Areas Clean/Launder and Dry Inspect

Fire Fighter Helmets Pre-stage in Training Areas Inspect

Fire Fighter Flash Hoods Pre-stage in Training Areas Launder and Dry Inspect Maintain

Fire Fighter Gloves Pre-stage in Training Areas Launder and Dry Inspect Maintain 300 pair

Fire Fighter Boots Pre-stage in Training Areas Inspect Maintain 150 pair

Fire Fighter Coveralls Pre-stage in Training Areas Launder and Dry Inspect Maintain

Damage Control Helmets Pre-stage in Training Areas Inspect Maintain

1.4 Fire Fighting/Damage Control Equipment.

NOMENCLATURE
QUANTITY*

Fire Hoses Pre-stage in Training Areas Inspect Maintain Pressure Test

Fire Hose Nozzles Pre-stage in Training Areas Inspect Repair Maintain

P-100 Portable Fire Hose/De-Water Pumps Fill oil & fuel Pre-stage in Training Areas Inspect Repair Maintain

Naval Firefighter Thermal Imager (NFTI) Pre-stage in Training Areas Inspect & Repair

Portable Exothermic Cutting Unit (PECU) Pre-stage in Training Areas Maintain battery charge Fill (Oxygen)

Portable Electric Access Rescue System Pre-stage in Training Areas Inspect Repair

Portable Battle Lanterns Pre-stage in Training Areas Inspect Maintain

1.5 SCBA Filling Station.

NOMENCLATURE
QUANTITY
a.
Air Compressor/ Lower Deck
1
b.
Air Compressor/ 3rd Deck
1
c.
Bauer Fill Containment Station
2

· Station includes: cascading fill system, storage bottles, fill station and carbon monoxide monitor.

· Air quality testing is required in accordance with (IAW) ANSI/CGA G-7.1 1989, Table 1 Grade D.

· Periodic tank hydro testing required.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 3

TRAINER SUPPORT GEAR

SURFACE WARFARE OFFICERS SCHOOL UNIT (SWOSU) GREAT LAKES, IL

1. DESCRIPTION.

1.1 General.

The Damage Control Wet Trainer (DCWT) is a trainer which simulates shipboard Damage Control emergencies in a realistic environment that mimics the compartments of a ship. Multiple training tasks can be accomplished including shoring, pipe patching, bulkhead plugging and patching, space evacuation, dewatering, decontamination, gas free engineering techniques and Repair Locker Leader instruction in a controlled environment. These simulated emergencies are staged, under instructor control in nine compartments that make up the Damage Control Wet Trainer. Four (4) compartments are considered “wet” spaces and are utilized during wet trainer operations. The remaining spaces are “dry” spaces and are utilized as either support spaces during wet training evolutions or for decontamination, gas free engineering techniques and Repair Locker Leader instruction.

1.2 Trainee Station.

The trainee stations are located within the training compartments and consist of locations where controlled flooding and leaks are generated in the mockups to duplicate actual shipboard emergencies. The configuration allows the trainees to track and repair an emergency while having to maneuver around obstacles surrounding the area. Staging areas sized to hold at least 15 people as well as storage for on-site damage control and protection equipment are located outside of and adjacent to the training compartment.

1.3 Instructor Operator Station.

The instructor (or operator) stations remotely controls the operation of pumps and adds sound effects in the trainer. In addition, all water flow may be secured in an emergency from inside the instructor control console. The instructor (or operator) duties are currently performed by schoolhouse military staff personnel.

1.4 Computer System.

Not applicable.

1.5 Other.

1.5.1 Water Chemistry.

The Damage Control Wet Trainer includes all necessary water flow, lighting and ventilation to the training compartments. Additionally, it includes automatic filtration and chemical treatment to maintain the water chemistry within NAVMED P-5010-4 (Rev. 6-2002) standards.

The contractor shall perform preventative and corrective maintenance to the water treatment system, which includes, but not limited to: the chlorinator, sensors, pump, piping, and valves. Chlorinator maintenance includes monthly inspection, electrode cleaning, testing and calibration, in addition to semi-annual peristaltic pump tube replacement and chemical replenishment as needed:

Water Chemistry. Contractor shall maintain water chemistry, to include: mixing chemicals and adding chemicals to maintain required chemical balance and chlorine levels, in accordance with Manual of Naval Preventative Medicine, Chapter 4 Swimming Pools and Bath Places 4 (NAVMED P-5010-4). Contractor shall perform System Readiness Test (SRT) with water chemical testing results reported daily before and after each training evolution to the TA. When water chemistry is out of established acceptable range of ph of 7.2- 8.0, Free available chlorine (FC) of 1.5-5.5 ppm, Total available chlorine (TC) 1.5-5.5 ppm, and Combined chlorine at 0 ppm, the trainer is considered out of commission (OOC). The Contractor shall procure chemicals and other items needed to test the water used for training. The Contractor shall submit a summary of the daily results in the monthly report in the format provided. If a deviation occurs on any day of the month, immediate notification of the COR is required.

1.5.2 Course Material.

The course material list requirements are provide below. The Government has a requirement to use this course material for every class. The Government provides the raw materials as Government Furnished Material then the contractor uses it to make the wedges/patches for each training evolution as required per class.

Wedges:

Sizes:Minimum on Hand:
2” x 4” x 12”80 EA per evolution/training session
2” x 2” x 8”80 EA per evolution/training session

Box Patches Using ½” Plywood:

Sizes:Minimum on Hand
24” x 24” x 63 EA per evolution/training session
18” x 18” x 6”3 EA per evolution/training session

Patch – 5GL Steel Bucket with a Threaded Steel Rod (1/2” – 13) and Wingnut locally manufactured (Two 1’ pieces of all-thread welded to each side), ½” Gasket Material, and Wingnut on Edge:

Minimum on Hand:

Two (2) each per evolution/training session

Rolled Marlin – 40 Rolls per Evolution/Training Session

Requirements for each roll:

· 1’ Long, 1” Stick

· Rolled Tight

· 150’ of Marlin per Roll

· Leave 1” of clearance between marlin and each end of stick

Shoring (Material to be provided by the Government in proper dimensions):

Two (2) each per quarter unless otherwise noted below

H-type shoring

Long Beam: 8ft, 11 3/8in Door Strong Backs: 2ft, 1/2in (4 Four per quarter) Cross Member: 2ft, 1 1/2in

K-type shoring:

Strong back: 2ft, 2in Strong back (for box): 1ft, 10in Box: 18in x 18in x 6 1/4in (deep) – (one to two per quarter) Bottom Beam: 6ft, 11 1/4in Top Beam: 7ft, 2 1/4in The Contractor shall track course material inventory and advise the TA when stock needs to be reordered. Stock levels and lead time to be established by the COR.

2. LOCATION.

Building: 510 Description: Trainer Area 6750 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: DCWT
SERIAL #: -
LOCATION: Great Lakes, IL
TITLE: Damage Control Wet Trainer
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
Task
OHPD
From:
To:
From:
To:
From:
To:
01
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
QUANTITY
Trainer Support Gear
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
QUANTITY

P100 Classroom in Bldg. 510, Room 157

a.
P100 Pumps
3
b.
P100 Tank (600 gal)
1
c.
1 ½” Tri Gate
2
d.
3" Hard Rubber Hose, Foot Valve Strainer
2
e.
1 ½” Fire Hose
5
Damage Control Trainer
1
f.
3 to 5 Ft Steel Shores
12
g.
Battle Lanterns
20
h.
6 to 11 Ft Steel Shores
4
i.
Water Tight Doors (WTD)
16
j.
Water Tight Hatches (WTH)
3
k.
1 1/2" Fire Hose
4
l.
Sound Powered Phones
5
m.
Pump Control Unit
1
n.
Emergency Lights
38
o.
2” Valve
17
p.
4” Valve
4
q.
8” Valve
2
r.
Y – Gate
4
s.
Fire Hose Nozzle
3
t.
0-160 PSI Gage
1

Damage Control Trainer (Facilities)

u.
Eye Wash and showers
2
v.
Main Water Supply Pump
2
w.
0-30 psi Gage
2
x.
0-100 psi gages
5
y.
0-300 psi gages
3
z.
0-200 Fo Gage
2
aa.
0-100 psi gages
2
ab.
Variable Frequency Drive
1
ac.
Pump Control Panel
1
ad.
Sand Filter Tank
1
ae.
Chemical Treatment Station w/Monitor
1
af.
Circulating Pump
3
ag.
Circulating Pump Control Panel
3
ah.
4” Strainer Basket
1
ai.
8” Strainer Basket
1
aj.
Float Shut Off and Sensor
1
ak.
Adjustable Flow Meter
2
al.
2” Valve
2
am.
3” Valve
6
an.
4" Valve
3
ao.
8” Valve
8
ap.
4” Automatic valve
4
aq.
Relief Valve
1
ar.
Pressure Regulator Valve
4
as.
Trainer Drain Line
1

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components.

NOTE: Consumable items will be purchased by the contractor IAW Appendix G, Section 3.0 Consumables.

6. LINES OF DEMARCATION.

In Building 510, water fill and suction equipment in direct support of the wet trainer which includes, but not limited to pump controllers, fire pumps, recirculation pumps, filtration systems, piping, and valves up to and including the following PWS-2-8, PWS-2-7, RC-22, RC-23, RC-16, RC13, and CW-15 are the maintenance responsibility of the contractor. The contractor is not responsible for maintenance on the hot water system in between RC-22 and RC-23.

7. DAMAGE CONTROL (DC) DEGRADED CAPABILITY MATRIX (DCM).

The following user Damage Control (DC) Degraded Capability Matrix (DCM) designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS
INSTRUCTOR OPERATOR STATION
50
Valves
20
Gauges
20
Lighting Controls
15
Emergency Stops
20
Viewing Ports
10
Requires safety observers instead.
Indicator Instruments
10
Only if indicator is not directly safety related and there are other means to measure performance of the system/subsystem.

WATER TREATMENT SYSTEM

Chlorinator
20
Sensors
20
Pump
25
Piping
20
Valves
20

HARDWARE

P100
20
P100 Tank (600 gal)
20
Battle Lanterns
15
Weather conditions must allow adequate visibility and skills training are limited to what is available.
Water Tight Doors (WTD)
25
Water Tight Hatches (WTH)
25

MAIN WATER SUPPLY SYSTEM

Pump Controllers
30
Fire Pumps
25
Depends on pump failure
Recirculation Pumps
30
Filtration Systems
20
Piping
20
Valves
20
Depends on valve failure

VENTILATION SYSTEM

Fans
10
Must provide other means for proper ventilation.
Fan Control
15
Must provide other means for proper ventilation.

Failure of the Water Treatment system shall the render the DCWT not operable, once the holding tanks are full.

These include chlorinator, sensor, pump, piping and main valves. Refer to the table above for further details.

Failure of any system or subsystem in the water supply shall render the entire DCWT not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire DCWT not operable. Refer to the table above for further details.

File details come from the government source that posted it. Updated .