Exhibit (A1) CDRL A001 CFSR w attach_FF_DC COMS_23 Oct 2019.doc

DOC document 142 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
Solicitation number
N61340-20-R-0005
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document outlines a solicitation for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. The solicitation seeks proposals from contractors to provide operation and maintenance services for training systems and equipment at seven commands located across six geographic locations for the Surface Warfare Officer School customer. Services include providing all labor, materials, consumables, equipment, tools, test equipment, and transportation necessary to maintain the training systems and equipment in a fully operational condition and to facilitate user training. The period of performance is one base year with four one-year options. The solicitation is set aside entirely for small businesses with a NAICS code of 541330 and size standard of $41.5M. Proposals are due by the date specified in Block 9 of the solicitation SF 33. The contracting agency is the Department of the Navy Naval Air Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services, newest first.
File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
ATCH 10G_CBA_Mayport - MAMP - FINAL.pdf PDF
ATCH 10L_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_11 Dec 2019 Amend 1.xlsx XLSX spreadsheet
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
ATCH 10C_WD 15-5636 (Rev.-11) San Diego.pdf PDF
ATCH 10A_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (L-14) Consolidated Solicitation Question_5 Dec 2019 FINAL.xlsx XLSX spreadsheet
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
Att (L-16E) Pearl Harbor Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A2) CDRL A002 Conference Minutes_FF_DC COMS_23 Oct 2019.doc DOC document
Evaluation Factor Guide Version 1.3 July 2019.docx DOCX document
.Section J Attachments_11.20.19.docx DOCX document
Att (L-15) Maint Hours and Throughput Feb 18 - Aug 19 dtd 7 Oct 2019.xlsx XLSX spreadsheet
Att (8) OAWR Procedures and Form_2 Jul 2019.docx DOCX document
Att (7) DOL Wage Adjust Baseline_10 Oct 19.xls XLS spreadsheet
Att (L-17) Past Performance Information Form Mar 2017.pdf PDF
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_Feb 2018 - Jan 2019.xlsx XLSX spreadsheet
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
FFDC COMS MOPAS for RFP posting.pdf PDF
Exhibit (A6) CDRL A006 Quality System Plan (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (6) SCA Price Adjustment Form_10 Oct 19.xls XLS spreadsheet
ATCH 10B_WD 15-4341 (Rev.-12) Norfolk.pdf PDF
Att (L-14) Solicitation QuestionResponse Form_10 Oct 19.xlsx XLSX spreadsheet
Att (3) Quality Assurance Surveillance Plan_2 Jul 2019.doc DOC document
Exhibit (A5) CDRL A005 Inventory Report (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A4-1) Samplet Rpt for Annex of Exhibit A004_23 Oct 2019.xlsx XLSX spreadsheet
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (1D) Appendix D_Surf FF-DC_Newport_1 Oct 2019.docx DOCX document
.FFDC COMS MOPAS Redacted.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_20 Nov 2019.docx DOCX document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10F_WD 15-4935 (Rev.-11) Great Lakes.pdf PDF
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-16F) RTC Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Show all 50

Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item) Form Approved

OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A ASK \* MERGEFORMAT
TDP
TM
OTHER ADMIN/MANAGEMENT
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
FF / DC COMS
N61340-20-R-0005
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001
TECHNICAL REPORT – STUDY/SERVICES
CONTRACT FUNDING STATUS REPORT (CFSR)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B
SEE BLK 16
NAWCTSD COMS
7. DD 250 REQ
9. DIST STATEMENT
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
LT
REQUIRED
MTHLY
SEE BLK 16
a. ADDRESSEE
b. COPIES
8. APP CODE
B
11. AS OF DATE
13. DATE IF SUBSEQUENT SUBM.
Draft
Final
SEE BLK 16
Reg
Repro
16. REMARKS
NAWCTSD COMS

1. BLK 4: ONLY DID PARAGRAPH 3(C)(2) APPLIES.

2. SEE ANNEX A001 FOR SAMPLE REPORT CONTENTS. ALL ANNEX PARAGRAPHS APPLY.

3. BLK 5: SEE PWS, PARAGRAPHS 3.7

4. BLK 12: FIRST SUBMISSION SHALL BE SIMULTANEOUSLY SUBMITTED TO ALL BLK 14A ADDRESSEES NO LATER THAN THE 15TH WORKING DAY AFTER EACH REPORTING PERIOD. THE FIRST REPORTING PERIOD SHALL BE FOR THE MOBILIZATION PERIOD.

5. BLK 13: SUBSEQUENT MONTHLY REPORTS SHALL BE DUE FROM CONTRACTOR SUPPORT DATE (CSD) THROUGH THE END OF THE CONTRACT OR UNTIL ALL BALANCES ARE ZERO (0), AND NO MORE ACTIONS ARE PENDING (I.E. DOL CLAIM, ETC.).

6. THE GOVERNMENT WILL HAVE FIFTEEN (15) WORKING DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION OF EACH SUBMISSION. NO RESPONSE WILL INDICATE ACCEPTANCE.

7. BLK 14: SUBMISSIONS SHALL BE SENT VIA EMAIL. SUBMISSIONS SHALL BE AN EMAIL ATTACHMENT IN MICROSOFT EXCEL 2016 FORMAT AND SHALL INCLUDE IN THE SUBJECT LINE CONTRACT, CDRL DATA ITEM NUMBER AND PERIOD (E.G. N61340-XX-X-XXXX A001 FEB 2019). EMAIL ADDRESSES ARE PROVIDED IN THE CDRL ADDRESSEE LIST.

8. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:

DISTRIBUTION B: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES ONLY, (ADMINISTRATIVE OR OPERATIONAL USE), (23 OCT 2019). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE GT43200), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

NAWCTSD PCO

NAWCTSD PJM

CONTRACT SPECIALIST

15. TOTAL ▬▬▬▬►
0
0
4
G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

I. AUZENNE, LOGISTICS MANAGER

23 OCT 2019
R. SOTO-ALBINO, PJM
23 OCT 2019

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED

Page 1 of 4 Pages

ANNEX TO EXHIBIT A001

CONTRACT FUNDING STATUS REPORT (CFSR)

N61340-20-R-0005 CDRL REQUIREMENT

1.0 Summary contents:

1.1 HEADER INFORMATION. Data elements to be provided as header information are as follows, in the order shown.

a. Contract. Enter appropriate contract number.

b. Contractor. Enter name of contractor's firm.

c. Reporting Period. Enter month and year for which report is being prepared.

1.2 REPORT BODY. The main body of the report shall be completed in accordance with the attached sample format. Entry of actual data is to be made in the appropriate column for the period covered by the report. Data element titles to be included are as follows:

a. CLIN/SLIN. Enter contract line item number/sub-line item number (CLIN/SLIN) which are being performed or have been performed, as shown in Section B. (The report is to be cumulative, showing all CLINs/SLINs which are currently active or have been active.)

b. ACRN. Enter appropriate Accounting Classification Requirements Number (ACRN) for the CLIN/SLIN.

c. Description of Supplies/Services. Enter CLIN/SLIN description as shown in Section B. An alternate format can be drawn from the Price Breakout Worksheet (PBW).

d. Total CLIN/SLIN Amount. Enter total CLIN/SLIN amount as shown in Section B.

e. CLIN/SLIN Funded Amount. Enter CLIN/SLIN funded amount as shown in Section B

f. De-obligated Amount To Date. Enter the de-obligation as a negative value. The negative amount may increase if there is more than one de-obligation in a funding line over time.

g. Invoiced/Expended Amount to Date. Enter cumulative amount invoiced for CLIN/SLIN.

h. CLIN/SLIN Funds Remaining. Enter difference between CLIN/SLIN funded (less de-obligations) and invoiced amounts.

i. Percent Invoiced of Funded Amount. Enter invoiced amount as a percentage of funded amount (less de-obligations).

j. Deductions for Period. Enter amount of any performance deduction taken against the CLIN/SLIN during the reporting period. Enter deduction amount or “N/A” (not applicable), as appropriate.

k. Cumulative Deductions. Enter cumulative total of all deductions taken to date against the CLIN/SLIN. Enter cumulative total or “N/A” as appropriate.

l. Amount Paid to Date. Enter amount which Contractor has received payment against the CLIN/SLIN.

m. Total Amount. Enter columnar sums.

1.3 FORMAT.

1.3.1 Magnetic Media. Where applicable, individual area files shall be placed on Compact Disc Recordable/Re-Writable (CD-R/CD-RW; 1x-4x drive capable media) optical disc. Magnetic files shall be compatible to Microsoft Office 2016 formats as specified in block 16 of the CDRL.

1.3.2 E-Mail. Reports shall be attached files to E-Mail that are compatible to Microsoft Office 2016 formats as specified in block 16 of the CDRL.

2.0 See attached Sample Contract Funding Status Report:

CDRL: A001 CONTRACT FUNDING STATUS REPORT Contract: N61340-XX-X-XXXX

Reporting Period: Month:________ Year: _______ Contractor: __________________

(1)

CLIN/SLIN

(2)

ACRN

(3)

DESCRIPTION

OF SUPPLIES/

SERVICES

(4)

TOTAL

CLIN/SLIN

AMOUNT

(5)

CLIN/SLIN

FUNDING

AMOUNT

(6)

DE-OBLIGATED

AMOUNT

TO DATE

(7)

INVOICED /

EXPENDED

AMOUNT

TO DATE

(8)

CLIN/SLIN

FUNDS

REMAINING

(5) + (6) – (7) (9)

PERCENT

INVOICED

OF FUNDED

AMOUNT

(7) / (5)+(6) (10)

DEDUCTIONS

FOR PERIOD

(11)

CUMULATIVE

DEDUCTIONS

(12)

AMOUNT

PAID TO

DATE

Example:

0002AA

AC

AC

COMS @

NS NORFOLK

SWOS Funding

$2,400
$1,200
($200)
$480
$520
48%
N / A
$75
$240

TOTAL AMT

$2,400
$1,200
($200)
$480
$520
48%
$25
$75
$240

FIGURE 1: SAMPLE CONTRACT FUNDING STATUS REPORT (CFSR)

File details come from the government source that posted it. Updated .