Att (L-16A) Mayport Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf

PDF 327 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services
Solicitation number
N61340-20-R-0005
Issued by

About this file

This is a request for proposal for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. The Naval Air Warfare Center Training Systems Division is seeking proposals to provide contractor operation and maintenance services for the Surface Warfare Officer School's training systems and equipment located at seven commands across six geographic locations. Offerors are to provide all labor, materials, consumables, equipment, tools, test equipment, and transportation necessary to maintain the training systems in a fully operational condition and facilitate user training. The government is pursuing a firm-fixed price contract with a one year base and four one year options, along with cost reimbursable lines for trainer consumable products. The solicitation number is N61340-20-R-0005 and proposals are due by the date specified in Section L of the request for proposal. This is a 100% small business set-aside with an applicable NAICS code of 541330 and size standard of $41.5M.

View the file

Other files

File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_4 Dec 2019_TrkChgs.docx DOCX document
.N61340-20-R-0005 Amendment 0001.docx DOCX document
ATCH 10L_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_11 Dec 2019 Amend 1.xlsx XLSX spreadsheet
ATCH 10G_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10C_WD 15-5636 (Rev.-11) San Diego.pdf PDF
ATCH 10C_CBA_San Diego - SDAMP - FINAL.PDF PDF
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_4 Dec 2019.xlsx XLSX spreadsheet
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (L-14) Consolidated Solicitation Question_5 Dec 2019 FINAL.xlsx XLSX spreadsheet
ATCH 10A_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10A_WD 15-4539 (Rev.-9) Mayport.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_7 Oct 2019.xlsx XLSX spreadsheet
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_1 Oct 2019.docx DOCX document
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10D_WD 15-4089 (Rev.-11) Newport.pdf PDF
Att (5B) Premium Time Hours Log_15 Oct 2019.xls XLS spreadsheet
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-18) Contractor Performance Assessment Questionnaire May 2016.msg.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CDRL A004 ~ (DI-MISC-81392) SWOS LS Mayport-Section IV

SWOS ELS Mayport ~ Monthly Report CDRL A004 ~SWOS LS Mayport-Section IV SWOS ELS Mayport, FL

Pg 4 of 7

Contract: N61339-10-D-2002 TO# 0002 Aug-19

Command: SWOS Mayport, FL 13-Aug-19

SECTION IV ~ MAINTENANCE ACTIONS

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 4 6 49 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 4 6 49

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Self Contained Breathing App. 9217

11:00:00 AM 9217

11:00:00 AM 2.00 9157

12:00:00 PM 2 Hrs

0.1 Days 397.5 Hrs

16.5 Days

19F1A Self Contained Breathing App. 9220

7:00:00 AM 9220

8:00:00 AM 1.00 9217

11:00:00 AM 1.5 Hrs

0.1 Days 370 Hrs

15.4 Days

19F1A Self Contained Breathing App. 9227

8:00:00 AM 9227

10:00:00 AM 1.00 9220

7:00:00 AM 1.3 Hrs

0.1 Days 354.5 Hrs

14.8 Days

19F1A Fireplace Assembly, Bilge 9239

11:00:00 AM 9239

12:00:00 PM 1.00 9239

11:00:00 AM 1 Hrs 0 Days 0 Hrs 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

CDRL A004 ~ Monthly Report (DI-MISC-81392) SWOS LS Mayport-Section IV Cont

SWOS ELS Mayport - Mthly Report CDRL AOO4 ~ Mthly Report SWOS LS Mayport-Section IV Cont SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Aug-19 Command: SWOS Mayport, FL Report Date: 13-Aug-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

91 Facilities NA 225006-002, Propane Sensor Sense Propane Lightning strike / old age 19214 19196 Item is obsolete and no longer available.

92 Facilities NA 226583-001, Sensor Transmitter 4-20 ma transmitter Lightning strike / old age 19214 19196 Item is obsolete and no longer available.

93 19F1A 1 2C1-001-823, Flame Rod Flame Sensing Normal Wear 19263 19239 19239 1 excess in inventory used.

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Jul-19

Command: SWOS Mayport, FL 2-Aug-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 6 3 45 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 6 3 45

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Draw Sample Assy 9192 07:00:00 9192 10:00:00 2.00 9169 07:00:00 2 Hrs

0.1 Days 461.5 Hrs

19.2 Days

19F1A Fireplace Assy Locker 9203 07:00:00 9203 12:00:00 2.00 9045 09:00:00 2 Hrs

0.1 Days 3790 Hrs

158 Days

19F1A Fog Head Module 9203 09:00:00 9203 12:00:00 1.00 9052 11:00:00 1 Hrs 0 Days 3622 Hrs 151 Days

19F1A Fireplace Assy, Oil Spray 9205 06:00:00 9205 09:00:00 2.00 9043 08:00:00 2 Hrs

0.1 Days 3886 Hrs

162 Days

Facilities Trainer Lighting 9190 09:00:00 9190 10:00:00 1.00 9190 09:00:00 1 Hrs 0 Days 0 Hrs 0 Days

Facilities Prop. Det. Sys. 9196 07:00:00 9196 12:00:00 4.00 9196 07:00:00 4 Hrs

0.2 Days 0 Hrs

0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Jul-19 Command: SWOS Mayport, FL Report Date: 2-Aug-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

91 Facilities NA 225006-002, Propane Sensor Sense Propane Lightning strike / old age 19214 19196 Item is obsolete and no longer available.

92 Facilities NA 226583-001, Sensor Transmitter 4-20 ma transmitter Lightning strike / old age 19214 19196 Item is obsolete and no longer available.

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Jun-19

Command: SWOS Mayport, FL 2-Jul-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 3 6 39 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 3 6 39

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Self Contained Breathing App. 9157 12:00:00 9157 13:00:00 1.00 9148 07:00:00 1 Hrs 0 Days 293.3 Hrs

12.2 Days

19F1A Fireplace Assy, Mattress 9165 07:00:00 9165 10:00:00 2.00 9038 07:00:00 2 Hrs

0.1 Days 3048 Hrs

127 Days

19F1A Draw Sample Assy 9169 07:00:00 9169 10:00:00 2.50 9137 08:00:00 2.5 Hrs

0.1 Days 448.6 Hrs

18.7 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Jun-19 Command: SWOS Mayport, FL Report Date: 2-Jul-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 May-19

Command: SWOS Mayport, FL 4-Jun-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 6 7 36 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 6 7 36

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Draw Sample Assy 9127 11:00:00 9127 13:00:00 2.00 9115 08:00:00 2 Hrs

0.1 Days 427.2 Hrs

17.8 Days

19F1A Self Contained Breathing App. 9129 08:00:00 9129 10:00:00 1.00 9116 11:00:00 1 Hrs 0 Days 282.1 Hrs

11.8 Days

19F1A Draw Sample Assy 9137 08:00:00 9137 10:00:00 1.00 9127 11:00:00 1.5 Hrs

0.1 Days 395.5 Hrs

16.5 Days

19F1A Self Contained Breathing App. 9148 07:00:00 9148 09:00:00 1.00 9129 08:00:00 1 Hrs 0 Days 301.3 Hrs

12.6 Days

19F1A Burner Control Assy, Multi -Element 9150 08:00:00 9150 10:00:00 1.00 9150 08:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F4A Emergency Stop 9142 08:00:00 9143 12:00:00 27.00 9142 08:00:00 27 Hrs

1.1 Days 0 Hrs

0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: May-19 Command: SWOS Mayport, FL Report Date: 4-Jun-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information,

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Apr-19

Command: SWOS Mayport, FL 2-May-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 7 10 29 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 7 10 29

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Self Contained Breathing App. 9099 09:00:00 9099 10:00:00 1.00 9070 08:00:00 1 Hrs 0 Days 384.5 Hrs 16 Days

19F1A Draw Sample Assy 9114 08:00:00 9114 09:00:00 1.00 9072 08:00:00 1 Hrs 0 Days 607 Hrs

25.3 Days

19F1A Draw Sample Assy 9115 08:00:00 9115 09:00:00 1.00 9114 08:00:00 1 Hrs 0 Days 461.2 Hrs

19.2 Days

19F1A Self Contained Breathing App. 9115 10:00:00 9115 12:00:00 2.00 9099 09:00:00 1.5 Hrs

0.1 Days 384.6 Hrs

16 Days

19F1A Self Contained Breathing App. 9116 09:00:00 9116 10:00:00 1.00 9115 10:00:00 1.3 Hrs

0.1 Days 324.3 Hrs

13.5 Days

19F1A Self Contained Breathing App. 9116 11:00:00 9116 12:00:00 1.00 9116 09:00:00 1.2 Hrs 0 Days 278.3 Hrs

11.6 Days

19F4A Cannon 9106 08:00:00 9106 09:00:00 0.50 9106 08:00:00 0.5 Hrs 0 Days 0 Hrs 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Apr-19 Command: SWOS Mayport, FL Report Date: 2-May-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information,

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Mar-19

Command: SWOS Mayport, FL 8-Apr-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 10 12 22 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 10 12 22

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A FM 9065

07:00:00 9067 11:00:00 51.00 9065 07:00:00 51 Hrs

2.1 Days 0 Hrs

0 Days

19F1A DSA 9066

06:00:00 9066 09:00:00 3.00 9038 11:00:00 3 Hrs

0.1 Days 667 Hrs

28 Days

19F1A SCBA 9070

08:00:00 9070 10:00:00 1.00 9036 12:00:00 1 Hrs 0 Days 280.3 Hrs

11.7 Days

19F1A DSA 9072

08:00:00 9072 09:00:00 1.00 9066 06:00:00 2 Hrs

0.1 Days 406.5 Hrs

17 Days

19F4A Decking 9063 10:00:00 9064 13:00:00 26.00 9063 10:00:00 26 Hrs

1.1 Days 0 Hrs

0 Days

19F4A Lighting 9072 13:00:00 9072 14:00:00 1.00 9072 13:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F4A SPS 9081

12:00:00 9081 13:00:00 1.00 9081 12:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F4A LCN 9087

12:00:00 9087 13:00:00 0.50 9087 12:00:00 0.5 Hrs 0 Days 0 Hrs 0 Days

DCWT EEA 9085

13:00:00 9086 08:00:00 0.80 9085 13:00:00 0.8 Hrs 0 Days 0 Hrs 0 Days

Facilities LPAC 9085 07:00:00 9085 09:00:00 2.00 9085 07:00:00 2 Hrs

0.1 Days 0 Hrs

0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Mar-19 Command: SWOS Mayport, FL Report Date: 8-Apr-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information,

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Feb-19

Command: SWOS Mayport, FL 5-Mar-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 12 10 12 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 12 10 12

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Self Contained Breathing App. 9035 07:00:00 9035 09:00:00 1.00 9035 07:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F1A Self Contained Breathing App. 9035 08:00:00 9035 10:00:00 1.00 9035 07:00:00 1 Hrs 0 Days 1 Hrs 0 Days

19F1A Fireplace Assy, Wire 9036 07:00:00 9036 11:00:00 3.00 9036 07:00:00 3 Hrs

0.1 Days 0 Hrs

0 Days

19F1A Self Contained Breathing App. 9036 12:00:00 9036 13:00:00 1.00 9035 08:00:00 1 Hrs 0 Days 14.5 Hrs

0.5 Days

19F1A Fireplace Assy, Mattress 9038 07:00:00 9038 10:00:00 3.00 9038 07:00:00 3 Hrs

0.1 Days 0 Hrs

0 Days

19F1A Draw Sample Assy 9038 11:00:00 9038 13:00:00 2.00 9038 11:00:00 2 Hrs

0.1 Days 0 Hrs

0 Days

19F1A Fireplace Assy, Oil Spray 9043 08:00:00 9043 12:00:00 1.00 9043 08:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F1A Fireplace Assy Locker 9045 09:00:00 9044 12:00:00 3.00 9045 09:00:00 3 Hrs

0.1 Days 0 Hrs

0 Days

19F1A Fireplace Assy, Stoarge 9052 06:00:00 9052 09:00:00 2.00 9052 06:00:00 2 Hrs

0.1 Days 0 Hrs

0 Days

19F1A Fog Head Module 9052 11:00:00 9052 13:30:00 2.00 9052 11:00:00 2 Hrs

0.1 Days 0 Hrs

0 Days

19F4A Fireplace (Deck) 9052 13:00:00 9052 13:30:00 0.50 9052 13:00:00 0.5 Hrs 0 Days 0 Hrs 0 Days

DCWT FIRE MAIN SYS 9052

11:45:00 9052 12:15:00 0.50 9052 11:45:00 0.5 Hrs 0 Days 0 Hrs 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Feb-19 Command: SWOS Mayport, FL Report Date: 5-Mar-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

90 19F4A 3 17541, VSC Switch Pilot 10 Blocking Valve wrong posit Water intrusion casued switch failure 18733 19029 19042 13

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Jan-19

Command: SWOS Mayport, FL 5-Feb-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 10 16 157 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 10 16 157

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F4A AFFF Hose Stations 9002 08:00:00 9009 13:00:00 170.00 8361 09:00:00 170 Hrs

7.1 Days 203.2 Hrs

8.5 Days

19F4A Trainer Lighting 9010 11:00:00 9010 12:25:00 1.00 8094 08:00:00 1 Hrs 0 Days 6747 Hrs 281 Days

19F4A AFFF Hose Stations 9014 07:00:00 9016 13:00:00 51.00 9002 08:00:00 110.5 Hrs

4.6 Days 220 Hrs

9.2 Days

19F4A Fireplace (Deck) 9029 07:00:00 9030 12:00:00 26.00 8095 12:00:00 26 Hrs

1.1 Days 3695.5 Hrs

154 Days

DCWT FIRE MAIN SYS 9004

07:00:00 9004 13:00:00 4.00 8339 08:00:00 4 Hrs

0.2 Days 446.9 Hrs

18.6 Days

DCWT FIRE MAIN SYS 9007

07:00:00 9007 13:00:00 4.00 9004 07:00:00 4 Hrs

0.2 Days 415.7 Hrs

17.3 Days

DCWT FIRE MAIN SYS 9007

08:00:00 9007 13:00:00 2.00 9007 07:00:00 3.3 Hrs

0.1 Days 383.8 Hrs

16 Days

DCWT FIRE MAIN SYS 9007

10:00:00 9007 13:00:00 3.00 9007 08:00:00 3.2 Hrs

0.1 Days 356.5 Hrs

14.9 Days

DCWT Hardware 9028 07:00:00 9029 12:00:00 29.00 8347 09:00:00 29 Hrs

1.2 Days 2011.2 Hrs

83.8 Days

Facilities Trainer Lighting 9007 12:00:00 9007 13:00:00 1.00 9007 12:00:00 1 Hrs 0 Days 0 Hrs 0 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Jan-19 Command: SWOS Mayport, FL Report Date: 5-Feb-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

87 19F1A 1 MDG-FHM-PM Plumbing Module 50% reducer needle valve wont seat Wear and tear 18668 18345 19024 44 88 19F4A 3 50300-90203-17 Thermocouple Pilot 10 failed due to thermocouple Wear and tear 18625 18347 18347 0 excess spare used 89 19F1A 1 2C1-001-823 Flame Rod Pilot intermittent Wear and tear 18678 18352 19010 23 V19-0006 90 19F4A 3 17541, VSC Switch Pilot 10 Blocking Valve wrong posit Water intrusion casued switch failure 18733 19029

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Dec-18

Command: SWOS Mayport, FL 4-Jan-19

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 16 10 147 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 16 10 147

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Draw Sample Assy 8338 10:00:00 8340 09:00:00 47.00 8268 11:00:00 47 Hrs 2 Days 1700.5 Hrs

70.8 Days

19F1A Fog Head Module 8345 08:00:00 8345 14:00:00 5.00 8331 10:00:00 5 Hrs

0.2 Days 1298.9 Hrs

54.1 Days

19F1A Fog Head Module 8347 08:00:00 8348 12:00:00 28.00 8345 08:00:00 16.5 Hrs

0.7 Days 1159.9 Hrs

48.3 Days

19F1A Fire Pilots 8352 08:00:00 8352 12:00:00 4.00 8305 07:00:00 4 Hrs

0.2 Days 5015.5 Hrs

209 Days

19F1A Mock-Ups 8352 12:00:00 8352 13:00:00 1.00 8352 12:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F1A propane system 8353 13:30:00 10:00:00 1 Hrs 0 Days 3195.5 Hrs 133 Days

19F4A AFFF Hose Stations 8334 11:00:00 8352 13:00:00 433.00 8334 11:00:00 433 Hrs 18 Days 4392 Hrs 183 Days

19F4A Fire Pilots 8347 09:00:00 8347 13:00:00 1.50 8253 06:00:00 1.5 Hrs

0.1 Days 2581.7 Hrs

107.6 Days

DCWT FIRE MAIN SYS 8337

11:00:00 8337 13:30:00 2.00 8309 08:00:00 2 Hrs

0.1 Days 830.4 Hrs

34.6 Days

DCWT FIRE MAIN SYS 8338

08:00:00 8338 13:30:00 5.00 8337 11:00:00 3.5 Hrs

0.1 Days 695.5 Hrs

29 Days

DCWT FIRE MAIN SYS 8338

09:00:00 8338 13:00:00 3.00 8344 09:00:00 12 Hrs

0.5 Days 1437.1 Hrs

59.9 Days

DCWT FIRE MAIN SYS 8339

08:00:00 8339 11:00:00 3.00 8338 09:00:00 10.5 Hrs

0.4 Days 1295.7 Hrs

54 Days

DCWT FIRE MAIN SYS 8339

08:00:00 8339 09:00:00 1.00 8338 08:00:00 2.7 Hrs

0.1 Days 599.6 Hrs

25 Days

DCWT FIRE MAIN SYS 8344

09:00:00 8346 10:00:00 49.00 8339 08:00:00 14.2 Hrs

0.6 Days 539.8 Hrs

22.5 Days

DCWT Hardware 8347 09:00:00 8347 13:30:00 4.00 8206 11:00:00 4 Hrs

0.2 Days 2238.5 Hrs

93.2 Days

Facilities High Pressure Air Compressor 8341 11:00:00 8341 13:30:00 2.00 8220 10:00:00 2 Hrs

0.1 Days 2905 Hrs

121 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Dec-18 Command: SWOS Mayport, FL Report Date: 4-Jan-19

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

87 19F1A 1 MDG-FHM-PM Plumbing Module 50% reducer needle valve wont seat Wear and tear 18668 18345 Waiting on MDG price / part number for needle valve 88 19F4A 3 50300-90203-17 Thermocouple Pilot 10 failed due to thermocouple Wear and tear 18625 18347 18347 0 excess spare used 89 19F1A 1 2C1-001-823 Flame Rod Pilot intermittent Wear and tear 18678 18352 V19-0006

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Nov-18

Command: SWOS Mayport, FL 3-Dec-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 10 13 134 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 10 13 134

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Fire Pilots 8305 07:00:00 8305 10:00:00 3.00 7299 09:00:00 3 Hrs

0.1 Days 8902 Hrs

371 Days

19F1A Self Contained Breathing App. 8305 10:00:00 8305 11:00:00 1.00 8298 12:00:00 1 Hrs 0 Days 204 Hrs

8.5 Days

19F1A Self Contained Breathing App. 8318 09:00:00 8319 11:00:00 24.00 8305 10:00:00 12.5 Hrs

0.5 Days 206.3 Hrs

8.6 Days

19F1A Self Contained Breathing App. 8318 11:00:00 8318 12:00:00 1.00 8318 09:00:00 8.7 Hrs

0.4 Days 202 Hrs

8.4 Days

19F1A AFFF Stations 8319 08:09:00 8319 07:00:00 4.00 8319 08:09:00 4 Hrs

0.2 Days 0 Hrs

0 Days

19F1A Fog Head Module 8331 10:00:00 8332 13:00:00 26.00 8290 11:00:00 26 Hrs

1.1 Days 1436.7 Hrs

59.9 Days

19F4A Fog Head Module 8318 07:00:00 8318 14:00:00 7.00 7320 09:00:00 7 Hrs

0.3 Days 8710 Hrs

363 Days

19F4A AFFF Hose Stations 8333 11:00:00 8334 11:00:00 23.00 8333 11:00:00 23 Hrs 1 Days 0 Hrs 0 Days

DCWT FIRE MAIN SYS 8305

07:00:00 8305 10:00:00 2.50 8302 09:00:00 2.5 Hrs

0.1 Days 1126.7 Hrs

47 Days

DCWT FIRE MAIN SYS 8309

08:00:00 8317 14:00:00 197.00 8305 07:00:00 99.8 Hrs

4.2 Days 869.2 Hrs

36.2 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Nov-18 Command: SWOS Mayport, FL Report Date: 3-Dec-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

83 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18538 8261 8331 70 PO18-0371 (6-8 week lead time) 84 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18539 8262 8331 69 PO18-0371 (6-8 week lead time)

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Oct-18

Command: SWOS Mayport, FL 5-Nov-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 13 13 124 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 13 13 124

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Sound Powered Phone 8274 10:00:00 8274 13:00:00 3.00 8267 11:00:00 3 Hrs

0.1 Days 241.5 Hrs

10 Days

19F1A Sound Powered Phone 8275 07:00:00 8275 11:00:00 4.00 8274 10:00:00 3.5 Hrs

0.1 Days 168 Hrs

7 Days

19F1A Temperature Sensor Assy 8282 08:00:00 8282 12:00:00 1.00 8282 08:00:00 1 Hrs 0 Days 0 Hrs 0 Days

19F1A Fog Head Module 8290 11:00:00 8290 12:00:00 1.00 8029 09:00:00 1 Hrs 0 Days 1512.3 Hrs 63 Days

19F1A Trainer COMM System 8295 07:00:00 8296 13:00:00 29.00 8295 07:00:00 29 Hrs

1.2 Days 0 Hrs

0 Days

19F1A AFFF Hose Stations 8295 10:00:00 8304 13:00:00 219.00 8295 10:00:00 219 Hrs

9.1 Days 0 Hrs

0 Days

19F1A Self Contained Breathing App. 8296 06:00:00 8296 07:00:00 1.00 8269 12:00:00 1 Hrs 0 Days 218.2 Hrs

9.1 Days

19F1A Self Contained Breathing App. 8296 07:00:00 8296 08:00:00 1.00 8296 06:00:00 1 Hrs 0 Days 213.2 Hrs

8.9 Days

19F1A Self Contained Breathing App. 8296 12:00:00 8296 13:00:00 1.00 8296 07:00:00 1 Hrs 0 Days 208.4 Hrs

8.7 Days

19F1A Self Contained Breathing App. 8298 12:00:00 8299 13:00:00 24.00 8296 12:00:00 6.8 Hrs

0.3 Days 204.9 Hrs

8.5 Days

19F4A AFFF Stations 8285 07:00:00 8291 13:00:00 148.00 8285 07:00:00 148 Hrs

6.2 Days 0 Hrs

0 Days

19F4A AFFF Stations 8291 11:00:00 8291 13:00:00 1.00 8285 07:00:00 74.5 Hrs

3.1 Days 148 Hrs

6 Days

DCWT FIRE MAIN SYS 8302

09:00:00 8302 10:00:00 1.00 8236 11:00:00 1 Hrs 0 Days 1655 Hrs 69 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Oct-18 Command: SWOS Mayport, FL Report Date: 5-Nov-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

83 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18538 8261 PO18-0371 (6-8 week lead time) 84 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18539 8262 PO18-0371 (6-8 week lead time) 86 19F1A 1 61212-000, Loud Speaker Loss of 1MC North DC Deck Electronic failure/End of Life 18589 8295 NA COR Approved Inventory Decreased 4 to 2

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Sep-18

Command: SWOS Mayport, FL 4-Oct-18

(1) CORRECTIVE MAINTENANCE ACTIONS

Corrective Maintenance Actions Current Month Previous Month

Fiscal Year To-Date

On-Site 13 16 111 Corporate 0 0 0 Vendor 0 0 0 Others 0 0 0

Totals: 13 16 111

(2) MEAN-TIME-TO-REPAIR (MTTR) and MEAN-TIME-BETWEEN-FAILURES (MTBF) (Cumulative by Fiscal Year)

Training System Major-Subsystem / Assembly Julian Date & Time Failed

Julian Date & Time Restored

Time to Repair (Hours)

Julian Date/Time Last Failure

Average MTTR Todate (Hours)

Average MTBF Todate (Hours)

19F1A Self Contained Breathing App. 8253 09:00:00 8260 10:00:00 169.00 8226 08:00:00 169 Hrs 7 Days 214.1 Hrs

8.9 Days

19F1A Self Contained Breathing App. 8253 12:00:00 8260 10:00:00 165.00 8253 09:00:00 167 Hrs 7 Days 208.7 Hrs

8.7 Days

19F1A Sound Powered Phone 8254 07:00:00 8255 14:00:00 27.00 8254 07:00:00 27 Hrs

1.1 Days 0 Hrs

0 Days

19F1A Draw Sample Assy 8261 07:00:00 8261 11:00:00 3.00 8214 12:00:00 3 Hrs

0.1 Days 4176 Hrs

174 Days

19F1A Draw Sample Assy 8262 07:00:00 8262 09:00:00 1.00 8261 07:00:00 2 Hrs

0.1 Days 2792 Hrs

116.3 Days

19F1A Draw Sample Assy 8263 08:00:00 8263 11:00:00 2.00 8262 07:00:00 2 Hrs

0.1 Days 2100.2 Hrs

87.5 Days

19F1A Self Contained Breathing App. 8263 09:00:00 8263 12:00:00 2.00 8253 12:00:00 112 Hrs

4.7 Days 209.4 Hrs

8.7 Days

19F1A Sound Powered Phone 8267 11:00:00 8267 13:00:00 2.00 8254 07:00:00 14.5 Hrs

0.6 Days 316 Hrs

13 Days

19F1A Draw Sample Assy 8268 11:00:00 8268 13:00:00 2.00 8263 08:00:00 2 Hrs

0.1 Days 1704.8 Hrs

71 Days

19F1A Self Contained Breathing App. 8269 12:00:00 8269 13:00:00 1.00 8263 09:00:00 84.2 Hrs

3.5 Days 207.9 Hrs

8.7 Days

19F4A Fire Pilots 8253 06:00:00 8253 10:00:00 2.00 8036 09:00:00 2 Hrs

0.1 Days 1175.5 Hrs

49 Days

19F4A Sound Powered Phone 8253 09:00:00 8253 10:00:00 1.00 8213 12:00:00 1 Hrs 0 Days 1488.3 Hrs 62 Days

19F4A Sound Powered Phone 8254 08:00:00 8254 14:00:00 5.00 8253 09:00:00 3 Hrs

0.1 Days 1122 Hrs

46.8 Days

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

SWOS ELS Mayport, FL

Contract: N61339-10-D-2002 TO# 0002 Month Ending: Sep-18 Command: SWOS Mayport, FL Report Date: 4-Oct-18

Section IV - Maintenance Actions (con't)

(3) REPAIR or REPLENISH

Seq No.

(e.)

Training System or

Equip (a & f.)

S/N (g.)

Failed Repairable or Repair Part (Part # & Nomenclature)

(b.)

Description (h.)

Cause of Failure (c.)

MAF

Number

(d.)

Date Repairable or Report Part

Failed (j.)

Date Repaired or Replenished

(k.)

# Days to Repair or Replenish

(l.)

Remarks: If Repairable NOT repaired or replenished w/in 30 days; or Repair Part NOT replenished w/in 30 days, provide COR plan of action to return Repairables or Repair Parts to MSP in an RFI condition. (Use additional sheets to provide this information, (m.)

82 19F4A 3 702003-315-R, Handset SPT Wires shorted station 1 handset Old wires exposed to the elements. 18530 8254 8263 9 83 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18538 8261 PO18-0371 (6-8 week lead time) 84 19F1A 1 SNR321, Catalytic Sensor High Propane indication Comp #3 Electronic failure/End of Life 18539 8262 PO18-0371 (6-8 week lead time) 85 19F4A 3 ACHI-10E, Corrosion Preventer Replace units in LCN Routine Maintenance 18520 8254 8270 16

* Sequence Number: = Number failed Repairable or Repair Part (R/RP) sequentially. R/RPs not returned to the MSP in an RFI condition at the end of the month are carried over to the following month, with its appropriate sequence number for tracking purposes. R/RPs shown repaired or replenished and returned to the MSP in an RFI condition during this report period will drop from the next month's report.

DISTRIBUTION B: DISTRIBUTION IS AUTHORIZED TO- U.S. GOVERNMENT AGENCIES ONLY, ADMINISTATIVE OR OPERATIONAL USE, AS DETERMINED 27 MAY 2009. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE 6643), 12350 RESEARCH PARKWAY, ORLANDO, FL 32826-3275.

CDRL A004 Mayport August 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport July 2019_rev 1
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport June 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport May 2019 Signed
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport April 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport March 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport February 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport January 2019
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport December 2018
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport November 2018
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport October 2018
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont
CDRL A004 Mayport September 2018
SWOS LS Mayport-Section IV
SWOS LS Mayport-Section IV Cont

File details come from the government source that posted it. Updated .