Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes_1 Oct 2019.docx

DOCX document 61 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
Solicitation number
N61340-20-R-0005
Issued by
Department of the Navy Naval Air Systems Command

About this file

This solicitation requests proposals for Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. Work will be conducted at seven commands located at six geographic locations, including Mayport, FL, Norfolk, VA, Newport, RI, San Diego, CA, Pearl Harbor, HI, Recruit Training Command Great Lakes, IL, and Surface Warfare Officers School Unit Great Lakes, IL. The services required include providing all labor, materials, consumables, equipment, tools, test equipment, and transportation necessary to maintain training systems and equipment in a fully operational condition and to facilitate user training. The government seeks a firm-fixed price contract with a one year base and four one year options, as well as cost reimbursable lines for trainer consumable products. The solicitation is a 100% small business set-aside with an NAICS code of 541330 and size standard of $41.5M. Proposals are due by the date specified in the RFP.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services, newest first.
File Type Posted
ATCH 10G_CBA_Mayport - MAMP - FINAL.pdf PDF
ATCH 10L_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_11 Dec 2019 Amend 1.xlsx XLSX spreadsheet
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_4 Dec 2019_TrkChgs.docx DOCX document
.N61340-20-R-0005 Amendment 0001.docx DOCX document
ATCH 10C_WD 15-5636 (Rev.-11) San Diego.pdf PDF
ATCH 10A_CBA_Mayport - MAMP - FINAL.pdf PDF
Att (L-14) Consolidated Solicitation Question_5 Dec 2019 FINAL.xlsx XLSX spreadsheet
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_4 Dec 2019.xlsx XLSX spreadsheet
ATCH 10C_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (L-16E) Pearl Harbor Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A1) CDRL A001 CFSR w attach_FF_DC COMS_23 Oct 2019.doc DOC document
Exhibit (A2) CDRL A002 Conference Minutes_FF_DC COMS_23 Oct 2019.doc DOC document
Evaluation Factor Guide Version 1.3 July 2019.docx DOCX document
.Section J Attachments_11.20.19.docx DOCX document
Att (L-15) Maint Hours and Throughput Feb 18 - Aug 19 dtd 7 Oct 2019.xlsx XLSX spreadsheet
Att (8) OAWR Procedures and Form_2 Jul 2019.docx DOCX document
Att (7) DOL Wage Adjust Baseline_10 Oct 19.xls XLS spreadsheet
Att (1D) Appendix D_Surf FF-DC_Newport_1 Oct 2019.docx DOCX document
.FFDC COMS MOPAS Redacted.pdf PDF
ATCH 10E_WD 15-5689 (Rev.-9) Pearl Harbor.pdf PDF
Att (L-16G) SWOSU Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (1E) Appendix E_Surf FF-DC_Pearl Harbor_20 Nov 2019.docx DOCX document
Att (L-13G) CDRL A005 SWOSU Great Lakes_Inventory Report_2 Jul 2019.xlsx XLSX spreadsheet
ATCH 10F_WD 15-4935 (Rev.-11) Great Lakes.pdf PDF
Att (5A) COMS Prem Time Request_2 Jul 2019.doc DOC document
Att (L-16F) RTC Great Lakes Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc DOC document
Att (L-13A) CDRL A005 Mayport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (2) CDRL Addressee List_23 Oct 2019.docx DOCX document
Att (L-13C) CDRL A005 San Diego_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-16D) Newport Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (11) Excess Repair_Replacement Form_2 Jul 2019.doc DOC document
Att (1A) Appendix A_Surf FF-DC_Mayport_1 Oct 2019.docx DOCX document
Att (5B) Premium Time Hours Log_15 Oct 2019.xls XLS spreadsheet
Att (L-16A) Mayport Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_7 Oct 2019.xlsx XLSX spreadsheet
ATCH 10D_WD 15-4089 (Rev.-11) Newport.pdf PDF
.Announcement_FinalRFP_11.20.2019.docx DOCX document
Att (L-18) Contractor Performance Assessment Questionnaire May 2016.msg.pdf PDF
ATCH 10A_WD 15-4539 (Rev.-9) Mayport.pdf PDF
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_1 Oct 2019.docx DOCX document
Att (L-17) Past Performance Information Form Mar 2017.pdf PDF
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_Feb 2018 - Jan 2019.xlsx XLSX spreadsheet
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
FFDC COMS MOPAS for RFP posting.pdf PDF
Exhibit (A6) CDRL A006 Quality System Plan (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (6) SCA Price Adjustment Form_10 Oct 19.xls XLS spreadsheet
Show all 50

Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 3

TRAINER SUPPORT GEAR

RECRUIT TRAINING COMMAND (RTC) GREAT LAKES, IL

PART I - TRAINING SYSTEMS OR EQUIPMENT INFORMATION

1. TRAINING SYSTEMS OR EQUIPMENT.

The following are the Training Systems or Equipment (TS/E) attachments to this appendix: Each trainer attachment provides description, location, normal operating hours and scheduling requirements, subsystems/assemblies not subject to supply support, and major hardware list Degraded Capability Matrix (DCM).

ATCH
TS/E
S/N
TITLE
QTY
1
19F5
1
Fire Fighting Trainer Recruit Basic
1
2
FOM
-
Facilities
Lot
3
TSG
-
Trainer Support Gear
Lot

PART II - SITE OPERATIONS AND MATERIAL SUPPORT PACKAGE (MSP) INFORMATION

1. TRAINING SYSTEMS & EQUIPMENT (TS/E) NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

1.1 Government Scheduled Use (GSU).

Government Scheduled Use (GSU) can be found in each attachment for each trainer under paragraph 3, Normal Operating Hours and Scheduling Requirements.

2. MATERIAL SUPPORT PACKAGE (MSP).

2.1 Specific Inventories.

Inventory listings of these items are available at each training system and equipment location. Specific Inventories of all GFP, physically verified by the Government and Contractor, shall be formally turned over to the Contractor on or about the CSD for a given training system and equipment, for which the Contractor shall sign for and accept their custody. These inventories shall reflect both the existence and condition of these assets, and shall become the baseline inventory and the standard against which the Contractor is measured when the GFP is returned to the Government. (See PWS, Part 4, Paragraph 4.50, Material Support Package.)

2.3 Government Furnished Facilities (GFF).

2.3.1 GFF Coverage.

GFF consist of maintenance, storage, office, and trainer spaces.

2.3.2 GFF Square Feet and Contractor Custody.

The following GFF is intended to be placed in the custody of the Contractor for the term of the contract:

BUILDING
ROOM
DESCRIPTION
MEASUREMENT
1410
ALL
Trainer, including Building, Propane System within the building, Water Tanks Equalization Basin, etc. – 19F5
15,000

3. CONSUMABLES.

3.1 Contactor Responsibility.

The Contractor shall purchase and account for the consumables necessary for firefighting and damage control training. Note: Excludes consumables required for scheduled maintenance. Consumables include the following:

CONSUMABLES FOR FIRE FIGHTING TRAINERS

Propane
Smoke generation fluid
SCBA consumable parts
CO2

CONSUMABLES FOR DAMAGE CONTROL WET TRAINER

N/A to this site.

Refer to the Unified Facilities Criteria (UFC) 4-179-01 dated 16 January 2004, Appendix A (MIL-HDBK 1027/1B) for additional information regarding agent surrogates.

Contractor will be reimbursed for these items.

3.2 Fire Fighting Preventive Maintenance Gases.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

APPENDIX F

RECRUIT TRAINING COMMAND (RTC) GREAT LAKES, IL

Contractor must procure at its expense all items, materials, gases, etc. required to perform all preventive maintenance actions necessary for calibration and alignment (e.g., span and zero gas used for calibration of the propane detection system). These items include, but are not limited to, certain test gases that are expensive. Exception: if the government requires the use of the contractor procured test gases when performing a re-host or other modification to the trainers, then the contractor may request reimbursement through the consumables contract line item.

F-1

1. DESCRIPTION.

1.1 General.

Training system and equipment 19F5 is a Recruit Fire Fighting Trainer, which is used to provide indoctrination and exposure training for recruit personnel. This involves teaching the identification and extinguishment of various Class A, B, and C fires, using live, computer-controlled, propane-fueled fires. These simulated fire emergencies are staged, under program control, in structures called fireplaces that are built to resemble equipment or locations, such as trash cans, bilges and electrical panels where actual fires can occur. In addition, emergency egress chamber training is supported, as is hose team training. Smoke is provided under operator or scenario control for realistic training in a visibility-impaired environment. The training system and equipment contains two (2) building sections, each containing three (3) fireplaces, an Emergency Egress Chamber or Wild Hose Room, and a bleacher area for observers.

1.2 Trainee Station.

The trainee stations are located within the training compartments and consist of locations where fires are generated in mockups which duplicate actual fires, or where wild hose training or emergency egress training is conducted.

1.3 Instructor Operator Station.

All of the trainer's electrical controls are activated from the control room and adjacent electrical room. Each IOS control the fires in each of the fire compartments and monitors the environment in each compartment to prevent unsafe conditions. There are two (2) IOS in the 19F5 control room, one (1) for each half of the firefighter building. There is also a requirement to have an instructor with each group of students in the trainer.

1.4 Computer System.

The original GE Series Six PLC ladder relay logic software was converted to a newer variant of PLC ladder relay logic and Function Block Diagrams (FBD) for the new RX3I PAC System.. This PLC System design has been integrated into the existing peripheral systems and provide complete control of all inputs and outputs of the trainer through an integrated IOS. The software used to read inputs from the fireplaces and CCPs, compute fireplace states, and drive outputs to control the training scenarios run on a single PLC System that has Input/Output (I/O) nodes in each compartment or group of compartments.

1.5 Other.

N/A

2. LOCATION.

Building: 1410 Description: Trainer Area 15,000 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 19F5
SERIAL #: 1
LOCATION: Great Lakes, IL
TITLE: Fire Fighting Trainer Recruit Basic
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
Task
OHPD
From:
To:
From:
To:
From:
To:
01
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note 1: Local climate temperatures fluctuate during the summer and winter. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, .or, drop to extreme subzero temperatures, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit or subzero temperatures, the Government will adjust working hours to accommodate fleet training requirements.

Note 2: Due to NAVCRUITCOM annual shipping schedules RTC typically has a surge season from May – October. During this period training hours may need to be extended to accommodate the high volume of recruit divisions to be trained.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
NTE

QUANTITY

Trainer Support Gear
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
Instructor Operator Station comprised as follows:

Processor Rack Assembly (GE Programmable Controller), Printer Primary Control Panel Control Console Sound Powered Telephone Call Station Computer Interface Panel (CIP) Microphone Communications Annunciator Panel Trainer Lighting Control Main Circuit Breaker Panel Magnetic Contactor Panel Data Terminal Cabinet Air Quality and Fire Effluent Monitor

b.
Manual Emergency Shutdown
1
c.
Propane Detection System
2
d.
Fire Effluent Monitor System
1
e.
Air Quality Monitor System
1
f.
Fire Pilot Monitor System
1
g.
Fail Safe System
2
h.
Block and Vent System
2
i.
Burner Control Enclosures
7
j.
Mock-ups of Ship Compartments
8
k.
Compartment Control Panels
2
l.
Portable Smoke Generators (F100)
2
m.
Fireplaces
6
n.
Engineering Work Station (PLC Maintenance Laptop)
1
o.
Electronic Enclosure Assemblies (EEA)
2

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components.

The systems include: wiring, piping, valves, filters, sensors, control circuitry, actuators, electronics and ducting.

6. DEGRADED CAPABILITY MATRIX (DCM).

The following user trainer operability designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

CONTROL SYSTEM/IOS

PLC/PC AND RELATED ELECTRICAL SYSTEMS
50
MONITOR
5
IOS CONTROLS
25
PRIMARY CONTROL PANEL
100
DATA TERMINAL CABINET
30

PROPANE SYSTEM

BLOCK AND VENT SUBSYSTEM
50
TRAINER PROPANE SYSTEM
25
PROPANE DETECTION AND MONITORING
50
PILOT FLAME SYSTEM (EACH FIREPLACE)
15
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED
MAIN FLAME SYSTEM (EACH FIREPLACE)
15
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED

HEATING, VENTILATION, AIR CONDITIONING SYSTEM (HVAC) SYSTEM

TRAINER HVAC VENTILATION SYSTEM (FANS)
25
TRAINER HVAC LOUVER SYSTEM
25
IF THE SYSTEM IS MECHANICAL (GRAVITY) THEN THE TRAINER CAN OPERATE IF FAILED ITEMS ARE REMOVED. IF TRAINER IS ELECTRICALLY ACTUATED THEN THE TRAINER IS NOT OPERABLE

ELECTRICAL SYSTEM

MAINTENANCE LIGHTING
5
EMERGENCY LIGHTING
5
GENERAL LIGHTING
10

WATER SUPPLY SYSTEM

WATER TANK
15
ALTITUDE VALVE
15
FIRE PUMPS
20
PROCESS WATER PUMP (EACH)
20
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.
FIRE HOSE STATION (EACH)
5
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.

AIR COMPRESSION SYSTEM

HIGH PRESSURE AIR COMPRESSOR
10
LOW PRESSURE AIR COMPRESSOR
20
HEAT EXCHANGER
5

WASTE WATER SYSTEM

RECIRCULATION PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
EFFLUENT PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH MONITORING SYSTEM
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH PROBE
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH RECORDER
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
CHEMICAL METERING PUMP
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
AGITATION PUMP
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
EQUALIZATION BASIN
10
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.

SCBA AIR SYSTEM AND FIRE EXTINGUISHER REFILL SYSTEM

AIR COMPRESSOR
N/A
ONLY IF ENOUGH SCBA’S ARE AVAILABLE FOR TRAINING.

DRY CHEMICAL FIRE EXTINGUISHER CHARGING SYSTEM

CO2 REFILL SYSTEM
25
LIMITED TO WHETHER USER CAN TRAIN WITHOUT CO2 UNTIL REPAIRS ARE MADE.
CO2 TRANSFER PUMP
25
LIMITED TO WHETHER USER CAN TRAIN WITHOUT CO2 UNTIL REPAIRS ARE MADE.

STRUCTURAL AND OTHER

SMOKE GENERATING SYSTEM
10
LIMITED TO WHETHER USER CAN TRAIN WITHOUT SMOKE UNTIL REPAIRS ARE MADE
GRATING
5
LIMITED TO THE FIREPLACES THAT ARE NOT AFFECTED
FRAME STRUCTURE
10
LIMITED TO THE FIREPLACES THAT ARE NOT AFFECTED

FIREPLACE STRUCTURE/BULKHEAD

10
LIMITED TO THE FIREPLACES THAT ARE NOT AFFECTED
DOORS
10
PERMIT WARRANTY, CERTIFICATIONS
10
UNLESS CERTIFICATION IS REQUIRED BEFORE TRAINING IS ALLOWED.
WATER COLLECTION/AGENT SENSING SYSTEM
10
MOCK UPS
5

COMMUNICATIONS EQUIPMENT

SOUND POWERED PHONE STATION
2
TRAINER COMM SYSTEM (1MC)
15
MUST PROVIDE ALTERNATIVE FOR ACTIVE COMMUNICATIONS

Failure of any fireplace subsystem shall the render the affected fireplace not operable. These include pilot and main flame assemblies, agent detection assemblies. Refer to the table above for further details.

Failure of any system or subsystem to be in the propane piping and propane assemblies shall render the entire trainer not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire trainer not operable. Refer to the table above for further details.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 1

FIRE FIGHTING TRAINER RECRUIT BASIC

19F5

RECRUIT TRAINING COMMAND (RTC) GREAT LAKES, IL

1. FACILITIES.

This section identifies the major facility systems and equipment the Contractor will be responsible for organizational level and corrective maintenance.

1.1 Heating, Ventilation, Air Conditioning (HVAC) System.

NOMENCLATURE
NTE

QUANTITY

a.
Packaged Roof Top Air Conditioning Units
2
b.
Room Ventilators
4
c.
Electronic Unit Heaters
4
d.
Combustion Air Preheating System
2
e.
High Temperature Exhaust Fans
2
f.
Self-Contained Instructor Station Air Conditioning
1
g.
Egress Chamber Heating System
1
h.
Damage Control Lockers Ventilation (Fans)
2

· System includes: piping, wiring, ducting, thermal insulation, louvers, ducts, registers, mounting and holding hardware, controls, indicators, interlocks, alarms, fans, blowers, motors, valves, dampers, fittings, adapters, and filters.

· Ventilation and air conditioning for the trainer buildings are stand-alone systems for which the Contractor is responsible.

· Heat for the Fire Fighter support facility is provided via the facility-wide steam system that will be maintained by NAVFAC. The items include: control air compressor units, filters, separators, reducers, receivers, fittings, piping, tubing, controls, indicators, and mounting hardware and include the specific controls and tubing for each air handler, air conditioner and air ventilator.

· Includes the compressor, motor, receiver, piping, fittings, regulators and reducers, valves, indicators, controls, hoses and filters.

1.1.1 Air Compression System

NOMENCLATURE
NTE

QUANTITY

a.
Low Pressure Air Compressor
1

· The items include: receivers, dryers, regulators, filters, separators, heat exchangers, valves, piping, wiring, mounting hardware, compressors, reducers, fittings, tubing, indicators, controls, transducers, and all specific controls and tubing.

1.2 Propane System. The Contractor shall provide refueling of the propane tanks and operational (DORT) support only of the propane system to support all training evolutions.

NOMENCLATURE
NTE

QUANTITY

a.
Loading Station Storage and Distribution
1
b.
Propane Vaporizers
2
c.
Storage Tanks: 4,500 gals each
2
d.
Water Cannons
2

· System includes: meters, piping, gauges, valves, strainers, wiring and electrical controls.

NOTE: NAVFAC is responsible for the propane farm to the block and vent since it is class 2 property. The FFT COMS contractor shall be responsible for operational maintenance and reporting any corrective and preventative maintenance and cathodic protection concerns to the TA and COR.

1.3 Water Supply System.

· System includes: all pumps (e.g. fire pumps, process pumps), valves, fittings, piping, meters, gauges, mounting hardware, insulation, filters and strainers.

1.4 Waste Water System.

NOMENCLATURE
NTE

QUANTITY

a.
Facility Drainage Collection Subsystem
2
b.
Separation Chamber and Traps Subsystem
1
c.
Recirculation and Discharge Subsystem
2
d.
Recirculation Pump
2
e.
Discharge Pump
2
f.
Treatment and Chemical Subsystem Metering Pump
2
g.
Series 44-213 4 Bubbler System
1
h.
Air Compressor
2
i.
Equalization Basins
2
j.
Monitoring and Recording System
1

· System includes: all pumps, piping, fittings, valves, storage containers, mounting hardware, floor drains, insulation, traps, separators, wiring and electrical controllers for:

a.Training System Room and Crawl Space
b.Emergency Shower and Eye Wash Stations
c.Fire Hose Stations
d.Clothes Washers
e.Ventilation Stacks

NOTE: A daily log of all sampling data and chemical additions will be maintained by the system operator, a Class K operator is required. A monthly report, summarizing sampling data, is required.

1.5 AFFF System.

N/A for this location.

1.6 Air Pack Charging System.

NOMENCLATURE
NTE

QUANTITY

N/A

1.7 Carbon Dioxide CO2 Fire Extinguisher Charging System.

NOMENCLATURE
NTE

QUANTITY

a.
CO2 Storage Tank, 22000lbs capacity
1
b.
CO2 Portable Extinguisher Charging Station
1

Includes all piping, pumps, hoses, valves, fittings, tanks, controls, indicators, used in the supply and replenishment of CO2 fire extinguishing agent, and the recharging of the CO2 portable fire extinguishers..

1.8 Electrical System.

The items include: breaker panels, controls, indicators, alarms, relays, receptacles, fixtures, bulbs, switches, wiring and cabling back to the main breaker of the component in question, conduit and fittings, mounting hardware, fuses, breakers, motors, transformers and fan belts.

1.9 Natural Gas.

Not applicable

1.10 Eyewash/Showers.

The Contractor is responsible for maintaining all Eyewash/Showers.

1.11 Air System – Utility Room

Includes the: compressor, motor, receiver, piping, fittings, regulators and reducers, valves, indicators, controls, hoses and filters.

1.12 Miscellaneous.

Includes all discharge hoses; electrical panels, steam supply lines and water supply lines from their demarcation points; and other subsystems, components and parts reasonably a part of the fire fighter training system and equipment.

2.0 LINES OF DEMARCATION

2.1 General.

This section identifies the major dividing points between Contractor and Government responsibilities relating to utility services. The COR can provide the Contractor with further clarification on these interfaces. Generally, Contractor’s responsibilities for maintenance shall begin at the earliest leg off a main for the purpose of use to the trainer, and includes all Facilities and systems within the fence line, both above and below ground, of the Fire Fighting Training Facility compound. It also includes demarcation points external to the fence line as indicated. These interfaces apply to the entire compound, and include each of the training system and equipment.

2.2 Control Air System.

Contractor is responsible for those items identified heretofore that are connected to components of previously discussed subsystems and are required for the control air system to function

2.3 Domestic Water.

Not applicable.

2.4 Electrical.

Contractor shall be responsible for the lighting and power distribution system for the equalization building, propane system and trainer building. Responsibility will commence at the load side of the supply transformers and include all equipment and components supplied by the distribution system. Additionally, the electrical components which directly support the trainer but are powered from the main facility power distribution located in the USS CHIEF shall be the responsibility of the contractor. The contractor shall also be responsible for receptacles and lighting in all trainer buildings except for the classroom building. Responsibility of the Contractor shall start at the load side of the breaker and shall include all equipment and components being supplied.

2.5 Heating, Air Conditioning, Ventilation System.

Contractor is responsible for those items identified heretofore. The steam generation system will be maintained by the Government, but Contractor shall retain responsibility for the heaters off this system that are within the Training Buildings, except the classroom building.

2.6 Natural Gas.

Not applicable.

2.7 Pressure Sewer.

Contractor will be responsible for the entirety of the pressure sewer, including discharge into the main sewer line.

2.8 Process Sewer.

Contractor will be responsible for the entirety of the process sewer.

2.9 Process Water.

All water utilities will become the responsibility of the Contractor immediately after the thrust block and will include all valves in the originating leg off the main.

2.10 Propane System.

Contractor will be responsible for Block and Vent Assemblies, and associated distribution piping within the FFT facility.

2.11 Sanitary Sewer.

Responsibility for all sanitary sewer lines will commence at the junction with the main in manholes.

2.12 Steam and Condensate.

Contractor responsibility for steam shall commence at the inlet of the two (2) 4-inch gate valves which mark the steam split in the Utility Trench. Contractor shall be responsible for all system components downstream of the split. Contractor responsibility for condensate shall consist of all condensate piping within the Trainer Buildings, except the classroom building, up to and including the inlet valve to the condensate tank.

2.13 Storm Drains.

Not applicable.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 2

FACILITIES

RECRUIT TRAINING COMMAND (RTC) GREAT LAKES, IL

1. TRAINER SUPPORT GEAR.

The items identified in the below subparagraphs will be Government furnished and maintained by the Contractor. Replacement of these items will be provided by the Government.

NOTES:

(1) Contractor must have a program in place in order to properly monitor and conduct maintenance requirements. This program must be detailed, accurate and holding contractors accountable for all maintenance requirements. This program will be able to track all SCBA’s, SCBA bottles, and all training support gear within the FFT. Including, Fire Protective Gear (FPG), gloves, helmets, firefighting helmets, etc.

(2) Quantity* required is the number of each item required to be available in a Fully Operational Condition for each Government scheduled use.

1.1 Extinguishers.

NOMENCLATURE
NTE

QUANTITY*

CO2 Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect Hydrostatic Test

PKP Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect N/A

Oxygen Bottles Fill Maintain Inspect Hydrostatic Test N/A

AFFF Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect N/A

1.2 Self-Contained Breathing Apparatus (SCBA).

NOMENCLATURE
NTE

QUANTITY*

Composite Cylinders Pre-stage in Training Areas Inspect Repair

SAR SCBA

Inspect Repair Hydrostatic Test N/A

Packs (frame, belts, harnesses, regulator, hoses) Pre-stage in Training Areas Inspect Repair ”O” level maintenance only for 19F5

SCBA Mask Pre-Stage in Training Areas Inspect Repair

SCBA Wall Mounted Brackets Inspect Repair

SCBA Notes:

(1) See paragraph 4.3.2.3 (Self-Contained Breathing Apparatus) of Addendum A.

1.3 Personal Protection Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Fighter Helmets Pre-stage in Training Areas Inspect Repair

Fire Fighter Flash Hoods Pre-stage in Training Areas Inspect Maintain Repair

Flash Gloves Pre-stage in Training Areas Inspect Maintain 200 pr

1.4 Fire Fighting/Damage Control Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Hoses Pre-stage in Training Areas Inspect Maintain Hydrostatic Test

Fire Hose Nozzles Pre-stage in Training Areas Inspect Repair

Portable Sound Powered Telephones (SPT) Inspect & Repair

Water Tight Doors Inspect Maintain and Repair

1.5 Miscellaneous (Other).

Commercial Industrial Gas Clothes Dryer Maintain Inspect Repair

Commercial Industrial Clothes Washer Maintain Inspect Repair

File details come from the government source that posted it. Updated .