Att (1D) Appendix D_Surf FF-DC_Newport_1 Oct 2019.docx

DOCX document 82 KB Posted

Attached to
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
Solicitation number
N61340-20-R-0005
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document provides details for a federal contract solicitation seeking Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. The Navy is soliciting proposals for a firm-fixed price contract with a one year base period and four one-year options to provide labor, materials, consumables, equipment and transportation necessary to maintain training systems and equipment in operational condition for surface warfare officer training at commands in Mayport, FL; Norfolk, VA; Newport, RI; San Diego, CA; Pearl Harbor, HI; Great Lakes, IL. The applicable NAICS code is 541330 with a size standard of $41.5M. This is a 100% small business set-aside, with proposals due by the date specified in the RFP Section L. The contractor will maintain trainers and equipment across multiple locations for surface warfare officer training.

View the file

Other files for this federal contract opportunity

Other files attached to Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services, newest first.
File Type Posted
Att (L-9B) Surf FF-DC Manpower Projection Workbook_23 Dec 2019.xlsx XLSX spreadsheet
Att (1A) Appendix A_Surf FF-DC_Mayport_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10J_CBA_Newport - NFSMWA - FINAL.PDF PDF
Att (1C) Appendix C_Surf FF-DC_San Diego_4 Dec 2019_TrkChgs.docx DOCX document
ATCH 10H_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10I_CBA_San Diego - SDAMP - FINAL.PDF PDF
Att (1) Surface FF-DC COMS PWS_2 Dec 2019_TrkChgs.DOCX DOCX document
Att (L-14) Consolidated Solicitation Question_19 Dec 2019 Amend 0001.xlsx XLSX spreadsheet
Att (1G) Appendix G_Surf FF-DC_SWOSU Great Lakes_4 Dec 2019_TrkChgs.docx DOCX document
Att (L-9B) Surf FF-DC Manpower Projection Workbook_20 Dec 2019.xlsx XLSX spreadsheet
ATCH 10K_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
Att (1B) Appendix B_Surf FF-DC_Norfolk_4 Dec 2019_TrkChgs.docx DOCX document
Att (9A) Surf FF-DC Sect B_Price Evaluation Worksht_10 Dec 2019.xlsx XLSX spreadsheet
ATCH 10F_CBA_Great Lakes - GLAFFSP - FINAL.PDF PDF
ATCH 10E_CBA_Pearl Harbor - LMS - FINAL.pdf PDF
ATCH 10B_CBA_Norfolk - TAMP - FINAL.PDF PDF
ATCH 10D_CBA_Newport - NFSMWA - FINAL.PDF PDF
Surface FF_DC Washer and Dryer List_4 Dec 2019.pdf PDF
Att (L-17) Past Performance Information Form Mar 2017.pdf PDF
Att (L-16B) Norfolk Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Att (L-13D) CDRL A005 OTC Newport_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-12) Surf FF-DC COMS Consumables Report All Sites_Feb 2018 - Jan 2019.xlsx XLSX spreadsheet
Att (1C) Appendix C_Surf FF-DC_San Diego_1 Oct 2019.docx DOCX document
FFDC COMS MOPAS for RFP posting.pdf PDF
Exhibit (A6) CDRL A006 Quality System Plan (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (6) SCA Price Adjustment Form_10 Oct 19.xls XLS spreadsheet
ATCH 10B_WD 15-4341 (Rev.-12) Norfolk.pdf PDF
Att (L-14) Solicitation QuestionResponse Form_10 Oct 19.xlsx XLSX spreadsheet
Att (3) Quality Assurance Surveillance Plan_2 Jul 2019.doc DOC document
Exhibit (A5) CDRL A005 Inventory Report (w attach)_FF_DC_23 Oct 2019.doc DOC document
Att (L-16C) San Diego Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A4-1) Samplet Rpt for Annex of Exhibit A004_23 Oct 2019.xlsx XLSX spreadsheet
Att (L-13E) CDRL A005 Pearl Harbor_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-9B) Surf FF-DC Manpower Projection Workbook_7 Oct 2019.xlsx XLSX spreadsheet
Exhibit (A4) CDRL A004 Monthly Rpt (1423 and Annex only)_FF_DC COMS_23 Oct 2019.doc DOC document
.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.pdf PDF
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.pdf PDF
Att (1F) Appendix F_Surf FF-DC_RTC Great Lakes_1 Oct 2019.docx DOCX document
.Announcement_FinalRFP_11.20.2019.pdf PDF
Att (4) Data Item Transmittal_Acceptance_Rejection_ Form.pdf PDF
.N61340-20-R-0005 Surface FF_COMS_11.20.2019_FINAL.docx DOCX document
Att (1B) Appendix B_Surf FF-DC_Norfolk_1 Oct 2019.docx DOCX document
Att (1) Surface FF-DC COMS PWS_20 Nov 2019.DOCX DOCX document
Att (L-13F) CDRL A005 RTC Great Lakes_Inventory Report_2 Jul 2019.xls XLS spreadsheet
ATCH 10C_WD 15-5635 (Rev.-11) San Diego.pdf PDF
Att (L-13B) CDRL A005 Norfolk_Inventory Report_2 Jul 2019.xls XLS spreadsheet
Att (L-16E) Pearl Harbor Maint Sep 18 - Aug 19 dtd 7 Oct 19.pdf PDF
Exhibit (A1) CDRL A001 CFSR w attach_FF_DC COMS_23 Oct 2019.doc DOC document
Exhibit (A2) CDRL A002 Conference Minutes_FF_DC COMS_23 Oct 2019.doc DOC document
Evaluation Factor Guide Version 1.3 July 2019.docx DOCX document
Show all 50

Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 4

TRAINER SUPPORT GEAR

OFFICER TRAINING COMMAND (OTC-N) NEWPORT, RI

PART I - TRAINING SYSTEMS OR EQUIPMENT INFORMATION

1. TRAINING SYSTEMS OR EQUIPMENT.

The following are the Training Systems or Equipment (TS/E) attachments to this appendix: Each attachment provides description, location, normal operating hours and scheduling requirements, subsystems/assemblies not subject to supply support, major hardware list Degraded Capability Matrix (DCM).

ATCH
TS/E
S/N
TITLE
QTY
1
19F3A
1
Multipurpose Fire Fighting Trainer
1
2
DCWT
-
Damage Control Wet Trainer
1
3
FOM
-
Facilities
Lot
4
TSG
-
Trainer Support Gear
Lot

PART II - SITE OPERATIONS AND MATERIAL SUPPORT PACKAGE (MSP) INFORMATION

1. TRAINING SYSTEMS & EQUIPMENT (TS/E) NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

1.1 Government Scheduled Use (GSU).

Government Scheduled Use (GSU) can be found in each attachment for each trainer under paragraph 3, Normal Operating Hours and Scheduling Requirements.

2. MATERIAL SUPPORT PACKAGE (MSP).

2.1 Specific Inventories.

Inventory listings of these items are available at each training system and equipment location. Specific Inventories of all GFP, physically verified by the Government and Contractor, shall be formally turned over to the Contractor on or about the CSD for a given training system and equipment, for which the Contractor shall sign for and accept their custody. These inventories shall reflect both the existence and condition of these assets, and shall become the baseline inventory and the standard against which the Contractor is measured when the GFP is returned to the Government. (See PWS, Part 4, Paragraph 4.50, Material Support Package.)

2.3 Government Furnished Facilities (GFF).

2.3.1 GFF Coverage.

GFF consist of maintenance, storage, office, and trainer spaces.

2.3.2 GFF Square Feet and Contractor Custody.

The following GFF is intended to be placed in the custody of the Contractor for the term of the contract:

BUILDING
ROOM
DESCRIPTION
MEASUREMENT
1275
ALL
Trainer and Maintenance Areas - 19F3A
~21,300 sq ft
1276
ALL
Trainer Support Building (Shared Access)
~4,400 sq ft
1278
ALL
Propane Tanks (2)
3,900 Gal
1279
ALL
Equalization Basin and Transfer Station Support Areas
~785 sq ft
1280
ALL
Water Tank
118,000 Gal
403
ALL
Trainer Area - DCWT
~700 sq ft

3. CONSUMABLES.

3.1 Contactor Responsibility.

The Contractor shall purchase and account for the consumables necessary for firefighting and damage control training. Note: Excludes consumables required for scheduled maintenance. Consumables include the following:

CONSUMABLES FOR FIRE FIGHTING TRAINERS

Propane
Smoke generation fluid
Nitrogen for smoke generator
CO2
AFFF surrogate (detergent)
CO2 extinguisher cartridges with seals
Sulfuric acid (70%)
Foam control agent for waste water treatment (Polydimethylsiloxane or equivalent anti-foam agent)

Oxygen for PECU

CONSUMABLES FOR DAMAGE CONTROL WET TRAINER

Wood – 10footers 4x4 Douglas Fir and additional wood material utilized for trainer shoring purposes as needed
LED light cap/cover “kit”
LED Batteries (14 qty) 6 volts universal
Water Chemistry treatment supplies necessary to maintain requirment cited in Attachment 2 Section 1.5.1, to include but not be limited to chlorine and cyanuric acid.
Water Chemistry Testing Supplies
Rubber Bumpers

Refer to the Unified Facilities Criteria (UFC) 4-179-01 dated 16 January 2004, Appendix A (MIL-HDBK 1027/1B) for additional information regarding agent surrogates.

Contractor will be reimbursed for these items.

3.2 Fire Fighting Preventive Maintenance Gases.

Contractor must procure at its expense all items, materials, gases, etc. required to perform all preventive maintenance actions necessary for calibration and alignment (e.g., span and zero gas used for calibration of the propane detection system). These items include, but are not limited to, certain test gases that are expensive. Exception: if the government requires the use of the contractor procured test gases when performing a re-host or other modification to the trainers, then the contractor may request reimbursement through the consumables contract line item.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

APPENDIX D

OFFICER TRAINING COMMAND (OTC-N) NEWPORT, RI

D-1

1. DESCRIPTION.

1.1 General.

The training system simulates Class A, B, and C shipboard fire emergencies in a realistic environment, using live, computer-controlled propane-fueled fires. These simulated fire emergencies are staged, under program control in structures called fireplace compartments that are built to resemble equipment or locations aboard ship where actual fires can occur. Fireplaces simulating shipboard components are as follows: (1) Class A Fireplaces (Combustibles): Storage Compartment, Mattress, Storage Locker, Trash Can, Ventilation Duct, and Clothes Dryer; (2) Class B Fireplaces (Oil Based): Oil Spray/Bilge, Prop Shaft, Deep Fat Fryer, and Pit; (3) Class C Fireplaces (Electrical): Motor Generator, Radar Console, Electrical Panel, and Wire Bundle. Also, trainer smoke for the fireplaces is simulated, non-polluting, non-toxic and is provided under operator or scenario control for realistic training in a visibility impaired environment. The fires can be controlled from a smoldering state to full involvement, and are controlled to respond realistically to the trainee’s application of extinguishing agents. Each fireplace consists of a mock-up of the item that is involved in the fire, one or more burner head assemblies, and agent collector/detector sensors. A propane burner control assembly in an adjoining room provides a controlled source of propane to each burner head assembly. A standard agent collector/detector sensor assembly is used for all fireplaces, augmented by additional sensors, as required for special purposes.

1.2 Trainee Station.

There are fourteen (14) trainee stations located within the nine (9) training compartments where fires are generated in mockups which duplicate actual shipboard fires. The configuration allows the trainee to attack a fire and extinguish it while having to maneuver around obstacles surrounding the area.

1.3 Instructor Operator Station.

Each Instructor Operator Station (IOS) is equipped with one (1) QuickPanel display with touch input for controlling their associated compartment fires and monitoring of the environment to prevent unsafe conditions. In addition, indicators showing the results of trainee operation of simulated equipment are located on the monitor. Controls are provided for introduction and cessation of fire, smoke, and ventilation fans. All fuel flow ignition controls can be secured in an emergency at the IOS or at remote locations within the trainer. Temperature, propane alert levels, and the fireplace state for each training compartment are monitored at the IOS. An audio system allows for communications between the IOS operator and personnel located within the trainer. There are two (2) IOSs located in the control room.

1.4 Computer System.

The original GE Series Six PLC ladder relay logic software was converted to a newer variant of PLC ladder relay logic for the new RX3I PAC System. This PLC System design has been integrated into the existing peripheral systems and provide complete control of all inputs and outputs of the trainer through an integrated IOS. The software used to read inputs from the fireplaces and CCPs, compute fireplace states, and drive outputs to control the training scenarios run on a single PLC System that has Input/Output (I/O) nodes in each compartment (including Pit Fireplace) or group of compartments.

1.5 Other.

N/A

2. LOCATION.

Building: 1275Description: Trainer and Maintenance Areas-19F3A21,300 square feet
Building: 1276Description: Trainer Maintenance Support Building4,400 square feet
Building: 1278Description: Propane TanksN/A square feet
Building: 1279Description: Equalization Basin and Transfer
Station Support Areas785 square feet
Building: 1280Description: Water Tank, 118,000N/A square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: 19F3A
SERIAL #: 1
LOCATION: NEWPORT, RI
TITLE: Multipurpose Fire Fighting Trainer
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
Task
OHPD
From:
To:
From:
To:
From:
To:
01
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note: Local climate temperatures fluctuate during the summer. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE
NTE

QUANTITY

Trainer Support Gear
Lot

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
Instructor Operator Station (with touch input display, printer, and associated control equipment)
2
b.
Primary Control Panel
1
c.
Training Compartments (with ship equipment mock-ups)
9
d.
Training Compartment Fireplaces
14
e.
Compartment Control Panels
9
f.
Burner Control Assemblies (including associated piping, pilots, and burner elements)
22
g.
Agent Detectors
58
h.
Propane Detection System (including sensors, drawn sample units, intake filters, and calibration units)
10
i.
Smoke (Fog) Generation System (including controls, pumps, fog heads, piping, wiring, etc.)
25
j.
Electronic Enclosure Assembly (EEA) (control equipment)
9
k.
Processor Rack Assembly
1
l.
Sound Powered Telephone System (handsets, call stations, SPT relay, jacks, and wiring)
37
m.
Trainer Communications System (including speakers, microphones, headsets, amplifiers, jacks, and wiring)
18
n.
Manual Emergency Shutdown (E-Stop) System
22
o.
Propane Block and Vent System
2
p.
Temperature Monitor System
9
q.
Trainer Lighting System (switches, hazard lights, emergency lights (battle lanterns), and maintenance lights)
85
r.
Damage Control (DC) Central Panel Assembly
2
s.
Engineering Work Station (PLC Maintenance Laptop)
1
t.
Undervoltage Monitor Assembly
1
u.
Magnetic Contactor/Control Panel Assembly
3
v.
Filter Cabinet Assembly
1
w.
Main Power Securement Panel
1
x.
Power Securement Panel
2

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components.

6. DEGRADED CAPABILITY MATRIX (DCM).

The following user trainer operability designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

CONTROL SYSTEM/IOS

PLC/PC AND RELATED ELECTRICAL SYSTEMS
10
MONITOR
5
IOS CONTROLS
25
PRIMARY CONTROL PANEL
35
CONTROL CONSOLE
25
DATA TERMINAL CABINET
30

PROPANE SYSTEM

STORAGE AND TRANSFER SYSTEM
30
BLOCK AND VENT SUBSYSTEM
20
TRAINER PROPANE SYSTEM
25
PROPANE DETECTION AND MONITORING
25
PILOT FLAME SYSTEM (EACH FIREPLACE)
15
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED
MAIN FLAME SYSTEM (EACH FIREPLACE)
20
DISABLE FIREPLACE (FP), OTHER FUNCTIONAL FP CAN BE OPERATED

HEATING, VENTILATION, AIR CONDITIONING SYSTEM (HVAC) SYSTEM

TRAINER HVAC VENTILATION SYSTEM (FANS)
25
TRAINER HVAC LOUVER SYSTEM
20
IF THE SYSTEM IS MECHANICAL (GRAVITY) THEN THE TRAINER CAN OPERATE IF FAILED ITEMS ARE REMOVED. IF TRAINER IS ELECTRICALLY ACTUATED THEN THE TRAINER IS NOT OPERABLE

ELECTRICAL SYSTEM

MAINTENANCE LIGHTING
5
EMERGENCY LIGHTING
20
GENERAL LIGHTING
5

WATER SUPPLY SYSTEM

WATER TANK
15
ALTITUDE VALVE
15
CATHODIC PROTECTION SYSTEM
5
TANK HEATING SYSTEM
10
WILL DEPEND ON WEATHER CONDITIONS. MUST BE BELOW FREEZING TEMPERATURES.
PROCESS WATER PUMP (EACH)
20
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.
FIRE HOSE STATION (EACH)
5
DO NOT RECOMMEND TRAINER OPERATION WITHOUT WATER AVAILABLE.
P-100 PUMP
10
SAFETY SPRINKLER SYSTEM
20
CURRENTLY NOT IN USE (MUST VERIFY)

AIR COMPRESSION SYSTEM

HIGH PRESSURE AIR COMPRESSOR
10
LOW PRESSURE AIR COMPRESSOR
20
EMERGENCY AIR BREATHING SYSTEM
20
HEAT EXCHANGER
5

WASTE WATER SYSTEM

RECIRCULATION PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
EFFLUENT PUMP
15
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH MONITORING SYSTEM
20
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH PROBE
10
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
PH RECORDER
10
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
CHEMICAL METERING PUMP
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
AGITATION PUMP
5
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.
EQUALIZATION BASIN
10
DO NOT EXCEED WASTE WATER TANK (WWT) LEVELS. OTHERWISE TRAINER NOT OPERABLE.

SCBA AIR SYSTEM AND FIRE EXTINGUISHER REFILL SYSTEM

AIR COMPRESSOR
20
ONLY IF ENOUGH SCBA’S ARE AVAILABLE FOR TRAINING.

DRY CHEMICAL FIRE EXTINGUISHER CHARGING SYSTEM

CO2 REFILL SYSTEM
25
LIMITED TO WHETHER USER CAN TRAIN WITHOUT CO2 UNTIL REPAIRS ARE MADE.
CO2 TRANSFER PUMP
25
LIMITED TO WHETHER USER CAN TRAIN WITHOUT CO2 UNTIL REPAIRS ARE MADE.

STRUCTURAL AND OTHER

SMOKE GENERATING SYSTEM
10
LIMITED TO WHETHER USER CAN TRAIN WITHOUT SMOKE UNTIL REPAIRS ARE MADE
GRATING
10
FRAME STRUCTURE
10
FIREPLACE STRUCTURE/BULKHEAD
10
DOORS
10
PERMIT WARRANTY, CERTIFICATIONS
10
UNLESS CERTIFICATION IS REQUIRED BEFORE TRAINING IS ALLOWED.
WATER COLLECTION/AGENT SENSING SYSTEM
10
MOCK UPS
5

COMMUNICATIONS EQUIPMENT

SOUND POWERED PHONE STATION
2
TRAINER COMM SYSTEM (1MC)
15
MUST PROVIDE ALTERNATIVE FOR ACTIVE COMMUNICATIONS

Failure of any fireplace subsystem shall the render the affected fireplace not operable. These include pilot and main flame assemblies, agent detection assemblies. Refer to the table above for further details.

Failure of any system or subsystem to be in the propane piping and propane assemblies shall render the entire trainer not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire trainer not operable. Refer to the table above for further details.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 1

MULTIPURPOSE FIRE FIGHTER TRAINER

19F3A

1. DESCRIPTION.

1.1 General.

The Damage Control Wet Trainer (DCWT) is a free-floating wet trainer designed for training students applicable damage control procedures. The trainer is approximately thirty-five (35’) by twenty feet (20’). The trainer floats in a 38,000 gallon pool of water supported by chlorine, filtration, CO2, and climate control systems. The trainer contains designated “damage” for the training of students. There are nine (9) spaces on the wet trainer. Three of these spaces are considered “wet” spaces and are utilized during wet trainer operations. The remaining spaces are “dry” spaces are utilized as support spaces during training. In addition to the nine enclosed spaces, the topside of the trainer is utilized extensively during training evolutions.

1.2 Trainee Station.

The trainee stations are located within the training compartments and consist of locations where controlled flooding and leaks are generated in the mockups to duplicate actual shipboard emergencies. The configuration allows the trainees to track and repair an emergency while having to maneuver around obstacles surrounding the area.

1.3 Instructor Operator Station.

The instructor (or operator) stations contain the valves, gauges, lighting controls, emergency stops and viewing ports for all equipment included in the trainer. In addition, indicators showing the results of trainee operation of simulated equipment are located on these panels. All water flow may be secured in an emergency manually from locally operated valves.

1.4 Computer System.

N/A

1.5 Other.

1.5.1 Water Chemistry

The DCWT includes all necessary water flow, lighting and ventilation to the training compartments. Additionally, it includes automatic filtration and chemical treatment to maintain the water chemistry within NAVMED P-5010-4 (Rev. 6-2002) standards.

The contractor shall maintain preventative and corrective maintenance to the water treatment system which includes, but not limited to: the chlorinator, sensors, pump, piping, and valves. Chlorinator maintenance includes monthly inspection, electrode cleaning, testing and calibration, in addition to semi-annual peristaltic pump tube replacement and chemical replenishment as needed:

Water Chemistry. Contractor shall maintain water chemistry, to include: mixing chemicals and adding chemicals to maintain required chemical balance and chlorine levels, in accordance with Manual of Naval Preventative Medicine, Chapter 4 Swimming Pools and Bath Places 4 (NAVMED P-5010-4). Contractor shall perform System Readiness Test (SRT) with water chemical testing results reported daily before and after each training evolution to the COR office. When water chemistry is out of established acceptable range of ph of 7.2- 8.0, Free available chlorine (FC) of 1.5-5.5 ppm, Total available chlorine (TC) 1.5-5.5 ppm, and Combined chlorine greater than 0.5 ppm, the trainer is considered out of commission (OOC). The Contractor shall procure chemicals and other items needed to test the water used for training. The Contractor shall submit a summary of the daily results in the monthly report in the format provided. If a deviation occurs on any day of the month, immediate notification of the COR is required.

2. LOCATION.

Building: 403 Description: DCWT 700 square feet

3. NORMAL OPERATING HOURS AND SCHEDULING REQUIREMENTS.

3.1 Government Scheduled Use (GSU).

The normal training system and equipment-operating window shall be as follows:

NORMAL TRAINING HOURS

DEVICE: DCWT
SERIAL #: -
LOCATION: NEWPORT, RI
TITLE: Damage Control Wet Trainer
WEEKDAY (Monday - Friday)
SATURDAY
SUNDAY
TASK
OHPD
From:
To:
From:
To:
From:
To:
02
9
0700
1600
-
-
-
-

OHPD = Operational Hours per Day

Note: Local climate temperatures fluctuate during the summer. If temperatures exceed 90ºF (degrees Fahrenheit) on the Wet-Bulb temperature index, the Government will have to discontinue training. If temperatures continually exceed this Wet-Bulb temperature limit, the Government will adjust working hours to accommodate fleet training requirements.

4. SUBSYSTEMS OR ASSEMBLIES REQUIRING CONTRACTOR MAINTENANCE BUT NOT SUPPLY SUPPORT.

Below are subsystems or assemblies for which the Government is responsible for Supply Support. The Contractor shall be responsible for Organizational Level on-line and off-line maintenance, and for requisitioning material and Depot Level support, as appropriate.

NOMENCLATURE

NTE

QUANTITY

Trainer Support Gear

5. MAJOR HARDWARE LIST*.

NOMENCLATURE
NTE

QUANTITY

a.
P-100 Water Pumps
3
b.
Fire Pumps
3
c.
Battle Lanterns
14

*This major hardware list is not all inclusive of the trainer equipment, assemblies and components.

NOTE: Consumable items will be purchased by the contractor IAW Appendix D, Section 3.0 Consumables.

6. LINES OF DEMARCATION.

COMS are responsible for all components in the trainer itself, attached to the trainer internally or externally, or points of physical interaction where the ship hull is contacted. Water fill and suction equipment in direct support of the wet trainer which includes, but not limited to pump controllers, fire pumps, recirculation pumps, filtration systems, piping, and valves within the floating trainer. The “pool”, chlorine injection system, and water circulation and filtration system is the responsibility of COMS. Trainer Support gear such as P100 repairs, bucket patch, and bumper standaoff assembly repair and refurbishment is covered by COMS. COMS are not responsible for the building surrounding the trainer.

7. DAMAGE CONTROL (DC) DEGRADED CAPABILITY MATRIX (DCM).

The following user Damage Control (DC) Degraded Capability Matrix (DCM) designations are assigned as a result of each system or subsystem(s) failure. Unless otherwise indicated, the operability designations are for each system or subsystem identified.

Degraded Capability Matrix (DCM)

FAILED SYSTEM(S)/

SUB-SYSTEM

PERCENT DEGRADED
LIMITATIONS/CONDITIONS

INSTRUCTOR OPERATOR STATION

Valves
20
Gauges
20
Lighting Controls
15
Weather conditions must allow adequate visibility.
Emergency Stops
20
Viewing Ports
10
Requires safety observers instead.
Indicator Instruments
10
Only if indicator is not directly safety related and there are other means to measure performance of the system/subsystem.

WATER TREATMENT SYSTEM

Chlorinator
20
Sensors
20
Pump
25
Piping
20
Valves
20

HARDWARE

P100
20
18 Ft. Shoring Material
20
Skills training are limited to what is available.
3 to 5 Ft Steel Shores
15
Skills training are limited to what is available.
Battle Lanterns
15
Weather conditions must allow adequate visibility and skills training are limited to what is available.
6 to 11 Ft Steel Shores
15
Skills training are limited to what is available.
Water Tight Doors (WTD)
25
Water Tight Hatches (WTH)
25
Sound Powered Phones
5
Must have other means to communicate.
1 1/2 Tri-Gates
10
Skills training are limited to what is available.
1 1/2 Fire Hose
10
Skills training are limited to what is available.

MAIN WATER SUPPLY SYSTEM

Pump Controllers
30
Fire Pumps
25
Recirculation Pumps
30
Filtration Systems
20
Piping
20
Valves
20

VENTILATION SYSTEM

Fans
10
Must provide other means for proper ventilation.
Fan Control
15
Must provide other means for proper ventilation.

Failure of the Water Treatment system shall the render the DCWT not operable. These include chlorinator, sensor, pump, piping and main valves. Refer to the table above for further details.

Failure of any system or subsystem in the water supply shall render the entire DCWT not operable. Refer to the table above for further details.

Failure of any safety system in shall render the entire DCWT not operable. Refer to the table above for further details

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 2

DAMAGE CONTROL WET TRAINER

1. FACILITIES.

This section identifies the major facility systems and equipment the Contractor will be responsible for organizational level and corrective maintenance.

1.1 Heating, Ventilation, Air Conditioning (HVAC) System.

NOMENCLATURE
NTE

QUANTITY

a.
Packaged Roof Top Air Conditioning Units
2
b.
Air Handling Units
3
c.
Exhaust Blowers
7
d.
Dampers
122
e.
Unit Steam Heaters (within training and maintenance spaces, excluding passageways)
40

· Ventilation and air conditioning for the trainer buildings are stand-alone systems for which the Contractor is responsible.

· System includes: piping, wiring, ducting, thermal insulation, louvers, ducts, registers, mounting and holding hardware, controls, indicators, interlocks, alarms, fans, blowers, motors, valves, dampers, fittings, adapters, and filters.

· Heat for the Fire Fighter support facility is provided via the facility-wide propane system that will be maintained by the Contractor; responsibility shall commence at the interface points delineated in paragraph 2.0.

1.1.1 Air Compression Systems.

NOMENCLATURE
NTE

QUANTITY

Low Pressure Air Compressor
1
High Pressure Air Compressor
1

· The items include: receivers, dryers, regulators, filters, separators, heat exchangers, valves, piping, wiring, mounting hardware, compressors, reducers, fittings, tubing, indicators, controls, transducers, and all specific controls and tubing for HVAC control.

1.2 Propane System. The Contractor shall provide refueling of the propane tanks and operational (DORT) support only of the propane system to support all training evolutions.

NOMENCLATURE
NTE

QUANTITY

a.
Storage Tanks: 4,500 gals each
2
b.
Propane Vaporizers
2 Banks
c.
Gas Meter
1

· System includes: meters, piping, gauges, valves, strainers, wiring and electrical controls.

NOTE: NAVFAC is responsible for the propane farm to the block and vent since it is class 2 property. The FFT COMS contractor shall be responsible for operational maintenance and reporting any corrective and preventative maintenance and cathodic protection concerns to the TA and COR.

1.3 Water Supply System.

NOMENCLATURE
NTE

QUANTITY

a.
Water Tank: 118,000 gals (Preventative Maintenance Only)
1
b.
Altitude Valve
1
c.
Cathodic Protection System
1
d.
Tank Heating System
1
e.
Process Water Pumps
2
f.
Fire Hose Stations
12
h
Cooldown/Safety Sprinkler System
1

· System includes: all valves, fittings, piping, meters, gauges, mounting hardware, insulation, filters and strainers.

1.4 Waste Water System.

NOMENCLATURE
NTE

QUANTITY

a.
Waste Treatment Basin: 85,000 gals
2
b.
Recirculation Pumps
2
c.
Effluent Pumps
2
d.
pH Monitoring System
1
e.
Chemical Metering Pumps
4
f.
Agitation Pumps
2
g.
Equalization Basin
2

· System includes: all piping, fittings, valves, storage containers, mounting hardware, floor drains, insulation, traps, separators, wiring and electrical controllers.

NOTE: A daily of all sampling data and chemical additions will be maintained by the system operator. A monthly report, summarizing sampling data, is required.

1.5 Air Pack Charging System.

NOMENCLATURE
NTE

QUANTITY

a.
SCBA Air Compressor
2

· System includes: cascading fill system, storage bottles, fill station and carbon monoxide monitor. Compressor may be used by firefighter staff for filling of user’s bottles.

· Quarterly air sampling required in accordance with (IAW) ANSI/CGA G-7.1 1989, Table 1 Grade D.

1.6 Carbon Dioxide CO2 Transfer and Re-Charge System.

NOMENCLATURE
NTE

QUANTITY

a.
CO2 Storage Tank: 4000 lbs
1
b.
CO2 Transfer Pump
1

· System includes: controls, funnels, scales, charging adapters, piping, fittings, valves, indicators, controls, hoses, and gauges.

· Includes all supply and replenishment of PKP surrogate, CO2 chemical fire extinguishers used for training.

1.7 Electrical System.

The items includes: breaker panels, data terminal cabinets, controls, indicators, alarms, relays, receptacles, fixtures, bulbs, switches, wiring and cabling back to the main breaker of the component in question, conduit and fittings, mounting hardware and equipment, fuses, breakers, motors, controllers, lighting, wiring, clocks, magnetic contactor panels, lighting control and transformers.

1.8 Natural Gas.

Not applicable

1.9 Eyewash/Showers.

The Contractor is responsible for maintaining all Eyewash/Showers.

2.0 LINES OF DEMARCATION

2.1 General.

This section identifies the major dividing points between Contractor and Government responsibilities relating to utility services. The COR can provide the Contractor with further clarification on these interfaces. Generally, Contractor’s responsibilities for maintenance shall begin at the earliest leg off a main for the purpose of use to the trainer, and includes all Facilities and systems within the fence line, both above and below ground, of the Fire Fighting and Damage Control Training Facility compound. It also includes demarcation points external to the fence line as indicated. These interfaces apply to the entire compound, and include each of the training system and equipment.

2.2 Control Air System.

Contractor is responsible for those items identified heretofore that are connected to components of previously discussed subsystems and are required for the control air system to function.

2.3 Domestic Water.

Not applicable.

2.4 Electrical.

Contractor shall be responsible for the lighting and power distribution system for the equalization building, propane system and trainer building. Responsibility will commence at the load side of the supply transformers and include all equipment and components supplied by the distribution system. Additionally, the following electrical components which directly support the trainer but are powered from the utility building shall be the responsibility of the contractor. The contractor shall also be responsible for receptacles and lighting in the Utility Building spaces. The responsibility of the Contractor shall start at the load side of the breaker and shall include all equipment and components being supplied.

2.5 Heating, Air Conditioning, Ventilation System.

Contractor is responsible for those items identified heretofore. The steam generation system will be maintained by the Government, but Contractor shall retain responsibility for the heaters off this system that are within the Training Building and the AFFF Fill Station.

2.6 Natural Gas.

Not applicable.

2.7 Pressure Sewer.

Contractor will be responsible for the entirety of the pressure sewer, including discharge into the main sewer line.

2.8 Process Sewer.

Contractor will be responsible for the entirety of the process sewer.

2.9 Process Water.

All water utilities will become the responsibility of the Contractor immediately after the thrust block and will include all valves in the originating leg off the main.

2.10 Propane System.

Contractor is responsible for the operation and maintenance of the entire system, including the fill station, storage tanks, vaporizers, above ground propane distribution piping, and the propane and power failure alarm control panel.

2.11 Sanitary Sewer.

Responsibility for all sanitary sewer lines will commence at the junction with the main in manholes.

2.12 Steam and Condensate.

Contractor responsibility for steam shall commence at the inlet of the two (2) 4 inch gate valves, which mark the steam split in the Utility Trench. Contractor shall be responsible for all system components downstream of the split. Contractor responsibility for condensate shall consist of all condensate piping within the Trainer Building, up to and including the inlet valve (Condensate Valve #7) to the Condensate Tank in the Mechanical Room.

2.13 Storm Drains.

Not applicable.

Surface FF-DC COMSN61340-20-R-0005
PWS # 66410-A-04521 Oct 2019

ATTACHMENT 3

FACILITIES

1. TRAINER SUPPORT GEAR.

The items identified in the below subparagraphs will be Government furnished and maintained by the Contractor. Replacement of these items will be provided by the Government.

NOTES:

(1) Contractor must have a program in place in order to properly monitor and conduct maintenance requirements. This program must be detailed, accurate and holding contractors accountable for all maintenance requirements. This program will be able to track all SCBA’s, SCBA bottles, and all training support gear within the FFTs and DCWT compound. Including, Fire Protective Gear (FPG), gloves, helmets, P-100’s, Portable Exothermic Cutting Unit (PECU), firefighting helmets, etc.

(2) Quantity* required is the number of each item required to be available in a Fully Operational Condition for each Government scheduled use.

1.1 Extinguishers.

NOMENCLATURE
NTE

QUANTITY*

CO2 Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect Hydrostatic Test

Oxygen Bottles Fill Maintain Inspect Hydrostatic Test 200 lbs

AFFF Surrogate Fire Extinguishers Fill Maintain Pre-stage in Structures Inspect

1.2 Self-Contained Breathing Apparatus (SCBA).

NOMENCLATURE
NTE

QUANTITY*

Composite Cylinders Fill Pre-stage in Training Areas

Packs (frame, belts, harnesses, regulator, hoses, masks) Pre-stage in Training Areas Clean

1.3 Personal Protection Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Protection Gear (FPG) Pre-stage in Training Areas Clean/Launder and Dry Inspect Repair

Fire Fighter Helmets Pre-stage in Training Areas Inspect Repair

Fire Fighter Flash Hoods Pre-stage in Training Areas Launder and Dry Inspect Maintain Repair

Fire Fighter Gloves Launder and Dry Inspect Maintain Repair 100 pair

Fire Fighter Boots Pre-stage in Training Areas Inspect Maintain Repair 125 pair

Damage Control Helmets Pre-stage in Training Areas Clean and Dry Inspect Maintain Repair

1.4 Fire Fighting/Damage Control Equipment.

NOMENCLATURE
NTE

QUANTITY*

Fire Hoses Pre-stage in Training Areas Inspect Maintain Repair Hydrostatic Test

Fire Hose Nozzles Pre-stage in Training Areas Inspect Repair

AFFF Hose Reels Pre-stage in Training Area Maintain Certify Repair

P-100 Portable Fire Hose/De-Water Pumps Fill oil & fuel Pre-stage in Training Areas Inspect Repair

Portable Battle Lanterns Pre-stage in Training Areas Inspect Maintain Repair

Water Tight Doors Inspect Maintain and Repair 20 at Fire School, 3 at DCWT

Hatches/Scuttles Inspect Maintain and Repair 2 at Fire School, 9 at DCWT

1.5 Miscellaneous (Other).

Industrial Clothes Washer Maintain Inspect Repair

Commercial Clothes Dryer Maintain Inspect Repair