Exhibit (A3) CDRL A003 Mob PSR w attach_FF_DC_23 Oct 2019.doc
DOC document 172 KB Posted
- Attached to
- Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services Federal contract opportunity
- Solicitation number
- N61340-20-R-0005
About this file
This document provides details for a federal solicitation seeking Surface Fire Fighter and Damage Control Contractor Operation and Maintenance Services. The Naval Air Warfare Center Training Systems Division is soliciting proposals for a firm-fixed price contract with cost reimbursable lines for consumables. The contractor will provide all labor, materials, equipment, and transportation to maintain training systems and equipment at seven commands located at six geographic sites, including Mayport, FL, Norfolk, VA, Newport, RI, San Diego, CA, Pearl Harbor, HI, Great Lakes, IL. The period of performance is one base year with four one-year options. This is a 100% small business set-aside with an NAICS code of 541330 and size standard of $41.5M. The proposal due date is listed in the RFP. The document also provides a Management and Oversight Process for the Acquisition of Services appendix.
View the file
Other files for this federal contract opportunity
Show all 50
Surface Fire Fighter and Damage Control Contractor Operation & Maintenance Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A ASK \* MERGEFORMAT |
| TDP |
| TM |
| OTHER MANAGEMENT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| FF / DC COMS |
| N61340-20-R-0005 |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| TECHNICAL REPORT – STUDY/SERVICES |
| MOBILIZATION COMS/CMS CONTRACTOR PERFORMANCE REPORT |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-MISC-80508B |
| PWS, PARA 3.7 |
NAWCTSD COMS
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| BI-WE |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
SEE BLK 16
| Reg |
| Repro |
| 16. REMARKS |
| NAWCTSD COMS** |
1. BLK 4: ONLY DID PARAGRAPH 3(C)(2) APPLIES.
2. SEE ANNEX TO EXHIBIT A003 FOR SAMPLE REPORT CONTENTS. ALL ANNEX PARAGRAPHS APPLY.
3. SUBMISSION SHALL INCLUDE ALL ASPECTS OF THE MOBILIZATION PLAN. FOR EXAMPLE, THE STATUS OF ANY PERSONNEL (NUMBER, DOL CATEGORY, FULL-TIME/PART TIME), INVENTORY STATUS, TRAINING REQUIREMENTS STATUS, ETC.
4. BLKS 12/13: MOBILIZATION COMS CONTRACTOR PERFORMANCE REPORTS ARE REQUIRED DURING THE MOBILIZATION PERIOD AND SHALL BE SUBMITTED TO THE COR FOR SIGNATURE THE FRIDAY OF THE 2ND AND 4TH FULL, FIVE-DAY (MONDAY THROUGH FRIDAY) WORKING WEEK OF EACH MOBILIZATION MONTH. DISTRIBUTION OF COPIES VIA E-MAIL ARE DUE WITHIN THREE (3) DAYS AFTER RECEIPT OF COR SIGNATURE.
5. THE GOVERNMENT WILL HAVE FIFTEEN (15) WORKING DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION OF EACH SUBMISSION. NO RESPONSE WILL INDICATE ACCEPTANCE.
6. BLK 14: REPORTS FOR COR ADDRESSEES SHALL BE DISTRIBUTED TO ONLY THE RESPECTIVE SITE COR’S*. NAWCTSD ** ADDRESSEES SHALL RECEIVE ALL REPORTS. SUBMITTED REPORTS SHALL BE SENT VIA E-MAIL. E-MAIL SUBJECT LINE SHALL INCLUDE CONTRACT NUMBER, CDRL DATA ITEM NUMBER, LOCATION AND PERIOD (E.G., N61340-XX-X-XXXX A003 XX FEB 2019). ALL REPORTS SHALL BE ATTACHMENT FILES TO THE EMAIL. ALL REPORTS SHALL BE IN MICROSOFT© EXCEL 2016 OR LATER SOFTWARE FORMAT. E-MAIL ADDRESSES ARE PROVIDED IN THE CDRL ADDRESSEE LIST.
7. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION B: DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES ONLY, (ADMINISTRATIVE OR OPERATIONAL USE), (23 OCT 2019). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, (CODE GT43200), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.
NAWCTSD PCO**
NAWCTSD PJM**
CONTRACT SPECIALIST**
COR*:
MAYPORT
NORFOLK
SAN DIEGO
NEWPORT
PEARL HARBOR
RTC GREAT LAKES
SWOSU GREAT LAKES
| 15. TOTAL ▬▬▬▬► |
| 0 |
| 0 |
| 11 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| I. AUZENNE, LOGISTICS MANAGER |
| 23 OCT 2019 |
| R. SOTO-ALBINO, PJM |
| 23 OCT 2019 |
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 6 Pages
ANNEX TO EXHIBIT A003
MOBILIZATION COMS/CMS CONTRACTOR PERFORMANCE REPORT
N61340-20-R-0005 CDRL REQUIREMENT
1.0 Report Contents.
1.1 Header Information. Data elements to be provided as header information are as follows, in the order shown:
a. Contract. Enter appropriate contract number.
b. Contractor. Enter name of contractor's firm.
c. Reporting Period. Enter the start and completion dates for the contract period the report is being prepared. Use a MMDDYY numerical format for each date.
1.2 Report Body.
1.2.1 General. This report documents summarizes status and contractor performance for the Training Systems Support contract. This report documents performance data relative to Contractor training equipment maintenance, repair and utilization during a specified performance period. The main body of each report shall be completed in accordance with the attached sample format. Block 16 of each Contract Data Requirements List (CDRL) shall tailor each report’s requirements by applying CDRL annex paragraphs 2.1 and 2.2, with attached sample formats, as applicable. Entry of actual data shall be made in the appropriate column for the period covered by the report.
1.2.2 Format. The report shall contain up to four parts as specified in the contract. The summary portion Part II, Part III, and Part IV shall be presented in columnar format to facilitate reporting of data on multi-station devices/equipment items or where multiple devices/equipment items are collocated (refer to applicable samples). Any of the following formats may apply as per block 14 and 16 of the CDRL:
1.2.2.1 Hard Copy. Where applicable, individual areas shall be prepared as delineated in the contract on 8 ½” by 11” to 11” by 15” size paper.
1.2.2.2 Magnetic Media. Where applicable, individual area files shall be placed on Compact Disc Recordable/Re-Writable (CD-R/CD-RW; 1x-4x drive capable media) optical disc. Magnetic files shall be compatible to Microsoft Office 2016 formats as specified in block 16 of the CDRL.
1.2.2.3 E-Mail. Reports shall be attached files to E-Mail that are compatible to Microsoft Office 2016 formats as specified in block 16 of the CDRL.
2.0 Report Content. The Mobilization Contractor Performance Report shall consist of the following areas:
2.1 Part I – Performance Report Summary. The main body of the report shall contain information on the distribution, work accomplished, manning, and problem areas encountered. Data elements not applicable to a specific device/equipment item shall be marked “NA” for alphanumeric fields and “0” (zero) for numeric fields. Data elements to be addressed are as follows, in the order shown. (See Figure 1 for a sample Contractor Device/Equipment Performance Report.)
a. To. Addressees shall be in accordance with the contract.
b. From. Name of contractor providing services.
c. Title. Data shall be titled the same as the data item description.
d. Device/Equipment nomenclature. Identify by nomenclature the trainer(s) which is/are the subject of the report (e.g., OFT or Pioneer UAV).
e. Device/Equipment Number. Identify alphanumeric training device/equipment designation number assigned to the device/equipment and weapon system. If the device/equipment does not have a device number, enter device/equipment name and weapon system (e.g., CBT/F/A-18 or 2F132/F/A-18).
f. Serial Number. Enter alphanumeric serial number or Bureau Numbers (BUNO) assigned to the device/equipment. To enable alphanumeric sorting, leading zeros (e.g., 000001, 000002) are required for numeric serial numbers.
g. Training Equipment/Device Designator Prefix. Enter as a separate alpha character the initial character (prefix) of the training device designator. The default is “blank”, which is the Cog 2”O” designator. Typical designators are prototype (“X”), Army (“A”), Air Force (“B”), non-Cog 2”O” (“S”), Interactive Courseware Hardware (“I”).
h. Contract Number. Self-explanatory. A character alphanumeric field contract number.
i. Contract Support Period. Enter the start and completion dates of the contract. Use a MMDDYY numerical format for each date.
j. Date of Report. Enter the date that the report is completed. Use a MMDDYY numerical format.
k. Report Period. Enter the ending date of the period covered by the report using a YYYYMMDD numerical format. When data is reported on a quarterly basis, use the last month in the quarter.
l. Activity Serviced/Device/Equipment Location. Enter by character alphanumeric field the activity assigned as the device/equipment custodian.
m. Activity Unit Identification Code (UIC). Enter the 5-digit Unit Identification Code (UIC) assigned to the custodian activity.
n. Report No. Number the reports consecutively throughout the contract period. Use a 3-digit numeric field.
o. CASREP. Identify whether or not the device was CASREP during the reporting period (“Yes” or “No”).
p. Personnel Time Distribution. The time distribution of all contractor personnel for the report period covered shall be classified in the following categories:
(1) Operation
(2) Scheduled Maintenance
(3) Unscheduled Maintenance
(4) Supply Support
(5) Authorized Contractor Modification
(6) Training of Contractor Personnel
(7) Verification of Documentation
(8) Other
For each category, enter the number of hours to the nearest hour, a numeric field limited to 99999.
q. Trainer Downtime. The number of hours the trainer/Equipment was down and not available for scheduled training shall be reported. Downtime hours shall be classified as follows:
(1) Maintenance
(2) Device Modifications
(3) Parts/Supply Problems
(4) Facility Problems
(5) Lack of Instructors/Operators
(6) Lack of Setup Times
(7) Miscellaneous Other
The sum of all such categorizations shall equal Total Trainer/Equipment Downtime for the reporting period, a numeric field limited to 99999.9 (rounded to the nearest tenth of an hour).
r. Course Identification Numbers (CINs). Enter the nine or ten digit alphanumeric code used to identify the course the device is used to support. If multiple courses are supported, enter the primary CINs up to a total of five, with additional CIN data to be separately provided as may be requested.
s. Summary of Work Accomplished. Include, at the end of the report, a narrative summary containing the following:
(1) Mobilization Status. Provide a brief summary of major work items accomplished and status, citing any problem areas encountered.
(2) Training Requirements/Status. Describe the nature and extent of training provided by the contractor to its on-site personnel. Mobilization training status shall be addressed during mobilization period.
(3) Inventory Progress. Provide a brief summary of remaining/accomplished inventory at each site, citing any problem areas encountered.
t. Signature of Contractor Site Manager and Contracting Officer’s Representative (COR). The report shall be signed by the Site Manager and by the COR. The Alternate COR (ACOR) shall sign in lieu of the COR. Signature authority shall be delegated to a designated Technical Assistant (TA) in writing by the COR, when applicable.
u. Classification of Report. Report originator shall ensure proper classification of the report in accordance with existing Navy regulations.
2.2 Part II – Contractor Personnel. The report shall also contain a list of all currently employed on-site contractor personnel by name and Department of Labor category associated with this contract (e.g., Electronics Technician, Maintenance III). Indicate if full time (“F”) or part time (“P”). Describe position assignment and/or nature and date of any change in employment status of contractor personnel. Identify Government accepted qualification specialties (i.e., site manager, shift supervisor, “V” tech, “H” tech), any special qualifications/training that is required and date qualified (MM/DD/YY). Indicate Department of Labor Anniversary date (MM/DD/YY). (See Figure 2 for sample report.)
Example: H. Smith (Full-Time); DOL Code 23183/Electronics Technician, Maintenance III/”Visual” Tech/”Laser Optics” Tech; hired as Tech II 01/01/99 and promoted to Tech III 11/01/99; ANSI Z136.1 Class IIIB qualified Laser Safety Officer (LSO) 11/01/99. DOL Anniversary Date: 09/99
3.0 SEE ATTACHED SAMPLE REPORTS:
PERFORMANCE REPORT SUMMARY
TO:
| 1. DEVICE/EQUIP NOMENCLATURE: |
| 2. DEVICE/EQUIP NO/SER/DESIG. |
| 3. CONTRACT NO. |
| 4. CONTRACT SUPPORT PERIOD |
FROM: _____ TO: ______
FROM:
| 5. DATE OF REPORT |
| 6. PERIOD COVERED |
| 7. ACTIVITY SERVICED |
| 8. ACTIVITY LOCATION/UIC |
| 9. REPORT NO. |
| 10. CASREP THIS PERIOD |
YES [ ] NO [ ]
| 11. PERSONNEL TIME DISTRIBUTION : |
| HRS |
| 12. TRAINER DOWN TIME: |
| HRS |
OPERATION
MAINTENANCE
SCHEDULED MAINTENANCE
DEVICE MODIFICATION
UNSCHEDULED MAINTENANCE
PARTS/SUPPLY PROBLEMS
SUPPLY SUPPORT
FACILITY PROBLEMS
MODIFICATION
LACK OF INSTR/OPER
TRAINING
LACK OF SETUP TIME
VERIFICATION OF DOCUMENTATION
MISCELLANEOUS
OTHER
TOTAL
TOTAL
13. COURSE IDENTIFICATION NUMBERS: SEE SECTION V, Part (3)
14. SUMMARY OF WORK ACCOMPLISHED:
Mobilization Status:
Training Requirements/Status:
Inventory Progress:
15. SIGNATURE OF SITE MANAGER
16. SIGNATURE OF COR/ACOR/TA
17. CLASSIFICATION OF REPORT
18. REMARKS:
FIGURE 1. SAMPLE MOB COMS/CMS PERFORMANCE REPORT SUMMARY
CONTRACTOR PERSONNEL:
Signature Site Manager :
Date:
Signature COR:
Date:
COR Remarks:
Contract #:
Site/CMD:
Report Period:
DOL CATEGORY/
TECH QUALS
FULFILLED
| CONTRACTOR EMPLOYEE NAME |
| STATUS |
F-FULL
P-PART TIME
NATURE AND DATE OF ANY CHANGE IN EMPLOYMENT TRAINING, STATUS OR ASSIGNMENT
Example:
DOL Code 23183/ Electronics Tech, Maintenance III, V (Visual) & LO (Laser Optics) Tech
| H. Smith |
| (F) |
| H. Smith (Full-Time); Electronics Tech III/”Visual” Tech/”Laser Optics” Tech; hired as Tech II 01/01/99 and promoted to Tech III 11/01/99; ANSI Z136.1 Class IIIB qualified Laser Safety Officer (LSO) 11/01/99. DOL Anniversary Date: 09/99 |
FIGURE 2. SAMPLE MOB COMS/CMS Performance Report Summary [Contractor Personnel]