Attachment_(1)_to_the_Amend_2.pdf
PDF 234 KB Posted
- Attached to
- Firefighter Training Structures and Props (FTSP), On-call Maintenance and Operator Training Support.
- Solicitation number
- N6134018R0007
About this file
Attachment_(1)_to_the_Amend_2.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6134018R0007_Amend_04.docx | DOCX document | |
| N6134018R0007_Conformed_Amend_04.docx | DOCX document | |
| CDRL_B001_MAFTD_Monthly_Report-10.docx | DOCX document | |
| N6134018R0007_Conformed_Amend_05.docx | DOCX document | |
| CDRL_B001_MAFTD_Monthly_Report-06.docx | DOCX document | |
| N6134018R0007_Amend_05.docx | DOCX document | |
| Attachment(1)_to__Amendment_3_RFP_QA_Log.pdf | ||
| Att_L-3_Past_Performance_Contract_Data_Sheet.xlsx | XLSX spreadsheet | |
| N6134018R0007_Amend_3.docx | DOCX document | |
| N6134018R0007_Conformed_Amend_3.docx | DOCX document | |
| N6134018R0007_Amend_2.docx | DOCX document | |
| N6134018R0007_Amend_2_Conformed.docx | DOCX document | |
| Attach_1_FTSP_SOW_FINAL_-_4.17.18.docx | DOCX document | |
| N6134018R0007_Amend_01.docx | DOCX document | |
| N6134018R0007_Conformed_Amend_01.docx | DOCX document | |
| Att_L-3_Past_Performance_Contract_Data_Sheet.xlsx | XLSX spreadsheet | |
| N6134018R0007_FTSP_RFP.docx | DOCX document | |
| Att_L-2__PPQ.docx | DOCX document | |
| Att_L-1_RFP_QA_Log.xlsx | XLSX spreadsheet |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N6134018R0007
Question Number Subject (title) Question Question Reference (SOW, L&M, Page #s, etc.)
Proprietary (Yes or No) Answer
R.1.1 SOW We have downloaded the RFP solicitation N6134018R0007 from the website provided in FBO, however, there is no Attachment 1 SOW provided! Can you please let us know where we can get the SOW for the FTSP solicitation?
SOW No If you click on either "See Solicitation" on the top right of FBO or click on the URL link for NECO, it will direct you to the NECO site. From there, at the top you will see "Click here for additional documents." On that list of documents you will see the SOW.
R.1.2 Site Visit The FTSP site visit is planned for Mayport on the 19th of April. It requests a JPAS visit request, but no SMO code is listed? Also, it references contacting Chief Mark
Brusoe if a JPAS visit cannot be completed, but no contact information for him is provided. Can the government please provide the SMO and his contact information?
RFP Section L 1.3.1 No Amendment 1 provided a correction to Section L, which provided the correct Point of Contact (POC).
R.1.3 Qualifications and
Certifications
Do the awardees company proposed personnel have to be certified by training device OEM or possess NFPA 1403 certifications to perform maintenance and instruction under this effort OR will the government accept equivalent experience? If the government will accept equivalent experience, what is the equivalent experience?
SOW 2.12 No Operator personnel shall have at a minimum: 3 years’ experience in training operators in the use of live-fire gas-fueled training systems and specialty props or possess appropriate certification from the original equipment manufacturer (OEM).
R.1.4 Technical Publications Section 2.17 Technical/Training Data of the SOW references various publications.
Are these available to the contractor upon award?
SOW, paragraph 2.17 No Yes, publications/training data will be made available at the site(s).
R.1.5 Past Performance
Questionnaires
Are Past Performance Questionnaires required when CPARS are available (and provided by the Offeror)?
RFP Section L.B.1.0 No Past Performance Questionnaires are not needed if the CPARS is provided in Volume 1 by the offeror.
R.1.6 Adding columns to L-4 May the Offeror add columns to Attachment L-4 to include additional information?
Attachment L-4 RFP Cost
Summary Spreadsheet
No Yes, the offeror may add columns to attachment L-4 in order to provide the additional information needed to clearly provide the specific rate information used to establish the burdened rates.
R.1.7 Amendment 1 I just wanted to confirm that the only updated document for Amendment 1 is the
RFP. And that no other attachments or additional documents were released for
Amendment 1.
RFP No Yes, that is correct
R.1.8 Transition/Mobilization
Period
The current MAFTD Task Order period of performance ends September 30, 2018.
The FTSP effort begins 1 December 2018. Is there a transition / mobilization period from the current effort to the new FTSP effort (October and November
2018)?
RFP, Amendment 1, Section F, No There will be no mobilization period. No services will be required for Oct/Nov 2018.
Attachment (1) to Amendment 2 - RFP Questions and Answers
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1021 Each TDPC - Functional Area 1 - LOT I FPI Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS). FOB: Destination TARGET COST TARGET PROFIT TOTAL TARGET PRICE CEILING PRICE SHARE RATIO ABOVE TARGET SHARE RATIO BELOW TARGET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1021 Each TDPC - Functional Area 1 - LOT I FPI Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS). FOB: Destination TARGET COST TARGET PROFIT TOTAL TARGET PRICE CEILING PRICE SHARE RATIO ABOVE TARGET SHARE RATIO BELOW TARGET
File details come from the government source that posted it.