Attachment_J.5_Supporting_Cost_Data.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
Operation and maintenance support of the Sea Fighter (FSF-1)
Solicitation number
N6133120R0004
Issued by

About this file

This document contains a solicitation for operation and maintenance support of the Sea Fighter (FSF-1) vessel, as well as a template for offerors to provide supporting cost data. The solicitation seeks offers from qualified 8(a) firms to provide crew support, operation, and maintenance of the 262-foot Sea Fighter, a wave-piercing catamaran powered by a CODOG power plant and homeported in Panama City, Florida. The Naval Surface Warfare Center Panama City Division intends to award a single contract consisting of both cost-plus-fixed-fee and cost line items, with a 12-month base period and four 12-month option periods for a total performance period of 60 months. Security clearances up to the TOP SECRET level are required. The current incumbent is Yulista/Y-Tech under contract N61331-15-C-0025. Offerors must register in the System for Award Management database and submit proposals through the Government Point of Entry by the specified due date.

View the file

Other files

File Type Posted
N6133120R0004-0004 Amendment.pdf PDF
N6133120R0004-0003 Amendment.pdf PDF
N6133120R0004-0002 Amendment.pdf PDF
Attachment_J.6_Staffing_Plan_WITHOUT_Cost-REVISED.xlsx XLSX spreadsheet
N6133120R0004 SOLICITATION.pdf PDF
Attachment_J.4_Cost_Summary_Format-REVISED.xlsx XLSX spreadsheet
Attachment_J.7_Staffing_Plan_WITH_Cost-REVISED.xlsx XLSX spreadsheet
Attachment J.13-NSAPCFLINST 3140.1D Destructive Weather Plan.pdf PDF
Attachment J.14-NSAPCFLINST 3171.1A Port Operations and Administration.pdf PDF
N6133120R3004-0001 Amendment.pdf PDF
Attachment J.12-5100 33b - hazardous materials management plan 41710.pdf PDF
Attachment_J.8-Desired Qualification for Required Key Personnel.pdf PDF
Attachment_J.7_Staffing_Plan_WITH_Cost.xlsx XLSX spreadsheet
Attachment_J.11_SeaFighter_Warehouse_Inventory_List.xlsx XLSX spreadsheet
Attachment_J.9_Past_Performance_Reference_Template.docx DOCX document
Attachment_J.4_Cost_Summary_Format.xlsx XLSX spreadsheet
Attachment_J.1-Appendix A Sea Fighter Equipment.pdf PDF
Attachment_J.6_Staffing_Plan_WITHOUT_Cost.xlsx XLSX spreadsheet
Attachment_J.10_SeaFighter_Inventory_List.xlsx XLSX spreadsheet
N6133120R3004 SOLICITATION.pdf PDF
Attachment_J.2-Appendix B ABS to Class.pdf PDF
Exhibit A-CDRLs-CONTRACT DATA REQUIREMENTS_10Dec19.pdf PDF
Exhibit_B-DI_MGMT_81991.pdf PDF
Attachment_J.3_DDFORM254.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Supporting Cost Data

SOLICITATION NO. N6133120R3001
ATTACHMENT J.5-SUPPORTING COST DATA
Company Name:
DCAA Point of Contact Information (Each Offeror & Subcontractor shall provide an office address, phone number and e-mail address for their DCAA point of contact.
Historical RatesProposed Rates
Direct Labor:

Employee Name

Labor CategoryHistorical Year 1Historical Year 2Historical Year 3
(Actual Current Labor Rate)Proposed Base Period Labor RateProposed Option 1 Period Labor RateProposed Option 2 Period Labor RateProposed Option 3 Period Labor RateProposed Option 4 Period Labor RateReason for difference between actual current labor rate and proposed labor rates. Reason for difference between proposed rates and DCMA/DCAA Forward Pricing Rate Agreement (FPRA) rates. Reason for increases greater than 3%.
Ex: John DoeEx: Sr. Program Mgr
Ex: Jane DoeEx: Sr. Systems Engineer
Ex: New Employee 1Ex: Jr. Junior Analyst

Indirect Rates:

If the Contractor's Indirect Rate are pooled differently than those listed below, the Contractor shall add or rename the categories as applicable.Historical Year 1Historical Year 2Historical Year 3Proposed Base RateProposed Option 1 RateProposed Option 2 RateProposed Option 3 RateProposed Option 4 RateReason for difference between actual current labor rate and proposed labor rates. Reason for difference between proposed rates and DCMA/DCAA Forward Pricing Rate Agreement (FPRA) rates. Reason for increases greater than 3%.
Fringe
Overhead CTR Site
Overhead GOV Site
G&A
Escalation
Other
Rate PeriodStart DateEnd Date
Historical Year 1:
Historical Year 2:
Historical Year 3:
Proposed Base Period:
Proposed Option 1:
Proposed Option 2:
Proposed Option 3:
Proposed Option 4:

Note to Offerors: The Offeror shall provide historical labor rates and proposed labor rates for the personnel (named and unnamed) identified above. The Offeror shall provide historical rates in Columns C, D and E; year 3 shall contain the Offeror's most recent annual labor rates. The Offeror shall then identify their proposed labor rates for those same individuals in columns F, G and H. The Offeror shall provide similar historical and proposed indirect rates for the items listed on lines 15 through 19. The Offeror shall identify the Start and End dates for each of their rate periods in the table on lines 23-30.

Contractor shall provide additional brief narrative in accordance with Section L, Section 3.4.2, Supporting Cost Data. Contractor format is acceptable.

File details come from the government source that posted it. Updated .