N5005422R0006 INT DECKING EXHIBITS A-E.xlsx

XLSX spreadsheet 48 KB Posted

Attached to
Interior Decking, Removal and Installation Federal contract opportunity
Solicitation number
N5005422R0006
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an Excel file containing line item pricing details for a Request for Proposals seeking Interior Decking Removal and Installation services on U.S. Navy vessels. The solicitation will result in multiple Indefinite-Delivery, Indefinite-Quantity contracts with fixed pricing for labor, material, equipment and other costs to perform tasks including removing various deck coverings and coatings, cleaning, painting, installing new decking materials such as tiles and polymers, and repair work. Pricing is provided for five potential contract years and separately for surface ships and submarines, with the work to be ordered on an as-needed basis and performed by the Naval Sea Systems Command Mid-Atlantic Regional Maintenance Center.

View the file

Other files for this federal contract opportunity

Other files attached to Interior Decking, Removal and Installation, newest first.
File Type Posted
Bidders_Questions_and_Answers.pdf PDF
Amendment_0001_SF30_N5005422R0006.pdf PDF
REVISED N5005422R0006 INT DECKING EXHIBITS A-E 06172022.xlsx XLSX spreadsheet
J-7_LWT 042-038.pdf PDF
J-11_Request_for_Specification_Clarification.docx DOCX document
J-1_DD Form 1423 Contract Data Requirement Lists CDRLs.pdf PDF
J-4_LWT 042-009.pdf PDF
J-9_Past_Performance_Reference_List.docx DOCX document
J-10_Past_Performance_Assessment_Questionnaire.docx DOCX document
N5005422R0006.pdf PDF
J-6_LWT 042-037.pdf PDF
J-2_LWT 042-006.pdf PDF
J-3_LWT 042-007.pdf PDF
J-5_LWT 042-010.pdf PDF
J-8_SWT 077-001.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

YEAR ONE - BASE YEAR
Supplies/RepairsQTYUnit
A101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
A102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)2,500LF$0.00
A103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)100SQ FT$0.00
A104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)100LF$0.00
A105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)100SQ FT$0.00
A106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
A107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)25,000LF$0.00
A108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)2,000SQ FT$0.00
A109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)100SQ FT$0.00
A110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
A111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)100SQ FT$0.00
A112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
A113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)100SQ FT$0.00
A114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
A115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
A116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)100LF$0.00
A117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)40,000SQ FT$0.00
A118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)100SQ FT$0.00
A119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)20,000SQ FT$0.00
A120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
A121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
A122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
A123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)100LF$0.00
A124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)100LF$0.00
A125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)2,500LF$0.00
A126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)100LF$0.00
A127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)100LF$0.00
A128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)100LF$0.00
A129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)5,000SQ FT$0.00
A130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)100LF$0.00
A131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
A132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)2,000SQ FT$0.00
A133LABOR and materials to install Carpet. (009-26 and 009-32)2,000SQ FT$0.00
A134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
A135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)100SQ FT$0.00
A136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)100SQ FT$0.00
A137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)100SQ FT$0.00
A138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)100SQ FT$0.00
A139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
A140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
A141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
A142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
A143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
A144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100LF$0.00
A145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)100SQ FT$0.00
A146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)100SQ FT$0.00
A147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
A148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)100LF$0.00
A149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)5,000SQ FT$0.00
A150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)100LF$0.00
A151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)100SQ FT$0.00
A152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
A153LABOR and material to install decals on Cosmetic Polymeric Deck Covering200EA$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A153. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A153. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in the Ordering Procedures in Section H.$0.00
A154Undisclosed Work Straight Time1HR$0.00
A155Undisclosed Work - Overtime1HR$0.00
A156Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
A157Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.$0.00
A158Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
A159Travel/Per Diem (for bidding purposes only).1X$0.00
A160Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
A161Contract Data Requirements (DD Form 1423)NSP

Total for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Year Two (Option 1)

YEAR TWO - OPTION I
Supplies/RepairsQTYUnitUnit Prices
B101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
B102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)2,500LF$0.00
B103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)100SQ FT$0.00
B104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)100LF$0.00
B105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)100SQ FT$0.00
B106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
B107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)25,000LF$0.00
B108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)2,000SQ FT$0.00
B109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)100SQ FT$0.00
B110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
B111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)100SQ FT$0.00
B112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
B113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)100SQ FT$0.00
B114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
B115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
B116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)100LF$0.00
B117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)40,000SQ FT$0.00
B118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)100SQ FT$0.00
B119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)20,000SQ FT$0.00
B120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
B121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
B122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
B123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)100LF$0.00
B124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)100LF$0.00
B125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)2,500LF$0.00
B126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)100LF$0.00
B127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)100LF$0.00
B128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)100LF$0.00
B129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)5,000SQ FT$0.00
B130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)100LF$0.00
B131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
B132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)2,000SQ FT$0.00
B133LABOR and materials to install Carpet. (009-26 and 009-32)2,000SQ FT$0.00
B134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
B135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)100SQ FT$0.00
B136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)100SQ FT$0.00
B137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)100SQ FT$0.00
B138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)100SQ FT$0.00
B139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
B140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
B141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
B142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
B143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
B144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100LF$0.00
B145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)100SQ FT$0.00
B146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)100SQ FT$0.00
B147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
B148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)100LF$0.00
B149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)5,000SQ FT$0.00
B150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)100LF$0.00
B151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)100SQ FT$0.00
B152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
B153LABOR and material to install decals on Cosmetic Polymeric Deck Covering200EA$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS B101 through B153. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS B101 through B153. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in the Ordering Procedures in Section H.$0.00
B154Undisclosed Work Straight Time1HR$0.00
B155Undisclosed Work - Overtime1HR$0.00
B156Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
B157Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.$0.00
B158Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
B159Travel/Per Diem (for bidding purposes only).1X$0.00
B160Adjustment/Percentage for ELINS B 101 through B 152 to accomplish tasks on submarines versus surface vessels. ELIN B 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
B161Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Year Three (Option 2)

YEAR THREE - OPTION II
Supplies/RepairsEst QtyUnit
C101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
C102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)2,500LF$0.00
C103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)100SQ FT$0.00
C104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)100LF$0.00
C105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)100SQ FT$0.00
C106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
C107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)25,000LF$0.00
C108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)2,000SQ FT$0.00
C109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)100SQ FT$0.00
C110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
C111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)100SQ FT$0.00
C112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
C113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)100SQ FT$0.00
C114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
C115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
C116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)100LF$0.00
C117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)40,000SQ FT$0.00
C118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)100SQ FT$0.00
C119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)20,000SQ FT$0.00
C120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
C121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
C122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
C123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)100LF$0.00
C124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)100LF$0.00
C125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)2,500LF$0.00
C126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)100LF$0.00
C127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)100LF$0.00
C128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)100LF$0.00
C129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)5,000SQ FT$0.00
C130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)100LF$0.00
C131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
C132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)2,000SQ FT$0.00
C133LABOR and materials to install Carpet. (009-26 and 009-32)2,000SQ FT$0.00
C134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
C135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)100SQ FT$0.00
C136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)100SQ FT$0.00
C137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)100SQ FT$0.00
C138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)100SQ FT$0.00
C139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
C140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
C141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
C142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
C143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
C144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100LF$0.00
C145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)100SQ FT$0.00
C146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)100SQ FT$0.00
C147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
C148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)100LF$0.00
C149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)5,000SQ FT$0.00
C150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)100LF$0.00
C151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)100SQ FT$0.00
C152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
C153LABOR and material to install decals on Cosmetic Polymeric Deck Covering200EA$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS C101 through C153. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS C101 through C153. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in the Ordering Procedures in Section H.$0.00
C154Undisclosed Work Straight Time1HR$0.00
C155Undisclosed Work - Overtime1HR$0.00
C156Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
C157Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.$0.00
C158Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
C159Travel/Per Diem (for bidding purposes only).1X$0.00
C160Adjustment/Percentage for ELINS C 101 through C 152 to accomplish tasks on submarines versus surface vessels. ELIN C 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
C161Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Year Four (Option 3)

YEAR FOUR - OPTION III
Supplies/RepairsEst QtyUnit
D101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
D102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)2,500LF$0.00
D103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)100SQ FT$0.00
D104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)100LF$0.00
D105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)100SQ FT$0.00
D106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
D107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)25,000LF$0.00
D108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)2,000SQ FT$0.00
D109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)100SQ FT$0.00
D110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
D111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)100SQ FT$0.00
D112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
D113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)100SQ FT$0.00
D114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
D115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
D116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)100LF$0.00
D117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)40,000SQ FT$0.00
D118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)100SQ FT$0.00
D119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)20,000SQ FT$0.00
D120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
D121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
D122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
D123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)100LF$0.00
D124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)100LF$0.00
D125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)2,500LF$0.00
D126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)100LF$0.00
D127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)100LF$0.00
D128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)100LF$0.00
D129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)5,000SQ FT$0.00
D130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)100LF$0.00
D131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
D132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)2,000SQ FT$0.00
D133LABOR and materials to install Carpet. (009-26 and 009-32)2,000SQ FT$0.00
D134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
D135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)100SQ FT$0.00
D136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)100SQ FT$0.00
D137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)100SQ FT$0.00
D138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)100SQ FT$0.00
D139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
D140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
D141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
D142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
D143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
D144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100LF$0.00
D145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)100SQ FT$0.00
D146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)100SQ FT$0.00
D147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
D148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)100LF$0.00
D149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)5,000SQ FT$0.00
D150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)100LF$0.00
D151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)100SQ FT$0.00
D152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
D153LABOR and material to install decals on Cosmetic Polymeric Deck Covering200EA$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS D101 through D153. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS D101 through D153. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in the Ordering Procedures in Section H.$0.00
D153Undisclosed Work Straight Time1HR$0.00
D154Undisclosed Work - Overtime1HR$0.00
D155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
D156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.$0.00
D157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
D158Travel/Per Diem (for bidding purposes only).1X$0.00
D159Adjustment/Percentage for ELINS D 101 through D 152 to accomplish tasks on submarines versus surface vessels. ELIN D 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
D160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Year Five (Option 4)

YEAR FIVE (OPTION IV)
Supplies/RepairsEst QtyUnit
E101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
E102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)2,500LF$0.00
E103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)100SQ FT$0.00
E104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)100LF$0.00
E105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)100SQ FT$0.00
E106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
E107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)25,000LF$0.00
E108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)2,000SQ FT$0.00
E109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)100SQ FT$0.00
E110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
E111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)100SQ FT$0.00
E112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
E113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)100SQ FT$0.00
E114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
E115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)100SQ FT$0.00
E116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)100LF$0.00
E117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)40,000SQ FT$0.00
E118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)100SQ FT$0.00
E119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)20,000SQ FT$0.00
E120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
E121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
E122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
E123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)100LF$0.00
E124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)100LF$0.00
E125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)2,500LF$0.00
E126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)100LF$0.00
E127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)100LF$0.00
E128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)100LF$0.00
E129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)5,000SQ FT$0.00
E130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)100LF$0.00
E131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
E132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)2,000SQ FT$0.00
E133LABOR and materials to install Carpet. (009-26 and 009-32)2,000SQ FT$0.00
E134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
E135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)100SQ FT$0.00
E136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)100SQ FT$0.00
E137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)100SQ FT$0.00
E138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)100SQ FT$0.00
E139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)100SQ FT$0.00
E140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)100SQ FT$0.00
E141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)100SQ FT$0.00
E142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)100SQ FT$0.00
E143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
E144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100LF$0.00
E145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)100SQ FT$0.00
E146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)100SQ FT$0.00
E147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)100SQ FT$0.00
E148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)100LF$0.00
E149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)5,000SQ FT$0.00
E150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)100LF$0.00
E151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)100SQ FT$0.00
E152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
E153LABOR and material to install decals on Cosmetic Polymeric Deck Covering200EA$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS E101 through E153. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS E101 through E153. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in the Ordering Procedures in Section H.$0.00
E154Undisclosed Work Straight Time1HR$0.00
E155Undisclosed Work - Overtime1HR$0.00
E156Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
E157Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.$0.00
E158Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
E159Travel/Per Diem (for bidding purposes only).1X$0.00
E160Adjustment/Percentage for ELINS E 101 through E 152 to accomplish tasks on submarines versus surface vessels. ELIN E 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
E161Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

Section B

Contractor Name
Supplies/ServicesTOTAL
1001BASE YEAR EFFORT
REFERENCE EXHIBIT A - BASE YEAR EFFORTNo Bid
2001OPTION I - SECOND YEAR EFFORT
REFERENCE EXHIBIT B - OPTION 1 - SECOND YEAR EFFORTNo Bid
3001OPTION II - THIRD YEAR EFFORT
REFERENCE EXHIBIT C - OPTION 2 - THIRD YEAR EFFORTNo Bid
4001OPTION III - FOURTH YEAR EFFORT
REFERENCE EXHIBIT D - OPTION 3 - FOURTH YEAR EFFORTNo Bid
5001OPTION IV - FIFTH YEAR EFFORT
REFERENCE EXHIBIT E - OPTION 4 - FIFTH YEAR EFFORTNo Bid

TOTAL $0.00

SOLICITATION N50054-10-R-0002 - AMEND 0005

Page B-1

SECTION B SUPPLIES OR SERVICES AND PRICES

File details come from the government source that posted it. Updated .