USS GRAVELY ISRA S-3 Rev 1 11-10-21.xlsx

XLSX spreadsheet 305 KB Posted

Attached to
USS GRAVELY (DDG-107) FY22 INCREMENTAL SELECTED RESTRICTED AVAILABILITY (ISRA)
Solicitation number
N5005421R0011
Issued by

About this file

This solicitation package is a Request for Proposals for a Firm-Fixed Price Contract for the FY22 Incremental Selected Restricted Availability of the USS GRAVELY (DDG-107). The work includes standard repair and preservation items, as well as alterations including work on the Integrated Bridge System, Hull Mechanical and Electrical systems, and Fuel Oil Lab systems. Proposals are due by November 17, 2021. The USS OSCAR AUSTIN is available for ship check by request from October 18-22, 2021 to inspect similar work. Attachments include the Work Specification Package, References, Execution Milestones and Key Event Dates, Pricing Workbook, and Schedule Model Review. The Naval Sea Systems Command is the contracting agency.

View the file

Other files

File Type Posted
N5005421R0011 A0007.pdf PDF
Conformed N5005421R0011 A0007.pdf PDF
Conformed N5005421R0011 A0006.pdf PDF
N5005421R0011 A0006.pdf PDF
USS GRAVELY ISRA S-3 Rev 1 11-8-21.xlsx XLSX spreadsheet
N5005421R0011 A0005.pdf PDF
Conformed N5005421R0011 A0005.pdf PDF
N5005421R0011 A0004.pdf PDF
Conformed N5005421R0011 A0004.pdf PDF
USS GRAVELY ISRA S-3 Rev 1 11-4-21.xlsx XLSX spreadsheet
N5005421R0011 A0003.pdf PDF
USS GRAVELY ISRA S-3 Rev 1 10-27-21.xlsx XLSX spreadsheet
Conformed N5005421R0011 A0003.pdf PDF
USS GRAVELY ISRA S-3 Rev 1 10-22-21.xlsx XLSX spreadsheet
Attachment S-10 DBIDS.pdf PDF
N5005421R0011 A0002.pdf PDF
Attachment S-11 SHIP ACCESS FORM.xlsx XLSX spreadsheet
Attachment S-7 Proposal Assessment Rev 1.xlsx XLSX spreadsheet
Conformed N5005421R0011 A0002.pdf PDF
USS GRAVELY ISRA S-3 10-19-21.xlsx XLSX spreadsheet
Attachment S-7 Proposal Assessment.xlsx XLSX spreadsheet
Conformed N5005421R0011 A0001.pdf PDF
N5005421R0011 A0001.pdf PDF
N5005421R0011 USS GRAVELY (DDG-107) FY22 ISRA.pdf PDF
Attachment S-3_BQ_PPI.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRV ISRA Q&A

USS GRAVELY (DDG-107) FY22 ISRA Pre-Proposal Information (PPI) Questions
DrawingDATE:11/10/21MARMC POC: Chase Brasher, chase.w.brasher.civ@us.navy.mil; Bethany Danyluk, bethany.danyluk1@navy.mil; Sherry Jarvis, sherry.jarvis@navy.mil
GFMSolicitation #:N5005421R0011MARMC Phone: 757-837-8585 (Chase), 757-837-8752 (Bethany), 757-837-8788 (Sherry)
RLARForward all requests to: Chase Brasher, chase.w.brasher.civ@us.navy.mil; Bethany Danyluk, bethany.danyluk1@navy.mil; Sherry Jarvis, sherry.jarvis@navy.mil
CONTRACTOR:
The following are answers to questions received from potential offerors. The answers provide clarification only and DO NOT constitute an amendment to the solicitation.
To request references, drawings, RLARs, and Errata being provided under this Solicitation Question & Answer Set,

please contact the POCs.

Q #RFP Section-Page/ Work Item #Document Number/TitleQuestionGovernment Response
1991-10-001Temporary and Roller Staging for SFPara 3.1 states to install staging in each location listed in 1.2. Para 1.2 states "throughout the ship". Further para 3.2 states to install a rolling stage for ships force use, but it doesn't give a location of where this rolling staging is to be installed. - Please provide a location for the staging to be installed in 3.1 and the rolling staging to be installed in 3.2.Errata written to remove the requirements of paragraph 3.1. For paragraph 3.2 states "The exact location will be designated by the SUPERVISOR.", so we don't know where yet. See Errata One
2262-40-001Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspectContractor is missing reference 2.3 (S9262-B1-MMA-010). Please provide reference at your earliestFile attached
3077-11-001Fire Safety and Emergency Fire Response Plan; accomplish3.1.1 states "Each drill will be scheduled within 30 days after the start of the availability and 180 calendar days thereafter throughout the availability" The period of performance is 92 days.
Please advise.There is only 1 drill required 30 days after start of avail.
4644-11-002Crew Washroom; repair3.2 states to remove honeycomb bulkhead, coaming, shower partition and SS sheathing. Will contractor be responsible for removing all WC partitions and reinstalling after 009-26 requirements are met?Yes.
5980-10-001Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancey; correctAdditional work item that includes a man-hour & material reservation require the submittal of a report that duplicates the report required by 042-11-001 para 3.5. Request that the Government delete the duplicate weekly man-hour and material report from the following work item, this will eliminate multiple redundant reports: 3.1.2 980-10-001The requirements in paragraph and subparagraph 3.5 of work item 042-11-003 are not the same as the requirements of paragraph and suparagraphs 3.1.2 of work item 980-10-001; therefore, they will not be deleted.
6123-10-001Tank and Void Open, Pump, Clean and Gas Free; accomplish3.6.2 states "Remove existing and install new a total of 25 each missing or broken manhole cover studs for each tank opened in 3.1"
Is it the Government's intent to replace a cumulative total of 25 studs for the 15 tanks or 25 studs for each tank for a total of 375 studs?The cumulative total for all of the tanks will be 25 studs.
7992-11-008Temporary Air Conditioning; provideTypically a Temporary Air Conditioning item requires access cuts, but no 009-05 is in the item.
Will access cuts be required? If yes, contractor requests the Government to add 009-05 in the item.No access cuts are required
8992-11-015Barge For Multi-Function Towed Array (MFTA) Cable; provideFor estimating purposes, how much crane support will be required IAW paragraph 3.1?4 crane lifts for off load and 4 crane lifts for on load
9992-11-015Barge For Multi-Function Towed Array (MFTA) Cable; provideWill the barge directed in paragraph 3.2 be required for the entire availability? If no, how many days will the barge be required?Barge will be required for 72 hrs for off load and 72 hours for onload.
10992-11-015Barge For Multi-Function Towed Array (MFTA) Cable; provideWhat size barge is required in paragraph 3.2?Minimum 135 ft long by 35 ft wide and a minimum of 6 feet of freeboard
11251-32-002Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4.1 States "Accomplish base metal weld buildup of a total of 50 square inches of plate defects". Is the 50 square inches per space or a cumulative total for all spaces?50 square inches per space.
12251-32-002Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4.2 States "Vee out and weld a total of 4 linear feet of each cracked, split, broken or damaged intake plenum/trunk weld". Is the 4-square feet, per space or a cumulative total for all spaces?4 linear feet per space
13251-32-002Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4.3 States "Remove existing and install new 5-square feet of bulkhead plate". Is the 5-square feet, per space or a cumulative total for all spaces, and what thickness and material type of bulkhead plate?5-square feet of bulkhead plate per space. For estimating Purposes use the thicker plate identified by the drawing.
14251-32-002Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4.4 States "Remove existing and install new 5-square feet of deck plate". Is the 5-square feet, per space or a cumulative total for all spaces, and what thickness and material type of deck plate?5-square feet of deck plate per space. For estimating Purposes use the thicker plate identified by the drawing
15251-32-002Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4.5 States "Remove existing and install new 10-linear feet of structural stiffener". Is the 10-linear feet, per space or a cumulative total for all spaces, and what thickness and material type of structural stiffener?10-linear feet of structural stiffener per space. For estimating Purposes use the largest/heaviest stiffener identified by the drawing.
16259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.2 States "Accomplish Power Tool clean to bare metal in each location in 1.2 to include uptake duct anchor foundation, each structural member, steel channel, deck plate and bulkhead for a total of 3,578 Square feet". Is the 3,578-square feet, per space or a cumulative total for all spaces?The square footage is to be distributed throughout as designated by the SUPERVISOR for a total of 3,578-square feet cumulative total for all spaces?
17259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.4 States "Remove existing and install new 30-square feet of deck plate located in 1.2.1". What thickness and material type of deck plate?.188 MIL-S-22698 DH-36 as noted in Ref 2.3
18259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.1 States "Accomplish base metal weld buildup of a total of 160 square inches of plate defects". Is the 160 square inches per space or a cumulative total for all spaces?160 square inches cumulative total for all spaces
19259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.2 States "Remove existing and install new 32-square feet of bulkhead plate". Is the 32-square feet, per space or a cumulative total for all spaces, and what thickness and material type of bulkhead plate?32-square feet of bulkhead plate cumulative total for all spaces. For estimating Purposes use the thicker plate identified by the drawing.
20259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.3 States "Remove existing and install new 32-square feet of deck plate". Is the 32-square feet, per space or a cumulative total for all spaces, and what thickness and material type of deck plate?32-square feet of deck plate cumulative total for all spaces. For estimating Purposes use the thicker plate identified by the drawing.
21259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.4 States "Remove existing and install new 50-linear feet of structural stiffener". Is the 50-linear feet, per space or a cumulative total for all spaces, and what thickness and material type of structural stiffener?50-linear feet of structural stiffener cumulative total for all spaces. For estimating Purposes use the largest/heaviest stiffener identified by the drawing.
22259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.5 States "Remove existing and install new 5-square feet of eductor nozzle cap foundation". What thickness and material type of structural stiffener?For estimating Purposes use the largest/heaviest stiffener identified by the drawing.
23259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.6 States "Remove existing and install new 25-linear feet of exhaust duct stiffener". Is the 25-linear feet, per space or a cumulative total for all spaces, and what thickness and material type of exhaust duct stiffener?25-linear feet of exhaust duct stiffener cumulative total for all spaces. For estimating Purposes use the largest/heaviest stiffener identified by the drawing.
24259-10-001Number One Gas Turbine Intake Partial Repair and Preservation; accomplish3.5.7 States "Remove existing and install new longitudinal stiffener 7 starboard located in 1.2.4 at frame 186". How many linear feet, and type of material is required?One linear foot of the material designated in the drawing.
25993-31-005Antenna Radome Protective Cover; fabricate and installParagraph 1.3.2 for Radome Antenna AS-4671 appears to be incorrect based on the equipment list in reference 2.3. Contractor requests the Government to confirm if Antenna Identification Number 3-13 in 1.3.2 should be AS-4667.Correct. It should be AS-4667/WSC-9(V). See Errata One
26991-10-001Temporary and Roller Staging for Ship's Force Use; provideParagraph 3.1 directs to provide staging in each location listed in 1.2, but no locations are listed.
Contractor requests the Government to provide locations requiring staging.Errata written to remove the requirements of paragraph 3.1. For paragraph 3.2 states "The exact location will be designated by the SUPERVISOR.", so we don't know where yet. See Errata One
27991-10-001Temporary and Roller Staging for Ship's Force Use; provideHow many sections of rolling staging is required IAW paragraph 3.2?Paragraph 3.2 states "a rolling stage", which indicates one.
28980-90-003ShipAlt 86937K, DDG Integrated Bridge System (IBS) Tech Refresh, Alteration Installation Team (AIT) Support Service; provideParagraph 3.17 states "Provide 10 square feet of deck tile services to procure and replace Nomex tiling…".
Is the deck tile actually Nomex Panels or a type of deck tile? Please clarify.The deck tile is NOMEX panels.
29123-10-001Tank and Void Open, Pump, Clean and Gas Free; accomplishFor estimating purposes the Contractor requests the Govt. provide the quantities of fuel to be taken to the Naval Fuel Depot?For estimating purposes, fuel will need to be pumped to a barge supplied by Craney Island. The barge will be delivered and picked up by Craney Island. The intentions are to bring the ship in full of fuel in Groups 5 and 6, so the total qty of fuel pumped will be approximately 127,939 gallons of f-76
30123-10-001Tank and Void Open, Pump, Clean and Gas Free; accomplishFor estimating purposes the Contractor requests the Govt. provide the quantities of Compensating Sea Water that will require removal and disposal?For estimating purposes the amount of compensating water will be 2,500 gallons
31123-10-001Tank and Void Open, Pump, Clean and Gas Free; accomplishFor estimating purposes the Contractor requests the Govt. provide any tanks and spaces, including adjacent tanks or spaces that require pumping, opening, cleaning for certification and maintenance that are not listed in Paragraph 1.2 for the location of work?None
32980-90-003ShipAlt 86937K, DDG Integrated Bridge System (IBS) Tech Refresh, Alteration Installation Team (AIT) Support Service; provideParagraph 3.12 requires the Contractor to provide an office trailer. Will existing office space be a suitable substitute?Yes as long as it is a lockable segregated area is and furnished with 2 each desks, 2 each chairs, 2 each Ethernet connections, and is lockable for the entire contract period.
33980-90-004ShipAlt DDG51-88325K and 94418K, Hull, Mechanical and Electrical (HM&E) Core, DDG FCS Fuel Oil Lab PC (FOLPC), CPS COTS MFM Integration, Alteration Installation Team (AIT) Support Service; provideParagraph 3.10 requires the Contractor to provide an office trailer. Will existing office space be a suitable substitute?Yes as long as it is a lockable segregated area and is furnished with 2 each desks, 2 each chairs, 2 each Ethernet connections, and is lockable for the entire contract period.
34991-10-001Temporary and Roller Staging for Ship's Force Use; provideParagraph 3.1 requires the Contractor to provide staging in each location listed in 1.2. Paragraph 1.2 reads, "location of work: 1.2.1 throughout the ship." For estimating purposes, can locations requiring staging be provided to the ContractorSee Errata One
35259-10-001Number One Gas Turbine Uptake; partial repair and
preservationReference 2.7 & 2.9 have the same drawing number of 7060388 (Rev E & F). Reference 2.9 was provided. Is 2.7 a typo?See Errata One
36262-40-001Main Reduction Gear (MRG) Lube Oil Cooler; clean and inspectParagraph 3.3.1.1 states "...of a report listing results of the requirements of 3.4.1…".
Contractor recommends the Government revise to 3.3.1.See Errata One
37259-10-001No One Gas Turbine UptakePara 3.1 states to accomplish a visual inspection of each area listed in 1.3, located in 1.2 to include exterior surface of each exhaust stack, exhaust trunk, uptake duct anchor foundation, "each structural member, steel channel, deck plate, bulkhead and pipe hanger for structural integrity"............. This can be accomplished easily for locations 1.2.1 & 1.2.2, however in order to accomplish the structural integrity in 1.2.3 - 1.2.7, there is quite a bit of stainless steel sheathing and insulation that will be required to be removed and reinstalled. Please confirm the contractors will accomplish this visual inspection without removing the stainless steel sheathing and insulation in 1.2.3 thru 1.2.7.There is no stainless steel sheathing in the exhaust trunks
38259-10-001No One Gas Turbine Uptake3.5 calls for base metal buildup of 160 square inches in locations 1.2.3 - 1.2.7. The contractor has no way of identifying what kind of interferences are involved if any. Recommend the Government identify the interferences IWO these repairs or provide a LOE para to cover unidentified interferences. Further, please identify if staging will be required for these repairs.This is a frontload and locations will be identified by inspection.
39259-10-001No One Gas Turbine UptakePara 3.5 states to accomplish repairs for each trunk listed in 1.2.3 thru 1.2.7. The sub para's following 3.5 identify repairs in 3.5.1 thru 3.5.7. First……the repairs identified in 3.5.5 & 3.5.6 are only for location 1.2.2, which is not one of the locations listed in 3.5. Second, are these repairs identified in 3.5.1 thru 3.5.4, 3.5.7, cumulative or total?Correct. 3.5 Should have stated ” 1.2.2 through 1.2.7; see questions 18-21, 23
40123-21-002CofferdamPara 3.3 Remove existing and install new stuffing tube listed in 1.3.2 and located in 1.2, using 2.5 for guidance. After reviewing ref 2.5 the "B" tube is shown installed slightly forward of FR216 and ref 2.4 shows that the fuel oil expansion tank forward bulkhead is at FR214. It would appear that the stuffing tube is installed in the F/O expansion tank rather than the cofferdam. If this is indeed the case the 5-214-1-F and the 5-212-2-W will need to be added to the gas free work item, 123-10-001. Can the government verify the "B" tube location?The stuffing tube in question is a MIL-T-19646A penetration for gas filled thermometer capillary tube with metal sheathing. Reference 505-7059977 REV F, THERMOMETER LIST and MIL-T-19646A, TEMPERATURE GAS ACTUATED REMOTE READING. Penetration does not need to be replaced, only the thermometer and the filler packing. The thermometer is a gas filled bulb type and comes as a sealed unit. Sheathing on capillary tube has failed and is no longer air tight. See Errata 2.
41980-11-002Mk 158 Vertical Launch HatchIf the third party requiring services identified in the specification are going to tent the VLS Hatch, please confirm this tenting will not effect the nonskid requirement of 634-21-001There will be no tent
42991-10-001Temporary & Roller StagingThe Governments response to Q&A #1 & 26 is not acceptable. If the Government does not know the location of the staging that will be required, how is the Contractor to price this requirement. Staging the mast is a different task than staging a bulkhead for example. The contractor is unable to provide a price for this item as it is written and in response to the Government responses.See Errata One
43Section L,pp 121-122Proposal Style and ContentsPlease provide clarification on the desired contents of Volume I, Cover Letter as some of the items listed seem to apply to each Volume individually or be more pertinent to printed proposals. Does the Government want a Table of Contents in Volume I or would an enclosures section on a cover letter for each Volume be sufficient and perhaps more helpful since offerors are likely submitting individual files rather than one consolidated PDF document for each digital volume?Volume I requires a cover letter and table of contents for the entire proposal. Volumes II and III do not require cover letters but each requires a table of contents arranged according to factors and subfactors. See revised Section L in Amendment 0002. Offerors will submit each volume separately as opposed to one consolidated document.
44Section L(V)(B)(2)(a)(ii)Manpower Utilization Data Sheet (S-1 Attachment)Please provide Attachment (S-1) Manpower Utilization Data SheetThe S-1 and other attachments are available in the PIEE Solicitation Module at the following link: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N5005421R0011
45Section L(V)(B)(2)(b)(i)Pier Graphical Representation Template (Attachment S-8)Please provide Attachment (S-8) Pier Graphical Representation TemplateThe S-8 and other attachments are available in the PIEE Solicitation Module at the following link: https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N5005421R0011
46Amendment 0002, Section J, Attachment J-4 Rev 1.J-4 Pricing WorkbookAmendment 0002 changed the LOE to Completion manhours to 4573…..However the J-4 Rev 1 states 4539 manhours. This contractor is going to price the J-4 Rev 1 as shown and received with Amendment 0002KTR is correct; the number is 4,539 as shown in the J-4 Rev 1 sent with A0002. This error will be corrected in forthcoming Amendment 0003.
47980-90-003ShipAlt 86937K, DDG Integrated Bridge System (IBS) Tech Refresh, Alteration Installation Team (AIT) Support Service; provideIs it the intent of paragraph 3.17 to provide Nomex tile replacement for a cumulative total of 10 SF for the 3ea locations listed or 10 SF in each location for a total of 30 SF?10 SF in each location for a total of 30 SF
48123-21-002Cofferdam; repairParagraph 3.2 states " Remove existing and install new manhole cover and coaming listed in 1.3.1" (manhole assembly number 23 , category number 01203-46). After review of reference 2.2 there are two manhole assemblies for cofferdamn 5-204-1-V and looks like the spec has the assembly number for one and the categrory number for the other assembly. The first is item number m1620, assembly number 23 and category 01203-223. The second is item number m1630 assembly number 47 category number 01203-461. Please advise which assembly needs to be replace. Also neither one of these manhole assemblies is listed in reference 2.3. Please provide fabrication drawing for manhole covers assembly.“Quantity (One EA), Manhole Cover (4-205-1), 15 Inches by 18 Inches, Raised Oil Tight (RSDOT), 3 Inch Coaming, Assembly Number 23 and Category Number 01203-223 of 2.2 and 2.3”

Drawing 8100-1254-0087_AJ shows this assembly on Sheet 3.

49588-21-001Flight Deck and Recovery Assist, Securing and Traversing (RAST) System Track and Plate; clean and preserveParagraph 3.10 directs to "Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 23..." Standard Item 009-32 line 23 Column E refers you back to line 22 which directs to apply "APPLICATION OF MIL-PRF24667, TYPE XI, COMP PS". This application is Peel & Stick Non-Skid.
Contractor requests the Government to verify if this is correct.Errata Change to Line 28 for Para 3.10. See Errata Two.
50982-31-003Machinery Space Production Completion and Requirement for Light-Off Assessment (LOA); accomplishThis package contains the subject LOA item, but no LOA Milestones are included in the provided Attachment J-3 Exec Milestones and Key Event Dates. Please adviseNo Milestones for LOA
51982-32-001Preliminary Light Off Assessment (LOA) Inspection Discrepancy Correction Assistance; provideThis package contains the subject LOA item, but no LOA Milestones are included in the provided Attachment J-3 Exec Milestones and Key Event Dates. Please adviseNo Milestones for LOA
52150-11-001Ref. 2.4 7498089 Rev RRef. 2.4 - 7498089 Rev R was not received with this package . Please provide this documentReference 2.4 is a controlled DWG:The applicable portions of

the drawing for the equipment being worked are available upon request from the point of contact; the POC is also source for PCMS material and training of personal in PCMS material installation requirements:

MID Atlantic Regional Maintenance Center (MARMC) Norfolk Va. 23511 POC: Debra Manley or Glenn Genier Phone:(757) 400-0803 Email Debra. Manley@navy.mil

53259-10-001No 1 Gas Turbine UptakePara 3.2 states to Power tool clean locations listed in 1.2 for a total of 3578 sq. ft. The specification does not identify any insulation that will require removal and replacement for the power tooling, so please confirm that if insulation is required to be removed, this will be covered with a change order to the contract. The insulation listed in para 3.6 appears to be a front loaded para for any damaged insulation that may need to be replaced, or will this cover insulation replacement required for the work in 3.2 ? Please clarify.If insulation removal is required in paragraph 3.2 it will be covered by paragraph 3.6.
54Long Lead MaterialPlease note, with this availability being only approximately 90 days, we have included a list of material over 45 day delivery in the tab below labeled "LLTM". The Government may want to consider making this material GFMGovernment feels KTR will have ample time from award to start of avail to order LLTM with a 45 day delivery time.
55982-10-001Light Off Assessment (LOA) Inspection Discrepancy Correction Assistance; provideThis package contains the subject LOA item, but no LOA Milestones are included in the provided Attachment J-3 Exec Milestones and Key Event Dates. Please adviseNo Milestones for LOA
56644-11-002Crew Washroom; repairPara 3.2 states “Remove each honeycomb bulkhead, coaming, shower partition and stainless sheathing”.
If the configuration of the spaces are not being changed, why is the coaming being removed?Para 3.6 States to Install New Coaming.
57644-11-002Crew Washroom; repairPara 3.6 states “Install NEW each honeycomb bulkhead, coaming, shower partition and stainless sheathing removed in 3.2,..”
Is all the removed material being replaced with new as stated and only the stainless steel sheathing being reused?Para 3.6 States to Install New Stainless Steel Sheathing that was removed in paragraph 3.2.
58644-11-002Crew Washroom; repairReference 2.15, on Page 94 Calls out the location being Crew Living Space Number 3 but the location listed in Paragraph 1.2.1 is a Washroom. Please confirm correct location.The Location will be the Washroom located in Crew Living Space No.3.
59VariousLLTMThe following material in the attached LLTM Sheet has long lead time ranging from 21 to 56 Days. Will the Government be providing the material GFM? (Provide specific details for each work item material that is long lead as to GFM.) SEE ATTACHMENT)Government notes that there is enough time to order the material for the AVAIL based on the fact that this is an A-120 award and all of the materiel identified on the sheets was under A-120.
60644-11-002Crew Washroom; repairParagraph 3.2 states "Remove each honeycomb bulkhead, coaming, shower partition and stainless sheathing".
Please clarify if the intent is to replace all honeycomb bulkheads and coaming throughout the entire space, or is this to apply to the shower areas only?Shower areas only.
61993-31-003Temporary Main Reduction Gear (MRG) Dehumidifier System; provideParagraph 3.1 states "Accomplish the requirements of 009-57 of 2.1 for maintaining reduction gear security." Please provide the amount of oil to be removed from one (1) reduction gear assembly and also provide clarification as to whether or not the reduction gear oil removed in paragraph 3.1 will be provided as GFM. Please provide type of oil required for reduction gear if material is not provided as GFM.MRG Oil will not be removed from MRG SUMP 2, but will be removed from MRG SUMP One due to the work required by work item 123-21-002 Cofferdam; repair. Paragraph 3.5 of work item 993-31-003 states "Fill the system to the full mark with new fluids for that removed in 3.1. Approximately 2,500 gallons of 2190 TEP will be required for MRG SUMP One and approximately 10 gallons of 2190 TEP for MRG 2 for spraying of the gears. The oil required will not be GFM.
62980-90-003Title: ShipAlt 86937K, DDG Integrated Bridge System (IBS) Tech Refresh, Alteration Installation Team (AIT) Support Service; provideDates listed in paragraph 4.3 exceed the POP end date. Contractor recommends Errata with corrected dates.See Errata Two.
63980-90-004Title: ShipAlt DDG51-88325K and 94418K, Hull, Mechanical and Electrical (HM&E) Core, DDG FCS Fuel Oil Lab PC (FOLPC), CPS COTS MFM Integration, Alteration Installation Team (AIT) Support Service; provideDates listed in paragraph 4.3 exceed the POP end date. Contractor recommends Errata with corrected dates.See Errata Two.
64VariousProposal DeadlineWill the Government consider extending the proposal deadline?The proposal deadline is extended from 12 p.m. 17 November 2021 to 12 p.m. 23 November 2021.
65123-10-001Tank and Void Open, Pump, Clean and Gas Free; accomplish123-21-002 Errata 2 adds the Lubricating Oil Sump Tank for the Cofferdam Repair without adding it to the 123-10-001 Item.
Is there an Errata forthcoming to add the Sump Tank to the Tank and Void Item 123-10-001?No forthcoming errata. Work is efficiently covered in the 123-10-001 item.

&P of &N image1.png

File details come from the government source that posted it. Updated .