RFP_N50054-19-R-0003.pdf
PDF 2 MB Posted
- Solicitation number
- N50054-19-R-0003
About this file
This document provides details about a forthcoming solicitation for hull, mechanical and electrical pierside assist services. The Mid-Atlantic Regional Maintenance Center intends to issue solicitation number N50054-19-R-0003 to acquire contractor services to perform depot-level repairs, maintenance, installation and removal of main and auxiliary HM&E equipment and systems onboard U.S. Navy vessels located within a 50-mile radius of Norfolk, Virginia or worldwide. The requirement is set aside 100% for small business and will result in multiple-award IDIQ contracts with a one-year base period and four one-year options. The total period of performance is five years. Interested parties are advised to monitor the FedBizOpps website for solicitation release planned on or around December 10, 2018. The document identifies points of contact for any questions.
RFP N50054-19-R-0003
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 10:00 AM local time 22 Jan 2019
X
A
X B
X C X D
EX
X
G
F 82 - 89
90 - 98
X H 99 - 105
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 105
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N50054 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 7
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
8 - 34
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
36 - 37
38 - 39 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 40 - 45 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 46 - 52 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
53 - 78
PART II - CO NTRACT CLAUSES
MID-ATLANTIC REGIONAL MAINTENANCE CENTER
CODE 412,
9727 AVIONICS LOOP
NORFOLK VA 23511-2124 (757) 396-5041
(757) 396-2336FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
79 - 81
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
21 Dec 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N5005419R0003
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
CLIN
Number
1 Job
HM&E - BASE YEAR
FFP
Base Year Effort
FOB: Destination
PSC CD: 1990
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
CLIN
UNDEFINED Job
CDRLs - BASE PERIOD
FFP
As applicable, the contractor shall meet the requirements outlined in the contract data requirements lists (CDRLs) provided as Exhibits A001, A002, A003 and
A004 (See DD1423 Exhibits) Price to be included in the price of CLIN 1001.
NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION HM&E - OPTION YEAR I
FFP
Option Year II - Third Year Effort
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION CDRLs – OPTION YEAR I
FFP
As applicable, the contractor shall meet the requirements outlined in the contract data requirements lists (CDRLs) provided as Exhibits B001, B002, B003, and
B004 (See DD1423 Exhibits). Price to be included in the price of CLIN 2001.
NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION HM&E - OPTION YEAR II
FFP
Option Year II - Second Year Effort
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION CDRLs – OPTION YEAR II
FFP
As applicable, the contractor shall meet the requirements outlined in the contract data requirements lists (CDRLs) provided as Exhibits C001, C002, C003, and
C004 (See DD1423 Exhibits). Price to be included in the price of CLIN 3001.
NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION HM&E - OPTION YEAR III
FFP
Option III - Fourth Year Effort
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION CDRLs – OPTION YEAR III
FFP
As applicable, the contractor shall meet the requirements outlined in the contract data requirements lists (CDRLs) provided as Exhibits D001, D002, D003, and
D004 (See DD1423 Exhibits). Price to be included in the price of CLIN 4001.
NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION HM&E - OPTION YEAR IV
FFP
Option IV - Fifth Year Effort
UNIT UNIT PRICE MAX AMOUNT
CLIN
OPTION CDRLs – OPTION YEAR IV
FFP
As applicable, the contractor shall meet the requirements outlined in the contract data requirements lists (CDRLs) provided as Exhibits E001, E002, E003, and
E003 (See DD1423 Exhibits). Price to be included in the price of CLIN 5001.
NOT SEPARATELY PRICED.
CLAUSES INCORPORATED BY FULL TEXT
HQ B-2-0022 CONTRACT SUMMARY FOR PAYMENT OFFICE (FIXED PRICE) (FEB 1997)
This entire contract is fixed price.
TOTAL FOR CLIN 1001 ______________________
TOTAL FOR CLIN 1002 __________NSP________
TOTAL FOR CLIN 2001 ______________________
TOTAL FOR CLIN 2002 __________NSP________
TOTAL FOR CLIN 3001 ______________________
TOTAL FOR CLIN 3002 __________NSP________
TOTAL FOR CLIN 4001 ______________________
TOTAL FOR CLIN 4002 __________NSP________
TOTAL FOR CLIN 5001 ______________________
TOTAL FOR CLIN 5002 __________NSP________
TOTAL CLIN 1001 THROUGH CLIN 5002 _____________________
Section C - Descriptions and Specifications
C.1. SCOPE OF WORK
C.1.1. The contractor shall provide pier side assists by providing the necessary management, technical services, labor, material, support services and equipment to accomplish a full range of depot level repairs and alterations, troubleshooting, maintenance, installation, and removal of main and auxiliary, hull, mechanical and electrical (HM&E) equipment and systems onboard U.S. Navy or other military type vessels including submarines. The work will be accomplished onboard U.S. Navy vessels located primarily within a 50-mile radius of Norfolk, Virginia but may be accomplished OCONUS.
C.1.2. Due to U.S. Navy or other customer commitments and schedules, a significant number of delivery orders may be issued as emergent requirements. The contractor may be required to respond to more than one requirement (simultaneous delivery orders for more than one vessel). A requirement may consist of a single or multiple vessels.
C.1.3. Required reports and documentation must be compatible with Windows 2010 Server
Revision 2 as the standard Network Operating System and MS Office 2010 Professional, or later, as the standard Office Software. The use of Web Applications will also be required.
C.1.4. The contractor shall assign one lead project manager for each delivery order and this person shall coordinate all aspects of the delivery order with the designated Government representative and vice versa. The contractor lead will keep the Government representatives apprised of schedule, technical, material and financial issues pertinent to the delivery order.
C.2. PERSONNEL
C.2.1. The contractor shall be responsible for the employment of trained and technically qualified personnel to perform a full range of depot level repairs and alterations, trouble shooting, maintenance, installation, and removal of major ship components and equipment onboard U.S. Navy or other military type vessels including submarines. The contractor, upon request of the Government representative, shall produce the qualifications of an individual to substantiate qualifications to perform the task being worked.
In addition, the contractor is responsible for employing and maintaining the personnel, organizational and administrative control necessary to ensure the performance meets or exceeds all contract specification requirements hereunder and as set forth in each individual delivery order.
NOTICE: Work aboard U.S. submarines will require personnel to comply with LWT 042-05 and to have a red badge which means personnel must have at least a final confidential clearance. The contractor accepts the responsibility to have sufficient personnel with the required security clearances to accomplish multiple, simultaneous tasking’s for submarines.
C.2.2. Organizations performing blasting and painting operations and preservation on steel hull craft shall be certified in accordance with QP-1 of Systems and Specifications, SSPC Painting Manual, Volume 2 or NAVSEA-approved equivalent.
C.2.3. Welders shall carry their welding certifications with them at all times. Welders shall be certified in accordance with NAVSEA Technical Publication (TP) 248 (S9074-AQ-GIB-010/248). The contractor shall be required to supply qualified American Bureau Shipping (ABS) welders.
C.3. ORGANIZATION
The contractor must have an organization with the experience and comprehensive understanding to apply management techniques, methods and procedures required to efficiently complete the requirements of this solicitation. Expertise and experience anticipated to be needed for performance of this contract include, but is not limited to, boats, craft, lighterage and service craft having the following characteristics:
a. Types of Vessels: Standard ship’s boats (vessels) to high performance advanced craft
b. Structural Material: Steel, aluminum, thin aluminum, composite (includes fiber reinforced plastic), wood and inflatable
c. Propulsion Method: gas and diesel engines, gas turbines, shaft with propeller, waterjets, outdrives and surface piercing propellers.
d. Design Types: Hull, Mechanical, Electrical and Electronic design; basic commercial off-the-shelf to militarized special designs
e. Hull Types: Displacement, semi-displacement, planning, wave piercing, surface effect, SWATH, monohulls, multi-hulls and other specialized one-of-a-kind hull forms
f. Operational Modes: Manned and Unmanned vehicles
C.4. REFERENCES
In performing the requirements of this contract, the contractor shall comply with all the following references and attachments (Section J) to this solicitation.
a. The following Category I, NAVSEA STANDARD ITEMS (NSIs) may be viewed on the Internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will apply to all delivery orders:
009‐01 General Criteria; accomplish
009‐02 Environmental Compliance Reports for Material Usage at Naval
Facility; accomplish
009‐03 Toxic and Hazardous Substances; control
009‐04 Quality Management System; provide
009‐06 Maintaining Protection and Cleanliness from Non‐Radioactive
Operations; accomplish
009‐07 Confined Space Entry, Certification, Fire Prevention and
Housekeeping; accomplish
009‐08 Shipboard Fire Protection and Fire Prevention; accomplish
009‐10 Asbestos-Containing Material (ACM); control
009‐18 Mine Warfare Ships Magnetic Material; control
009‐19 Provisioning Technical Documentation (PTD); provide
009‐20 Government Property; control
009‐21 Alteration Verification, Logistics and Technical Data; provide
009‐23 Interferences; remove and install
009‐24 Authorization, Control, Isolation, Blanking, Tagging and Cleanliness;
accomplish
009‐34 Fire Protection of Unmanned Vessels at Contractor’s Facility;
accomplish
009‐39 Technical Manual Contract Requirement (TMCR) for a New
Technical Manual for Commercial Equipment/ Component;
accomplish
009‐40 Contractor Crane, Multi-Purpose Machine and Material Handling
Equipment at a Naval Facility; provide
009‐60 Schedule and Associated Reports for Availabilities Over 9 Weeks in
Duration; provide and manage
009‐61 Shipboard Use of Fluorocarbons; control
009‐67 Integrated Total Ship Testing; manage
009‐69 Heavy Weather/Mooring Plan; provide
009‐70 Confined Space Entry, Certification, Fire Protection, Fire
Prevention and Housekeeping for Unmanned Vessel;
accomplish
009‐72 Physical Security at a Private Contractor’s Facility; accomplish
009‐73 Shipboard Electrical/Electronic Cable Procedure; accomplish
009‐74 Occupational, Safety and Health Plan; accomplish
009‐79 Government Owned Material (GOM); Status; report
009‐80 Ship’s Facilities; maintain
009-81 Compartment Closeout; accomplish
009‐82 Installation of Equal Component Vice Specified Component; report
009-84 Threaded Fastener Requirements; accomplish
009‐93 Emergency Planning and Community Right‐to‐Know Act (EPCRA) and
Pollution Prevention Act (PPA) Information; provide
009‐99 Ship Departure Report; provide
009‐100 Ship's Stability; maintain
009‐101 Ship Transit and Berthing; accomplish
009‐106 Work Authorization Form Coordinator (WAFCOR); provide
009‐109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish
009‐110 Non-Nuclear Work on a Nuclear Vessel; accomplish, 009‐111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in
Duration; provide and manage
009-117 Combat Systems Light-Off; support
009-118 CG Deck Loading; accomplish
009-120 Fact Finding and Critique of Unplanned Event; manage
009-122 Temporary Padeye; install and remove
b. The following Category II, NAVSEA STANDARD ITEMS (NSIs) may be viewed on the Internet at http://www.navsea.navy.mil/CNRMC/SERMC/SSRAC1/standard.aspx and will be invoked on individual delivery orders as needed:
009‐05 Temporary Accesses; accomplish
009‐09 Process Control Procedure; provide and accomplish
009‐11 Insulation and Lagging; accomplish
009‐12 Weld, Fabricate, and Inspect; accomplish
009‐13 Meter, Gage, Switch, and Thermometer; repair
009‐15 Rotating Machinery; balance
009‐16 Electronic Equipment; repair
009‐17 Rotating Electrical Equipment; repair
009‐25 Structural Boundary Test; accomplish
009‐26 Deck Covering; accomplish
009‐27 Material Identification and Control (MIC) for Level I Systems;
accomplish
009‐30 Boiler Sample Tube; inspect
009‐31 Boiler Waterjet Cleaning; accomplish
009-32 Cleaning and Painting Requirements; accomplish
009‐33 Rotating Electrical Equipment; rewind
009‐36 Controller; repair
009‐37 General Procedures for Woodwork; accomplish
009‐38 Boiler, Catapult Accumulator, and Reboiler Dry Lay-up; accomplish
009‐45 Tapered Plug Valve; repair
009‐46 Butterfly Valve, Synthetic and Metal Seated; repair
009‐47 Gate Valve; repair
009‐48 Pressure Seal Bonnet Valve Shop Repair; accomplish
009‐49 Pressure Seal Bonnet Valve In-line Repair; accomplish
009‐50 Horizontal Swing Check Valve; repair
009‐52 Relief Valve; repair
009‐53 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop
Repair; accomplish
009‐54 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve In-line
Repair; accomplish
009‐55 Regulating/Reducing Valve; repair
009‐56 Main Propulsion Boiler Wet Lay‐up; accomplish
009‐57 Reduction Gear Security; accomplish
009‐58 Pump and Driver Shaft Alignment; accomplish
009‐62 Boiler Handhold, Manhole Seat and Plate; inspect
009‐63 Lubricating Oils and Hydraulic Fluids; analyze
009‐65 Polychlorinated Biphenyls (PCBs); control
009‐71 Piping Systems; test
009‐75 Circuit Breaker; repair
009‐76 Waveguide and Rigid Coaxial Lay-Up; accomplish
009‐77 Cofferdam Installation; accomplish
009‐78 Passive Countermeasures System (PCMS) Material Repair/Installation
Requirements; repair
009-83 Wire Rope Assembly; fabricate
009-84 Threaded Fastener Requirements; accomplish
009‐85 Government Sponsored Planning Yard/Configuration Data Manager
(CDM) On‐Site Representative Facility; provide
009-86 Recovery and Turn-In of Ozone Depleting Substance (ODS); accomplish
009-87 Chemical Disinfection Procedure; accomplish
009-88 Collection, Holding and Transfer (CHT) and Motor
Gasoline(MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify
009-89 Contractor Furnished Anode (Purchase and Inspection); accomplish
009‐90 Technical Representative; provide
009‐91 Propeller In‐Place Inspection; accomplish
009‐92 Resilient Mount; install
009-95 Mechanically Attached Fitting (MAFs); install
009‐96 Ball Valve; repair
009-103 Weight and Moment Change Data; provide
009‐104 Vibration Testing and Analysis; accomplish
009‐105 Thermal Sprayed Coatings for Machinery Component Repair;
accomplish
009‐107 Piping System Cleanliness Restoration (Non-Nuclear); accomplish
009‐112 Prevention of Radiographic‐Inspection Ionizing‐Radiation Hazard;
accomplish
009‐113 Rotating Electrical Equipment with Sealed Insulation Systems (SIS);
rewind
009‐114 Mold Remediation; accomplish
009‐115 Bearing Rebabbitting; accomplish
009‐116 Auxiliary and Waste Heat Boiler Sodium Nitrite Wet Lay‐up;
accomplish
009-121 Ship Assessment/Inspection; accomplish
009-123 Fiber Optic Component; remove, relocate, repair, and install
009-124 Thermal Spray NonSkid Application; accomplish
c. The following LOCAL WORK TEMPLATES (LWTs) will be invoked on delivery orders as needed and are provided as attachments in Section J of the solicitation:
042‐001 Work Completion Certification Data for Continuous Maintenance
Availability (CMAV) and Emergent Availability (EM); provide
042-001 Work Completion Certification Data for Chief of Naval Operations
(CNO) Availability; provide
042‐005 General Requirements for Work Within Norfolk Naval Shipyard
(NNSY); accomplish (Attachment J3)
042-005 General Requirements for Work on Submarines; accomplish (Attachment
J4)
042‐005 Norfolk Naval Shipyard (NNSY) Work Authorization Form (WAF)
Requirements; accomplish (Attachment J5)
042-006 General Occupational Safety, Health and Environment (OSHE)
Requirements for Work Within Norfolk Naval Shipyard; accomplish
(PCP) (Attachment J6)
042-007 Security Requirements for Work Within Norfolk Naval Shipyard;
accomplish (Attachment J7)
042‐008 General Requirements for Work on Aircraft Carriers; accomplish
(Attachment J8)
042‐009 General Requirements for Work Within Norfolk Naval Shipyard
(FOR SHIPS/CRAFT UTILIZING CONVENIENCE BERTHING);
accomplish (Attachment J9)
042‐038 General Requirements for Work Within Naval Station Norfolk and Joint
Expeditionary Base (JEB) Little Creek‐Fort Story; accomplish
(Attachment J10)
992-001 Heavy Weather Plan (Remobilization); accomplish (Attachment J11)
992-001 Heavy Weather Plan (Demobilization); accomplish (Attachment J12)
d. The STANDARD WORK TEMPLATES (SWTs) will be invoked on individual delivery orders as needed and are provided as attachments in Section J of the solicitation:
e. Naval Ship’s Technical Manual S9086-VD-STM-010/Chapter 631; Preservation of Ships in Service
(NSTM Manuals may be viewed at the MARMC Technical Library).
f. NAVSEA 0924-062-0010, Submarine Safety (SUBSAFE) Requirements Manual
g. NAVSEA 0948-LP-045-7010, Material Control Standard (Non-Nuclear)
h. NAVSEAINST 3120.1/NAVSEA Technical Publication S0400-AD-URM-010/TUM, Tag-out User’s
Manual
i. Rev 7
j. COMFLTFORCOMINST 4790.3, Joint Fleet Maintenance Manual
k. NAVSEAINST 9210.4B; Changes, Repair, and Maintenance to Nuclear Powered Ships (Attachment
J26)
l. S9086-CH-STM-030/CH 074, Gas Free Engineering
m. NAVSEA 0924-LP-064-8010, SSN 688 Class Maintenance Requirements for Continued Operation to
Design Test Depth
n. OPNAVINST 5100.19 Navy Occupational Safety and Health Program Manual for Forces Afloat
042-001 Accountability of Manhour and Material Reservation; accomplish
(Attachment J13)
077‐001 Hazardous Waste Produced on Naval Vessels; control (Attachment J14)
992‐031 Cleaning and Pumping; accomplish (Attachment J15)
o. Occupational Safety and Health Administration (OSHA) Standards 29 CFR, Parts 1910, 1915, 1917, 1918, 1926
p. National Fire Protection Association Standard 306 and 312
q. NSTM S9086-WK-STM-010/CH-670 Stowage, Handling and Disposal of Hazardous General Use
Consumables
r. S9086-T8-STM-010/CH-593, Pollution Control
s. S9086-VG-STM-010 NSTM Chapter 634, Deck Coverings
t. Department of Transportation (DOT) Regulations of 49 CFR
u. OPNAVINST 5100.23 Navy Occupational Safety and Health Program Manual
v. OPNAVINST 5090.1 Environmental and Natural Resources Program Manual
w. S9086-CQ-STM-010/CH-081, Waterborne Underwater Hull Cleaning of Navy Ships
x. IPI 9911-450, Scaffolding; Installation, Use, and Removal of
y. IPI 9911-453, Scaffolds Inspections
z. S6360-AD-HBK-010 Technical Handbook for Special Hull Treatment Maintenance and Repair for
Submarines
aa. SUBMARINE MAINTENANCE STANDARD (SMS) 6350-081-001, Inspect; Repair Vibration
Damping
bb. Systems and Specifications, Steel Structures Painting Manual, Volume 2
cc. The Society of Protective Coatings, Surface Preparation Standards (SSPC) are available at http://www.sspc.org.
dd. American Bureau of Shipping (ABS), Part 2, Rules for Materials and Welding
ee. American Bureau of Shipping (ABS), Part 4, Steel Vessels Under 90 Meters in Length
ff. American Bureau of Shipping (ABS), Part 7, Rules for Survey After Construction
NOTE: The contractor shall comply with the latest revision of these documents in effect at solicitation closing and when each option year is invoked. Additionally, in the event that there is any conflict between the references, NSIs, LWTs, and SWTs take precedence over technical manuals, other specifications, and other references. Also, when references incorporate other tiered references, they are to be followed.
C.5. POST-AWARD SUBMISSION
After receipt of a delivery order award and prior to starting work onboard the vessel (as applicable), the contractor must submit a Visit Authorization Letter (VAL) in accordance with SECNAV M-5510.30 (Dept.
of the Navy, Personnel Security Program), and/or DOD 5220.22M (National Industrial Security Program
Operating Manual), to the Commanding Officer of the ship via the MARMC Security Officer.
C.6. FACILITIES
Although facility requirements may vary with the work authorized for a specific delivery order, the successful offeror must be a ship repair company with facilities within the MARMC Norfolk local travel area (an area consisting of a fifty (50) mile radius of MARMC Norfolk and possess the minimum facility requirements described below:
C.6.1 Provide specific information on Shop Facilities to be used to perform work under this contract including:
(a) Sheet metal work. Forming, shaping, cutting (gas, arc, and shear) and stamping steel and aluminum sheets.
(b) Shipfitting types of work. Cutting (gas, arc, and shear), rolling, shaping, grinding and fitting steel and aluminum plates and shapes.
(c) Welding. Welding plates (ABS and Mil-Standard) and shapes (steel and aluminum), sheet metal
(steel and aluminum) and piping joints and fittings.
(d) Pipefitting. Targeting, fitting, bending, pickling, testing, stress relieving and threading all kinds of pipe (including brazing).
(e) Machinist/Mechanical (shop and marine). Removing, machining, repairing, testing, cleaning, hydraulic flushing and reinstalling shafting, propellers, sea chests, foundations, winches, hoists, rotating machinery, davits, deck equipment, pumps, valves and bearings.
(f) Electrical. Removal, (re)installing, repairing, and testing and operational testing of wiring, cabling, controllers, switchboards, equipment, motors (including motor rewind and repair), lighting, communications, telephones, solenoids, switches and metering.
(g) Electronics. Removal, (re)installing, repairing, and testing and operational testing of electronic equipment.
(h) Rigging and Crane Operations. Availability of equipment to remove and install major ship components and equipment.
(i) Insulators. Availability of equipment to remove and install insulation on major ship components and equipment.
(j) Woodworking and Composite (includes fiber reinforced plastic): Repairing/modifying hulls and items made of wood and/or composite (includes fiber reinforced plastic) material.
C.7. GENERAL REQUIREMENTS
The following are applicable to the extent they apply to all repairs, modifications, testing and adjustments.
Any cost to comply with these requirements shall be included in the price of the CLINs listed in Section B.
C.7.1. The Contractor shall:
a. Exercise sound judgment and expertise to assure the successful completion of all tasks placed hereunder.
b. Designate those persons authorized to accept/reject verbal orders by the Administrative
Contracting Officer (ACO).
c. Coordinate schedules in the work affected areas with the Ship’s Authorized Representative
(SAR), MARMC Maintenance Team, Lead Maintenance Activity (LMA), and the Contracting Officer’s
Representative (COR) during the performance period of the delivery order. Obtain a copy of the ship’s operation drills, etc.
(prior to start of work) from the SAR thus avoiding unnecessary delays. The work effort on delivery orders shall be coordinated at minimum on a daily basis with the SAR to allow for changing situations onboard ships, vessels and shore activities to minimize delays and disruptions.
d. Promptly forward all requests for changes in delivery schedules, funding requirements and scope of work in one legible copy, in hard copy or approved transferrable media. These requests shall include specific details as to what changes are required and circumstances requiring such and shall be submitted to the COR for forwarding to the ACO prior to 85% of delivery availability being exceeded.
e. Not respond to new performance requirements until a delivery order or a modification has been signed or verbal authorization has been given by the ACO.
f. Not respond to any requests requiring deviations in technical performance as specified in the delivery order without obtaining prior approval of the ACO.
g. Be responsible for inspection of workspaces prior to manning to ensure spaces are available for work to avoid unnecessary delays in day to day work schedule.
h. Comply with NSI 009-24 in regards to isolation, blanking and tagging equipment, systems, circuits, components, piping and valves. Also comply with LWT 042-005 if the work is being performed in
Norfolk Naval Shipyard (NNSY). Work Authorization Form (WAF) will be utilized and invoked in conjunction with NSI 009-106 when work is being accomplished in Norfolk Naval Shipyard. The Website for the WAF is:
https://www.submepp.csd.disa.mil/jfmm/jfmm_qa.htm
i. Provide protection during contamination-producing operations and maintain cleanliness in accordance with NSI 009-06. Remove and properly dispose of all debris or trash resulting from cleaning, removal, installation or any other aspect of task performance. This will be required of all tasks performed on this contract whether at a Government facility or at a privately owned facility.
j. Be responsible for any required lifting, handling, on-loading/off- loading, and transporting, whether on board or going from or to the ship. If crane services are to be provided, they will be contractor provided and shall comply with the requirements of NSI 009-40 when working at Commander Naval Base
Norfolk and Joint Expeditionary Base Little Creek – Fort Story. Additionally, for authorized work at
Norfolk Naval Shipyard, comply with additional crane requirements of LWTs 042-006 and 042-009.
k. Except as otherwise provided in this contract, or delivery orders issued hereunder, the Contractor shall provide all material, labor services, equipment, supplies, power, accessories, facilities and such other supplies and services as necessary for accomplishing assigned tasks. The Contractor may request on a case-by-case basis to use ship's services that are available. A request for use of ship's services must be made jointly to the SAR, LMA, and COR. Written permission will be obtained from the Commanding Officer
(CO) of the ship before actual use of any ship services. A request for ship's services may be turned down whether or not the requested service is available. Denial of a request for use of ship's services will not be a valid basis for any claim or request for compensation. Regardless of any request for ship’s services, ship’s services shall not be used for contractor life support systems (compressors for breathing air), lifting equipment or any other equipment wherein an unexpected disruption of services has a high potential for loss of life, injury or damage to the ship’s equipment.
l. Any requirements for temporary access shall be handled in accordance with the requirements of
NSI 009-05.
m. Ensure personnel are familiar with the requirements of NSIs 009-08.
n. Accomplish the requirements of NSI 009-40 for the use of contractor cranes at naval facilities.
For work at other than naval facilities, contact the facility manager to determine the requirements and restrictions for crane operations prior to mobilization on-load, final determination of production sequencing and production zone layout, and demobilization off-load. Crane placement restrictions may affect production sequencing and zoning.
o. Ensure that persons assigned to render services hereunder are at all times under the direction and control of the contractor and are not employees of the Government.
p. Accomplish the requirements of NSI 009-23. The contractor shall be responsible for the removal/installation of interferences, as required.
q. Accomplish the requirements of NSI 009-84 when using any temporary fasteners and NSI 009-
95 when using any mechanically attached fittings.
r. Follow all applicable Federal, State, and Local Laws concerning safety, health, and welfare of personnel and equipment as well as other personnel and equipment within a close proximity of the ongoing work and participate in drills to exercise the capacity for compliance to applicable Federal, State, and Local
Laws.
s. Contact the COR and/ or Maintenance Team (MT) Project Manager (PM) when problems are encountered after normal working hours. If neither of them can be reached, the contractor shall contact the
MARMC Duty Officer at 757-739-5324. The MARMC Duty Officer will contact the Contracting Officer.
t. Submit a written weekly report detailing the daily events and the progress made during the course of each day to the COR and the MT. Time and location for submission of the weekly report shall be agreed upon at the beginning of each delivery order and prior to the start of the work.
u. Provide diesel-powered generators and air compressors as required for the accomplishment of the work package. Only diesel powered equipment will be allowed in the dry-dock basin.
v. The contractor will identify needed repairs incidental to work identified on the delivery order, and recommend corrective actions during the contract performance for those deficiencies discovered which are not covered by the work specifications. Needed repairs and corrective action reported will be submitted to the Government in the form of a Condition Found Report (CFR).
CFR’s, price and supporting data will be submitted within five working days of identification of the requirement. As a minimum, the CFR will include the following:
i Identify the contract and delivery order number, ship, and hull number ii Serialize by CFR number iii Identification of the applicable Work Item
Number iv Date requirement was discovered v Description of work requirement vi Specification location of work vii Recommendation for corrective action viii Recommendation for the appropriate/best time to accomplish the work (with or without schedule change). Provide supporting rational for the recommendation, such as price efficiencies, availability of the work force, availability of material, premium expenditures, etc.
ix Price and time estimates, and the time frame for which it is valid. The estimates should include premium/acceleration price for the material, subcontractors, man-hours, rework, and any additional price to on- going work resulting from the inclusion of the CFR work requirement.
x Identification of related changes, if any, to the internal milestones and the production and delivery order completion dates. If there are no changes, the CFR should state that.
C.7.2. Environmental and Safety Requirements. The Contractor shall:
a. Consider all insulation, lagging, deck tile, underlayment, gasket shipboard cabling and mastic to be asbestos- containing material (ACM) until it can be established by laboratory analysis, or other reliable methods, that the material does not contain asbestos, in accordance with 29 CFR 1915.1001.
Removal, disturbance or disposal of ACM shall be accomplished IAW the requirements of NSI 009-10.
b. Accomplish confined space entry, certification, fire prevention and housekeeping requirements of NSI 009-07 and 009-70. Maintain area cleanliness and ensure all residues and refuse are removed daily and ensure that general housekeeping is maintained for the duration of the task in the work areas specified on each delivery order.
c. Consider all marine coatings to contain heavy metals (e.g. lead, cadmium or chromium), hexavalent chromium, crystalline silica and/or other toxic or hazardous substances as defined in 29 CFR
1915.1000. Identify materials that may contain toxic or hazardous substances as listed in 29 CFR 1915, Subpart Z, that are to be used, removed, or disturbed during work operations. Conduct an initial determination of potential personnel exposure to these materials prior to the start of work. Work operations shall be performed IAW the requirements of NSI 009-03.
d. The contractor shall review and evaluate all solid waste generated during work operations to determine if that waste is hazardous waste IAW 40 CFR 262.11. This includes liquids generated as a result of hydro-blasting operations and includes wastes not identified under SWT 077-001.
e. All solid waste with the known potential to be hazardous, including but not limited to non-skid debris, paint chip debris, flooring/debris, and all liquid waste removed from the ship shall be tested by a certified laboratory for metals IAW 40 CFR 261.24, using the Toxicity Characteristic Leaching
Procedure (TCLP), Method 1311 in EPA Publication SW-846. Contractor shall submit all laboratory analysis reports to the COR as soon as possible upon receipt from the laboratory. For work performed on
Naval facilities, no solid waste removed from the vessel shall be transported off the naval facility until authorized by the COR.
f. All removed non-skid/paint debris shall be containerized IAW 40 CFR Subpart I. Non-skid/paint debris shall not be accumulated and stored in cardboard, “tri-wall” containers. During the timeframe between when a solid waste is generated and a sample of that solid waste is collected and submitted to an accredited laboratory for analysis, and when the laboratory analysis results are received by the contractor, all containers of the solid waste shall be labeled as “Pending Analysis.”
g. Contractor shall prepare, provide and affix labels/placards for all containers of solid waste accumulated on the land, pier and/or the vessel, including solid waste that is “Pending Analysis”.
Labels/placards shall weatherproof, large enough to provide ready identification, and provide the following information:
- Contractor Name
- Contractor POC: (name, cell phone number, phone number)
- Vessel
- MARMC Contract Number
- MARMC Delivery Order Number
- COR Point of Contact (name, cell phone number, phone number)
- Ship’s QTR Deck/OOD phone number
- Description of waste
- Analysis Pending/Sample date (if applicable)
- MARMC Maintenance Team Project Manager (name, cell phone number, phone number) if applicable.
- MARMC Port Engineer (name, cell phone number, phone number) if applicable.
h. For operations at Naval Station Norfolk (NAVSTA), Joint Expeditionary Base Little Creek –
Fort Story (JEBLCFS), all solid waste determined to be hazardous waste shall be turned over to the ship/vessel from which the waste was produced for processing and disposal through NAVFAC
MIDLANT (formerly PWC) hazardous waste operations. For operations in Norfolk Naval Shipyard
(NNSY), all hazardous waste shall be turned in to NNSY Code-106, via the MARMC COR and/ or
Maintenance Team (MT), for disposal. For operations at Naval Facilities outside the Commonwealth of
Virginia, the contractor shall comply with all state and local regulations, and local work items applicable in those areas. For operations inside private shipyards and facilities, the contractor shall comply with all facility requirements.
i. In the event that a solid waste is determined to be non-hazardous, the contractor shall dispose of the waste in accordance with federal, state, and local regulations.
j. Provide a clean/empty barge or tank truck for off-loading and transport of wastewater generated to accomplish the requirements of the delivery order. The contractor shall coordinate the barge/tank truck placement with the SAR. The contractor is responsible for the barge/tank truck and all plumbing and piping up to 2000 linear feet.
k. Accomplish continuous clean-up of all debris and fluids incidental to installation or removal of piping system components during performance of work in individual delivery orders.
l. When pumping wastewater from the ship/vessel to the barge/tank truck, the contractor shall provide a minimum of three (4) personnel to monitor pumping operations as follows: one person on the barge/tank truck receiving the wastewater, two persons walking the piping/hoses from the pumping site to the barge/tank truck, and one person at the pumping site. The four personnel shall be in constant radio contact so that pumping operations can be ceased immediately in the event of a leak or a spill.
m. The contractor shall submit to the COR and/ or Maintenance Team (MT) Project Manager
(PM), upon completion of each delivery order, one legible copy, in hard copy or electronic media, a report of the types and amounts of wastewater generated as a result of accomplishment of the delivery order. The report shall include: description of wastewater, volume of wastewater, name/address of transporter, and the name/address of the disposal facility. If work is performed in a private contractor’s facility, the contractor shall submit this report to the COR and to the facility’s environmental manager.
n. Accomplish the requirements of Local Work Template 042-038 for all delivery orders performed. If work is performed on a Naval Facility, contractor shall submit all required reports to the
COR and/ or Maintenance Team (MT) Project Manager (PM). If work is performed in a private contractor’s facility, contractor shall submit reports to the COR, Maintenance Team (MT) Project
Manager (PM), and to the facility’s environmental manager.
o. For operations at Naval Station Norfolk (NAVSTA) and Joint Expeditionary Base Little Creek
– Fort Story (JEBLCFS), all contractor personnel working on the facility shall complete Environmental
Compliance, Assessment, Training, and Tracking System (ECATTS) training IAW facility directives. Users can access
ECATTS by logging into the following website: http://navfac.ecatts.com. The contractor shall contact the facility environmental department to determine specific ECATTS training required.
C.7.3. The Ship’s Force will:
a. Comply with Ship’s Force requirements as set forth in NSI 009-24 (and the WAF when applicable).
b. Provide a Ship’s Force Coordinator who shall act as the Ship’s Quality Assurance
Representative to aid the contractor in access to spaces and monitor job progress.
c. Remove and stow ship’s equipment and materials.
d. Operate shipboard equipment, if required.
e. Witness all final checkpoints and operational tests.
C.8. DETAILED REQUIREMENTS
C.8.1. Definition of Repair Requirements. The contractor may be required to define repair requirements. These efforts, when required, will include, but are not limited to inspecting equipment and/or systems to determine repair options and alternatives, and making recommendations to the Contracting Officer’s Representative (COR).
C.8.2. Repair implementation. The contractor shall provide qualified technicians and tradesman to perform onboard and ashore repairs and refurbishment. This effort shall include, but is not limited to, the following:
a. Conduct liaison ship visits (with Government representative) to coordinate schedules for shipboard repairs, equipment removal for repair, and refurbishment or replacement. Repair actions will include the removal and reinstallation of all interferences in accordance with NSI
009-23.
b. Correct deficiencies identified during ship visits and/or surveys when authorized by the individual delivery order. Deficiencies identified that cannot be corrected due to ship’s operating schedule will be re-scheduled.
c. Provide teams of qualified journeymen level mechanics, and technicians to accomplish repairs onboard vessels. Repair efforts on short notice may be required and will require work efforts to continue around the clock, including weekends and holidays, until completed.
d. Provide subcontracting capabilities, administration, and management to accomplish repairs which may require highly specialized skills beyond the contractor’s internal workforce.
e. Conduct completion inspections, accompanied by authorized Government representative and/or the COR after all repair and/or replacement actions have been accomplished.
f. Provide Quality Assurance Inspections, Certifications and Testing for all repair actions accomplished in accordance with this contract and standard industry practices.
g. Repair and refurbishment work efforts will be conducted at locations specified in each delivery order.
h. During the shipboard visits, the contractor shall work closely with the COR, and ship’s authorized Government representative to expeditiously fulfill planned or emergency work requirements and keep them fully informed of the status of work items.
i. Provide the necessary tools, rigs, and test equipment to perform repairs.
j. Provide written reports to COR and/ or Maintenance Team (MT) Project Manager (PM) on all work performed, and test documentation of those results.
k. Submit completed Automated Work Request (OPNAV 4790.2 Kilos) when required.
C.9. REQUIRED STANDARD OF WORKMANSHIP
Unless otherwise specifically provided in this contract, the quality of all efforts rendered hereunder shall conform to the highest standards in the relevant profession, trade, or field of endeavor. All efforts shall be rendered by or supervised directly by individuals fully qualified in the relevant profession, trade, or field, and holding any licenses required by law.
C.10. QUALITY ASSURANCE
C.10.1 The contractor shall provide and maintain a quality assurance program acceptable to the
Government. The contractor shall perform or have performed, the inspections and tests pursuant to that program to substantiate that the material and workmanship provided pursuant to the contract and conform to the drawings, specifications, and contract requirements listed herein. The contractor’s quality program shall be in accordance with that set forth in Standard Item 009-04. The Government shall have the right to deem work or material furnished by the contractor to be incomplete and not in accordance with the requirements of the contract by reason of the contractor’s failure to: (1) provide a written quality assurance program that has been accepted by MARMC prior to the start of productive work (2) comply with the requirements of the quality assurance system.
NOTE: THE QUALITY ASSURANCE PROGRAM SHALL BE SUBMITTED TO THE COR AND/OR MT
PM WITH A COPY TO MARMC QA NOT LATER THAN 10 CALENDAR DAYS AFTER AWARD OF
CONTRACT. CONTRACTORS WILL NOT BE ISSUED DELIVERY ORDERS WITHOUT AN
APPROVED QUALITY ASSURANCE PROGRAM.
C.10.2 The Contracting Officer, COR, or MT may inspect work in progress, either at the Contractor's facility or onboard any Navy vessel, at any time.
C.10.3 The contractor shall respond to any Government corrective documents, such as Corrective
Action Reports (CARs), issued because of unsatisfactory contract performance. The appropriate corrective actions shall be taken by the contractor and written response shall be provided in accordance with the specific corrective action document requirements.
C.10.4 The performance by the Contractor and the quality of the work delivered including any equipment furnished, and documentary material written or compiled, shall be subject to in-process review and inspection during performance.
The Government may provide quality assurance surveillance per the Quality Assurance
Surveillance Plan (QASP), Attachment J20. Combatting Trafficking in Persons requirements, Contract Data
Requirements List (CDRL) report submissions, and overall contract performance will be regularly reviewed by the COR. Inspection may be accomplished at any work location involved and authorized government personnel shall be permitted to observe the work or to conduct inspection at all reasonable hours.
Inspection or test by the Government of any services rendered or supplies furnished hereunder does not relieve the Contractor from any responsibility regarding defects or other failures to meet contract requirements which may be discovered prior to final acceptance.
NOTE: Quality assurance oversight may be provided by a third party inspector.
C.11. PROPERTY MANAGEMENT
The Property Management System (PMS) shall be submitted to the Code 470 not later than 10 calendar days after award of contract. Contractors will not be issued delivery orders until the Property Management System has been reviewed by Code 470. If Contractor’s Property Management System has been reviewed by MARMC Code 470 within the last 12 months, provide the last date your PMS was reviewed and list any changes which have been instituted.
CLAUSES INCORPORATED BY REFERENCE
HQ C-2-0020 Dock Trials and Fast Cruise (NAVSEA) MAY 1993
The Contractor shall furnish supplies or services under items specified in Section B of the Schedule in accordance with detailed specifications or requirements set forth in orders issued by the Contracting Officer in accordance with the special contract requirement(s) of this agreement entitled "ORDERS".
HQ C-2-0002 ACCESS TO PROPRIETARY DATA OR COMPUTER SOFTWARE (NAVSEA) (JUN 1994)
(a) Performance under this contract may require that the Contractor have access to technical data, computer software, or other sensitive data of another party who asserts that such data or software is proprietary. If access to such data or software is required or to be provided, the Contractor shall enter into a written agreement with such party prior to gaining access to such data or software. The agreement shall address, at a minimum, (1) access to, and use of, the proprietary data or software exclusively for the purposes of performance of the work required by this contract, and (2) safeguards to protect such data or software from unauthorized use or disclosure for so long as the data or software remains proprietary. In addition, the agreement shall not impose any limitation upon the
Government or its employees with respect to such data or software. A copy of the executed agreement shall be provided to the Contracting Officer. The Government may unilaterally modify the contract to list those third parties with which the Contractor has agreement(s).
(b) The Contractor agrees to: (1) indoctrinate its personnel who will have access to the data or software as to the restrictions under which access is granted; (2) not disclose the data or software to another party or other Contractor personnel except as authorized by the Contracting Officer; (3) not engage in any other action, venture, or employment wherein this information will be used, other than under this contract, in any manner inconsistent with the spirit and intent of this requirement; (4) not disclose the data or software to any other party, including, but not limited to, joint venturer, affiliate, successor, or assign of the Contractor; and (5) reproduce the restrictive stamp, marking, or legend on each use of the data or software whether in whole or in part.
(c) The restrictions on use and disclosure of the data and software described above also apply to such information received from the Government through any means to which the Contractor has access in the performance of this contract that contains proprietary or other restrictive markings.
(d) The Contractor agrees that it will promptly notify the Contracting Officer of any attempt by an individual, company, or Government representative not directly involved in the effort to be performed under this contract to gain access to such proprietary information. Such notification shall include the name and organization of the individual, company, or Government representative seeking access to such information.
(e) The Contractor shall include this requirement in subcontracts of any tier which involve access to information covered by paragraph (a), substituting "subcontractor" for "Contractor" where appropriate.
(f) Compliance with this requirement is a material requirement of this contract.
HQ C-2-0003 ACCESS TO THE NAVY SUPPLY SYSTEM (NAVSEA) (MAR 2011)
(a) In compliance with the comparability requirement of 10 U.S.C. 7314, Public and Private Shipyards will be provided equal access to the Naval Supply System. Use by private yards is permissive, not mandatory.
(b) Pursuant to the clause of this contract entitled "GOVERNMENT SUPPLY SOURCES" (FAR 52.251-1) the
Contracting Officer hereby authorizes the Contractor to place orders with the Navy Supply System for materials and equipment or other supplies necessary to perform the required work.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .